HomeMy WebLinkAboutFile Documents.233 W Hallam St.0077.2019.ARBK 223 W. Hallam St.
April 10th, 2019 1 m
TO: City of Aspen Building Department
SUBJECT: Change Order 2 - Items
No. 2019-Change Order 2
Main 1. Skylight Addition by back porch to lower level family room. HPC approved.
Level 2. Front Porch : Updated design after additions take out. HPC approved.
3. Living Room:Changed location of Fireplace.Vent HPC approved.
4. Wine Chiller added at Living Room.
5. All addition exterior siding changed from wood shingle.
6. All addition windows had mullions removed. HPC approved.
7. AC units moved from east to west side(they are now in property setback)
8. Victorian Stair configuration from U shape to curbed.
Upper 9. Addition Stair: Upper stringer section:treads changed to glass.
Level 10. Upper Level Hot Tub Deck: Changed railing material. HPC approved.
11. Master Deck handrail changed to glass. HPC approved.
12. Master Bedroom: roof pitch over sliding doors. HPC approved.
13. All addition exterior siding changed from wood shingle. HPC Approved.
14. All addition windows had mullions removed. HPC approved.
RECEIVED
04/11/2019
223 W. Hallam St. KIM RAYMOND ARCHITECTS+INTERIMDEN
BUILDING DEPARTMENT