Loading...
HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0320.2017 (81).ARBK 1/28/25,5:30 PM 0002-2022-BCHO-Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0002-2022-BCHO Number 0002-2022-BCHO Record Type Change Order Address 209 E BLEEKER ST Owner Sydney Fallon Original Number 21-3799 Status Closed-Final Type Change Order Reason for Cancel or Comp!. Review Fail Applicant MELANIE NOONAN Aspen Internal? No Account Z GROUP ARCHITECTS P.C. Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 636-259-750 Master Building Permit 0320.2017.ARBK HPC-ZON-EH-UTIL Review HPC Rev, Permit Contractor STEEPLECHASE CONSTRUCTION HPC-ZON-EH-UTIL Review-2 Valid Business License on Eng Review Eng-CMP Rev,Util Rev,Eng-Wtr Rev, Account Imported Parks-Prkng-San Review San Rev, Required Submissions Conditional Inspections Documents Resubmitted Conditional Final Insp Approved Covid-19 Plan Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 ,/ Conditional Flat Fee Formula Price Book 2021 Conditional Tiered Fee Formula Applicant is a Nonprofit? No Conditional Tiered SqFt Fee MIR, Discount All Fees(%) Formula Fee Discount Reason Queue Score Project Designation Milestone Current Days in 0 Applicant Hand Queue Designation Major Change Order-Additional Rounds Milestone Current Days in City 113 Hands Queue Score 0 Milestone-Total Days in 0 Applicant Hand Last Date Received from Milestone-Total Days in City 82 Applicant Hands Dates New Application Date 12/9/2021 TCO Issuance Date Application Complete Date 12/23/2021 Close/CO Issuance Date 12/29/2022 Application Accepted Date 12/23/2021 Last Activity Date 4/18/2022 Issue Date 4/18/2022 Expiration Date Days to Issue 116 Due Date Override Expiration Date Basic Information Description Interior plan changes to Main Level addition&Cabin Main Census Code **Change Order Level kitchen.Minor window changes(additions& deletion)&updates to Mechanical layout per new interior floor plans. Use of Building Multi-Family Use Class Residential Class of Work Addition Permit Comments Job Location Address 209 E BLEEKER ST,ASPEN:273707320002 Lot C&D https://cityofaspen.my.salesforce.com/a034000000GVLLAAA3/p 1/9 1/28/25,5:30 PM 0002-2022-BCHO—Salesforce-Enterprise Edition Site Address Display on Map Legal Description Subdivision:CITY AND TOWNSITE OF ASPEN Block:73 Lot:C&D Historic Property? Yes Eden Address Historic District? No HPC-Planning-Zoning Details Zone District R-6 HOA/Covenant Property Not Subject to HOA or Covenant Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Use No Approval? Deed Restricted? No Located in a PD? No #of Dwellings 2 Adds/Changes Floor Area? No Category of Zoning Fee Residential Occupancy or Use Change? No Zoning Work Level Minor Zoning Fee Work Affects Exterior of Yes Building? Building Project Details Valuation $170,348.91 Lot Size Sq.Ft. 6,666 Reason for Valuation Change Soil Disturbance Sq Ft 0 Unit Sq.Ft. 8,751 Affected Area Sq Ft 0 Building Footprint Sq Ft Existing Hardscape Footprint Sq 0 Ft Sq Ft of Building Work Area 838 Existing Hardscape%of Lot 0% Building Fire Area Sq Ft Con Mit Sq Ft Total 838 Utility Review Sq.Ft. 10 Utility Review Sq Ft Total 0 %of Interior being Altered 10% New Sq.Ft. 0 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Line? No Footprint? Work Changes No Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? No Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes Yes Work Subject to Water Efficient No Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? No Involved? Change of Restaurant No Prevents Access to Sewer Main? No Ownership? Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Size of Existing Domestic Water Irrigation? Line Irrigated Area Sq Ft Number of Meters Proposed Identify ALL Sources of Water Size of Existing Fire Suppression Line Is There a Pool,Spa or Water Size of Proposed Domestic Feature? Water Line Summary of Prior Water Fees Size of Proposed Fire Paid Suppression Line https://cityofaspen.my.salesforce.com/a034o00000GvLLAAA3/p 2/9 1/28/25,5:30 PM 0002-2022-BCHO—Salesforce-Enterprise Edition Building Description Code Editions Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Two family Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Fire Sprinkler Existing? Yes Total Pool Sq Ft Fire Sprinkler Required? Yes Amount of Onsite Renewable Generation? Fire Sprinkler Type NFPA 13 D CO Description Fire Alarms Installed? NFPA 72 Basement #Wood Fireplaces 1st Floor #Gas Log Fireplaces 2nd Floor #Gas Appliances 3rd Floor Open Text Field For Comments Additional Financials Total Fees $4,275.17 Total Payments $4,275.17 Total Balance $0.00 System Information Number 0002-2022-BCHO Community Visibility Bluebeam Project Id 636-259-750 Contact IDs 0036A00000wIOLZQAY,0036A00000ZPoLZQA1,0038X00003eEBIXQAW BB Project Name 209 E BLEEKER ST-0002-2022-BCHO Last Modified By Aspen Avocette,9/28/2024 1:45 AM Created By MELANIE NOONAN,12/8/2021 7:40AM VIP Form Tool VIP 12/9/2021 VIP Permit Application Submitted 3:36 PM Form Template VIP VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"), Foreign Template ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"), Language Status {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"}, {"parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvV UAS"}, {"parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"}, {"parentCategoryld":null,"isSubm it":nu I I,"isCu Trent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"}, ("parentCategoryld":null,"isSubm it":nu I I,"isCu Trent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwva UAC"), ("parentCategoryld":null,"isSubm it":nu I I,"isCu Trent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"), ("parentCategoryld":null,"isSubmintrue,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC")] Action Items View/Print Permit Link Attachment Activity History Email:Building Permit 0002-2022-BCHO-209 E BLEEKER ST,ASPEN:273707320002-Issued Type Billable Assigned To Risa Rushmore Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/18/2022 Days in Applicant's Hands Comments To:melanie@zgrouparchitects.com CC: BCC: Attachment:Building_Permit-0002-2022-BCHO.pdf,City_Use_Tax_Letter-0002-2022-BCHO.pdf Subject:Building Permit 0002-2022-BCHO-209 E BLEEKER ST,ASPEN:273707320002-Issued Body: Dear MELANIE NOONAN, Please find attached your issued building permit for 0002-2022-BCHO for 209 E BLEEKER ST,ASPEN:273707320002,City Use Tax exemption letter and COVID-19 site safety plan approval notice(if applicable). Below is a link to your plans.Please print these 24x36 in color and keep them on site at all times.As a reminder,Dropbox links expire,so please download the plans as soon as you get this email. https://www.d ropbox.com/sh/p8wuxw6v3y10gq 1/AABsq_zcjGZOMTJ3CH BXtUaU a?d1=0 PLEASE NOTE THAT ALL REFERRAL AGENCIES MUST APPROVE THEIR FINAL INSPECTIONS PRIOR TO THE FINAL BUILDING INSPECTION. https://cityofaspen.my.salesforce.com/a034o00000GvLLAAA3/p 3/9 1/28/25,5:30 PM 0002-2022-BCHO—Salesforce-Enterprise Edition Please allow 7 working days prior to requesting your final building inspection for this process.All inspections are scheduled through the Salesforce applicant portal.Scheduling information can be found on our website:https://www.cityofaspen.com/DocumentCenter/View/6436/How-to-request-an- inspection?bidld= Referral Agency Sign Off Requirements for Your Permit ENGINEERING* ENVIRONMENTAL HEALTH FIRE DISTRICT HISTORIC PRESERVATION LANDSCAPE EFFICIENCY PARKS SANITATION WATER ZONING *Please provide these items to Engineering two weeks prior to requesting their final building inspection: As builts Maintenance plan&agreements Storm Water video(if applicable) Thank you, City of Aspen Have a great day, Risa Rushmore Email:Permit Fees Due:0002-2022-BCHO at 209 E BLEEKER ST,ASPEN:273707320002 Type Billable Assigned To Risa Rushmore Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/18/2022 Days in Applicant's Hands To:melanie@zgrouparchitects.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:0002-2022-BCHO at 209 E BLEEKER ST,ASPEN:273707320002 Body: If you have not already paid the fees due on your permit 0002-2022-BCHO,at 209 E BLEEKER ST,ASPEN:273707320002,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor Comments •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$4,275.17 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.cityofaspen.com/DocumentCenterNiew/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Have a great day, Risa Rushmore Email:City of Aspen Utility Water Connection Permit(UCP)Required Type Billable Assigned To Robert Gregor Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/13/2022 Days in Applicant's Hands https://cityofaspen.my.salesforce.com/a034o00000GvLLAAA3/p 4/9 1/28/25,5:30 PM 0002-2022-BCHO—Salesforce-Enterprise Edition To:melanie@zgrouparchitects.com CC: BCC: Attachment:--none-- Subject:City of Aspen Utility Water Connection Permit(UCP)Required Body: Hello MELANIE NOONAN, You recently submitted a permit to the City of Aspen,#0002-2022-BCHO,for the property located at 209 E BLEEKER ST,ASPEN:273707320002,and during the Utilities review on this permit,we determined that you are required to apply for a Utility Water Connection permit application(UCP). To submit this application,please click on the link below to the City of Aspen Applicant Portal(or paste it into your browser),and once logged into the Comments portal,click the Next button to start a new application(located at the center of the portal home page). Link to Applicant Portal:https://cityofaspen.force.com Please be aware the City Reviewers will need both the architectural plans and a completed ECU calculator to perform a fixture count review,and that we will not be able to approve Utilities review on your current permit 0002-2022-BCHO until you submit a UCP application and all required tap fees are paid. If you have any questions,please feel free to contact me at the number below. Sincerely, City of Aspen Utilities Department (970)429-1993 Email:City of Aspen-Application Status:Completeness Review Failed Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/14/2021 Days in Applicant's Hands To:melanie@zgrouparchitects.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear MELANIE NOONAN, Your Permit Application#21-3799 for 209 E BLEEKER ST,ASPEN:273707320002 is in the"Completeness Review Failed"Status because of the following: Melanie, Your document uploads have failed.Please send them to me directly(mech,arch,narrative)with the addition of the following files to make this application complete: Comments 1.Building permit application:https://www.cityofaspen.com/DocumentCenter/View/5704/COA-Permit-Application-Signature-Package 2.Covid plan:https://www.cityofaspen.com/DocumentCenter/View/6170/COA-Sample-Covid-Plan-Requirements?bidld= 3.CMP:https://www.cityofaspen.com/DocumentCenter/View/7178/2020-CMP-Application-for-Small-Projects---Acknowledgement-Style---Final-20210205 4.Residential ECU calculator:https://www.cityofaspen.com/DocumentCenter/View/6232/20200310_Residential-ECU-Calculator Kindly send the above referenced documents to emmy.garrigus@aspen.gov so I can manually load them for you. Thanks, Emmy Please contact Emmy Garrigus with any questions at emmy.garrigus@services.cityofaspen.com. Thank you, City of Aspen Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/14/2021 Days in Applicant's Hands Comments To:melanie@zgrouparchitects.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect https://cityofaspen.my.salesforce.com/a034o00000GvLLAAA3/p 5/9 1/28/25,5:30 PM 0002-2022-BCHO—Salesforce-Enterprise Edition Body: Dear MELANIE NOONAN: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 10-14 business days.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the Salesforce portal,clicking on the`Related'tab,and scrolling down to`Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal. Just go into your permit,scroll down to the bottom of the page,and use the`Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see instructions below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email,but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the`Share an update...'box,type'@,'then start typing my name.My name will appear.Just click on it then add your message. Please let me know if you have any questions. Regards, PC-Comm Dev City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/13/2021 Days in Applicant's Hands Comments To:melanie@zgrouparchitects.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear MELANIE NOONAN: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 10-14 business days.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the Salesforce portal,clicking on the`Related'tab,and scrolling down to'Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal. Just go into your permit,scroll down to the bottom of the page,and use the`Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see instructions below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your https://cityofaspen.my.salesforce.com/a034o00000GvLLAAA3/p 6/9 1/28/25,5:30 PM 0002-2022-BCHO—Salesforce-Enterprise Edition approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email,but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the'Share an update...'box,type'@,'then start typing my name.My name will appear.Just click on it then add your message. Please let me know if you have any questions. Regards, Emmy Garrigus City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Review Type Building Billable ✓ Assigned To Nick Thompson Number of Hours 1.00 Total Cost $325.00 Fee Generated Date 4/15/2022 Start Date Completed Date 4/15/2022 Days in Applicant's Hands Comments Contacts MELANIE NOONAN Account Z GROUP ARCHITECTS P.C. Type Applicant Active Contractor License Count 0.00 Number 0042851 STEVE WALDECK Account STEEPLECHASE CONSTRUCTION Type Contractor Active Contractor License Count 1.00 Number 0042852 William Johnson Account STEEPLECHASE CONSTRUCTION Type Contractor Active Contractor License Count 1.00 Number 0053520 Fees 0068726 Type Change Order Fee Total $3,950.17 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0071310 Type Building Hourly Review Fee Total $325.00 https://cityofaspen.my.salesforce.com/a034o00000GvLLAAA3/p 7/9 1/28/25,5:30 PM 0002-2022-BCHO—Salesforce-Enterprise Edition Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files Building_Permit-0002-2022-BCHO City_Use_Tax_Letter-0002-2022-BCHO Last Modified 4/18/2022 5:20 PM Last Modified 4/18/2022 5:20 PM Created By Risa Rushmore Created By Risa Rushmore City_U se_Tax_Letter_20220418.docx Building_Permit 20220418.docx Last Modified 4/18/2022 5:19 PM Last Modified 4/18/2022 5:18 PM Created By Risa Rushmore Created By Risa Rushmore Permit Application 2021-12-09 22:36:34.pdf Last Modified 12/9/2021 3:36 PM Created By MELANIE NOONAN Inspections INS-0001601-22 Status Pending Type Building&Referral Inspection Status Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE Milestones Review Round 1-0002-2022-BCHO Status Approved Due Date Created Date 1/4/2022 Payments PY-012514 Related To 0002-2022-BCHO Amount $0.03 Created Date 4/18/2022 Payment Source R-0011890 Receipt-Amount Remaining R-0011890:$0 PY-012513 Related To 0002-2022-BCHO Amount $4,275.14 Created Date 4/18/2022 Payment Source R-0011889 Receipt-Amount Remaining R-0011889:$0 Reviews REV-022405 Milestone Review Round 1-0002-2022-BCHO Status Approved Type Zoning Due Date Completed Date 2/4/2022 1:07 PM Owner Alias JPome On Hold Created Date 1/4/2022 REV-022406 Milestone Review Round 1-0002-2022-BCHO Status Approved Type Building Due Date Completed Date 4/15/2022 12:00 PM Owner Alias NThom On Hold Created Date 1/4/2022 https://cityofaspen.my.salesforce.com/a034o00000GvLLAAA3/p 8/9 1/28/25,5:30 PM 0002-2022-BCHO-Salesforce-Enterprise Edition REV-022407 Milestone Review Round 1-0002-2022-BCHO Status Approved Type Sanitation Due Date Completed Date 1/14/2022 2:33 PM Owner Alias CStra On Hold Created Date 1/4/2022 REV-022408 Milestone Review Round 1-0002-2022-BCHO Status Approved Type HPC Due Date Completed Date 2/23/2022 9:30 PM Owner Alias NFein On Hold Created Date 1/4/2022 REV-022409 Milestone Review Round 1-0002-2022-BCHO Status Approved Type Utilities Due Date Completed Date 3/18/2022 4:07 PM Owner Alias RGreg On Hold Created Date 1/4/2022 Submissions CO3.Arch.209 E Bleeker St.2021.pdf Actions Upload Submission Date Status Required Description CO3.Mech.209 E Bleeker St.2021.pdf Actions Upload Submission Date Status Required Description Narrative.pdf Actions Upload Submission Date Status Required Description Narrative.pdf Actions Upload Submission Date Status Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a034o00000GvLLAAA3/p 9/9