Loading...
HomeMy WebLinkAboutresolution.council.072-25RECEPTION#: 709726, R: $38.00, D: $0.00 DOC CODE: RESOLUTION Pg 1 of 6, 06/04/2025 at 12:14:07 PM Ingrid K. Grueter, Pitkin County, CO RESOLUTION #072 SERIES OF 2025 A RESOLUTION OF THE CITY OF ASPEN CITY COUNCIL APPROVING A DEMOLITION ALLOTMENT PER LAND USE CODE SECTION 26.470.110.G, SPECIAL REVIEW FOR AN ALTERNATIVE TOP OF SLOPE DETERMINATION, AND A RESIDENTIAL MITIGATION DEFERRAL AGREEMENT FOR 790 CASTLE CREEK DRIVE, LEGALLY DESCRIBED AS: SUBDIVISION: CASTLE CREEK LOT: 9, COUNTY OF PITKIN, STATE OF COLORADO WHEREAS, on January 10, 2025 the Community Development Department received an application from Patrick Rawley of Rawley Design Planners (Representative) on behalf of James M. Cerise and Carolyn Barabe (Applicants) for the property at 790 Castle Creek Drive for Special Review for an Alternative Top of Slope Determination, Residential mitigation deferral agreement, and Demolition Allotment pursuant to Land Use Code Section's 26.435.040.E - Special Review, Section 26.470.080.d.13 - Residential mitigation deferral —agreement, and 26.470.090.0 - Single-family and duplex redevelopment or expansion that does trigger demolition as defined by Chapter 26.580; and WHEREAS, the Community Development Department Staff reviewed the application for demolition of an existing single-family residence and redevelopment of a duplex residence for compliance with the applicable review standards and on January 13, 2025, a Letter of Completeness was sent after reviewing the application for compliance; and, WHEREAS, subsequently, on February 21, 2025, a Notice of Denial was issued by the Community Development Director in response to the Land Use application component under Section 26.470.090.C, requesting a 2025 Demoljtion Allotment due to no available 2025 Demolition Allotments; and, 1 ' WHEREAS, on February 26, 2025, Community Development received an amended application from the Representative on behalf the Applicants for the property at 790 Castle Creek Drive, pursuing a 2026 Demolition Allotment under 26.470.110.G — which allows two additional, annual allotments for long-time locals who have owned and occupied their homes for more than 35 years; and, WHEREAS, further, the Community Development Department referred the Application to the City of Aspen Engineering Department and the City of Aspen Parks Department for the request of Section 26.435.040.E - Special Review; and, WHEREAS, the City of Aspen Engineering Department, the applicant's surveyor, and the applicant's planning team met on -site and determined an appropriate Top of Slope as there is no existing Top of Slope on the property; and, Resolution #072, Series of 2025 790 Castle Creek Drive Page 1 of 4 WHEREAS, the City of Aspen Engineering Department, Representative, and Applicant discussed and agreed upon a proposed Top of Slope and approves such proposed changes to the Top of Slope with conditions; and, WHEREAS, the Community Development Department referred the Application to APCHA for the request of Section 26.470.080.d.13 - Residential mitigation deferral agreement; and, WHEREAS, APCHA and the Community Development Department found the Applicant to qualify as a full-time local working resident and may defer the affordable housing mitigation through a Deferral Agreement through the City of Aspen and APCHA; and, WHEREAS, Community Development staff have reviewed the application and have provided a memorandum for City Council consideration recommending approval of the request; and, WHEREAS, all required public noticing was provided as evidenced by an affidavit of public notice submitted to the record; and, WHEREAS, City Council at a regular meeting on May 27, 2025, considered Community Development's recommendation, reviewed application materials and heard testimony from the owner of the property and/or their Representative; and, WHEREAS, by a vote of five to zero (5-0) City Council approved Resolution #072, Series of 2025, granting approval of a Demolition Allotment (Section 26.470.110.G), Special Review for an Alternative Top of Slope (Section 26.435.040.E) with the conditions as stated below in Section 2, and Residential mitigation deferral agreement (Section 26.470.080.d.13) with the condition as stated below in Section 3; and, WHEREAS, the City Council finds that this Resolution furthers and is necessary for the promotion of public health, safety, and welfare. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN AS FOLLOWS: Section 1 A. A 2026 GMQS Demolition Allotment is granted to the Applicant for the property at 790 Castle Creek Drive. B. The Demolition Allotment is granted per 26.470.110. G —Additional Allotments for local property owners of Single -Family and Duplex Development or Expansion that does trigger Demolition. C. The allotment is subject to the following conditions: • All requirements of the Residential Demolition and Redevelopment Standards in place on August 8, 2022, must be met prior to building permit issuance. Resolution #072, Series of 2025 790 Castle Creek Drive Page 2 of 4 • The building permit submission must include a signed and notarized affidavit the property owner, or successors, will comply with the requirements of the Building IQ program. • The building permit submission must include a signed and notarized affidavit the property owner, or successors, will comply with the requirements of the Embodied Carbon requirement prior to receiving a Certificate of Occupancy. • Approval and related vesting are limited to the issuance of a GMQS Demolition Allotment and Residential Demolition and Redevelopment Standards. The property is subject to all other requirements of the Land Use and Building Codes in effect at the time of building permit submission. Section 2: The approved Top of Slope is identified in Exhibit A. The proposed remodel as depicted in Exhibit A, meets applicable Review Criteria for Special Review with the following Engineering conditions which shall be met prior to the issuance of a building permit: 1. Utilities/Water: The plans shown in the land use case are not code compliant but demonstrate that the property will be able to comply with all adopted regulations and ordinances of the City of Aspen. Plans that meet all adopted regulations and ordinances are required prior to permit issuance. 2. Top of Slope: No development is permitted within the Top of Slope and Top of Slope Setback. All removals in this area may only be revegetated with native vegetation. Section 3: Applicants qualify as a full-time working locals pursuant to the APCHA qualifications and are therefore authorized to enter an affordable housing mitigation deferral agreement pursuant to Section 26.470.080.d.13 - Residential mitigation deferral agreement. Furthermore, the Applicants shall be eligible to participate in any deferral or fee waiver program offered to residents that is subsequently adopted by City Council, even if such program is enacted after the date of this approval. Section 4: This resolution shall not affect any existing litigation and shall not operate as an abatement of any action or proceeding now pending under or by virtue of the resolutions or ordinances repealed or amended as herein provided, and the same shall be conducted and concluded under such prior resolutions or ordinances. Section 5: If any section, subsection, sentence, clause, phrase, or portion of this resolution is for any reason held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a separate, distinct, and independent provision and shall not affect the validity of the remaining portions thereof. Resolution #072, Series of 2025 790 Castle Creek Drive Page 3 of 4 FINALLY, adopted this 27 h day of May, 2025. A-44 Rachael kichards, Mayor ATTEST: APPROVED AS TO FORM: Nicole HeACity Katharine Jo s n, City Attorney Exhibit A — Approved Site Plan and Top of Slope Resolution #072, Series of 2025 790 Castle Creek Drive Page 4 of 4 \�1 N Cr � o Y tTIIIEJ -r 9 wi m ti r e Esr sr ll p _"a. o o O 9 8 =�i yjt-...••t �....1 cow ¢� w § 5 0_ °� mao x°_��� ~ 6 o Jo a a § $ w€ E s a € Oa Y n z; m o •: _ o W :���K _ - Joy �sd — �- ,\ DO -J DO 1.. �t\ 1..1 i '....... ...... uK.-....4.....\ \ \ ' V W QO a z• _w K VV J- e G o = �� .......... %l .. _.. \\��I�✓ o S \.............. ... _............ .......... 30�o I 1 ¢�5 P a O ¢ `c X DQ s c �T�� O a I Ol !Y 4 I I .. u oS� W O W ~���o I °00 �F. Ia I I aan � a 1 I VJ w I � ow I I �Cff'z3 QQC2 U ° �` •r I G�+ Zap !n 1a o Ff�a3o 'oa�p z H_i S '-Hu NsFta'v � �—wo �� I �, S. _� Who �nnn�o000ouaaY000 u gg� rm "Ez -gS O a�=3oi� Wog a 34g W /yz E 3 O:z zz — �v ¢a I" i �3 Wes¢ o QUO o _,�� - 11��.. CT\�!ice ` '�� I 3� €<g $� u� WS ig C oEh ° i'"r I pg°' (n Fy.�, `%--- •_. � �'<_._� r r � t \ �`L �` oc Gov � 8W=< �� <` "' uW z a U ,��. w• s "f / l\ �`.\..�� ''33.�� •�`�\\�a� .,.1 f;b � o ax 3s° L ���z W< og �z 3z �i �`� — •_ %_ _^moo z n93 w •w ...1; I I /-{\\$!• � ^< o z Lp,; aSi7 5' �o nW I w.9< 3g 30 a Vg o €30 V 8 a s 1 € Wo € �s o w `s o o�3s O sod 5 3 w< is & o€e psi � � �" ��ii.�. — <,0t< /.'^•• -, �t ,� I ' c° � � 5a W a<a o � 7 � 3€€ 9 z oWa �W�° L= tlos °3 _ day a oe � V (� �'.II/ �� 88 l��lil•I� �J' a g �I � F s � a 9�3a �, a .� ., e . . � . i ' ��/`�,UiIINIIlui11IM � _ sar Id o I -0° cWv i.AS, .u;.3A r k el\ -i— ydrueucRo.tioJ € c UP ,y-a n �'rl —�-�•' 11 ON 9 's LL3a 33 3f�i Ra Or 095 €° a W $'se. ''.gj �L�9�11�9���9�9901 IIIII N �mmo���aa�u z`.oa u 3s w Q Z HU CD 5NINNVId NOIS34 A3ltAV?J V V V LU m ug wiz g CL N JOO Z N O ,—y Y �a Q W N U Q n Q y N //''�� 0 0 � S' 0 w -- - ---- _ - J._ _ 8 _-_ O W m II - -___ Erj F ����,a—•lam—��-__----,—�— -;�— _�_—_' ,// JI m®era � ���_ — _\ ,�i��, ,~yl• 1 4 li \�Y- 0 I • I F �: �. -1 y.1.. �� ��I I o z - I / I y ( I I ` ' r I I I ,.... :, t. I I •I: a I1� / i it I Lu x r I EL EL [If ,i ---------- .. a /, • , i 0 _Iz i 1 1 S. II III \\.; •. I, ' �. / i n�/ 1'YT i.. .-..- .: ., // \ '; , W P < �%y i Exhibit A Special Review Criteria Sec. 26.435.040. Stream margin review. E. Special review. An application requesting a variance from the stream margin review standards or an appeal of the Stream Margin Map's top of slope determination, shall be processed as a special review in accordance with common development review procedure set forth in Chapter 26.304. The special review shall be considered at a public hearing for which notice has been published, posted and mailed, pursuant to Subsection 26.304.060.E.3 Paragraphs a, b and c. Review is by the Planning and Zoning Commission. A special review from the stream margin review determination may be approved, approved with conditions or denied based on conformance with the following review criteria: 1. An authorized survey from a Colorado professionally licensed surveyor shows a different determination in regard to the top of slope and 100-year flood plain than the Stream Margin Map located in the Community Development Department and filed in the City Engineering Department; and Staff Response: The Applicant is proposing a new top of slope determination and has submitted a survey from a licensed surveyor showing the proposed Top of Slope and 100- year flood plain. The top of slope determination site plan was submitted by a licensed surveyor and referred to the City of Aspen Engineering for review. The proposed top of slope as presented, is what was discussed and agreed upon between the Engineering Staff member and the applicant. The Engineering Department has confirmed the proposed alternative Top of Slope as sufficient and consistent with the alternative. Staff finds this criterion to be met. 2. The proposed development meets the stream margin review standard(s) upon which the Community Development Director had based the finding of denial. Staff Response: Not applicable as proposed development does not necessitate a Stream Margin Review, therefore a denial has not been issued. LAND USE APPLICATION James M. Cerise and Carolyn Barabe 790 Castle Creek Drive Aspen, Colorado PID: 273512206001 12 December 2024 An application for Demolition of the existing single-family residence and the redevelopment of the property with a duplex and the establishment of Top of Slope. Represented by: 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 2 TABLE OF CONTENTS • Project Overview and Code Response • Attachment 1 – City of Aspen Community Development Department Land Use Application • Attachment 2 - Vicinity Map and Parcel Description • Attachment 3 - Improvement Survey • Attachment 4 – Affidavit with Documentation Evidencing Ownership and Residency • Attachment 5 - Architectural Plans with Landscape Plan • Attachment 6 – Residential Design Standards (RDS) Approval • Attachment 7 - Civil Engineering Report • Attachment 8 - Previous Approvals • Attachment 9 - Proof of Ownership • Attachment 10 - Letter of Authorization • Attachment 11 – City of Aspen Community Development Department Homeowner Association Compliance Form • Attachment 12 - Adjacent Property Owners within 300 feet • Attachment 13 - Pre-application Conference Summary 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 3 Project Overview James M. Cerise and Carolyn Barabe (collectively the “Applicants”) submit this land use application to demolish the existing single-family residence and to develop a duplex that will serve as their primary residences. As the parcel is beyond the official City of Aspen Stream Margin map, the Applicants wish to establish the Top of Slope from Castle Creek. As part of this application, the Applicants will also seek Affordable Housing Mitigation deferral as long-time locals. The parcel is located at 790 Castle Creek Drive, PID #: 273512206001 (the “Property”). This application is submitted in conformance with the Pre -application Conference Summary PRE-24-003, dated 16 February 2024. Please note, the Pre-application Conference Summary also contemplated the creation of an Accessory Dwelling Unit (ADU). The Applicants will not seek the creation of an ADU at this time. Property Overview The Property is located in the Low-Density Residential Zone District (R -30) of the City of Aspen and in the Castle Creek Subdivision. The Property contains 58,010 SF of gross lot area. The Property extends from Castle Creek Drive on the west to Castle Creek on the east. Red Butte Cemetery borders the Property to the north, with single -family residential uses in the Castle Creek Subdivision to the south. The existing development consists of a one (1) story single-family residence of approximately 2,000 SF with a patio and wood deck. There is an approximately 650 SF garage and a shed on the Property that will be removed during redevelopment. All buildings are on the western side of the Property, above the Castle Creek riparian area. The Cerise family has owned the Property since 1956. The Applicants, who are brother and sister, have controlled the Property since 1981. The one (1) story single-family residence was originally built in 1957. Existing Site Conditions The Castle Creek Homeowners Ditch enters the Property on the southern boundary line and crosses the Property to the east before descending the steep slope. The ditch wyes and feeds a small irrigation control structure immediately to the east of the existing residence. This man-made water feature, along with a secondary pond, will continue to supply water for irrigation on the Property. Discussions concerning the maintenance and operation of the ditch have been pursued with the ditch company and the City of Aspen Raw Water administrator. Coniferous trees, planted by the Applicants’ family, line the western border of the Property along Castle Creek Drive. Coniferous and cottonwood trees border the northwestern edge of the Property adjacent to the cemetery. Aspens, serviceberry, scrub oak, and other riparian plant communities predominate to the east of the home. Castle Creek flows through the extreme eastern end of the property. Approximately 5,337 SF of the property lies below the high -water line of Castle Creek, as defined by the City of Aspen Land Use Code. Portions of this area of the Property lie within the Special Flood Hazard Area (Flood Area Zone AE). No development is proposed in this area. An area of steep slope, which exceeds 40% in gradient, divides the Property. The 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 4 area of steep slope has a wildfire hazard ranging from “very high” to “low.” No development will occur below the top of slope. Taking into account the areas under the high-water line and areas of steep slope, net lot area is calculated to be 41,371.5 SF. This allows 6,502.29 SF of floor area for the proposed duplex use. Proposed Development The Applicants are proposing to demolish the existing residence and develop a new duplex for their primary residences. The proposed duplex will be located in the same general area of the existing single-family residence. The driveway curb cut for the existing residence will access the proposed southern unit of the duplex. The curb cut for the existing garage will be used to access the proposed northern unit of the duplex. The garage curb cut was reviewed with Kyla Smits of the City of Aspen Engineering Department. Kyla did not express concerns with maintaining the two curb cuts and they were both shown on the 2012 GIS map. The Applicants will seek formal Engineering approval as part of the redevelopment process. Residential Design Standard (RDS) approval was granted Kevin Rayes on 8 August 2024. No RDS variations are required. The architectural character of the proposed duplex enhances the neighborhood by introducing two inviting front porches. The mountain -modern design blends the family's history with the current Aspen aesthetic. Given this family's strongly rooted history in Aspen over the last 70 years, we aimed to create a home that could be cherished and passed along to future generations, much like their current home. The duplex features a cohesive overall design while allowing for individuality on each side. By angling t he building to parallel the southern property line, we achieved greater privacy for each residence and capitalized on views to the east. The primary living spaces are all located on the main floor to support multigenerational use. This home is designed to be constructed with a panelized system, an efficient technique that helps reduce costs significantly. The system utilizes airtight, high-performance panels for the exterior walls, floors, and roofs, ensuring both durability and energy efficiency. The construction duration and neighborhood impacts are significantly reduced with panelized construction. Affordable Housing Deferral The Applicants look forward to seeking an Affordable Housing mitigation deferral in light of their long-time residency and work history in the City of Aspen. The Applicants believe that it is important that the City of Aspen recognize its long -time locals by providing additional financial support in connection with the redevelopment of the family property. The Applicants are 5th-generation Aspenites and can trace their family history in the Roaring Fork Valley to the 1800’s. The Applicants and their families have lived in Aspen their entire lives. Carolyn Barabe and her husband Leo have a daughter who is a teacher in the Aspen schools, striving to do the same. The Applicants look forward to one day transferring the home to their daughter and her family to continue the tradition. The Applicants urge the City Council to consider this in their review of this applicatio n and they look forward to working with staff to create the family home for generations yet to come. 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 5 Land Use Code Response Chapter 26.410. - RESIDENTIAL DESIGN STANDARDS Sec. 26.410.010. - General. (a) Intent. The City's Residential Design Standards are intended to ensure a strong connection between residences and streets; ensure buildings provide articulation to break up bulk and mass; and preserve historic neighborhood scale and character. The standards do not prescribe architectural style, but do require that each home, while serving the needs of its owner, contribute positively to the streetscape. The Residential Design Standards are intended to achieve the following objectives: (1) Connect to the Street. Establish a visual and/or physical connection between residences and streets and other public areas. The area between the street and the front of a residential building is a transition between the public realm of the neighborhood and the private realm of a dwelling. This transition can strongly impact the human experience o f the street. Improve the street experience for pedestrians and vehicles by establishing physical and visual relationships between streets, and residential buildings located along streets. Porches, walkways from front entries to the street, and prominent windows that face the street are examples of elements that connect to the street. (2) Respond to Neighboring Properties. Reduce perceived mass and bulk of residential buildings from all sides. Encourage a relationship to adjacent development through similar massing and scale. Create a sense of continuity through building form and setback along the streetscape. Providing off sets or changes of plane in the building facades or reducing the height near side lot lines are examples of responding to neighboring properties. (3) Reflect Traditional Building Scale. Retain scale and proportions in building design that are in keeping with Aspen's historic architectural tradition, while also encouraging design flexibility. Reinforce the unique character of Aspen by drawing upon the City's vernacular architecture and ne ighborhood characteristics in the design of structures. Encourage creative and contemporary architecture, but at a scale that respects historic design traditions. Ensure that residential structures respond to "human -scale" in their design. Ensure that residential structures do not visually overwhelm or overshadow streets. Windows that are similar in size to those seen in historic Aspen architecture or limiting the height of a porch to be in line with the first story of a building are examples of reflecting traditional building scale. The design of the proposed duplex complies with the City’s Residential Design Standards and has received RDS approval. The proposed duplex will be compatible to neighboring properties in both size and appearance. A strong connection between the duplex and Castle Creek Drive will be created by street facing elements as well as site features that will draw the pedestrian into the site. The careful design of the duplex features various forms that will break up the bulk and massing of the duplex. The design 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 6 also reflects the unique needs of the Applicants and will serve to continue to function as the family home as the Property has since the 1950s. (b) Applicability. Except as outlined in Section 26.410.010(c), Exemptions, this Chapter applies to all residential development in the City, except for residential development within the R-15B zone district. Specific applicability for each standard is identified within each standard. (c) Exemptions. No residential development shall be exempt from the provisions of this Chapter unless the Community Development Director determines that the proposed development: (1) Is an addition or remodel to an existing structure that does not change the exterior of the building; or (2) Is a remodel of a structure where the alterations proposed change the exterior of the building, but are not addressed by any of the residential design standards; or (3) Is a residential unit within a mixed -use building; or (4) Is a designated historic resource listed on the Aspen Inventory of Historic Landmark Sites and Structures. New buildings on a historic landmark lot are not exempt. Not applicable. The proposed duplex will be an entirely new structure, is not located within a mixed -use building, and is not a historic resource. Sec. 26.410.020. - Procedures for Review. (a) Determination of Applicability. The applicant may request a preliminary Residential Design Standards pre-application conference with Community Development Department staff to determine the applicability of the requirements of this Chapter for the proposed development. A pre-application conference has been conducted and feedback was provided to the Applicants. (b) Administrative Review. Consistency with the Residential Design Standards shall be determined administratively, unless a variation is requested. The Administrative Review process will result in a determination of approval or denial for compliance with the Residential Design Standards. The RDS were reviewed with staff administratively. Approval was granted 8 August 2024. Copies of the approval stamped plans have been submitted with this application. Sec. 26.435.040. - Stream margin review. (a) Applicability. The provisions of the stream margin review shall apply to all development within one hundred (100) feet, measured horizontally, from the high water line of the Roaring Fork River and its tributary streams and to all development within the Flood Hazard Area, also known as the 100-year flood plain. 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 7 The Property is located beyond the official Stream Margin map of the City of Aspen. Due to this, staff has determined that the Applicants will need to establish the Top of Slope on the Property as part of this land use application. (b) Stream margin review standards. No development shall be permitted within the stream margin of the Roaring Fork River unless the Community Development Director makes a determination that the proposed development complies with all requirements set forth below. No development is proposed within the Stram Margin area. All development will remain to the west of the delineated Top of Slope in the general area as existing development. Sec. 26.470.090.c - Administrative applications. (c) Single-family and duplex redevelopment or expansion that does trigger demolition as defined by Chapter 26.580 Demolition and Redevelopment of Single -Family and Duplex properties shall require a land use application pursuant to Chapter 26.304, the allocation of a Growth Management allotment, and shall provide affordable housing mitigation in one (1) of the methods described below. The Applicants are requesting the allocation of a Growth Management demolition allotment for long-tome locals. 1) Applicability. This review shall apply to all applications for development and redevelopment of single-family and duplex project that triggers Demolition as outlined Chapter 26.580, unless otherwise exempted in Section 26.580.050. The Applicants proposed the development of a duplex, following full demolition of the existing single-family residence. The duplex will be the Applicants’ primary residence. 2) Procedures for review. a. General. An application for a GMQS review of the Demolition and Redevelopment of a single-family or duplex project shall be submitted (subject to the requirements of Chapter 26.304, Chapter 26.580 and Section 26.470.090(c)) and will considered in an Administrative Review by the Community Development Director. Following review, an approval would be granted by a recorded Notice of Approval and the issuance of a Development Order. On a single parcel, the Demolition of a Single Family, two (2) detached dwellings, or Duplex residential structure shall require one (1) allotment. The Applicants request Administrative Review for Demolition and Redevelopment of a single-family or duplex project. As it is anticipated that no demolition allotments for long-time locals will be available, the Applicants will 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 8 appeal the Administrative Review determination to City Council. b. Determination of applicability. The applicant may request a preliminary Demolition pre-application conference with Community Development staff to determine the applicability of the Chapter and the application submission requirements. If a project is likely to trigger Demolition, a meeting should be set up with a Zoning Officer to confirm if the project is subject to Chapter 26.580, Demolition. An applicant must request a Pre-application conference summary outlining application requirements when a project tr iggers Demolition pursuant to Chapter 26.580, Demolition. The Applicants have held a pre-application conference with Community Development staff and confirmed the parameters of demolition and the process moving forward. c. Timing. Applications for a Demolition Allotment shall be received and processed on a first come, first serve basis. An application shall not be reviewed or considered until determined "Complete" per Chapter 26.304. An application may be submitted concurren tly with a building permit application for the project. Once determined "Complete" the application will be considered in order with any other "Complete" applications, based on the date and time at which the applications were determined "Complete". Once in review, the ordering of applications for consideration of an allotment will remain. The Applicants are aware of the process for obtaining Demolition Allotments. The Applicants will work with staff to ensure the application for Demolition Allotment is complete. As it is anticipated that no demolition allotments for long-time locals will be available, the Applicants will appeal the Administrative Review determination to City Council. d. Residential demolition and redevelopment standards. This document sets the standards under which a redevelopment project will be reviewed and will serve as the basis under which a project will be approved for the issuance of a development allotment. This document, as amended from time to time, is available on Community Development's web page or may be requested from a staff planner. The Applicants understand the residential demolition and redevelopment standards. The proposed duplex complies with these standards. 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 9 e. Combined reviews. An application for growth management review may be a combined with development applications for other associated land use reviews, pursuant to Section 26.304.060(b)(1), Combined Reviews. In addition to Demolition Allotments, the Applicants will seek to delineate the Top of Slope. Additionally, the Applicants will seek Affordable Housing mitigation deferral. The deferral is an important measure that will ensure this long-time local family will be able to stay in Aspen, a community they had a significant part in creating. f. Variations. An application requesting a Variation of the Residential Demolition and Redevelopment Standards, or the review standards identified below, shall be processed as a Special Review in accordance with the common development review procedures set forth in Chapter 26.304. The Special Review (Section 26.430.040(k)) shall be considered a public hearing for which notice has been provided pursuant to Section 26.304.060(e)(3). Review is by the Planning and Zoning Commission. In this case, the granting of t he development allotment would not be granted until Planning and Zoning Commission approves the special review. No variations are requested. g. Insufficient demolition allotments. Any property owner within the City who is prevented from redeveloping a property because that year's Demolition allotments have been entirely allocated may apply for City Council Review for a Multi-Year Development Allotment subject to Section 26.470.110(a). As it is anticipated that no demolition allotments for long- time locals will be available, the Applicants will appeal the Administrative Review determination to City Council. 3) Review standards for projects requesting a demolition allotment. a. Adequate growth management allotments are available for the project and the project meets any applicable review criteria in Chapter 26.470, Growth Management Quota System. The Applicants understand the limited supply of Demolition Allotments. As it is anticipated that no demolition allotments for long-time locals will be available, the Applicants will appeal the Administrative Review determination to City Council. b. The project shall meet the requirements of the Residential Demolition and Redevelopment Standards prior to building permit issuance. The project shall be subject to the Residential Demolition 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 10 and Redevelopment Standards in effect at the time of building permit submission is deemed complete. The requirements of the Residential Demolition and Redevelopment Standards will be met prior to building permit issuance. The Applicants look forward to working with staff in this regard. 4) Application contents. Applications for a Demolition allotment shall include all application requirements outlined in Section 26.470.130 and Chapter 26.304, in addition to the following: a. Demolition diagrams depicting total area to be demolished consistent with the methodology outlined in Section 26.580.040. Demolition diagrams have been provided depicting total area to be demolished. The entire existing structure will be removed. b. A written response to all applicable review criteria, including responses to the Residential Demolition and Redevelopment Standards, as amended from time to time pursuant to Chapter 26.580. The Applicants submit this written request to the applicable review criteria and will continue to work with staff to ensure all materials and responses are provided, as necessary. 5) Affordable housing mitigation requirements. a. Affordable housing mitigation requirements for free -market residential development that triggers Demolition pursuant to Chapter 26.580 shall be as follows. The applicant shall have four (4) options: i. Recording a Resident-Occupancy (RO), or lower, deed restriction on the single-family dwelling unit or one (1) of the residences if a duplex or two (2) detached residences are developed on the property. An existing deed restricted unit does not need to re-record a deed restriction. ii. Providing a deed restricted one-bedroom or larger affordable housing unit within the Aspen Infill Area pursuant to the Aspen/Pitkin County Housing Authority Guidelines (which may require certain improvements) in a size equal to or larger than thirty (30) percent of the Allowable Floor Area increase to the Free-Market unit. The mitigation unit must be deed-restricted as a "for sale" Category 2 (or lower) housing unit and transferred to a qualified purchaser according to the provisions of the Aspen/Pitkin County Housing Authority Guidelines. iii. Providing a fee-in-lieu payment or extinguishing a Certificate of Affordable Housing Credit in a full-time- equivalent (FTE) amount based on the following schedule: 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 11 a. Employment Generation Rate: 0.107 per 1000 square feet of Mitigation Floor Area. b. For redevelopment or renovation of an existing single-family or duplex that meets the definition of Demolition (Section 26.104.100), all Mitigation Floor Area (existing and new) shall be calculated toward employee generation and required mitigation. c. Affordable housing mitigation must be provided at a Category 2 (or lower) rate. Certificates must be extinguished pursuant to the procedures of Chapter 26.540, Certificates of Affordable Housing Credit. Fee-in-lieu rates shall be those stated in Section 26.470.100 - Calculations; Employee Generation and Mitigation, in effect on the date of application acceptance. Providing a fee-in-lieu payment in excess of .10 FTE shall require City Council approval, pursuant to Section 26.470.110(c). iv. An affordable housing mitigation Deferral Agreement may be accepted by the City of Aspen pursuant to Section 26.470.080(d)(12). The Applicants request City Council to direct the Community Development Director and the Aspen Pitkin County Housing Authority to enter into a Deferral Agreement for affordable housing mitigation. As this deferral still seems punitive for long-time locals that have lived and worked in this community for multiple generations, the Applicants will pursue a modification of the deferral to ensure no affordable housing mitigation is required. Sec. 26.470.110.a - City Council Applications - Multi-year Demolition Allotments The following types of development shall be approved, approved with conditions or denied by the City Council, pursuant to Section 26.470.060, Procedures for Review, and the criteria for each type of development described below. Except as noted, all growth mana gement applications shall comply with the general requirements of Section 26.470.080. Except as noted, all City Council growth management approvals shall be deducted from the respective annual development allotments. Sec. 26.470.110.g - City Council Applications - Additional Allotments for Local Property Owners (g) Additional allotments for local property owners of Single -Family and Duplex Redevelopment or Expansion that does trigger Demolition as defined by Chapter 26.580 and Section 26.470.090(c). Any property owner within the City who applied for an allotment through Section 26.470.090 and was not granted an allotment due to a lack of allotments available for the calendar year can request an allotment from future years. Up to two (2) allotments may be granted through this 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 12 process and shall not be deducted from a future year's available allotments. This review procedure is available only to property owners who can establish, through such procedures and documentation set forth below, that the property proposed for redevelopment or expansion has been owned and occupied by the applicant or applicant's immediate family members for at least 35 years. All other property owners may request an allotment through the Multi-year development allotment procedures outlined in Section 26.470.110(a). The following review criteria shall apply to the consideration of the award of additional allotments pursuant to this subsection (g): a. The property owner or immediate family members have owned and occupied the property for at least thirty-five (35) years. Documentation evidencing ownership and residency shall be provided, which may include but is not limited to property transactions recor ds, property tax remittance, voter registration records, and the like. Additionally, signed affidavit(s) attesting to ownership and occupancy for all thirty -five (35) years must be submitted. The Applicants’ family has owned the Property since 1956. The Applicants themselves have controlled the Property since 1981. Documentation evidencing ownership and residency have been provided. b. The granting of the allotment furthers the goals, objectives and policies of the Aspen Area Community Plan. The Aspen Area Community Plan is aimed at preserving the character of Aspen. Long-time locals such as the Applicant, are the very essence of the character of Aspen. Ensuring that a family that literally helped build the community is possibly the penultimate way that the goals, objectives, and policies of the AACP are met. c. The project meets all review criteria in Section 26.470.090(c)(3), or a variation is approved by the Planning and Zoning Commission. The proposed duplex meets all review criteria and no variations are requested. Sec. 26.470.160.c – Appeals - Insufficient Development Allotment Appeal. (c) Insufficient development allotments. Any property owner within the City who is prevented from developing a property because that year's development allotments have been entirely allocated may appeal to the City Council for development approval. An application requesting allotments must first be denied due to lack of necessary allotments. The appeal procedures set forth at Chapter 26.316 shall apply. The City Council may take any such action determined necessary, including but not limited to making a one-time increase of the annual development allotment sufficient to accommodate the application. 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 13 As it is anticipated that no demolition allotments for long -time locals will be available, the Applicants will appeal the Administrative Review determination to City Council. Chapter 26.580. - DEMOLITION Sec. 26.580.030. - Applicability. This Chapter applies to land use applications and building permit submissions for development within the City limits for projects that that meet or exceed the definition of Demolition, unless exempted by Section 26.580.050. All portions of the existing development, which was constructed in 1957 and no longer serves the purposes of the Applicants, will be removed. Sec. 26.580.040. - Measurement of demolition. The Applicant proposes a complete demolition of the existing surfaces or a 100% removal. Sec. 26.710.080. - Low-Density Residential (R-30). (a) Purpose. The purpose of the Low-Density Residential (R-30) Zone District is to provide areas for long-term residential purposes, Short-term Rentals, and customary accessory uses. Recreational and institutional uses customarily found in proximity to residential uses are included as conditional uses. Lands in the Low-Density Residential (R-30) Zone District are typically located along river frontages in outlying areas of the City. The proposed duplex will serve as the Applicants’ primary, long - term residence. (b) Permitted uses. The following uses are permitted as of right in the Low- Density Residential (R-30) Zone District: (1) Detached residential dwelling. (2) Duplex. (3) Triplex or Fourplex, if One Hundred (100) Percent Deed -Restricted Affordable Housing. (4) Existing multi-family housing, if One Hundred (100) Percent Deed - Restricted Affordable Housing. Existing multi-family housing that is not One Hundred (100) Percent Deed-Restricted Affordable Housing remains a nonconforming use. New multi-family housing is not permitted, except for triplexes and fourplexes as described in subsection (3) above. (5) Home occupations. (6) Accessory buildings and uses. (7) Accessory dwelling units and carriage houses meeting the provisions of Chapter 26.520. (8) Short-term Rentals. Pursuant to Chapter 26.530. 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 14 The proposed use of the Property will be for duplex. The duplex will house the Applicants and their families. Accessory structures may be proposed in the future. (c) Conditional uses. The following uses are permitted as conditional uses in the Low-Density Residential (R-30) Zone District, subject to the standards and procedures established in Chapter 26.425: (1) Arts, cultural and civic uses. (2) Academic uses. (3) Agricultural uses. (4) Recreational uses. (5) Group home. (6) Child care center. No conditional uses are proposed by the Applicants. (d) Dimensional requirements. The following dimensional requirements shall apply to all permitted and conditional uses in the Low-Density Residential (R- 30) Zone District: (1) Minimum Gross Lot Area (square feet): 30,000 (2) Minimum Net Lot Area per dwelling unit (square feet): a. Detached residential dwelling: 30,000 b. Duplex: 15,000 c. One Hundred (100) Percent Deed-Restricted Affordable Housing; triplex, fourplex: No requirement. d. One Hundred (100) Percent Deed-Restricted Affordable Housing; existing multifamily: No requirement. (3) Minimum lot width (feet): 100 For lots proposed for One Hundred (100) Percent Deed-Restricted Affordable Housing: 30 (4) Minimum front yard setback (feet):a.Residential dwellings: 25b.Accessory buildings and all other buildings: 30 (5) Minimum side yard setback (feet): 10 (6) Minimum rear yard setback (feet): a. Residential dwellings: 15 b. Accessory buildings: 5 c. All other buildings: 30 (7) Maximum height (feet): 25 (8) Minimum distance between principal and accessory buildings (feet): 10 (9) Percent of open space required for building site: No requirement. (10) Floor area ratio (applies to conforming and nonconforming lots of record): a. Single-Family and Duplex. Each City historic transferable development right certificate extinguished, pursuant to Chapter 26.535, Transferable Development Rights, shall allow an additional two hundred fifty (250) square feet of floor area. Each residence on the parcel, excluding ac cessory dwelling units and carriage houses, shall be eligible for one (1) floor area increase in exchange for the extinguishment of one (1) historic TDR. Properties listed on the Inventory of Historic Landmark Sites and Structures shall not be eligible for this floor area increase. 790 Castle Creek Drive, Aspen, Colorado PID: 273512206001 Demolition, development of duplex, and establishment of Top of Slope 12 December 2024 15 Nonconforming uses and structures shall not be eligible for this floor area increase. No more than one (1) floor area increase shall be allowed per residence, with the following exceptions: i. Non-historic properties with a net lot area of 30,000 sf or larger that contain only a single family residence are eligible to extinguish up to two (2) historic TDRs. b. One Hundred (100) Percent Deed-Restricted Affordable Housing; Triplex or Fourplex: Allowable Floor Area shall be consistent with the Allowable Floor Area for a Duplex or Two Detached Dwellings as indicated in the table in subsection (10)a., above. c. One Hundred (100) Percent Deed-Restricted Affordable Housing; Existing Multifamily: 0.75:1 FAR. Existing multifamily that is not One Hundred (100) Percent Deed-Restricted Affordable Housing remains a nonconforming use and is limited to its existing floor a rea. All dimensional requirements of the R-30 zone district will be met by the proposed duplex. The Applicants are not proposing to utilize City of Aspen Historic TDRs. Attachment 1 9,028 1,504.7 Legend 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet01,504.7752.33 Notes Vicinity Map THIS MAP IS FOR INFORMATIONAL PURPOSES. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content represented. Map Created on 10:12 AM 04/08/24 at http://www.pitkinmapsandmore.com State Highway Road Centerline 9K Primary Road Secondary Road Service Road Rivers and Creeks Continuous Intermittent River, Lake or Pond County Line Wilderness Area Peaks and Passes Town Boundary Federal Land Boundary BLM State of Colorado USFS Attachment 2 Report Created: 12/2/2024 1:43:56 PM Parcel ID: 273512206001Pitkin County Community Development Report Library District School District Fire District Water District Within 1/4 Mile of Sewer Service Sewer System Caucus Land Use Category 2000 Sq. FeetImprovements Assessor's Information Township, Range, Section 55016.28 Sq. Feet 790 CASTLE CREEK DR Aspen GIS Parcel Size Address (Assessor's Records) Jurisdiction Services Boundaries Property Information 1112: Residential-Single Family Residence Aspen Consolidated Sanitation District Aspen Consolidated Sanitation District City of Aspen Water Service Area Aspen Fire Protection District Aspen School District No. 1 (RE) Pitkin County Library Not within a Caucus Area Address (GIS Points)790 CASTLE CREEK DR 790 CASTLE CREEK DR ASPEN, CO 81611 R005306 CERISE JAMES MOwner Account Owner Address 790 CASTLE CREEK DR ASPEN, CO 81611 R005306 BARABE CAROLYNOwner Account Owner Address T:10, R:85, S:12 Subdivision: CASTLE CREEK Lot: 9Legal Description Subdivision: CASTLE CREEK Lot: 9Legal Description Outlet Castle Creek Castle Creek No Wildfire Hazard Classification Within a Scenic View 100-year flood (AE), 500-year flood (0.2 PCT), Floodway Castle Creek Watershed Subbasin Watershed Drainage Wildfire Scenic Floodplain Within 100 Feet of Creek or River Historic District Zone District Overlays Master Plan Area Caucus Environmental Areas Boundaries Address Retired Parcel Documents Parcel 273512206001 None Found Not within a Caucus Area Aspen Area Community Plan (AACP) No Zoning Overlay on this parcel Not within a Historic District Floor Area Overlay Not within a Floor Area Zone Overlay Refer to local regulationsZone District None Found Pitkin County GIS presents the information and data on this report as a service to the public. Every effort has been made to ensure that the information and data contained in the report is accurate, but the accuracy may change. The information maintained by the County may not be complete as to mineral estate ownership and that information should be determined by separate legal and property analysis. http://www.pitkinmapsandmore.com Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content at this site or at other sites to which we link. Assessing accuracy and reliability of information and data is the sole responsibility of the user. The user understands he or she is solely responsible and liable for use, modification, or distribution of any information or data obtained on this web site. Disclaimer Data is presented in WGS 1984 Web Mercator. Size, shape, measurement and overlay of features may be distorted. In some cases, multiple results could be valid; for example, Zoning. In other cases, a parcel may cross over the boundary of more than one data area, for example, multiple Precincts. Visit the Pitkin County GIS Department at EG123456789101112131415171820232428293031323334353637383940SITE BENCH MARKFOUND 1" IRON PIPEIN WIRE FENCE LINEELEVATION: 7871.04425.0' WITNESS CORNERFOUND REBAR & 1-1/4"ORANGE PLASTIC CAPLS38215 AT TOP OF BANK363.8' WITNESS CORNERFOUND REBAR & 1-1/4"YELLOW PLASTIC CAPLS24312 AT TOP OF BANKFOUND REBAR & 1-1/4"YELLOW PLASTIC CAPLS24312FOUND REBAR & 1-1/4"YELLOW PLASTIC CAPLS ILLEGIBLE41NEIGHBOR'S DECKHIGH WATER LINECASTLE CREEKJUNE 2017TOE O F S L O P E EXISTING TOP OF SLOPE GARDENAREASHEDCONCRETEWOODRETAININGWALLWIRE FENCECONCRETEPLANTERPONDPONDWINDOWWELLGRAVELDRIVEGRAVELDRIVESIDEWALKPATIOWOODDECKSTEPSSTEPS42DITCH FLOWLINECONCRETERETAININGWALLSWALE GARAGE11.8'15.0'57.7'38.5'9.4'32.2'32.2'20.1'FFE:7872.0520.1'7.0'12.2'LEAN-TOCONCRETE36.4'20.0'5.6'32.2'20.0'14.4'14.9'7.0'FFE:7875.39FFE:7874.7021.5'30.4'1 - STORYFRAME HOUSE& BASEMENT790 CASTLE CREEKDRIVES 4 6 ° 1 4 ' 0 0 "W 1 0 0 . 7 3 ' ( 1 0 0 ' ± )(140'±)N08°18'21"W 140.08'20'± PAVEDROADWAY(40' PUBLIC R.O.W.)CASTLE CREEKDRIVEC A S T L E C R E E K LOT 9TOTAL AREA1.332± AC.58,010± S.F.APPROXIMATESEWER SERVICESPECIAL FLOODZONE XFLOODWAY AREAIN ZONE AEBASE FLOODELEVATION:77967795 7800 7805 7810 7815 7820 7825 7830 7835 7840 7845 7850 7855 7860 7865787078747873 78727871N80°01'25"W 242.04'S38°47'59"E 2198.60'CITY OF ASPENGPS#10CITY OF ASPENGPS#20LOT 8RED BUTTE CEMETERYLOT10LOT 115 ' S E T B A C K 1 5 ' S E T B A C K 3 0 ' S E T B A C K10' SETBACK10' SETBACK25' SETBACK30' SETBACKTHIS AREA EXCEEDS THE40% SLOPE RANGESWA L E4"CMP4"CMP 4"CMP S84°14'00"E 625.00'N89°34'51"W 530.31'(445'±)FLOOD AREAZONE X2122252627SWALEN08°18'55"W 129.96'BASIS OF BEARINGS (124'±)100' SETBACK43WOOD STEPSAREA BELOWHIGH WATER LINE0.419± AC.18,267± S.F.STREAM MARG INREV I EW BOUNDAR Y FLOOD AREAZONE AEBASE FLOODELEVATION:7796IRRIGATIONPUMPTREE TYPE SIZE DRIPTREE CHART1214" 28'12"24'CONIFEROUSELECTRICAL TRANSFORMERTELEPHONE PEDESTALFIRE HYDRANTWATER SHUTOFFSANITARY MANHOLEGAS METERELECTRICAL METERSCALE: 1" = 1,000'GVICINITY MAPEWATER LINESEWER LINETELEPHONE LINEWIRE FENCE LINECATV LINESURVEY NOTES:1.BASIS OF BEARINGS FOR THIS SURVEY IS A BEARING OF N08°18'55"W ALONG THE WESTERLY PROPERTY LINEBETWEEN THE SOUTHWEST CORNER OF LOT 9, A FOUND REBAR & 1-1/4" YELLOW PLASTIC CAP LS24312 ANDTHE NORTHWEST CORNER OF LOT 9, A FOUND 1" IRON PIPE AS SHOWN HEREON.2. DATE OF FIELD SURVEY: JUNE 14 & 19, 2017.3. LINEAR UNITS USED TO PERFORM THIS SURVEY WERE U.S. SURVEY FEET.4. THIS SURVEY IS BASED ON CASTLE CREEK SUBDIVISION, ACCORDING TO THE PLAT THEREOF RECORDEDNOVEMBER 18, 1957 IN PLAT BOOK 2A AT PAGE 241 AS RECEPTION NO. 105783. A BUILDING PERMIT SURVEYPREPARED BY DAVID W. MCBRIDE DATED 6/29/80, AN IMPROVEMENT SURVEY OF LOT 8 PREPARED BY ROBERTHUTTON DATED 9/2012 AND CORNERS FOUND IN PLACE AS SHOWN HEREON.5. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE COMMITMENT, THEREFORE, ANY EXCEPTIONS TOTITLE THAT MAY AFFECT THE SUBJECT PROPERTY HAVE NOT BEEN RESEARCHED BY TRUE NORTH COLORADO, LLC.6. ELEVATIONS SHOWN HEREON ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88)REFERENCED FROM NATIONAL GEODETIC SURVEY (NGS) BENCHMARK STATION S 159 HAVING AN ELEVATION OF7720.88.7. CONTOUR INTERVAL EQUALS 1 FOOT.8. DISTANCES SHOWN IN PARENTHESIS IS OF RECORD AS SHOWN ON THE CASTLE CREEK SUBDIVISION,ACCORDING TO THE PLAT THEREOF RECORDED NOVEMBER 18, 1957 IN PLAT BOOK 2A AT PAGE 241 ASRECEPTION NO. 105783.9. UNDERGROUND UTILITIES SHOWN HEREON WERE MARKED BY ROARING FORK UTILITY LOCATORS AND THE CITYOF ASPEN WATER & SANITARY DISTRICT AND SHOULD BE VERIFIED PRIOR TO ANY EARTH MOVINGCONSTRUCTION.LOT 9 - CASTLE CREEK SUBDIVISION SITUATED IN SECTION 12, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6TH P.M.CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADOPITKIN COUNTY PARCEL NO. 2735-122-06-001IMPROVEMENT & TOPOGRAPHIC SURVEYTRUE NORTH COLORADO LLC.A LAND SURVEYING AND MAPPING COMPANYPO BOX 614 - 386 W. MAIN STREET-UNIT 3NEW CASTLE, COLORADO 81647(970) 984-0474www.truenorthcolorado.comPROJECT NO: 2017-145DATE: JUNE 26, 2017DRAWNRPKSURVEYEDLDVSHEET1 OF 1TRUENORTHA LAND SURVEYING AND MAPPING COMPANY020'10'40'SCALE: 1" = 20'NFEMA FLOOD ZONE INFORMATIONFEMA FLOOD INSURANCE RATE MAP COMMUNITY PANEL NO. 08097C0354-E HAVING AN EFFECTIVE DATE OFAUGUST 15, 2019.ZONE X - AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN (500-YEAR FLOODPLAIN.)SPECIAL ZONE X - AREAS OF 0.2% ANNUAL CHANCE FLOOD (500-YEAR FLOODPLAIN), AREAS OF 1% ANNUALCHANCE FLOOD (100-YEAR FLOODPLAIN) WITH AVERAGE DEPTHS OF LESS THAN 1 FOOT OR DRAINAGE AREAS LESSTHAN 1 SQUARE MILE; AND AREAS PROTECTED BY LEVEES FROM 1% ANNUAL CHANCE FLOODZONE AE - THE 1% ANNUAL CHANCE FLOOD (100-YEAR FLOODPLAIN) WITH BASE FLOOD ELEVATIONS DETERMINED.BASE FLOOD ELEVATION FOR THIS PROPERTY IS 7796.SITEHIGHWAY 82CEMETERYLANEASPEN GOLFCOURSECITYOFASPENTREE TYPE SIZE DRIPTREE CHART38"16'412"20'510" 16'COTTONWOOD624" 40'720" 30'824" 30'91032" 40'1114"28'1218"36'1314"28'1426" 40'1514"20'1718DECIDUOUS20DECIDUOUS2136" 40'ASPEN228"16'DECIDUOUS23ASPEN2412"24'ASPEN2512"24'26272824" 48'DECIDUOUS298" 40'DECIDUOUS307"40'3116" 16'3222" 28'3328" 28'3424" 28'3518"20'3630" 28'379"18'386"12'3940CONIFEROUSCONIFEROUSCONIFEROUSCONIFEROUSCOTTONWOODCOTTONWOODCOTTONWOODCOTTONWOODCOTTONWOODCOTTONWOODCOTTONWOOD24" 40'CONIFEROUSCONIFEROUSASPENASPEN18"24'18"24'36" 40'8"16'ASPEN12"24'12"24'ASPENASPENCONIFEROUSCONIFEROUSCONIFEROUSCONIFEROUSCONIFEROUSCONIFEROUSASPENASPENASPENASPEN9"18'9"18'41ASPEN10"20'42ASPEN16"32'LEGENDELECTRIC LINE WOOD FENCEPROPERTY DESCRIPTION:PROPERTY ZONED:SURVEYOR'S CERTIFICATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF, HOWEVER ITIS NOT A GUARANTY OR WARRANTY, EITHER EXPRESSED OR IMPLIED.4318"48'CONIFEROUSNOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTIONBASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRSTDISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT INTHIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATIONSHOWN HEREON.SLOPE LEGEND20% TO 30%30% TO 40%40% & GREATER0% to 20%Attachment 3 AFFIDAVIT STATE OF COLORADO ) )ss. COUNTY OF PITKIN ) The undersigned, Carolyn Barabe and James M. Cerise, being first duly sworn upon their oath, state as follows: 1. Our father, Martin J. Cerise, purchased the property legally described as Lot 9, Castle Creek Subdivision, according to the recorded plat thereof with a street address of 790 Castle Creek Drive (“Property”), in 1956 from Fred Hinman. A Deed evidencing the purchase and conveyance is attached hereto as “Exhibit A.” 2. Our father constructed the existing residence on the Property in 1957. This was the family’s primary home where we were raised. 3. We have owned the property as tenants in common since 1981. A Deed evidencing the conveyance of the Property is attached as “Exhibit B.” 4. We have continued to live in the existing residence with our spouses since 1981. 5. Virginia R. Cerise, as personal representative of the Estate of Martin J. Cerise, Carolyn Barabe, and James M. Cerise, conveyed a 25% interest to both James M. Cerise and Carolyn Barabe as tenants in common, a 35.821% interest as tenant in common to the James M. Cerise and Carolyn A. Cerise Trust, as created under the will of Martin J. Cerise, dated July 6, 1981, and a 14.179% interest as tenant in common to Virginia R. Cerise. A General Warranty Deed evidencing the sale and conveyance is attached hereto as “Exhibit C.” 6. Virginia R. Cerise sold and conveyed to James M. Cerise, as to an undivided 1% interest as tenant in common and to Carolyn M. Barabe, as to an undivided 1 % interest as tenant in common. A General Warranty Deed evidencing the sale and conveyance is attached here to as “Exhibit D.” 7. Carolyn A. Cerise, James M. Cerise, the James M. Cerise and Carolyn A. Cerise Trust as created under the Will of Martin J. Cerise dated July 6, 1981, and Virginia R. Cerise for no consideration and for purposes of correcting and/or clarifying record title, transferred and conveyed to Carolyn Barabee (sic) and James M. Cerise each an undivided 50% interest as tenants in common. A General Warranty Deed evidencing the sale and conveyance is attached hereto as “Exhibit E.” 8. Virginia R. Cerise, for no consideration and as a gift, transferred to James M. Cerise an undivided 24% interest as tenant in common and transferred to Carolyn Barabe Attachment 4 D CASTLE CREEK DRIVESETBACK10'-0"S E T B AC K 2 5 '-0 " S E T B A C K 3 0 '-0 " LOT 9 TOTAL AREA 1.332+/- AC. 58,010+/- S.F. AREA BELOW HIGH WATER LINE 0.123+/- AC. 5,337+/- S.F.EXISTING TOP OF SLOPE7870 7871 DITCH FLOW LINE PROPERTY LINE SETBACK10'-0"PROPERTY LINEPROPERTY LINE 7873 7872 7872 7871 WOOD RETAINING WALL WIRE FENCE DRIVEWAY NORTH UNIT SIDE PORCH NORTH UNIT ENTRANCE DRIVEWAY SOUTH UNIT ENTRANCE NORTH UNIT BACK PORCH SOUTH UNIT BACK PORCH N O R T H U N I T S O U T H U N I T PAVER PATHWAY LANDSCAPE PLANTERNORTH UNIT SOUTH UNIT 7865786078557850SOUTH PATIO - 1 IRRIGATION PUMP WOOD STEPS MAILBOX 7872 78717872787378737872 7 8 7 2 7 8 7 1 7872 7 8 7 1 7870 U P UP UP U P PROPOSED COLLECTOR POND RE: LANDSCAPE PROPOSED COLLECTOR POND RE: LANDSCAPE REFERENCE TREE MITIGATION PLAN FOR ALL EXISTING, PROPOSED, AND DEMOLISHED TREES 100'-0 3/4" 7872.90 100'-0 3/4" 7872.9012'-0"12'-0"PROPOSED ROOF LINE RED BUTTE CEMETERY S W A L EFROM PROPERTY LINE TO FINISH34'-11 27/64"F R O M P R O P E R T Y L I N E T O F I N I S H 3 1 '-1 " LOT 8 UTILITY METERS UTILITY METERS UP ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT DATE REVISIONS DATE 1" = 10'-0" ---LAND USE SITEPLANCC DUPLEX11.25.2024LAND USE 790 CASTLE CREEK DRIVE, ASPEN, CO 816111" = 10'-0" PROPOSED SITE PLAN1 N Attachment 5 DN UP UP A-3.01 2 A C (20% overall UNIT width = 10' min)10'-10 9/256"20% of overall UNIT width = 7'-6 min14'-3 7/8"A-3.01 4 A-3.01 3 2 4 5 6 13 11 Q M S 1 D H I 8° A-3.05 2 12 SETBACK10'-0"SETBACK 25'-0" SETBACK 30'-0" DITCH FLOW LINE PROPERTY LINE SETBACK10'-0"PROPERTY LINEPROPERTY LINE OUTLINE OF ROOF ABOVE DASHED, TYP. T.O.F.F. T.O.F.F. 99'-6" 99'-6" 99'-6" 99'-6" 7872.33 7872.33 99'-11" 99'-11" 99'-11" 99'-11" NORTH UNIT DRIVEWAY SOUTH UNIT DRIVEWAY NORTH UNIT ENTRANCE PATHWAY 116 N - GARAGE 109 N - M. BATH 108 N - M. CLST 106 N - STAIR CLST 101 N - ENTRY 113 N - KITCHEN 150 S - G. BDRM151 S - G. BATH 152 S - MUD/LDRY 141 S - STAIR 133 S - M. BATH 2 A-4.01 2 A-4.03 2 A-4.02 1 A-4.02 1 A-4.03 1 A-4.01 14 O6'-0"15'-0"10"15'-0"22'-0"58'-10"A-3.04 3 102 N - COAT CLST PN FB 114 N - DINING 112 N- LIVING 110 N - M. BDRM 105 N - SITTING 103 N - LNDRY 104 N - PDR 155 S - GARAGE 154 S - PDR 147 S - G. CLST 146 S - PANTRY 145 S - KITCHEN 144 S - DINING 140 S - ENTRY 142 S - LIVING 130 S - DEN 131 S - BDRM 1 132 S - BATH 1 134 S - M. CLST 135 S - M. BDRM 138 S - MAIN HALL 99'-11" 100'-0 3/4" 100'-0 3/4" 7872.90 R 6'-0"4'-0"20'-0"9'-0"9'-0"16'-0"4'-0" 68'-0" RDS 4'-0" RDS 6'-0"13'-0" 9'-0" 14'-0" 10'-0" 56'-0"14'-0"14'-0"16'-0"44'-0"6'-0"2'-0"3'-0" 22'-0" 4'-0" 19'-0" W/D A-3.04 1 wall mounted coat rack 1'-6 1/2"RDS 6'-0" RDS 4'-0" 153 S - ENTRY CLST 115 N - PTY 137 S - W/D 119 N - SIDE PORCH 120 N - BACK PORCH 118 N - FRONT PORCH 157 S - BACK PORCH 156 S - FRONT PORCH 139 N - PATIO 1 A-3.03 2 A-3.05 1 A-3.04 2 1'-8" 3 A-3.01 2 E 9 1/4"G GENERAL PLAN NOTES 1. FOR GENERAL NOTES SEE A-0.01. 2. CONTRACTOR TO ESTABLISH PERMANENT BENCHMARK PRIOR TO COMMENCEMENT OF WORK. 3. DO NOT SCALE DIMENSIONS FROM DRAWINGS. 4. DIMENSIONS PROVIDED ON DRAWINGS MEASURE FROM THE FACE OF FRAMING. TYPICAL UNLESS NOTED OTHERWISE. 5. IMMEDIATELY MAKE ARCHITECT AWARE IF ANY DISCREPANCIES ARE DISCOVERED BETWEEN THE ARCHITECTURAL DRAWINGS AND ANY CONSULTANT DRAWINGS. 6. SHEAR WALLS SHOWN FOR COORDINATION PURPOSES ONLY. CONFIRM ALL SHEAR LOCATIONS IN STRUCTURAL DRAWINGS. 7. FIRE RATED UL LISTED ASSEMBLIES MAY HAVE ADDITIONAL REQUIREMENTS NOT LISTED IN DRAWINGS. REFER TO A-0.05 FOR FIRE SEPARATION DIAGRAMS AND CONFIRM CONTINUITY OF ALL EXIT CORRIDORS. 8. GC TO PROVIDE ALLOWANCE FOR FIRESTOPPING ASSEMBLIES PER SECTION 714. 9. RADON MITIGATION SYSTEM TO BE DESIGN/BUILD. SEE PLANS FOR PIPE ROUTING. SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES. 10. REFER TO STRUCTURAL FOR FOUNDATION DETAILS. ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE As indicated A-2.01OVERALL MAINLEVEL PLANCC DUPLEX11.25.2024LAND USE 790 CASTLE CREEK DRIVE, ASPEN, CO 816111/8" = 1'-0" MAIN LEVEL FLOOR PLAN1 N DN DN A-3.01 2 A C A-3.01 1 A-3.01 4 A-3.01 3 2 4 5 6 13 11 Q M S 1 D H I A-3.05 2 12 206 N - G. BDRM 227 S - CLST 3 2 A-4.01 2 A-4.03 2 A-4.02 1 A-4.02 1 A-4.03 1 A-4.01 14 O A-3.04 3 PN FB R 6'-0"2'-0"3'-0" 22'-0" 4'-0" 19'-0" 56'-0"6'-0"15'-0"10"15'-0"22'-0"58'-10"14'-0"14'-0"16'-0"44'-0"6'-0"4'-0"20'-0"9'-0"25'-0"4'-0" 68'-0" 8° 228 S - BDRM 3 226 S - BATH 3 225 S - BATH 2 222 S - BDRM 2 221 S - LOFT 5'-0 3/4" 6'-0" 4'-0"19'-0 1/4"10'-11 1/2" 7'-0 1/2"12'-7 3/8"A-3.04 1 202 N - LOFT 12'-0" 3 1/2" 5'-8 3/4" 3 1/2" 6'-3" 5 1/2" 6'-6" 3 1/2" 16'-3 1/2"3'-6"3 1/2"12'-3 3/4"3 1/2"6'-0"2'-8" 5 1/2" 3'-4 1/2" 9'-7 1/8"2'-1"201 N - STAIR 203 N - G. BATH 230 S - DECK 2 207 N - DECK 1 229 S - DECK 1 220 S - STAIR A-3.03 2 A-3.05 1 3'-0 1/8"A-3.04 223'-0 15/16"23'-0 15/16"23'-6"EQ EQ 3 A-3.02 1 A-3.02 2 A-3.031 E 29'-0" G GENERAL PLAN NOTES 1. FOR GENERAL NOTES SEE A-0.01. 2. CONTRACTOR TO ESTABLISH PERMANENT BENCHMARK PRIOR TO COMMENCEMENT OF WORK. 3. DO NOT SCALE DIMENSIONS FROM DRAWINGS. 4. DIMENSIONS PROVIDED ON DRAWINGS MEASURE FROM THE FACE OF FRAMING. TYPICAL UNLESS NOTED OTHERWISE. 5. IMMEDIATELY MAKE ARCHITECT AWARE IF ANY DISCREPANCIES ARE DISCOVERED BETWEEN THE ARCHITECTURAL DRAWINGS AND ANY CONSULTANT DRAWINGS. 6. SHEAR WALLS SHOWN FOR COORDINATION PURPOSES ONLY. CONFIRM ALL SHEAR LOCATIONS IN STRUCTURAL DRAWINGS. 7. FIRE RATED UL LISTED ASSEMBLIES MAY HAVE ADDITIONAL REQUIREMENTS NOT LISTED IN DRAWINGS. REFER TO A-0.05 FOR FIRE SEPARATION DIAGRAMS AND CONFIRM CONTINUITY OF ALL EXIT CORRIDORS. 8. GC TO PROVIDE ALLOWANCE FOR FIRESTOPPING ASSEMBLIES PER SECTION 714. 9. RADON MITIGATION SYSTEM TO BE DESIGN/BUILD. SEE PLANS FOR PIPE ROUTING. SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES. 10. REFER TO STRUCTURAL FOR FOUNDATION DETAILS. ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE As indicated A-2.02OVERALL UPPERLEVEL PLANCC DUPLEX11.25.2024LAND USE 790 CASTLE CREEK DRIVE, ASPEN, CO 816111/8" = 1'-0" UPPER LEVEL FLOOR PLAN1 N A-3.01 2 A C A-3.01 1 A-3.01 4 A-3.01 3 2 4 5 6 13 11 Q M S 1 D H I A-3.05 2 12 2 A-4.01 2 A-4.03 2 A-4.02 1 A-4.02 1 A-4.03 1 A-4.01 14 O A-3.04 3 PN FB R 6'-0"4'-0"20'-0"9'-0"25'-0"4'-0" 68'-0"6'-0"15'-10"15'-0"22'-0"58'-10"8° 56'-0"14'-0"14'-0"16'-0"44'-0"6'-0"2'-0"3'-0" 22'-0" 4'-0" 19'-0" A-3.04 1 4 1/2" / 12"4 1/4" / 12"A-3.03 2 A-3.05 1 A-3.04 2 3 A-3.02 1 A-3.02 2 A-3.031 E G GENERAL PLAN NOTES 1. FOR GENERAL NOTES SEE A-0.01. 2. CONTRACTOR TO ESTABLISH PERMANENT BENCHMARK PRIOR TO COMMENCEMENT OF WORK. 3. DO NOT SCALE DIMENSIONS FROM DRAWINGS. 4. DIMENSIONS PROVIDED ON DRAWINGS MEASURE FROM THE FACE OF FRAMING. TYPICAL UNLESS NOTED OTHERWISE. 5. IMMEDIATELY MAKE ARCHITECT AWARE IF ANY DISCREPANCIES ARE DISCOVERED BETWEEN THE ARCHITECTURAL DRAWINGS AND ANY CONSULTANT DRAWINGS. 6. SHEAR WALLS SHOWN FOR COORDINATION PURPOSES ONLY. CONFIRM ALL SHEAR LOCATIONS IN STRUCTURAL DRAWINGS. 7. FIRE RATED UL LISTED ASSEMBLIES MAY HAVE ADDITIONAL REQUIREMENTS NOT LISTED IN DRAWINGS. REFER TO A-0.05 FOR FIRE SEPARATION DIAGRAMS AND CONFIRM CONTINUITY OF ALL EXIT CORRIDORS. 8. GC TO PROVIDE ALLOWANCE FOR FIRESTOPPING ASSEMBLIES PER SECTION 714. 9. RADON MITIGATION SYSTEM TO BE DESIGN/BUILD. SEE PLANS FOR PIPE ROUTING. SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE CODES. 10. REFER TO STRUCTURAL FOR FOUNDATION DETAILS. ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE As indicated A-2.03OVERALL ROOFPLANCC DUPLEX11.25.2024LAND USE 790 CASTLE CREEK DRIVE, ASPEN, CO 816111/8" = 1'-0" ROOF PLAN1 N MAIN LEVEL T.O. PLY 100'-0" UPPER LEVEL T.O. PLY 110'-8 3/4" UPPER ROOF T.O. PLATE 119'-0 3/4" HEIGHT LIMIT (ROOF 1/3) (25') 124'-6" 2456 1 2 A-4.02 CRAWLSPACE 94'-0"8'-4"10'-8 3/4"6'-0"T.O. CONC - GARAGE 99'-6" N.CCN.CCN.CCN.CC 112A110B N.CC N.CC202A S.CC S.CCS.DD S.DD S.DD S.DD 228B 135C 221A 142A 144A S.GG S.GG 3 ACDHI 2 A-4.01 1 A-4.01 F B N.CCN.CCN.CC N.CC N.CC N.AAN.AAN.AAN.AAN.AA 113A 116A S.AA S.AA S.AA S.AA S.CCS.CC S.CCS.CC EG QM S 1 A-4.03 O PN R S.AA S.AA S.AA S.AA S.AA S.AAS.AAS.AA S.CC S.CC S.CCS.CCS.CC N.AA N.AA N.AA N.AA N.AA S.CCS.EE 155A MAIN LEVEL T.O. PLY 100'-0" UPPER LEVEL T.O. PLY 110'-8 3/4" UPPER ROOF T.O. PLATE 119'-0 3/4" HEIGHT LIMIT (ROOF 1/3) (25') 124'-6" 2 4 5 61 2 A-4.02 CRAWLSPACE 94'-0"8'-4"10'-8 3/4"6'-0"T.O. CONC - GARAGE 99'-6" N.AA N.AA N.AA N.AA N.AA N.AAN.BBN.BB 101A N.CC N.CC S.AA S.AA 140A S.CCS.CC S.CC S.CC S.JJS.JJ 3 GENERAL ELEVATION NOTES 1. FOR GENERAL NOTES SEE A-0.0. 2. GRADE SHOWN FOR REFERENCE ONLY. RE: CIVIL AND LANDSCAPE DWGS FOR ADDITIONAL INFORMATION. 3. RE: STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION REGARDING ROOF HEIGHTS. 4. RE: EXTERIOR OPENING SCHEDULED FOR ADDITIONAL INFORMATION AT DOORS AND WINDOWS. 5. RE: FINISH SCHEDULE FOR FINISH INFORMATION. ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE As indicated A-3.01OVERALLEXTERIOR ELEVATIONSCC DUPLEX11.25.2024LAND USE 790 CASTLE CREEK DRIVE, ASPEN, CO 816111/8" = 1'-0" OVERALL EAST ELEVATION3 1/8" = 1'-0" OVERALL NORTH ELEVATION2 1/8" = 1'-0" OVERALL SOUTH ELEVATION4 1/8" = 1'-0" OVERALL WEST ELEVATION1 DNUPUP<<UEUEUEUEUEUEUEUEUEUEUEUE UEUEUEUEUEUEUEUEUEUEUEUE CCCCCCCCCCCCCCCCCCCCCCCCCCCCGGGGGGGGGGGGGGG GGGGGGGGGGGGGGGSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWSWSWSWSWSWSWSWSWSWSWSWSWSWSW S W S W S W SWSWSWSWSWSWSW S W S W S W S SCHEMATICLANDSCAPEPLANL2.00DATE:DRAWN BY:CHECKED BY:ISSUE:HISTORY:BAJSHEET TITLE:COLORADOCOTTAGEFOR PLANNINGPURPOSES ONLYNOT FOR CONSTRUCTION10.29.2024ADDRESS:790 CASTLE CREEKASPEN, CO 81611PARCEL #_____________PSRDATE00.00.2022ISSUE___________STAMP PER DISCIPLINEPITKIN COUNTY STAMPSDRAFT0'5'10'20'SCALE: 1"= 10'-0"NORTHBERMS WITH NATIVE GRASSESEXISTING TREES TO REMAIN, TYP.PROPOSED COLLECTOR PONDSPROPOSED ORNAMENTAL TREESPROPOSEDDUPLEXEXISTING TREES TO REMAIN, TYP.PROPOSED PERENNIAL BEDEXISTING LAWN TO REMAINPROPOSED DRIVEWAYPROPOSED DRIVEWAYEXISTING POND TO REMAINEXISTING DITCH LINE TO REMAINPROPERTY LINEPROPERTY LINE 04.08.2024 790 CASTLE CREEK DRIVE, ASPEN, CO 81611 CC DUPLEX RESIDENTIAL DESIGN STANDARDS Attachment 6 W IN DOW W E L L S I DE W A L K P ATI O CONCRETE RETAINING WALL 3 2 .2' 32.2 '20.1'F F E: 7872 .0 5 20.1'7.0 '12.2'C O N C R E T E 36.4 ' 2 0 .0 '5.6'32.2'2 0 .0'14.4'1 4 .9'7.0'F F E: 7875.3 9 F FE: 7 8 7 4 .70 2 1 .5'30.4'APPROXIMATE SEWER SERVICE 4"CMP4"CMP4"CMP1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 212223 24 25 26 27 28 29 30 31 32 33 34 35 36 3738 39 40 41 42 EEEEEEEEEEEEE E E IN WIRE FENCE LINE ELEVATION: 7871.04 425.0' WITNESS CORNER SET REBAR & 1-1/4" ORANGE PLASTIC CAP LS38215 AT TOP OF BANK 363.8' WITNESS CORNER FOUND REBAR & 1-1/4" YELLOW PLASTIC CAP LS24312 AT TOP OF BANK FOUND REBAR & 1-1/4" YELLOW PLASTIC CAP LS24312 TOP OF BANKGARDEN AREA SHED CONCRETE WOOD RETAINING WALL WIRE FENCE CONCRETE PLANTER POND POND GRAVEL DRIVE GRAVEL DRIVE W O O D D ECK S T E PS STEPSDITCH FLOWLINESWALESWALE G A R A G E 11.8'1 5 .0 ' 5 7 .7 '38.5'9.4'LEAN-TO1 - S T O R Y F R A M E H O U SE & B A S E M E N T 79 0 C AST L E C R E EK D R IV E N89°34'51"W 530.31' (445'±)N08°18'55"W 129.96'BASIS OF BEARINGS (124'±)2 0 '± P A V E D R O A D W A Y S 3 8 ° 4 7 ' 5 9 " E 2 1 9 8 . 6 0 ' RED BUTTE CEMETERY 10' SETBACK 25' SETBACK30' SETBACKTHIS AREA EXCEEDS THE45% SLOPE RANGESWALE78507855786078657 8 7 0 78747 8 7 3 787 2 7 8 7 1 DYHS E G OSWLOT 9 TOTAL AREA 1.332+/- AC. 58,010+/- S.F. AREA BELOW HIGH WATER LINE 0.419+/- AC. 18,267 +/- S.F.SETBACK10'-0"S E T B AC K 2 5 '-0 " S E T B AC K 3 0 '-0 " 7870 DITCH FLOW LINE PROPERTY LINE SETBACK10'-0"PROPERTY LINEPROPERTY LINE 7872 7872 CONRETE PAD SHED WOOD RETAINING WALL WIRE FENCE S E T B AC K 2 5 '-0 " S E T B AC K 3 0 '-0 "SETBACK10'-0"S E T B AC K 2 5 '-0 " S E T B AC K 3 0 '-0 "SETBACK10'-0"ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE 1" = 10'-0" A-1.01EXISTING SITEPLANCC DUPLEX04.18.2024RDS MEETING 790 CASTLE CREEK DRIVE, ASPEN, CO 816111" = 10'-0" EXISTING SITE PLAN1 N 1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 18 19 20 212223 24 25 26 27 28 29 31 32 33 34 35 36 3738 39 40 41 42 UPCASTLE CREEK DRIVESETBACK10'-0"S E T B AC K 2 5 '-0 " S E T B A C K 3 0 '-0 " LOT 9 TOTAL AREA 1.332+/- AC. 58,010+/- S.F. AREA BELOW HIGH WATER LINE 0.419+/- AC. 18,267 +/- S.F.TOP OF BANK7870 7871 DITCH FLOW LINE 100'-0 3/4" 100'-0 3/4" 99'-6" 99'-11" 99'-6" 99'-11" 99'-6" 99'-11" 99'-11" 99'-11" 7872.50 PROPERTY LINE SETBACK10'-0"PROPERTY LINEPROPERTY LINE 7873 7872 7872 7871 7873.06 7872.50 7873.06 GARDEN AREA CONRETE PAD SHED WOOD RETAINING WALL WIRE FENCE N ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE 1" = 10'-0" A-1.02ARCHITECTURAL SITE PLANCC DUPLEX04.18.2024RDS MEETING 790 CASTLE CREEK DRIVE, ASPEN, CO 816111" = 10'-0" ARCHITECTURAL SITE PLAN1 1 2 3 4 5 6 7 8 17 18 23 24 25 26 27 28 29 3132 33 34 35 36 37 38 3940 41 42 UP A-3.01 2 (20% overall UNIT width = 10' min)11'-10 39/256"(RDS) 6'-0" (RDS) 4'-0"50'-8 55/256"3'-0"18'-0"20% of overall UNIT width = 7'-6 min15'-1"27'-8 73/256"23'-0"A-3.01 1 A-3.01 5 A-3.0135'-0"A-3.01 487'-11 201/256"24'-0" 3'-0"18'-0"37'-3 1/2"22'-2 1/2"32'-0"16'-0"32'-3" 15'-5 1/2" 7'-6" 10'-6" 6'-10" 6'-6 1/2" 12'-3"3'-0"4'-0"2'-0"12'-0 1/2"12'-2" 28'-0"21'-0" 36'-3" 56'-0" 60'-0"16'-0"38'-0"SETBACK10'-0"SETBACK 25'-0" SETBACK 30'-0" DITCH FLOW LINE PROPERTY LINE SETBACK10'-0"PROPERTY LINEPROPERTY LINE OUTLINE OF ROOF ABOVE DASHED, TYP.3'-0"4'-0"2'-0"7873.06 100'-0 3/4" T.O.F.F. 7873.06 100'-0 3/4" T.O.F.F. 99'-6" 99'-6" 99'-6" 99'-6" 7872.50 7872.50 99'-11" 99'-11" 99'-11" 99'-11" 99'-11" 99'-11" NORTH UNIT DRIVEWAY SOUTH UNIT DRIVEWAY NORTH UNIT ENTRANCE PATHWAY 4'-0"6'-0" single door with a 1 ft divider inbetween loggia - 6' min, 10' max depth - open two sides may need /want a demacrated pathway connection to strees (d1) entry connection - verify with City of Aspen - may be difficult 2nd loggia - 6' min, 10' max depth N - GARAGE N - M. BATHN - M. BATH N - M. CLST N - MECH N - ENTRY N - LNDRY N - PDR N - SIDE ENTRY N - DINING N - LIVINGN - KITCHEN S - GARAGE S - G. BDRM S - G. BATH S - PDR S - M. BDRM S - BDRM 1 S - BATH S - DEN S - HALL S - LIVING S - DINING S - KITCHEN S - PANTRY S - MUD/LNDRY S - STAIR S - M. BATH S - M. CLST N - STAIR S - ENTRY ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE 1/8" = 1'-0" A-2.01MAIN LEVEL PLANCC DUPLEX04.18.2024RDS MEETING 790 CASTLE CREEK DRIVE, ASPEN, CO 816111/8" = 1'-0" MAIN LEVEL FLOOR PLAN1 N A-3.01 2 A-3.01 1 A-3.01 5 A-3.013 bath clst w/dA-3.01 4 30'-0" 10'-7 1/2"10'-3"16'-0"25'-6"16'-0"50'-0"6'-8"12'-3" 6'-1" 6'-10" 11'-3 1/2" 7'-2 1/2" 5'-5" 50'-0" OUTLINE OF ROOF ABOVE DASHED, TYP. N - DEN N - G. BATH N - G. BDRM N - STAIR S - LOFT S - STAIR S - BDRM 2 S - BATH 3 S - UPPER HALL S - BATH - 2 S - BDRM 3 S - OFFICE S - CLST 32" / 12"5 1/2" / 12"2" / 12"2" /12" 2 1/2"/ 12"2" / 12"4 1/4" / 12"14'-0"ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE 1/8" = 1'-0" A-2.02UPPER LEVELPLANCC DUPLEX04.18.2024RDS MEETING 790 CASTLE CREEK DRIVE, ASPEN, CO 816111/8" = 1'-0" UPPER LEVEL FLOOR PLAN1 N A-3.01 2 A-3.01 1 A-3.01 5 A-3.013 A-3.01 4 2" / 12"2" / 12"9" / 12"9" / 12"5 1/2" / 12"2" / 12"2" /12" 2 1/2" / 12"4 1/4" / 12"9" / 12"9" / 12"9" / 12" 9" /12" 3" / 12" 3" / 12" ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE 1/8" = 1'-0" A-2.03ROOF PLANCC DUPLEX04.18.2024RDS MEETING 790 CASTLE CREEK DRIVE, ASPEN, CO 816111/8" = 1'-0" ROOF PLAN1 N MAIN LEVEL T.O. PLY 100'-0" UPPER LEVEL T.O. PLY 110'-0" ROOF T.O. PLATE 121'-0" HEIGHT LIMIT 125'-0"9 " / 1 2"9" / 1 2" 2 " / 1 2 " 9 " / 1 2 "9" / 1 2" 2" / 12" 9 " / 12 "9" / 1 2" 3" / 12" 3 " / 1 2 " 5 1/2" / 12" MAIN LEVEL T.O. PLY 100'-0" UPPER LEVEL T.O. PLY 110'-0" ROOF T.O. PLATE 121'-0" HEIGHT LIMIT 125'-0" 2 " / 1 2 " MAIN LEVEL T.O. PLY 100'-0" UPPER LEVEL T.O. PLY 110'-0" ROOF T.O. PLATE 121'-0" HEIGHT LIMIT 125'-0" 9 " / 1 2 "9" / 1 2" 4 1/4" / 12" 2 " / 1 2 " 2" / 12" 9" / 1 2"9 " / 1 2 "5 1 /2 " / 1 2 "ISSUE NAME SHEET NUMBER SCALE 970.205.9094 PO BOX 943 CARBONDALE, CO 81623 PROJECT N O T F O R C O N S T R U C T IO N DATE REVISIONS DATE 1/8" = 1'-0" A-3.01EXTERIOR ELEVATIONSCC DUPLEX04.18.2024RDS MEETING 790 CASTLE CREEK DRIVE, ASPEN, CO 816111/8" = 1'-0" OVERALL EAST ELEVATION3 1/8" = 1'-0" OVERALL NORTH ELEVATION2 1/8" = 1'-0" SOUTH ELEVATION - SOUTH UNIT5 1/8" = 1'-0" OVERALL WEST ELEVATION1 1/8" = 1'-0" OVERALL SOUTH ELEVATION4 Crystal River Civil LLC 970.510.5312 Page 1 of 4 790 Castle Creek Drive Engineering Report 11/25/2024 A summary of the existing site conditions and proposed changes for 790 Castle Creek Drive has been performed by Crystal River Civil for City of Aspen County Site Plan Review. This report addresses access, utilities, drainage, grading, as well as overall site design for the proposed conditions. Existing Site The property being reviewed is known as Pitkin County Parcel #273512206001 and is designated as Lot 9 of the Castle Creek Subdivision. The parcel is accessed via Castle Creek Drive, which extends from Cemetery Lane, just northwest of downtown Aspen. Castle Creek Drive borders the western property line, and a developed site is located to the south. The eastern property line follows Castle Creek Right-Of-Way and the Red Butte Cemetery is located to the north of the site. An existing one-story framed, single-family residence, as well as a detached garage and small shed, currently exist on the site. A short, gravel driveway provides access from Castle Creek Drive to the garage. The access enters the property near the southwestern property corner and travels due east towards the existing residence. The residence is centrally located on the parcel. 790 Castle Creek Drive Vicinity Map The western portion of the site is generally flat, with a gradual slope from the west to the east. Steep slopes exist on the eastern portion of the site as the grades descend quickly towards Castle Creek along the eastern property line. There is no existing development within this steep slope Site Attachment 7 Crystal River Civil LLC 970.510.5312 Page 2 of 4 area. An irrigation ditch follows the southern property line that supplies water to two ponds located on the site. One pond is located near the western property line that is supplied by a small irrigation lateral labeled as a “swale” on the survey, that traverses under the gravel driveway via a small culvert. The other pond is located in the backyard of the residence, just east of the structure that is also supplied from an irrigation ditch lateral labeled “swale” on the survey. Each of the ponds appear to have overflow paths that continue off the property. Existing utility infrastructure is in place and currently services the existing structures on the parcel under evaluation. The development ties into a City of Aspen water line within Castle Creek Drive Right-Of-Way. A sewer service exits the site towards the northwest property corner and ties into the Aspen Consolidated Sanitation District main under Castle Creek Drive as well. A Holy Cross Energy electric transformer is located near the southwest property corner on the neighboring property. The development utilizes a Black Hills Energy gas service, which ties into the gas main located within the Castle Creek Drive Right-Of-Way. A communications pedestal is located next to the electric transformer in the southwest property corner, which is utilized for the existing development. For information regarding the existing conditions, please refer to the survey that has been included with this application. Proposed Site The scope of the project includes the development of a two-unit, residential structure. The existing residential structure will be demolished as part of the project. The pond to the west will be filled in and the pond to the east will be reconfigured. Each of the proposed residential units includes a separate access, garage, patios layout, and landscaping. The structure is split into a southern and northern unit, as shown on the included land use drawings with this submission package. Each residential unit includes separate utility infrastructure to service the respective units, as well as a combined stormwater management system that will meet the City of Aspen drainage code. Please refer to the land use drawings in conjunction to this engineering report. Access The southern unit’s access is a 60 foot long concrete driveway that transitions off of Castle Creek Drive and extends east to the southern portion of the structure. The twelve foot wide access descends between 2.0% and 3.5% until it reaches the auto court. As the driveway approaches the structure, it expands to the north in order to transition to the proposed garage location. The entirety of the driveway and autocourt are to be collected by a centrally located inlet and drain basin, which conveys stormwater to the onsite stormwater detention system. All slopes tie into existing grade from the driveway and do not exceed 3:1 slopes. This proposed design meets the City of Aspen requirements for residential access. Crystal River Civil LLC 970.510.5312 Page 3 of 4 The northern unit’s driveway extends off of Castle Creek Drive near the northwestern property corner and extends roughly 100 feet to the east. As the driveway approaches the residence, it expands to the south to transition into the proposed garage. The driveway continues further east to accommodate additional turning room and a potential parking space. A center drain is proposed in the northeast corner of the auto court, which will convey the stormwater collected off the driveway and auto court to the onsite stormwater detention system. Drainage All stormwater affected by the development shall be captured, detained and treated on site to meet the City of Aspen drainage requirements. The concept of the drainage for the site is to collect all impervious areas, including the structure, patios, walkways, auto courts and the driveways around the residence with a series of swales, inlets, downspout tie ins, and pipes. This system will convey the stormwater to a drywell located in the landscaping to the east of the structure. Stormwater volumes for the 100-year, 1-hour storm event shall be determined utilizing the FAA method and will provide the necessary detention on site. The drywell shall release the pre- developed, historic runoff rate of the captured drainage basin, using the calculation from the FAA Rational Method. Detention basin calculations and storage volumes will be included in the building permit submittal. All conveyance structures will have capacity for a 100-year, 1-hour storm event, as defined in the City of Aspen Urban Runoff Management Plan (URMP). Utilities Water – The existing water service will be abandoned as per City of Aspen Water Department Standards. The proposed service for each unit will extend off the water main located underneath Castle Creek Drive and will extend up the south unit’s access. Sizing will be determined for Building Permit. All water service lines shall be Type-K Copper. Sanitary – The existing service and wye will be abandoned as per Aspen Consolidated Sanitation District standards. Two services will extend from the proposed structure to the northwest and wye into the sewer main under Castle Creek Drive. The services shall each be four-inch SDR-26 and sloped at minimum 2.0% towards the tie in at the sewer main. Electric – The existing service will be abandoned, and two proposed services will extend from the existing transformer up to the southwest corner of the garage. Transformer capacity and the proposed loads for the development will be determined for building permit in coordination with Holy Cross Energy. Gas – The existing service to the residence will be abandoned and two proposed services will extend from the main in the Right-Of-Way up the driveway and will transition into the west side of the residence. Crystal River Civil LLC 970.510.5312 Page 4 of 4 Telephone and Communications – Existing communication services will be abandoned, and new services will extend from the pedestal up to the northeast corner of the garage. If there are any questions regarding this analysis or concerns regarding the site design, feel free to contact me directly. Jay Engstrom Owner and Principal Engineer, P.E. Crystal River Civil, LLC jay@crystalrivercivil.com (970) 510 - 5312 XSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXUEXUEX U E X U E XU E XU E XU E XU E XU E XU E X U E X U E X U E XCXCX CXCXCXCXCXCXCXCXCXCXCXCXCXCXCXCXC XC XC XC XCXT XTXTXTXTXT XTXTXTXTXTXTXTX T X T XT XT XTXTXTXTXTX T X T X T X T XGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXGXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXTXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXUEXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXWXUEXWXWXWXWXWXWXWXSSXSSEGXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSSXSS<<UEUEUEUEUEUEUEUEUEUEUEUE UE UEUEUEUEUEUEUEUEUEUEUECCCCCCCCCCCCCCCCCCCCCCCCCCCCG GGGGGGGGGGGGGGGGGGGGGGGGGGGGGSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWSWSWSWSWSWSWSWSWSWSWSWSWSWSW S WS W S W SWSWSWSWSWSWSW S W S W S W S D787178727872787278737873 7873787278737873 78737 8 7 2 7872787178717871 78707870 7871787078717872787278717871787078727872787078 6 9 786 8 Abandon Existing Sewer Service WyeAs Per Aspen Consolidated Sanitation DistrictAbandon Existing Electric Service In PlaceCommon Trench Communications AlongsidePrimary Electric LineAbandon Existing Sewer ServiceAbandon Existing Water Service TapAs Per City Of Aspen Water Department StandardsContact City Of Aspen Prior To AbandonmentAbandon Existing Gas StubAs Per Black Hills EnergyTie Proposed Gas Stub Into Existing Main Line(2) Proposed Electric Service64 Linear Feet Of 2" ConduitInstall As Per Holy Cross Energy Standards(2) Install 2" Water Service Tap As PerCity Of Aspen Water Department StandardsMaintain 18" of Separation Between All Fittings(2) Install Water Line Curb StopAt Property Line(2) Proposed Water Service Install As City of Aspen Water Department23 Linear Feet of 2" Type K CopperFrom Service Tap to Curb Stop(2) Proposed Water Service Install As Per City of Aspen Water Department56 Linear Feet of 2" Type K CopperFrom Curb Stop to Residence(2) 77' Linear Feet of Gas Service LineSize and Material To Be DeterminedBy Black Hills Energy(2) Communications Service69 Linear Feet of 2" ConduitInstall As Per Utility ProviderTie Electric Service Into Existing TransformerInspect and Verify Capacity Prior to ConstructionTie Proposed Communications ServiceInto Existing Communications PedestalAbandon Existing Gas Service(2) Install Sanitary Wye At Sanitary Sewer Main As Per AspenConsolidated Sanitation District Standards. Contractor ToVerify Locations Prior To Construction(2) 46 Linear Feet of 4" SDR-26 PVC Sanitary Sewer ServiceMaintain Minimum 2% Slope and 7' of Cover Over Service(2) Install Bi-Directional Cleanout(2) 13 Linear Feet of 4" SDR-26 PVC Sanitary Sewer ServiceMaintain Minimum 2% Slope and 7' of Cover Over ServiceProperty Line30' Easement25' Easement10' EasementProposed ResidenceSouth UnitProposed ResidenceNorth UnitAbandon ExistingWater Service LineAbandon Existing Communications ServiceOf 4 Pages01 Land Use 11.25.2024 WJE #Description Date Drawn By 790 Castle Creek Drive Aspen, Colorado 81611 1101 Village Road, Unit UL-3CCarbondale, CO 81623(970) 510 - 5312JKE Reviewed By Not For ConstructionJob #: 39.24020NSWEDrawing ScaleUnits (Feet) 1" = 10'10C.01Utilities <<D7871787278727872787378737873 790 Castle Creek DriveProposed Residence - South UnitMain Level F.F.E. - 7872.90Garage F.F.E. - 7872.33790 Castle Creek DriveProposed Residence -North UnitMain Level F.F.E. - 7872.90Garage F.F.E. - 7872.332.0%TOW:72.83BOW:70.14TOW:71.9772.2972.3372.6972.33BOS:72.33F.F.E. - 72.33TOW:72.78TOS:72.78Inlet:72.04F.F.E. - 72.90Property Line25' Setback30' SetbackCastle Creek Drive Right-Of-Way20' Paved Road Existing TreesSee Tree Removal Plan For Demolitionand Protection of Existing TreesProposed PorchElev:7872.9072.3372.3372.332.0%3.0%5.0%3.0%2.0%2.0%72.3372.2472.332.0%72.90BOS:72.331 - 5.4" StepStone Paver PatioTOS:72.78Proposed Center DrainCollects DrivewayF.F.E. - 72.33EX:73.34EX:73.02Landscape Planter72.6772.8073.28EX:73.72EX:73.1573.2872.4572.7972.0371.82EX:71.79EX:71.5771.9272.795.0%2.0%BOW:70.28Retaining WallMax. Height 30"Transition To Existing GradeMaintain 6" Curb Above Pavement2.5% 4.5%2.5%10' SetbackBOW:70.12TOW:72.28BOW:70.43TOW:72.7570.9670.9270.6270.3871.0071.3271.3171.5271.5272.9072.9072.9072.9072.9072.9072.9072.9072.7272.753.0:16.0%2.0%6.0%2.0%787278737873 78737872 7872787178717871 78707870 787178707871787278727871787178707872787272.90Proposed PorchElev: 7872.90Stone Paver PorchInlet:71.42BOW:70.7078707865 7860 7855 7850 7845 7840 7835 783 0 782 5 782 0 78 6 9 786 810' Setback100' Stream SetbackExisting PondTo Be ReconfiguredExisting ShedTo Be RemovedFlowline2.0%Stormwater DetentionProposed DrywellSized For A 100-Year 1-Hour Storm Event5' Dia. 14.5' Deep - Size To BeFinalized For Permit SetCovered DeckF.F.E. - 72.9072.421 - 5.7" StepExisting Top Of SlopeMaintain Existing Ditch Flow Line72.33Existing PondTo Be Removed72.33Existing GardenTo Be RemovedStone Paver Patio72.9072.8072.82Note: Spot ElevationsAlong DeckingReflects GradesBelow DeckProposed FootprintOf Reconfigured PondsRoof Overhang5.0%Paver WalkwayOf 4 Pages01 Land Use 11.25.2024 WJE #Description Date Drawn By 790 Castle Creek Drive Aspen, Colorado 81611 1101 Village Road, Unit UL-3CCarbondale, CO 81623(970) 510 - 5312JKE Reviewed By Not For ConstructionJob #: 39.24020NSWEDrawing ScaleUnits (Feet) 1" = 10'10C.02Grading and Drainage <<<<0 00 1 00 1 13PC: 0+13.03PT: 0+28.74Start N. Unit AccessSTA:0+00.00N:1501341.73E:2622764.72End N. Unit AccessSTA:1+12.76N:1501361.31E:2622871.37Sta:0+10.54Off:6.00'LElev:7871.91Sta:0+05.72Off:9.00'LElev:7871.57Sta:0+08.78Off:6.00'RElev:7871.82Sta:0+05.00Off:0.00'Elev:7871.63Sta:0+02.98Off:9.00'RElev:7871.79Sta:0+57.37Off:6.00'RElev:7872.29Sta:0+62.35Off:10.53'RElev:7872.30Sta:0+62.41Off:11.19'RElev:7872.33Sta:0+61.87Off:10.24'LElev:7872.28Sta:0+56.93Off:6.00'LElev:7872.30Sta:0+62.59Off:14.91'LElev:7872.28Sta:1+02.55Off:8.77'LElev:7871.47End AccessSta:1+03.37Off:0.00'Elev:7871.74Sta:1+03.50Off:1.33'RElev:7871.78Sta:0+88.84Off:2.70'RElev:7871.87N42° 35' 11.04"E13.03'N87° 35' 11.04"E84.02'L=15.708,R=20.000D=45.0000790 Capitol Creek RdNorth UnitF.F.E. - 7872164546Sta:0+89.32Off:8.68'RElev:7872.33North Unit GarageF.F.E. - 7872.332.0%2.0%5.0%Center DrainSta:1+01.38Off:7.76'LElev:7871.42Concrete Retaining WallMax. Height - 30"787178727872787225' Setback25' SetbackExisting Structure12'2.0%R5.00R5.007872787178717871 78707871787078723.003.00GarageSta:0+75.86Off:9.94'RElev:7872.33Sta:0+30.15Off:0.00'Elev:7872.83Paver WalkwayCovered Entryway DeckRoof OverhangN. Unit Access ProfileHorizontal Scale: 1"=5'Vertical Scale: 1"=5'78707880787078800+20EG 7871.1 FG 7872.38 0+40EG 7871.8 FG 7872.81 0+60EG FG 7872.29 0+80EG 7870.2 FG 7872.23 1+00EG 7870.1 FG 7871.80 5.00%-2.00%1.18%Start N. Unit Access = 0+05.00ELEV = 7871.632 End S. Unit Access = 0+93.51 ELEV = 7872.330 PVI STA: 0+74.94PVI ELEV: 7872.11K: 2.75LVC: 8.76BVCS: 0+70.56 BVCE: 7872.20 EVCS: 0+79.32 EVCE: 7872.16LOW PT. STA: 0+76.06LOW PT ELEV: 7872.14PVI STA: 0+31.82PVI ELEV: 7872.97K: 1.72LVC: 12.01BVCS: 0+25.82BVCE: 7872.67 EVCS: 0+37.83 EVCE: 7872.85HIGH PT. STA: 0+34.40HIGH PT ELEV: 7872.89Property LineOf 4 Pages01 Land Use 11.25.2024 WJE #Description Date Drawn By 790 Castle Creek Drive Aspen, Colorado 81611 1101 Village Road, Unit UL-3CCarbondale, CO 81623(970) 510 - 5312JKE Reviewed By Not For ConstructionJob #: 39.24010NSWEDrawing ScaleUnits (Feet) 1" = 5'5C.03N. Unit Access Plan and Profile 0 00 0 81Start South Unit AccessSTA:0+00.00N:1501264.51E:2622779.83End South Unit AccessSTA:0+81.38N:1501274.58E:2622860.58Sta:0+10.00Off:9.00'LElev:7873.19Sta:0+10.00Off:9.00'RElev:7873.60Start AccessSta:0+10.00Off:0.00'Elev:7873.38Sta:0+15.00Off:6.00'LElev:7873.28Sta:0+15.00Off:6.00'RElev:7873.28Sta:0+34.65Off:6.00'RElev:7872.80Sta:0+38.61Off:10.55'RElev:7872.67Sta:0+38.08Off:14.43'RElev:7873.34Sta:0+50.64Off:16.22'RElev:7873.02Sta:0+50.71Off:15.74'RElev:7872.95Sta:0+55.18Off:12.34'RElev:7872.45Sta:0+69.64Off:14.21'RElev:7872.36End AccessSta:0+71.38Off:0.00'Elev:7872.24Sta:0+71.97Off:4.58'LElev:7872.24Sta:0+76.23Off:4.03'LElev:7872.33Sta:0+77.79Off:16.13'LElev:7872.33Sta:0+46.41Off:15.78'LElev:7872.33Sta:0+46.43Off:14.09'LElev:7872.35Sta:0+38.43Off:6.00'LElev:7872.692.0%3.0%3.0%1.8%2.5%1.9%790 Castle CreekSouth UnitF.F.E. - 785321321311South Unit GarageF.F.E. - 7872.33Property Line10' SetbackCapitol Creek Rd Stone Paver Entryway Patio25' Setback30' SetbackLandscape Planter12'Concrete AutocourtCenter DrainSta:0+60.10Off:0.00'LElev:7872.0478737873 7873R4.00R4.00R8.00787278737873 78737872 78717871787278727872N82° 53' 15.59"E81.38'3.00GarageSta:0+62.10Off:15.95'LElev:7872.33Property LineSta:0+21.49Off:0.00'Elev:7873.15Roof OverhangSouth Unit Access ProfileHorizontal Scale: 1"=5'Vertical Scale: 1"=5'78707880787078800+20EG 7873.1 FG 7873.18 0+40EG 7872.9 FG 7872.64 0+60EG 7872.6 FG 7872.04 0+80EG 7872.3 FG -2.00%-3.00%1.81%Start S. Unit Access = 0+10.00ELEV = 7873.377 End N. Unit Access = 0+71.38 ELEV = 7872.244 PVI STA: 0+26.56PVI ELEV: 7873.05K: 5.00LVC: 4.99BVCS: 0+24.07 BVCE: 7873.10 EVCS: 0+29.06 EVCE: 7872.97Property LineOf 4 Pages01 Land Use 11.25.2024 WJE #Description Date Drawn By 790 Castle Creek Drive Aspen, Colorado 81611 1101 Village Road, Unit UL-3CCarbondale, CO 81623(970) 510 - 5312JKE Reviewed By Not For ConstructionJob #: 39.24Drawing ScaleUnits (Feet) 1" = 5'0510NSWEC.04S. Unit Access Plan and Profile Attachment 8 Customer Distribution Prevent fraud - Please call a member of our closing team for wire transfer instructions or to initiate a wire transfer. Note that our wiring instructions will never change. Order Number: Q62016849-3 Date: 01/09/2025 Property Address: 790 CASTLE CREEK DR, ASPEN, CO 81611 For Closing Assistance For Title Assistance Land Title Roaring Fork Valley Title Team 533 E HOPKINS #102 ASPEN, CO 81611 (970) 927-0405 (Work) (970) 925-0610 (Work Fax) valleyresponse@ltgc.com Seller/Owner JAMES M CERISE Delivered via: No Commitment Delivery RAWLEY DESIGN PLANNING LLC Attention: PATRICK RAWLEY 39 QUAIL RUN CARBONDALE, CO 81623 (970) 920-1628 (Cell) (970) 925-2323 (Work) (970) 920-1628 (Work Fax) patrick@rawleydesignplan.com Delivered via: Electronic Mail Attachment 9 Estimate of Title Fees Order Number: Q62016849-3 Date: 01/09/2025 Property Address: 790 CASTLE CREEK DR, ASPEN, CO 81611 Seller(s): VIRGINIA R. CERISE AS THE PERSONAL REPRESENTATIVE OF THE ESTATE OF MARTIN J. CERISE AND CAROLYN BARABE AND JAMES M. CERISE Buyer(s): TO BE DETERMINED Thank you for putting your trust in Land Title. Below is the estimate of title fees for the transaction. The final fees will be collected at closing. Visit ltgc.com to learn more about Land Title. Estimate of Title Insurance Fees "TBD" Commitment $265.00 TBD - TBD Income $-132.50 TBD - TBD Income $-132.50 TOTAL $0.00 Note: The documents linked in this commitment should be reviewed carefully. These documents, such as covenants conditions and restrictions, may affect the title, ownership and use of the property. You may wish to engage legal assistance in order to fully understand and be aware of the implications of the documents on your property. Chain of Title Documents: Pitkin county recorded 07/17/1956 under reception no. 104059 at book 172 page 533 Pitkin county recorded 05/05/1981 under reception no. 232610 at book 408 page 8 Pitkin county recorded 03/23/1995 under reception no. 379981 at book 777 page 4 Pitkin county recorded 06/28/1995 under reception no. 382754 at book 785 page 156 Pitkin county recorded 08/12/1996 under reception no. 395858 Pitkin county recorded 01/04/2000 under reception no. 439171 Pitkin county recorded 01/04/2000 under reception no. 439172 Pitkin county recorded 06/25/2003 under reception no. 484558 Plat Map(s): Pitkin county recorded 03/02/1955 at book 2A page 177 Copyright 2006-2025 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. Property Address: 790 CASTLE CREEK DR, ASPEN, CO 81611 1.Effective Date: 12/27/2024 at 5:00 P.M. 2.Policy to be Issued and Proposed Insured: "TBD" Commitment Proposed Insured: TO BE DETERMINED $0.00 3.The estate or interest in the land described or referred to in this Commitment and covered herein is: FEE SIMPLE 4.Title to the estate or interest covered herein is at the effective date hereof vested in: VIRGINIA R. CERISE AS THE PERSONAL REPRESENTATIVE OF THE ESTATE OF MARTIN J. CERISE AND CAROLYN BARABE AND JAMES M. CERISE 5.The Land referred to in this Commitment is described as follows: LOT 9, ​ CASTLE CREEK SUBDIVISION,​ AS SHOWN ON THE PLAT RECORDED MARCH 2, 1955 IN DITCH BOOK 2A AT PAGE 177. ​ COUNTY OF PITKIN, STATE OF COLORADO. ALTA COMMITMENT Old Republic National Title Insurance Company Schedule A Order Number:Q62016849-3 ALTA COMMITMENT Old Republic National Title Insurance Company Schedule B, Part I (Requirements) Order Number: Q62016849-3 All of the following Requirements must be met: This proposed Insured must notify the Company in writing of the name of any party not referred to in this Commitment who will obtain an interest in the Land or who will make a loan on the Land. The Company may then make additional Requirements or Exceptions. Pay the agreed amount for the estate or interest to be insured. Pay the premiums, fees, and charges for the Policy to the Company. Documents satisfactory to the Company that convey the Title or create the Mortgage to be insured, or both, must be properly authorized, executed, delivered, and recorded in the Public Records. 1.EVIDENCE SATISFACTORY TO THE COMPANY THAT THE TERMS, CONDITIONS AND PROVISIONS OF THE CITY OF ASPEN TRANSFER TAX HAVE BEEN SATISFIED. 2.PROVIDE LAND TITLE GUARANTEE COMPANY WITH A CURRENT IMPROVEMENT SURVEY PLAT OF SUBJECT PROPERTY. THIS REQUIREMENT IS NECESSARY TO ISSUE DELETIONS. UPON REVIEW, ADDITIONAL REQUIREMENTS AND/OR EXCEPTIONS MAY BE NECESSARY. NOTE: ANY MATTERS DISCLOSED BY SAID IMPROVEMENT SURVEY PLAT WILL BE REFLECTED ON SAID POLICY(S) TO BE ISSUED HEREUNDER. NOTE: LAND TITLE IS NOT RESPONSIBLE FOR ORDERING SAID IMPROVEMENT SURVEY PLAT. 3.COPY OF LETTERS CERTIFIED BY A COLORADO COURT EVIDENCING THE APPOINTMENT OF A PERSONAL REPRESENTATIVE IN THE ESTATE OF MARTIN J. CERISE, DECEASED. (MUST BE CERTIFIED WITHIN THE LAST YEAR) 4.RECORD PERSONAL REPRESENTATIVES DEED FROM ______, AS PERSONAL REPRESENTATIVE OF THE ESTATE OF MARTIN J. CERISE, DECEASED TO TO BE DETERMINED. 5.WARRANTY DEED FROM JAMES M. CERISE AND CAROLYN BARABE TO TO BE DETERMINED CONVEYING SUBJECT PROPERTY. THIS COMMITMENT IS FOR INFORMATION ONLY, AND NO POLICY WILL BE ISSUED PURSUANT HERETO. This commitment does not republish any covenants, condition, restriction, or limitation contained in any document referred to in this commitment to the extent that the specific covenant, conditions, restriction, or limitation violates state or federal law based on race, color, religion, sex, sexual orientation, gender identity, handicap, familial status, or national origin. 1.Any facts, rights, interests, or claims thereof, not shown by the Public Records but that could be ascertained by an inspection of the Land or that may be asserted by persons in possession of the Land. 2.Easements, liens or encumbrances, or claims thereof, not shown by the Public Records. 3.Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that would be disclosed by an accurate and complete land survey of the Land and not shown by the Public Records. 4.Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed by law and not shown by the Public Records. 5.Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the effective date hereof but prior to the date of the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this Commitment. 6.(a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records. 7.(a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water. 8.RIGHT OF THE PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE THEREFROM, SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES HEREBY GRANTED, AND A RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE UNITED STATES, AS RESERVED IN UNITED STATES PATENT RECORDED OCTOBER 27, 1892 IN BOOK 55 AT PAGE 32 AND RECORDED DECEMBER 3, 1892 IN BOOK 55 AT PAGE 35 AND RECORDED JUNE 16, 1894 IN BOOK 55 AT PAGE 45. 9.TERMS, EASEMENTS, RIGHTS OF WAY AND ALL OTHER MATTERS AS CONTAINED IN PLAT RECORDED MARCH 5, 1955 IN PLAT BOOK 2A AT PAGE 177 AND CORRECTION PLAT RECORDED NOVEMBER 18, 1957 IN PLAT BOOK 2A AT PAGE 241. 10.TERMS, CONDITIONS AND PROVISIONS OF WATER AGREEMENT RECORDED AUGUST 22, 1955 IN BOOK 180 AT PAGE 401 AND RATIFICATION OF AGREEMENT RECORDED FEBRUARY 2, 1959 IN BOOK 186 AT PAGE 465 AND AGREEMENT RECORDED NOVEMBER 19, 1958 IN BOOK 186 AT PAGE 34, WHICH WAS CONVEYED TO THE CITY OF ASPEN BY CONVEYANCE RECORDED JANUARY 27, 1970 IN BOOK 246 AT PAGE 395 AND MAINTENANCE AGREEMENT RECORDED AUGUST 26, 1980 IN BOOK 393 AT PAGE 695 AND AMENDMENT RECORDED FEBRUARY 21, 2013 AS RECEPTION NO. 597137. 11.TERMS, CONDITIONS AND PROVISIONS OF UNILATERAL AGREEMENT FOR UNDERGROUND CONVERSION OF SECONDARY SERVICE RECORDED MARCH 30, 1992 IN BOOK 673 AT PAGE 106. 12.TERMS, CONDITIONS, PROVISIONS AND OBLIGATIONS OF FENCE LINE AGREEMENT AND LICENSE AGREEMENT RECORDED OCTOBER 18, 2012 AS RECEPTION NO. 593195. 13.TERMS, CONDITIONS, PROVISIONS AND OBLIGATIONS OF RESOLUTION BY THE PITKIN COUNTY BOARD OF COUNTY COMMISSIONERS RECORDED SEPTEMBER 9, 2020 AS RECEPTION NO. 667951. ALTA COMMITMENT Old Republic National Title Insurance Company Schedule B, Part II (Exceptions) Order Number: Q62016849-3 14.ANY QUESTION, DISPUTE OR ADVERSE CLAIMS AS TO ANY LOSS OR GAIN OF LAND AS A RESULT OF ANY CHANGE IN THE RIVER BED LOCATION BY NATURAL OR OTHER THAN NATURAL CAUSES, OR ALTERATION THROUGH ANY CAUSE, NATURAL OR UNNATURAL, OF THE CENTER THREAD, BANK, CHANNEL OR FLOW OF WATERS IN THE CASTLE CREEK LYING WITHIN SUBJECT LAND; AND ANY QUESTION AS TO THE LOCATION OF SUCH CENTER THREAD, BED, BANK OR CHANNEL AS A LEGAL DESCRIPTION MONUMENT OR MARKER FOR PURPOSES OF DESCRIBING OR LOCATING SUBJECT LANDS. ALTA COMMITMENT Old Republic National Title Insurance Company Schedule B, Part II (Exceptions) Order Number: Q62016849-3 Land Title Guarantee Company Disclosure Statements Note: Pursuant to CRS 10-11-122, notice is hereby given that: Note: Effective September 1, 1997, CRS 30-10-406 requires that all documents received for recording or filing in the clerk and recorder's office shall contain a top margin of at least one inch and a left, right and bottom margin of at least one half of an inch. The clerk and recorder may refuse to record or file any document that does not conform, except that, the requirement for the top margin shall not apply to documents using forms on which space is provided for recording or filing information at the top margin of the document. Note: Colorado Division of Insurance Regulations 8-1-2 requires that "Every title entity shall be responsible for all matters which appear of record prior to the time of recording whenever the title entity conducts the closing and is responsible for recording or filing of legal documents resulting from the transaction which was closed". Provided that Land Title Guarantee Company conducts the closing of the insured transaction and is responsible for recording the legal documents from the transaction, exception number 5 will not appear on the Owner's Title Policy and the Lenders Policy when issued. Note: Affirmative mechanic's lien protection for the Owner may be available (typically by deletion of Exception no. 4 of Schedule B, Section 2 of the Commitment from the Owner's Policy to be issued) upon compliance with the following conditions: No coverage will be given under any circumstances for labor or material for which the insured has contracted for or agreed to pay. Note: Pursuant to CRS 10-11-123, notice is hereby given: The Subject real property may be located in a special taxing district.(A) A certificate of taxes due listing each taxing jurisdiction will be obtained from the county treasurer of the county in which the real property is located or that county treasurer's authorized agent unless the proposed insured provides written instructions to the contrary. (for an Owner's Policy of Title Insurance pertaining to a sale of residential real property). (B) The information regarding special districts and the boundaries of such districts may be obtained from the Board of County Commissioners, the County Clerk and Recorder, or the County Assessor. (C) The land described in Schedule A of this commitment must be a single family residence which includes a condominium or townhouse unit. (A) No labor or materials have been furnished by mechanics or material-men for purposes of construction on the land described in Schedule A of this Commitment within the past 6 months. (B) The Company must receive an appropriate affidavit indemnifying the Company against un-filed mechanic's and material-men's liens. (C) The Company must receive payment of the appropriate premium.(D) If there has been construction, improvements or major repairs undertaken on the property to be purchased within six months prior to the Date of Commitment, the requirements to obtain coverage for unrecorded liens will include: disclosure of certain construction information; financial information as to the seller, the builder and or the contractor; payment of the appropriate premium fully executed Indemnity Agreements satisfactory to the company, and, any additional requirements as may be necessary after an examination of the aforesaid information by the Company. (E) This notice applies to owner's policy commitments disclosing that a mineral estate has been severed from the surface estate, in Schedule B-2. Note: Pursuant to CRS 10-1-128(6)(a), It is unlawful to knowingly provide false, incomplete, or misleading facts or information to an insurance company for the purpose of defrauding or attempting to defraud the company. Penalties may include imprisonment, fines, denial of insurance, and civil damages. Any insurance company or agent of an insurance company who knowingly provides false, incomplete, or misleading facts or information to a policyholder or claimant for the purpose of defrauding or attempting to defraud the policyholder or claimant with regard to a settlement or award payable from insurance proceeds shall be reported to the Colorado Division of Insurance within the Department of Regulatory Agencies. Note: Pursuant to Colorado Division of Insurance Regulations 8-1-3, notice is hereby given of the availability of a closing protection letter for the lender, purchaser, lessee or seller in connection with this transaction. Note: Pursuant to CRS 24-21-514.5, Colorado notaries may remotely notarize real estate deeds and other documents using real-time audio-video communication technology. You may choose not to use remote notarization for any document. That there is recorded evidence that a mineral estate has been severed, leased, or otherwise conveyed from the surface estate and that there is substantial likelihood that a third party holds some or all interest in oil, gas, other minerals, or geothermal energy in the property; and (A) That such mineral estate may include the right to enter and use the property without the surface owner's permission. (B) Joint Notice of Privacy Policy of Land Title Guarantee Company Land Title Insurance Corporation and Old Republic National Title Insurancy Company This Statement is provided to you as a customer of Land Title Guarantee Company as agent for Land Title Insurance Corporation and Old Republic National Title Insurance Company. We want you to know that we recognize and respect your privacy expectations and the requirements of federal and state privacy laws. Information security is one of our highest priorities. We recognize that maintaining your trust and confidence is the bedrock of our business. We maintain and regularly review internal and external safeguards against unauthorized access to your non-public personal information ("Personal Information"). In the course of our business, we may collect Personal Information about you from: applications or other forms we receive from you, including communications sent through TMX, our web-based transaction management system; your transactions with, or from the services being performed by us, our affiliates, or others; a consumer reporting agency, if such information is provided to us in connection with your transaction; and The public records maintained by governmental entities that we obtain either directly from those entities, or from our affiliates and non-affiliates. Our policies regarding the protection of the confidentiality and security of your Personal Information are as follows: We restrict access to all Personal Information about you to those employees who need to know that information in order to provide products and services to you. We may share your Personal Information with affiliated contractors or service providers who provide services in the course of our business, but only to the extent necessary for these providers to perform their services and to provide these services to you as may be required by your transaction. We maintain physical, electronic and procedural safeguards that comply with federal standards to protect your Personal Information from unauthorized access or intrusion. Employees who violate our strict policies and procedures regarding privacy are subject to disciplinary action. We regularly assess security standards and procedures to protect against unauthorized access to Personal Information. WE DO NOT DISCLOSE ANY PERSONAL INFORMATION ABOUT YOU WITH ANYONE FOR ANY PURPOSE THAT IS NOT STATED ABOVE OR PERMITTED BY LAW. Consistent with applicable privacy laws, there are some situations in which Personal Information may be disclosed. We may disclose your Personal Information when you direct or give us permission; when we are required by law to do so, for example, if we are served a subpoena; or when we suspect fraudulent or criminal activities. We also may disclose your Personal Information when otherwise permitted by applicable privacy laws such as, for example, when disclosure is needed to enforce our rights arising out of any agreement, transaction or relationship with you. Our policy regarding dispute resolution is as follows: Any controversy or claim arising out of or relating to our privacy policy, or the breach thereof, shall be settled by arbitration in accordance with the rules of the American Arbitration Association, and judgment upon the award rendered by the arbitrator(s) may be entered in any court having jurisdiction thereof. Commitment For Title Insurance Issued by Old Republic National Title Insurance Company NOTICE IMPORTANT—READ CAREFULLY: THIS COMMITMENT IS AN OFFER TO ISSUE ONE OR MORE TITLE INSURANCE POLICIES. ALL CLAIMS OR REMEDIES SOUGHT AGAINST THE COMPANY INVOLVING THE CONTENT OF THIS COMMITMENT OR THE POLICY MUST BE BASED SOLELY IN CONTRACT. THIS COMMITMENT IS NOT AN ABSTRACT OF TITLE, REPORT OF THE CONDITION OF TITLE, LEGAL OPINION, OPINION OF TITLE, OR OTHER REPRESENTATION OF THE STATUS OF TITLE. THE PROCEDURES USED BY THE COMPANY TO DETERMINE INSURABILITY OF THE TITLE, INCLUDING ANY SEARCH AND EXAMINATION, ARE PROPRIETARY TO THE COMPANY, WERE PERFORMED SOLELY FOR THE BENEFIT OF THE COMPANY, AND CREATE NO EXTRACONTRACTUAL LIABILITY TO ANY PERSON, INCLUDING A PROPOSED INSURED. THE COMPANY’S OBLIGATION UNDER THIS COMMITMENT IS TO ISSUE A POLICY TO A PROPOSED INSURED IDENTIFIED IN SCHEDULE A IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THIS COMMITMENT. THE COMPANY HAS NO LIABILITY OR OBLIGATION INVOLVING THE CONTENT OF THIS COMMITMENT TO ANY OTHER PERSON. . COMMITMENT TO ISSUE POLICY Subject to the Notice; Schedule B, Part I—Requirements; Schedule B, Part II—Exceptions; and the Commitment Conditions, Old Republic National Title Insurance Company, a Minnesota corporation (the “Company”), commits to issue the Policy according to the terms and provisions of this Commitment. This Commitment is effective as of the Commitment Date shown in Schedule A for each Policy described in Schedule A, only when the Company has entered in Schedule A both the specified dollar amount as the Proposed Policy Amount and the name of the Proposed Insured. If all of the Schedule B, Part I—Requirements have not been met within 6 months after the Commitment Date, this Commitment terminates and the Company’s liability and obligation end. COMMITMENT CONDITIONS 1. DEFINITIONS 2. If all of the Schedule B, Part I—Requirements have not been met within the time period specified in the Commitment to Issue Policy, Commitment terminates and the Company’s liability and obligation end. 3. The Company’s liability and obligation is limited by and this Commitment is not valid without: 4. COMPANY’S RIGHT TO AMEND The Company may amend this Commitment at any time. If the Company amends this Commitment to add a defect, lien, encumbrance, adverse claim, or other matter recorded in the Public Records prior to the Commitment Date, any liability of the Company is limited by Commitment Condition 5. The Company shall not be liable for any other amendment to this Commitment. 5. LIMITATIONS OF LIABILITY i. comply with the Schedule B, Part I—Requirements; ii. eliminate, with the Company’s written consent, any Schedule B, Part II—Exceptions; or iii. acquire the Title or create the Mortgage covered by this Commitment. 6. LIABILITY OF THE COMPANY MUST BE BASED ON THIS COMMITMENT “Knowledge” or “Known”: Actual or imputed knowledge, but not constructive notice imparted by the Public Records.(a) “Land”: The land described in Schedule A and affixed improvements that by law constitute real property. The term “Land” does not include any property beyond the lines of the area described in Schedule A, nor any right, title, interest, estate, or easement in abutting streets, roads, avenues, alleys, lanes, ways, or waterways, but this does not modify or limit the extent that a right of access to and from the Land is to be insured by the Policy. (b) “Mortgage”: A mortgage, deed of trust, or other security instrument, including one evidenced by electronic means authorized by law.(c) “Policy”: Each contract of title insurance, in a form adopted by the American Land Title Association, issued or to be issued by the Company pursuant to this Commitment. (d) “Proposed Insured”: Each person identified in Schedule A as the Proposed Insured of each Policy to be issued pursuant to this Commitment.(e) “Proposed Policy Amount”: Each dollar amount specified in Schedule A as the Proposed Policy Amount of each Policy to be issued pursuant to this Commitment. (f) “Public Records”: Records established under state statutes at the Commitment Date for the purpose of imparting constructive notice of matters relating to real property to purchasers for value and without Knowledge. (g) “Title”: The estate or interest described in Schedule A.(h) the Notice;(a) the Commitment to Issue Policy;(b) the Commitment Conditions;(c) Schedule A;(d) Schedule B, Part I—Requirements; and(e) Schedule B, Part II—Exceptions; and(f) a counter-signature by the Company or its issuing agent that may be in electronic form.(g) The Company’s liability under Commitment Condition 4 is limited to the Proposed Insured’s actual expense incurred in the interval between the Company’s delivery to the Proposed Insured of the Commitment and the delivery of the amended Commitment, resulting from the Proposed Insured’s good faith reliance to: (a) The Company shall not be liable under Commitment Condition 5(a) if the Proposed Insured requested the amendment or had Knowledge of the matter and did not notify the Company about it in writing. (b) The Company will only have liability under Commitment Condition 4 if the Proposed Insured would not have incurred the expense had the Commitment included the added matter when the Commitment was first delivered to the Proposed Insured. (c) The Company’s liability shall not exceed the lesser of the Proposed Insured’s actual expense incurred in good faith and described in Commitment Conditions 5(a)(i) through 5(a)(iii) or the Proposed Policy Amount. (d) The Company shall not be liable for the content of the Transaction Identification Data, if any.(e) In no event shall the Company be obligated to issue the Policy referred to in this Commitment unless all of the Schedule B, Part I—Requirements have been met to the satisfaction of the Company. (f) In any event, the Company’s liability is limited by the terms and provisions of the Policy.(g) Only a Proposed Insured identified in Schedule A, and no other person, may make a claim under this Commitment.(a) Any claim must be based in contract and must be restricted solely to the terms and provisions of this Commitment.(b) Until the Policy is issued, this Commitment, as last revised, is the exclusive and entire agreement between the parties with respect to the subject matter of this Commitment and supersedes all prior commitment negotiations, representations, and proposals of any kind, whether written or oral, express or implied, relating to the subject matter of this Commitment. (c) 7. IF THIS COMMITMENT HAS BEEN ISSUED BY AN ISSUING AGENT The issuing agent is the Company’s agent only for the limited purpose of issuing title insurance commitments and policies. The issuing agent is not the Company’s agent for the purpose of providing closing or settlement services. 8. PRO-FORMA POLICY The Company may provide, at the request of a Proposed Insured, a pro-forma policy illustrating the coverage that the Company may provide. A pro-forma policy neither reflects the status of Title at the time that the pro-forma policy is delivered to a Proposed Insured, nor is it a commitment to insure. 9. ARBITRATION The Policy contains an arbitration clause. All arbitrable matters when the Proposed Policy Amount is $2,000,000 or less shall be arbitrated at the option of either the Company or the Proposed Insured as the exclusive remedy of the parties. A Proposed Insured may review a copy of the arbitration rules at http://www.alta.org/arbitration. IN WITNESS WHEREOF, Land Title Insurance Corporation has caused its corporate name and seal to be affixed by its duly authorized officers on the date shown in Schedule A to be valid when countersigned by a validating officer or other authorized signatory. Issued by: Land Title Guarantee Company 3033 East First Avenue Suite 600 Denver, Colorado 80206 303-321-1880 Craig B. Rants, Senior Vice President This page is only a part of a 2016 ALTA® Commitment for Title Insurance issued by Old Republic National Title Insurance Company. This Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B, Part I—Requirements; and Schedule B, Part II —Exceptions; and a counter-signature by the Company or its issuing agent that may be in electronic form. Copyright 2006-2016 American Land Title Association. All rights reserved. The use of this Form (or any derivative thereof) is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. The deletion or modification of any Schedule B, Part II—Exception does not constitute an agreement or obligation to provide coverage beyond the terms and provisions of this Commitment or the Policy. (d) Any amendment or endorsement to this Commitment must be in writing and authenticated by a person authorized by the Company.(e) When the Policy is issued, all liability and obligation under this Commitment will end and the Company’s only liability will be under the Policy.(f) Attachment 10 Attachment 11 Pitkin County Mailing List of 300 Feet Radius Pitkin County GIS presents the information and data on this web site as a service to the public. Every effort has been made to ensure that the information and data contained in this electronic system is accurate, but the accuracy may change. The information maintained by the County may not be complete as to mineral estate ownership and that information should be determined by separate legal and property analysis. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content at this site or at other sites to which we link. Assessing accuracy and reliability of information and data is the sole responsibility of the user. The user understands he or she is solely responsible and liable for use, modification, or distribution of any information or data obtained on this web site. This document contains a Mailing List formatted to be printed on Avery 5160 Labels. If printing, DO NOT "fit to page" or "shrink oversized pages." This will manipulate the margins such that they no longer line up on the labels sheet. Print actual size. From Parcel: 273512206001 on 12/02/2024 Instructions: Disclaimer: http://www.pitkinmapsandmore.com Attachment 12 745-755 CASTLE CREEK DR OWNERS ASSOC ASPEN, CO 81611 745-755 CASTLE CREEK DR 750 CCD LLC FORT WORTH, TX 76102 616 TEXAS ST 765/767 CEMETERY LANE LLC CUMBERLAND, RI 02864 200 SCENIC VIEW DR 777 CLUB LLC ASPEN, CO 81611 777 CEMETERY LN 810 CEMETERY LN CONDO ASSOC ASPEN, CO 81611 COMMON AREA 810 CEMETERY LN ANDRULAITIS FIONA MCWILLIAM & TIMOTHY A ASPEN, CO 81611 409 PARK CIR #4 BICKHAM FAMILY INTERESTS LLC HOUSTON, TX 77019 3229 DEL MONTE DR CASTLE CREEK DRIVE TOWNHOMES ASPEN, CO 81611 777 CASTLE CREEK DR CASTLE FELIZ 8 PROPERTY LLC HOUSTON, TX 77024 10910 KEMWOOD CITY OF ASPEN ASPEN, CO 81611 427 RIO GRANDE PL ENGLANDER ALAN S QPRT GREENWICH, CT 06831-3642 9 BAILIWICK WOODS CIR ENGLANDER LINDA K QPRT GREENWICH, CT 06831-3642 9 BAILIWICK WOODS CIR FRYKLUND ROBERT & LOUISE HOUSTON, TX 77005 2917 DUKE ST GCC PROP LLC ASPEN, CO 81611 787 CASTLE CREEK DR GOLDSBURY CHRISTOPHER JR TRUST SAN ANTONIO, TX 782151285 303 PEARL PKWY #300 GOLDSMITH TOWNHOMES CONDO ASSOC ASPEN, CO 81611 COMMON AREA 795 CEMETERY LN HORAN CONDO ASSOC ASPEN, CO 81611 COMMON AREA 805 CEMERTERY LN MCLAUGHLIN TRACY REV TRUST ASPEN, CO 81611 737 CEMETERY LN MEYER FAMILY LLC RIVER RIDGE, LA 70123 101 DESTIN LN PATSLEY FAMILY REV TRUST DALLAS, TX 75205 25 HIGHLAND PARK VLG #100-762 RABINOW FAM 2021 GST TRUST HOUSTON, TX 77027 3464 WICKERSHAM RABINOW KATHRYN L E HOUSTON, TX 77027 3711 SAN FELIPE #12-I RABINOW RICHARD A HOUSTON, TX 77027 3711 SAN FELIPE #12-1 RED BUTTE CEMETERY ASPEN, CO 81611 PO BOX 194 ROWLANDS DONNA K REV TRST ASPEN, CO 81611 770 CEMETERY LN SAMS CONDO ASSOC ASPEN, CO 81611 COMMON AREA 743 CEMETERY LN SEGUIN MICHAEL A & KIMBERLY ASPEN, CO 81611 793 CEMETARY LN WAYBURN CYNTHIA ANN REV LVG TRUST MEDINA, WA 98039 2441 EVERGREEN POINT RD WEIMANN-WINCHESTER CONDO ASSOC ASPEN, CO 81611 COMMON AREA 775 & 777 CEMETERY LN WESTVIEW HOLDINGS LLC SAN ANTONIO, TX 782151285 303 PEARL PKWY #300 WINCHESTER ROBERT P ASPEN, CO 81611 777 CEMETERY LN 9,028 1,504.7 Legend 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet01,504.7752.33 Notes Pitkin Maps & More THIS MAP IS FOR INFORMATIONAL PURPOSES. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content represented. Map Created on 2:38 PM 12/02/24 at http://www.pitkinmapsandmore.com State Highway Road Centerline 9K Primary Road Secondary Road Service Road Parcel Boundary Town Boundary Federal Land Boundary BLM State of Colorado USFS PRE-APPLICATION CONFERENCE SUMMARY PRE-24-003 DATE: February 16, 2024 PLANNER: Sophie Varga, Sophie.varga@aspen.gov, 970-429-2778 PROJECT ADDRESS: 790 Castle Creek Drive PARCEL ID: 273512206001 REPRESENTATIVE: Patrick Rawley, patrick@rawleydesignplan.com, 970-306-5669 REQUEST: Growth Management – Single Family and Duplex Demolition and Redevelopment Allotment; Establishment of an Accessory Dwelling Unit; Establishment of Top of Slope. DESCRIPTION: The applicant proposes to demolish the existing single-family residence and redevelop the property with a duplex and an Accessory Dwelling Unit. The applicant has represented that the owners have owned and occupied their residence for at least 35 years. The subject parcel is a 58,010 square foot lot located in the Low-Density Residential Zone District (R-30). Castle Creek flows through the property. The eastern side of the property is below the Top of Slope and/or within the Special Flood Hazard Area (Flood Area Zone AE). The Stream Margin Environmentally Sensitive Area applies “to all development within one hundred (100) feet, measured horizontally, from the high water line of the Roaring Fork River and its tributary streams and to all development within the Flood Hazard Area, also known as the 100-year flood plain.” Since this parcel is outside of the official stream margin map, the applicant will need to establish the Top of Slope on the property as part of the land use application. The Accessory Dwelling Unit (ADU) should conform to Sec.26.520.050- Design Standards. A deed restriction must be placed on the ADU and it must be detached from the primary residences. ADUs are not considered units of density. A detached ADU that is conveyed separate from the primary residences as a “for sale” affordable housing may be used to satisfy employee housing requirements (Sec.26.520.020 – General). A “for sale” ADU is excluded from the calculation of floor area up to 1,200 square feet per parcel and the allowable floor area of a parcel containing said ADU is increased in an amount equal to 50% of the floor area of the ADU, up to a maximum bonus of 600 square feet per parcel. The applicant mentioned a front-to-back orientation for the proposed duplex. This layout may present difficulties when complying with the Residential Design Standards. Alternative compliance or a variance to the Residential Design Standards may be combined with other land use reviews in a single application. The Demolition of a free-market single family or duplex residential structure requires a Growth Management Quota System Allotment pursuant to Chapter 26.580 and Section 26.470.090.C. Typically there are six demolition allotments available each year, however, City Council granted four of the 2024 allotments in 2023 via Section 26.470.110.A, Multi-Year Demolition Allotment. Four 2024 allotments were available at the start of 2024 for the demolition allotment lottery. The lottery period for administrative applications closed in January; more applications were received than the available Attachment 13 allotments. The following options are available for property owners to pursue a Demolition Allotment in 2024. 1. Multi-Year Demolition Allotment – Section 26.470.110.A An application may be submitted to be considered by City Council for a Multi-year Demolition allotment. This review requires a project to demonstrate compliance with five or more of the review criteria established by this section. Multi-year allotments are considered at a public hearing and approved by resolution at City Council’s discretion. Any allotments awarded through this review are subtracted from future years available allotments. 2. Additional Allotments for Local Property Owners who have owned and occupied their residence for at least 35 years. – Section 26.470.110.G If a property owner has owned and occupied their residence for 35+ years and can provide adequate documentation demonstrating continual occupancy and ownership, City Council may grant up to two (2) additional allotments beyond the initial six available each year. These allotments are not subtracted from subsequent years. In order to submit for one of the additional allotments pursuant to Section 26.470.110.G, an application must first be accepted for an administrative Demolition allotment Pursuant to Section 26.470.090.C and must include the standard application contents listed below. That application will be denied via a Notice of Denial, once denied, an amended application can be submitted to pursue an Additional Allotment for Local property owners. The amended application must contain the required additional application contents for this review, as described below. On January 9, 2024, Council approved Resolution #006, Series of 2024, to ‘carry forward’ two unused and unclaimed 35+ Year Local Demolition Allotments, creating four (4) total 35+ Year Local Demolition Allotments for 2024. 3. Section 26.470.160.C – Insufficient Development Allotment Appeal This code section allows for an appeal to be considered by City Council when no allotments are available. In order to submit for an Appeal due to Insufficient Development Allotments, an application must first be submitted for an administrative Demolition allotment Pursuant to Section 26.470.090.C, and must include the standards application contents listed below. That application will be denied via a Notice of Denial, once denied, an amended application can be submitted to pursue the Appeal option. The appeal procedures in Chapter 26.316 apply to this process. The applicant has represented that they will pursue Option 2, Additional Allotments for Local Property Owners who have owned and occupied their residence for at least 35 years. The fees and hearing path below are based off of Option 2. The applicant should initially submit an application requesting an administrative allotment. Staff will issue a Notice of Denial due to a lack of allotments. The applicant will then respond to the Notice of Denial, requesting a local demolition allotment. Below are links to the Land Use Application form and Land Use Code for your convenience: Land Use Application Land Use Code Land Use Code Section(s) 26.304 Common Development Review Procedures 26.410 Residential Design Standards 26.435.040 Stream Margin Review 26.470.040 Allotment Procedures 26.470.090.c Administrative Applications - Single Family & Duplex Demolition and Redevelopment 26.470.110.A City Council Applications - Multi-year Demolition Allotments 26.470.110.G City Council Applications - Additional Allotments for Local Property Owners 26.470.160.C Appeals - Insufficient Development Allotment Appeal 26.520 Accessory Dwelling Units and Carriage Houses 26.575.020.d.11 Measuring Floor Area - Permanently Affordable Accessory Dwelling Units and Carriage Houses 26.580 Demolition 26.710.080 Low-Density Residential (R-30) Review by: Staff for completeness. Step 1: Staff will review and issue a Notice of Denial due to insufficient allotments. Step 2: The applicant will submit an amended application requesting a local allotment, staff will provide a recommendation to City Council. City Council for Decision Public Hearing: Yes Initial review and denial will be administrative. Subsequent review for local allotment will be before City Council. Planning Fees: $3,250 deposit for 10 hours of staff work. Additional/lesser hours will be billed/refunded at $325/hr. Referral Fees: Engineering: $1,500 flat fee Parks: $975 flat fee APCHA: $375 deposit for 1 hour of staff work. Additional/lesser hours will be billed/refunded at $325/hr. TOTAL: $6,100 To apply, email the following information in a single pdf to CDEHadmins@aspen.gov with PRE-24-003 in the subject line. Standard Application Contents:  Completed Land Use Application, including signed HOA Compliance form and agreement to pay fees.  Pre-application Conference Summary (this document).  Contained within a letter signed by the applicant, the applicant's name, address and telephone number and the name, address and telephone number of any representative authorized to act on behalf of the applicant.  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.  A site improvement survey (no older than a year from submittal) including topography and vegetation showing the current status of the parcel certified by a registered land surveyor by licensed in the State of Colorado. The survey and proposed site plan shall include the 100-year floodplain line, high water line, and proposed Top of Slope. It should also include existing and proposed grades at two-foot contours, with five-foot intervals for grades over ten percent (10%).  A written description of the proposal and a written explanation of how the proposed development complies with the review standards relevant to the development application. o Complete responses to all Review Criteria in Section 26.470.090.C sufficient to analyze and determine that review criteria are met. o Responses to 26.520.050 – ADU Design standards. This should include a floor plan, floor area calculations, and net livable calculations. o Responses to 26.435.040 – Stream Margin review. o If RDS Alternative Compliance or a Variance is requested, refer to Sec. 26.410.020 (Procedures for Review)  Proposed site plan. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. 26 February 2025 Ms. Haley Hart, AICP Long-Range Planning City of Aspen Community Development 427 Rio Grande Place Aspen, CO 81611 Provided Via Electronic Mail: haley.hart@aspen.gov RE: 790 Castle Creek / Addendum Submitted in Connection with Notice of Denial (LPA-24-133) Dear Haley: On behalf of James M. Cerise and Carolyn Barabe (the “Applicants”) and in connection with the Notice of Denial, dated 21 February 2025, of the demolition allotments requested in connection with the land use application submitted for 790 Castle Creek Drive, Aspen, Colorado (the “Property”), please accept this addendum/alternative to a formal appeal of the Notice of Denial. The Applicants are providing a response to “Option 3: Own & Occupy Subject Residence for at Least 35 Years” (“Option 3”). This addendum is submitted within the required fifteen (15) days from the date of the Notice of Denial. Option 3 is specifically provided as an alternative to a formal appeal of the Notice of Denial. Pursuant to COA LUC Sec. 26.470.110.G, Option 3 allows a property owner who has owned and occupied a residence for thirty -five (35) years or more to ask the City Council to grant one of two additional Demolition Allotments (beyond the initial four that are made available) from future year demolition allotments. The applicants are fifth-generation Aspenites and can trace their family history in the Roaring Fork Valley to the 1800s. Moreover, the Applicants and their families have lived on the Property since 1956. Rather than simply relying on the sixty-eight (68) years spent on the Property, the Applicants request that the City Council consider their families’ very real commitment to the Aspen community, where family members have lived and worked for so long. The Applicants also ask the Council to appreciate that the proposed duplex associated with the demolition permit will allow the Applicants to remain on the Property and among their friends in the community during their retirement, while also providing a new family home for the next generations to remain in Aspen. The Applicants provide the attached additional documentation in support of Option 3. This information includes: Ms. Haley Hart, AICP 790 Castle Creek / Addendum Submitted in Connection with Notice of Denial (LPA-24-133) 26 February 2025 Page | 2 • Affidavit signed by the Applicants, providing a history of the Property and the family’s ownership of the Property; • A chain of title of the Property; • Pitkin County Treasurer’s receipts of tax payments for taxes due on the Property; and • Confirmation of the Applicant’s local and long-term employment with the Aspen Skiing Company. We look forward to working with staff to verify the sufficiency of the supporting documentation. Following this coordination, we anticipate scheduling and attending a public hearing with the City Council to review the Applicant’s request for a demolition allotment. Very truly yours, Patrick S. Rawley, AICP, ASLA RAWLEY DESIGN PLANNING LLC ATTACHMENTS