Loading...
HomeMy WebLinkAboutMaster Permit.427 Rio Grande Pl.0016.2019.ACBK 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0016.2019.ACBK Number 0016.2019.ACBK Record Type Building-Imported Address 427 RIO GRANDE PL Owner Sydney Fallon Original Number 0016.2019.ACBK Status Issued Type Building Reason for Cancel or Comp!. Review Fail Applicant NICK KETPURA Aspen Internal? Yes Account CHARLES CUNNIFFE ARCHITECTS Required Bond Amount Project City Hall Total Available Bond Amount Land Use Planning Is This Associated w/a Application Building Permit? Permit Contractor SHAW CONSTRUCTION LLC Master Building Permit Valid Business License on Bluebeam Project Id 312-286-247 Account Imported 1 HPC-ZON-EH-UTIL Review EH-Rcyl Rev, Required Submissions HPC-ZON-EH-UTIL Review-2 Documents Resubmitted Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Approved Covid-19 Plan ,/ Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,Parking Rev,San Rev, Conditional Inspections Parks Insp, Conditional Final Insp EH-Rcyl Final,Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parking Final,Parks Final,Water-LSE Final,San Final, Action Items Hold All Reviews Create Fees 1 Hold Reason Create Fees 2 Utility Review Type Major Price Book EDEN Conditional Flat Fee Formula FP, Applicant is a Nonprofit? No Conditional Tiered Fee Eligible for Small Lodge No Formula Program? Conditional Tiered SqFt Fee MAC, Discount All Fees(%) Formula Fee Discount Reason CO/LOC? CO Status if Applicable Queue Score Queue Designation Milestone Current Days in Applicant Hand Queue Score 0 Milestone Current Days in City Hands Last Date Received from Milestone-Total Days in Applicant Applicant Hand Milestone-Total Days in City Hands Dates New Application Date 11/14/2019 TCO Issuance Date Application Complete Date 3/16/2019 Close/CO Issuance Date 12/2/2024 Application Accepted Date 3/16/2019 Expiration Date 3/16/2023 Issue Date 3/12/2020 Override Expiration Date https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 1/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Last Activity Date 12/9/2024 Basic Information Description Address: Census Code 325-Public Works and Utilities Buildings 427 Rio Grande Applicant: Nick Keptura Charles Cunniffe Architects NEW CITY HALL:CORE AND SHELL//JOHN//BB 312286247 Use of Building Commercial Interior Remodel Only Use Class Commercial Class of Work New Permit Comments Job Location Address 427 RIO GRANDE PL,ASPEN:273707306852 Lot 2 Site Address Display on Map Legal Description Subdivision:RIO GRANDE Lot:2 PARKING GARAGE Historic Property? No Eden Address 427 RIO GRANDE PL Historic District? No HPC-Planning-Zoning Details Zone District HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Use Yes Approval? Deed Restricted? No Located in a PD? Yes #of Dwellings Adds/Changes Floor Area? Yes Category of Zoning Fee Commercial Occupancy or Use Change? Yes Zoning Work Level Major Zoning Fee Work Affects Exterior of Yes Building? Building Project Details Valuation $19,000,000.00 Lot Size Sq.Ft. 75,034 Reason for Valuation Soil Disturbance Sq Ft 75,034 Change Unit Sq.Ft. 40,712 Affected Area Sq Ft 75,034 Building Footprint Sq Ft Existing Hardscape Footprint Sq Ft Sq Ft of Building Work Area 40,712 Existing Hardscape%of Lot 0% Building Fire Area Sq Ft 192,179 Con Mit Sq Ft Total 115,746 Utility Review Sq.Ft. 75,034 Utility Review Sq Ft Total 75,034 %of Interior being Altered 100% New Sq.Ft. 40,712 Scope of Work Details Work Changes Building Yes Work Affects Tree/Drip Line? Yes Footprint? Work Changes Yes Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? Yes Adjacent to City Open No Space? Photovoltaic Installation Yes Impacts City Trails/Parks? No Work Yes Work Subject to Water Yes Adds/Removes/Changes Efficient L.O.? Plumbing Fixt? Restaurant/Food Service No Involves Impact on Sewer? Yes Involved? https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 2/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Change of Restaurant No Prevents Access to Sewer Yes Ownership? Main? Affects Yes Sewer Easements Affected? Yes Parking/Alleys/Loading? Building Description Code Editions 2015 IBC Required Special High-Strength Bolting;Epoxy Anchors;Structural Inspections Steel Welding;Permanent Micropiles;Sprayed Fire- Resistants Other Code Editions Energy Code Compliance COMCheck UAAlternative Building Type(IRC) Total Snowmelt Sq Ft Construction Type IIB Total Spa Sq Ft Occupancy Load 1545 Total Pool Sq Ft Fire Sprinkler Existing? Yes Amount of Onsite Renewable Generation? Fire Sprinkler Required? Yes CO Description Fire Sprinkler Type NFPA 13 Basement Library/Parking Garage/Mechanical,Storage Fire Alarms Installed? NFPA 72 1st Floor Library/Parking Garage/Office #Wood Fireplaces 2nd Floor Library/Parking Garage/Office #Gas Log Fireplaces 3rd Floor Library/Parking Garage/Office and Public Meeting Rooms #Gas Appliances Additional Open Text Field For Comments Financials Total Fees $570,473.31 Total Payments $570,473.31 Fees Due at Current Status $570,473.31 Total Balance $0.00 System Information Number 0016.2019.ACBK Community 1 Visibility Created By Ruth Kinney, Contact 0036A00000mXQWjQAO,0036A00000mXQWjQA0,0033s000010djMnAA1,0033s000010dsAZAAY,0036A00000vw69JQAQ 7/27/2019 1:50 IDs PM IsTestData? Last Tersia Ernst,12/31/2024 11:42 AM Modified By VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Utility Connection Permit Final Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 10/13/2021 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC: BCC: Attachment:UCP_Water_Final_20211013.docx.pdf https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 3/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Subject:Utility Connection Permit Final Body: Hello NICK KETPURA, Attached is your review Utility Connection Permit for the completed project at 427 RIO GRANDE PL associated with permit#: 0016.2019.ACBK. After review,please print,have signed by owner,and notarized.Once signed and notarized,please return UCP with payment,if applicable,to the Finance Department window located on the first floor of City Hall at 130 S.Galena St. Alternatively,you may upload the signed and notarized copy of the UCP as a SCANNED(not photographed).pdf file and pay all fees due via Salesforce,but if submitting via Salesforce,please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a"push"notification that these permit requirements are complete. Please reach out with any questions or concerns. Thanks,Nick! Steve Email:COVID-19 Safety Plan Approval Type Billable Assigned To MITCH MILLER Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/27/2020 Days in Applicant's Hands To:jackhughes@shawconstruction.net CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200427.pdf Subject:COVID-19 Safety Plan Approval Comments Body: Dear NICK KETPURA, Thank you for submitting a COVID-19 Site Safety Plan for 0016.2019.ACBK at 427 RIO GRANDE PL.City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re-commence construction.Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement.Please adhere to all aspects of the plans to keep all employees and the community safe.Failure to adhere to the plan,as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe,and please let us know if you have any further questions. Email: Building permit 0016.2019.ACBK-427 Rio Grande-Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/12/2020 Days in Applicant's Hands To:nickk@cunniffe.com CC: BCC: Attachment:Building_Permit_0016.2019.acbk-427 RIO GRANDE PL.pdf Subject:Building permit 0016.2019.ACBK-427 Rio Grande-Issued Body: Good afternoon, Comments Please find attached your issue building permit. Below is a link to your plans.Please print these off 24 x 36 in color and keep them on site at all times.As a reminder our dropbox links do expire so please download these plans as soon as you get them. https://www.dropbox.com/sh/c9tic96zctxn0s3/AAD-EgyhGT8gMQ27sITUm 16Ma?d1=0' Kind regards, Lilly Culver Email: Permit Fees Due Type Billable https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 4/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Assigned To Denis Murray Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/12/2020 Days in Applicant's Hands To:nickk@cunniffe.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due Body: If you have not already paid the fees due on your permit or land use application 0016.2019.ACBK at 427 RIO GRANDE PL,please come to our office to pay them,or log into the Aspen Permits and Land Use Application Portal to pay them.If you pay online,be aware that credit card transaction fees will apply.If you have already paid your fees due,please disregard this message. Comments Current Amount Due:$570,473.31 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select "Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email: Building Comments-0016.2019.ACBK-427 RIO GRANDE PL Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/27/2020 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC:denis.murray@cityofaspen.com BCC: Attachment:0016-2019-ACBK_BuildingComments_6.pdf Subject:Building Comments-0016.2019.ACBK-427 RIO GRANDE PL Body: Hello NICK KETPURA, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments.You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:427 RIO GRANDE PL Permit Number:0016.2019.ACBK Permit Coordinator:John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information.Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner Community Development 130 S Galena St. Aspen,CO 81611 p:970.429.2757 c:970.456.5165 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 5/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email: Engineering Comments-0016.2019.ACBK-427 RIO GRANDE PL Type Billable Assigned To Hailey Roedel Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/26/2019 Days in Applicant's Hands To:nickk@cunniffe.com CC:richp@cunniffe.com;nickk@cunniffe.com;dannys@rfeng.biz;richardg@rfeng.biz BCC: Attachment:Plan Set.Civil.425 Rio Grande Place.2019.11.27_ENG COMMENTS 4.pdf,0016.2019.ACBK_427 Rio Grande PI_Engineering 4.pdf Subject:Engineering Comments-0016.2019.ACBK-427 RIO GRANDE PL Body: Hello NICK KETPURA, There are a couple of items left before I can sign off on the permit.The irrigation sheets need to be updated to show irrigation in the landscape buffer along Mill St.The other items can be resolved with a response to the comment letter,and not necessarily updated sheets.I need to know how you guys want to handle the Mill St complete St.Right now the plans have a note to reference the complete st plans,however there are a few things that will need some modification. I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions Comments on the comments.You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:427 RIO GRANDE PL Permit Number:0016.2019.ACBK Permit Coordinator:John Barker These design documents have been reviewed for conformance to the URMP and Engineering Design Standards.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. Engineering check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Thanks. Hailey Guglielmo (970)429-2751 Email: First Round Zoning Comments for 427 RIO GRANDE PL-0016.2019.ACBK Type Billable Assigned To Jim Pomeroy Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/4/2019 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC:john.barker@cityofaspen.com BCC:jim.pomeroy@cityofaspen.com Attachment:0016.2019.AC B K_Zo n i n g_2.p df Subject:First Round Zoning Comments for 427 RIO GRANDE PL-0016.2019.ACBK Body: Address:427 RIO GRANDE PL Permit Number:0016.2019.ACBK Permit Coordinator:John Barker Hi Nick, https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 6/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition These design documents have been reviewed for conformance with the Land Use Code as adopted and amended by the City of Aspen.You can find a copy of the Land Use Code on our website. Attached are the comments for Zoning.All comments must be addressed.Please revise and redraw the plans to clearly respond to the comments.Revised drawings must clearly show code compliance.Please resubmit the attached comment letters with your written response to each comment.Your response should indicate which detail or specific page shows the required information. Responses such as"will comply with code"are not adequate. Zoning plan check is only one part of the review process by which projects are reviewed for approval.If you choose to begin updating plans prior to receiving comments from all review agencies,you assume the risk of needing to update or otherwise redo your plans. If you have any questions regarding the Zoning comments,please reach out and we can set up a meeting. Re-submittal:When all comments from all agencies have been addressed,contact your Permit Coordinator.If all comments have not been addressed,the resubmittal will be deemed incomplete,and will not be accepted. Jim Pomeroy Zoning Enforcement Officer Community Development 130 S.Galena St. Aspen,CO 81611 p:970-429-2745 c:jim.pomeroy@cityofaspen.com www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contained in the email are based on current zoning,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email: Important!Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To John Barker Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/17/2019 Days in Applicant's Hands To:nickk@cunniffe.com CC: BCC: Attachment:--none-- Subject:Important!Your City of Aspen permit has been moved to new permitting system Body: Dear NICK KETPURA, As you may know,the City of Aspen has been transitioning to a new online-based permitting system,Salesforce.Thank you for your patience during this transition,which is now complete.Your permit is now operational in Salesforce.Your project located at 427 Rio Grande will retain its original permit number,0016.2019.ACBK and you will use this number to find your permit in Comments Salesforce.If you have not already done so,you must register in Salesforce before you are able to access your permit information, upload new documents,or otherwise track the status of your permit.Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support If you have additional questions that are not addressed at the above link,you may reach out directly to city staff for assistance at sfsupport@cityofaspen.com. Sincerely, John Barker City of Aspen Planning Review Type Utilities Billable Assigned To Steve Wilson https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 7/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Number of Hours 3.00 Total Cost $975.00 Fee Generated Date Start Date Completed Date 10/13/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 4/15/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 4/1/2021 Days in Applicant's Hands Comments Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 3/30/2021 Days in Applicant's Hands Comments Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/18/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/16/2021 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 8/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/8/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/26/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/20/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/19/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/6/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 9/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Fee Generated Date Start Date Completed Date 1/5/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 12/9/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 12/4/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 12/1/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 11/24/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 11/20/2020 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 10/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 11/17/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 11/10/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 10/30/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 10/29/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/20/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 11/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Fee Generated Date Start Date Completed Date 10/16/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 10/15/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/14/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 10/6/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/2/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 9/16/2020 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 12/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 9/14/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 9/11/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 9/4/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 8/28/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/28/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 13/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Fee Generated Date Start Date Completed Date 8/19/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/17/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/12/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/23/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/16/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/11/2021 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 14/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/8/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/11/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/1/2021 Days in Applicant's Hands Comments Permit Inspection Type Planning Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/23/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/16/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 15/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Fee Generated Date Start Date Completed Date 1/14/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/12/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/8/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 12/1/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/3/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/29/2020 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 16/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7128/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 7/13/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/7/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/4/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/13/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 17/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Fee Generated Date Start Date Completed Date 5/8/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/7/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 4/27/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/14/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/12/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/11/2020 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 18/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/10/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/26/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/25/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/4/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 1/31/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 19/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Fee Generated Date Start Date Completed Date 1/30/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 1/29/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 1/23/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 1/15/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/10/2020 Days in Applicant's Hands Comments Conditions 0000249 Type Stormwater Other Type Status Closed Date Resolved Last Modified Date 3/11/2020 Contacts NICK KETPURA Account CHARLES CUNNIFFE ARCHITECTS Type Architect Active Contractor License Count 0.00 Number 0021502 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 20/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition NICK KETPURA Account CHARLES CUNNIFFE ARCHITECTS Type Applicant Active Contractor License Count 0.00 Number 0022427 BILLY SALLEE Account SHAW CONSTRUCTION LLC Type Contractor Active Contractor License Count 2.00 Number 0023664 PERRY KLEESPIES Account SHAW CONSTRUCTION LLC Type Representative Active Contractor License Count 2.00 Number 0023715 JACK HUGHES Account SHAW CONSTRUCTION LLC Type Representative Active Contractor License Count 2.00 Number 0023716 Fees 0042990 Type Building Permit Fees Total $78,887.50 Waived/Refunded Amt Discount$ $78,887.50 Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0042993 Type Zoning Review Fee Total $21,628.25 Waived/Refunded Amt Discount$ $21,628.25 Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0042996 Type Construction Mitigation Fee Total $4,333.90 Waived/Refunded Amt Discount$ $4,333.90 Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0042998 Type GIS Fee Total $250.00 Waived/Refunded Amt Discount$ $250.00 Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 21/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Fee Paid Date/Time 0043002 Type Sanitation District Fee Total $270,220.68 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0047709 Type REMP Fee Total $300,252.63 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files Chief Building Official_Clty Hall Skylight_Minimum Height Required IBC_CO_Letter_Template_20211028.docx Per IBC Last Modified 10/28/2021 12:08 PM Last Modified 11/4/2021 7:54 AM Created By Lilly Culver Created By Bob Narracci UC P_Water_Final_20211006.docx UCP_Water_Final_20211013.docx Last Modified 10/6/2021 2:20 PM Last Modified 10/13/2021 10:10 AM Created By Steve Wilson Created By Steve Wilson ASPEN CITY OFFICES NWCCOG PERMIT 20-159 ASPEN CITY OFFICES NWCCOG PERMIT 20-158 Last Modified 9/9/2021 2:25 PM Last Modified 9/14/2021 9:10 AM Created By PERRY KLEESPIES Created By PERRY KLEESPIES CTL Thompson Special Inspection GS06369.000 Completion of ASPEN CITY OFFICES NWCCOG PERMIT 20-158 Services Last Modified 9/9/2021 2:25 PM Last Modified 9/8/2021 3:56 PM Created By PERRY KLEESPIES Created By PERRY KLEESPIES 210907 KLA Structural Closeout Letter with Special Inspection Kumar Special Inspection Compliance Report signed Template-Aspen City Offices Last Modified 9/8/2021 3:56 PM Last Modified 9/8/2021 3:56 PM Created By PERRY KLEESPIES Created By PERRY KLEESPIES Elevator Permit 425 Rio Grande Place-0016.2019.ACBK 2 Elevator Permit 425 Rio Grande Place-0016.2019.ACBK Last Modified 10/28/2020 5:51 AM Last Modified 10/28/2020 5:51 AM Created By Lilly Culver Created By Lilly Culver APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200427.pdf 427 Rio Grande PI Temp Heat Permit Last Modified 4/27/2020 8:06 AM Last Modified 10/26/2020 3:18 PM Created By MITCH MILLER Created By Jan Legersky Building_Permit_20200312.docx Building_Permit_0016.2019.acbk-427 RIO GRANDE PL Last Modified 3/12/2020 4:00 PM Last Modified 3/12/2020 4:06 PM Created By Lilly Culver Created By Lilly Culver 0016-2019-ACBK_BuildingComments_7 CORE Transfer Last Modified 3/5/2020 3:56 PM Last Modified 3/12/2020 11:55 AM Created By Nick Thompson Created By John Barker City Hall Fee Waiver 0016-2019-ACBK_BuildingComments_6 Last Modified 1/27/2020 3:28 PM Last Modified 2/27/2020 3:11 PM Created By John Barker Created By Nick Thompson Plan Set.Civil.425 Rio Grande Place.2019.11.27_ENG COMMENTS 4 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 22/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition 0016.2019.ACBK_427 Rio Grande PI_Engineering 4 Last Modified 12/26/2019 3:11 PM Last Modified 12/26/2019 3:11 PM Created By Hailey Roedel Created By Hailey Roedel 0016.2019.ACBK_Zoning_2 0016.2019.ACBK_427 Rio Grande_Engineering 3 Last Modified 12/4/2019 9:22 AM Last Modified 12/26/2019 1:31 PM Created By Jim Pomeroy Created By Hailey Roedel 0016.2019.acbk fees Last Modified 11/17/2019 6:34 PM Created By John Barker Inspections INS-0005699-19 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 11/21/2019 Completed Date 11/21/2019 Owner Last Name MILLER Permit Inspection Round Midpoint Inspection Closed TRUE INS-00 0591 3-1 9 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 12/12/2019 Completed Date 12/12/2019 Owner Last Name MILLER Permit Inspection Round Closed TRUE I N S-0009553-19 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 12/17/2019 Completed Date 12/17/2019 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0010265-19 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 12/20/2019 Completed Date 12/20/2019 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010969-19 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 12/23/2019 Completed Date 12/23/2019 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 23/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition INS-0000246-20 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 1/10/2020 Completed Date 1/10/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0000658-20 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 1/30/2020 Completed Date 1/30/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0000822-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date Scheduled Start Date 1/15/2020 Completed Date 1/15/2020 Owner Last Name MILLER Permit Inspection Round Closed TRUE INS-0000835-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date Scheduled Start Date 1/22/2020 Completed Date 1/22/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0001500-20 Status Pass/Accepted Type Concrete Subtype Requested Date Scheduled Start Date 1/24/2020 Completed Date 1/24/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0006517-20 Status Re-Inspection Required Type Covid-19 Plan Review Subtype Requested Date 4/23/2020 12:15 PM Scheduled Start Date 4/23/2020 Completed Date 4/23/2020 Owner Last Name MILLER Permit Inspection Round Final Inspection Closed TRUE INS-0001840-20 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 24/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Status Partial/Non-Complete Type Concrete Subtype Requested Date Scheduled Start Date 1/29/2020 Completed Date 1/29/2020 Owner Last Name MILLER Permit Inspection Round Closed TRUE INS-0001858-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date Scheduled Start Date 1/31/2020 Completed Date 1/31/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0001953-20 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 2/26/2020 Completed Date 2/26/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0002012-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 5/7/2020 3:00 PM Scheduled Start Date 5/7/2020 Completed Date 5/7/2020 Owner Last Name MILLER Permit Inspection Round Closed TRUE INS-0002047-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date Scheduled Start Date 2/4/2020 Completed Date 2/4/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE I NS-0002391-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 5/13/2020 10:30 AM Scheduled Start Date 5/13/2020 Completed Date 5/13/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0003873-20 Status Partial/Non-Complete https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 25/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Type Building Subtype Foundation Requested Date Scheduled Start Date 3/6/2020 Completed Date 3/6/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0004196-20 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 3/10/2020 Completed Date 3/10/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0004357-20 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 3/11/2020 Completed Date 3/11/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0004528-20 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 3/12/2020 Completed Date 3/12/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE I NS-0004551-20 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date 5/8/2020 10:30 AM Scheduled Start Date 5/8/2020 Completed Date 5/8/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0004557-20 Status Failed/Rejected Type APECC Subtype Foundation Insulation Requested Date 1/7/2021 10:00 AM Scheduled Start Date 1/7/2021 Completed Date 1/7/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0004559-20 Status Partial/Non-Complete Type Building https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 26/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Subtype Drywall Requested Date 8/3/2020 11:00 AM Scheduled Start Date 8/3/2020 Completed Date 8/3/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0004560-20 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 3/13/2020 6:28 AM Scheduled Start Date 3/13/2020 Completed Date 3/13/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE I NS-0004561-20 Status Partial/Non-Complete Type Concrete Subtype Piers Requested Date 6/25/2020 3:00 PM Scheduled Start Date 6/25/2020 Completed Date 6/25/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0004563-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 7/24/2020 11:00 AM Scheduled Start Date 7/24/2020 Completed Date 7/24/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0004567-20 Status Partial/Non-Complete Type Concrete Subtype Wall Core Requested Date 6/29/2020 10:00 AM Scheduled Start Date 6/29/2020 Completed Date 6/29/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0004568-20 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date 8/17/2020 10:00 AM Scheduled Start Date 8/17/2020 Completed Date 8/17/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0004569-20 Status Accepted as Noted Type APECC Subtype Glazing https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 27/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Requested Date 2/18/2021 9:00 AM Scheduled Start Date 2/18/2021 Completed Date 2/18/2021 Owner Last Name Kanipe Permit Inspection Round Initial Inspection Closed TRUE INS-0004570-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 6/30/2020 10:00 AM Scheduled Start Date 6/30/2020 Completed Date 6/30/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE I NS-0004571-20 Status Partial/Non-Complete Type APECC Subtype Radon Requested Date 6/1/2020 10:00 AM Scheduled Start Date 6/1/2020 Completed Date 6/1/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0004572-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 8/28/2020 11:00 AM Scheduled Start Date 8/28/2020 Completed Date 8/28/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0004573-20 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 8/20/2020 10:00 AM Scheduled Start Date 8/20/2020 Completed Date 8/20/2020 Owner Last Name Parry Permit Inspection Round Initial Inspection Closed TRUE INS-0004578-20 Status Partial/Non-Complete Type Building Subtype Roof Ventilation Requested Date 9/23/2020 11:30 AM Scheduled Start Date 9/23/2020 Completed Date 9/23/2020 Owner Last Name Parry Permit Inspection Round Initial Inspection Closed TRUE INS-0004579-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 8/10/2020 10:30 AM https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 28/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Scheduled Start Date 8/10/2020 Completed Date 8/11/2020 Owner Last Name Parry Permit Inspection Round Initial Inspection Closed TRUE I NS-0004581-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 7/10/2020 3:00 PM Scheduled Start Date 7/10/2020 Completed Date 7/10/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0004582-20 Status Pass/Accepted Type Zoning Subtype Requested Date 9/29/2021 10:14 AM Scheduled Start Date 9/29/2021 Completed Date 10/27/2021 Owner Last Name Narracci Permit Inspection Round Final Inspection Closed TRUE INS-0004583-20 Status Pass/Accepted Type Fire Subtype Requested Date Scheduled Start Date Completed Date 9/2/2021 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0004584-20 Status Accepted as Noted Type Building&Referral Inspection Status Subtype Requested Date 10/25/2021 10:15 AM Scheduled Start Date 10/25/2021 Completed Date 10/25/2021 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0004585-20 Status Waiting on Applicant Type Water Efficient Landscaping Subtype Requested Date 10/6/2021 10:15 AM Scheduled Start Date Completed Date 9/17/2022 Owner Last Name Magill Permit Inspection Round Final Inspection Closed FALSE INS-0004586-20 Status Pass/Accepted Type Recycling Subtype Requested Date 10/8/2021 11:57 AM Scheduled Start Date https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 29/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Completed Date 10/11/2021 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0004587-20 Status Pass/Accepted Type Parking Subtype Requested Date 10/25/2021 10:00 AM Scheduled Start Date Completed Date 10/27/2021 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0004588-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 10/13/2021 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0004589-20 Status Pending Type Engineering Dev Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0004590-20 Status Pass/Accepted Type Sanitation Subtype Requested Date 9/27/2021 10:11 AM Scheduled Start Date Completed Date 10/11/2021 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE I NS-0004591-20 Status Pass/Accepted Type Engineering Erosion&Sediment Subtype Requested Date 10/18/2021 10:45 AM Scheduled Start Date Completed Date 10/13/2021 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0004592-20 Status Pass/Accepted Type Parks Subtype Requested Date 10/6/2021 10:15 AM Scheduled Start Date Completed Date 10/26/2021 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 30/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0004732-20 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 6/26/2020 10:00 AM Scheduled Start Date 6/26/2020 Completed Date 6/26/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0006822-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/27/2020 7:55 AM Scheduled Start Date 4/27/2020 Completed Date 4/27/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0007276-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 5/15/2020 10:00 AM Scheduled Start Date 5/15/2020 Completed Date 5/15/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0007453-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 6/4/2020 12:00 PM Scheduled Start Date 6/4/2020 Completed Date 6/4/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0007687-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 6/4/2020 12:00 PM Scheduled Start Date 6/4/2020 Completed Date 6/4/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0008342-20 Status Pending Type APECC Subtype Radon Requested Date Scheduled Start Date Completed Date Owner Last Name https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 31/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit Inspection Round Re-Inspection Closed FALSE INS-0008558-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 6/25/2020 3:00 PM Scheduled Start Date 6/25/2020 Completed Date 6/25/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0008559-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 11/5/2020 10:00 AM Scheduled Start Date 11/5/2020 Completed Date 11/5/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE I NS-0009641-20 Status Partial/Non-Complete Type Concrete Subtype Piers Requested Date 7/23/2020 10:00 AM Scheduled Start Date 7/23/2020 Completed Date 7/23/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0009642-20 Status Pass/Accepted Type Concrete Subtype Requested Date 11/18/2020 3:30 PM Scheduled Start Date 11/18/2020 Completed Date 11/18/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0009678-20 Status Pass/Accepted Type Concrete Subtype Footings Requested Date 7/29/2020 3:18 PM Scheduled Start Date 7/29/2020 Completed Date 7/29/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0009728-20 Status Partial/Non-Complete Type Concrete Subtype Wall Core Requested Date 7/7/2020 2:00 PM Scheduled Start Date 7/7/2020 Completed Date 7/7/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 32/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Closed TRUE INS-0009765-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 9/23/2020 11:30 AM Scheduled Start Date 9/23/2020 Completed Date 9/23/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0009911-20 Status Partial/Non-Complete Type Concrete Subtype Wall Core Requested Date 7/22/2020 1:00 PM Scheduled Start Date 7/22/2020 Completed Date 7/22/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010168-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 7/28/2020 2:30 PM Scheduled Start Date 7/28/2020 Completed Date 7/28/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010628-20 Status Partial/Non-Complete Type Concrete Subtype Piers Requested Date 7/30/2020 11:00 AM Scheduled Start Date 7/30/2020 Completed Date 7/30/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010670-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 7/31/2020 11:00 AM Scheduled Start Date 7/31/2020 Completed Date 7/31/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010823-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 7/30/2020 11:00 AM Scheduled Start Date 7/30/2020 Completed Date 7/30/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 33/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition INS-0010886-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 8/4/2020 1:00 PM Scheduled Start Date 8/4/2020 Completed Date 8/5/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0010900-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 8/3/2020 11:00 AM Scheduled Start Date 8/3/2020 Completed Date 8/3/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010993-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/11/2020 10:00 AM Scheduled Start Date 8/11/2020 Completed Date 8/11/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0010994-20 Status Pass/Accepted Type Building Subtype Rough Framing Requested Date 8/6/2020 10:00 AM Scheduled Start Date 8/6/2020 Completed Date 8/6/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0011017-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 11/16/2020 1:30 PM Scheduled Start Date 11/16/2020 Completed Date 11/16/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011278-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 10/13/2020 10:00 AM Scheduled Start Date 10/13/2020 Completed Date 10/14/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011346-20 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 34/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/13/2020 10:00 AM Scheduled Start Date 8/13/2020 Completed Date 8/13/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0011356-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 10/1/2020 10:00 AM Scheduled Start Date 10/1/2020 Completed Date 10/1/2020 Owner Last Name MILLER Permit Inspection Round Closed TRUE INS-0011357-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 10/14/2020 11:00 AM Scheduled Start Date 10/14/2020 Completed Date 10/14/2020 Owner Last Name MILLER Permit Inspection Round Closed TRUE INS-0011395-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/18/2020 10:00 AM Scheduled Start Date 8/18/2020 Completed Date 8/18/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011463-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 9/11/2020 10:00 AM Scheduled Start Date 9/11/2020 Completed Date 9/11/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011669-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/20/2020 10:00 AM Scheduled Start Date 8/20/2020 Completed Date 8/20/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0011754-20 Status Partial/Non-Complete https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 35/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Type Concrete Subtype Walls Requested Date 10/5/2020 10:00 AM Scheduled Start Date 10/5/2020 Completed Date 10/5/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011755-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/27/2020 10:00 AM Scheduled Start Date 8/27/2020 Completed Date 8/27/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012075-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 9/3/2020 10:30 AM Scheduled Start Date 9/3/2020 Completed Date 9/3/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012145-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 9/3/2020 10:30 AM Scheduled Start Date 9/3/2020 Completed Date 9/3/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012293-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 9/10/2020 10:00 AM Scheduled Start Date 9/10/2020 Completed Date 9/10/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012294-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 9/10/2020 10:00 AM Scheduled Start Date 9/10/2020 Completed Date 9/10/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012549-20 Status Partial/Non-Complete Type Building https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 36/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Subtype Drywall Requested Date 9/15/2020 10:00 AM Scheduled Start Date 9/15/2020 Completed Date 9/15/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012550-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 10/5/2020 10:00 AM Scheduled Start Date 10/5/2020 Completed Date 10/5/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012654-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 10/14/2020 11:00 AM Scheduled Start Date 10/14/2020 Completed Date 10/14/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012855-20 Status Re-Inspection Required Type Building Subtype Drywall Requested Date 10/19/2020 10:00 AM Scheduled Start Date 10/19/2020 Completed Date 10/19/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0013240-20 Status Pending Type Building Subtype Roof Ventilation Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Re-Inspection Closed FALSE INS-0013242-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 10/12/2020 10:00 AM Scheduled Start Date 10/12/2020 Completed Date 10/12/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0013774-20 Status Partial/Non-Complete Type APECC Subtype Insulation https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 37/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Requested Date 10/5/2020 10:00 AM Scheduled Start Date 10/5/2020 Completed Date 10/5/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0014023-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 10/28/2020 9:30 AM Scheduled Start Date 10/28/2020 Completed Date 10/28/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0014024-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 10/15/2020 11:00 AM Scheduled Start Date 10/15/2020 Completed Date 10/15/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0014288-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 11/19/2020 9:30 AM Scheduled Start Date 11/19/2020 Completed Date 11/19/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0014368-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 10/21/2020 9:30 AM Scheduled Start Date 10/21/2020 Completed Date 10/21/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0014421-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 10/16/2020 9:30 AM Scheduled Start Date 10/16/2020 Completed Date 10/16/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0014422-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 10/16/2020 9:30 AM https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 38/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Scheduled Start Date 10/16/2020 Completed Date 10/16/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0014458-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 10/28/2020 9:30 AM Scheduled Start Date 10/28/2020 Completed Date 10/28/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0014510-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 11/10/2020 11:00 PM Scheduled Start Date 11/10/2020 Completed Date 11/10/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0014512-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 11/6/2020 10:30 AM Scheduled Start Date 11/6/2020 Completed Date 11/6/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0014617-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 10/22/2020 11:30 AM Scheduled Start Date 10/22/2020 Completed Date 10/22/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0014719-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 11/11/2020 10:00 AM Scheduled Start Date 11/11/2020 Completed Date 11/11/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0014767-20 Status Accepted as Noted Type Building Subtype Drywall Requested Date 10/26/2020 10:00 AM Scheduled Start Date 10/26/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 39/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Completed Date 10/26/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0014976-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 10/29/2020 10:00 PM Scheduled Start Date 10/29/2020 Completed Date 10/29/2020 Owner Last Name MILLER Permit Inspection Round Closed TRUE INS-0015030-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 11/10/2020 11:00 AM Scheduled Start Date 11/10/2020 Completed Date 11/10/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0015031-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 11/23/2020 10:30 AM Scheduled Start Date 11/23/2020 Completed Date 11/23/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015079-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 11/5/2020 10:00 AM Scheduled Start Date 11/5/2020 Completed Date 11/5/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015501-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 11/6/2020 10:30 AM Scheduled Start Date 11/6/2020 Completed Date 11/6/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015502-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 12/1/2020 11:00 AM Scheduled Start Date 12/1/2020 Completed Date 12/1/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 40/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015640-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 11/18/2020 10:00 AM Scheduled Start Date 11/18/2020 Completed Date 11/18/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015642-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 1/11/2021 11:00 AM Scheduled Start Date 1/11/2021 Completed Date 1/11/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015783-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 11/17/2020 9:30 AM Scheduled Start Date 11/17/2020 Completed Date 11/17/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015784-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 12/1/2020 11:00 AM Scheduled Start Date 12/1/2020 Completed Date 12/1/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015804-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 11/24/2020 10:00 AM Scheduled Start Date 11/24/2020 Completed Date 11/24/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-001 61 67-2 0 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 12/3/2020 10:30 AM Scheduled Start Date 12/3/2020 Completed Date 12/3/2020 Owner Last Name MILLER https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 41/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit Inspection Round Re-Inspection Closed TRUE INS-0016200-20 Status Pass/Accepted Type APECC Subtype Insulation Requested Date 11/30/2020 10:30 AM Scheduled Start Date 11/30/2020 Completed Date 11/30/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0016245-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 12/3/2020 10:30 AM Scheduled Start Date 12/3/2020 Completed Date 12/3/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0016351-20 Status Partial/Non-Complete Type Concrete Subtype Requested Date 12/11/2020 10:30 AM Scheduled Start Date 12/11/2020 Completed Date 12/11/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0016491-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 12/8/2020 10:00 AM Scheduled Start Date 12/8/2020 Completed Date 12/8/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0016548-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 12/10/2020 1:00 PM Scheduled Start Date 12/10/2020 Completed Date 12/10/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0016695-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 12/3/2020 10:30 AM Scheduled Start Date 12/3/2020 Completed Date 12/3/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 42/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Closed TRUE INS-0016825-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 12/8/2020 10:00 AM Scheduled Start Date 12/8/2020 Completed Date 12/8/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0016827-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 12/14/2020 10:30 AM Scheduled Start Date 12/14/2020 Completed Date 12/14/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0017101-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 12/11/2020 10:30 AM Scheduled Start Date 12/11/2020 Completed Date 12/11/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-00 1 71 02-2 0 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 12/11/2020 10:30 AM Scheduled Start Date 12/11/2020 Completed Date 12/11/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0017246-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 12/11/2020 10:30 AM Scheduled Start Date 12/11/2020 Completed Date 12/11/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0017264-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 12/16/2020 10:30 AM Scheduled Start Date 12/16/2020 Completed Date 12/16/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 43/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition INS-0017265-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 12/14/2020 10:30 AM Scheduled Start Date 12/14/2020 Completed Date 12/14/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0017269-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 12/22/2020 1:00 PM Scheduled Start Date 12/22/2020 Completed Date 12/22/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-001 731 0-2 0 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 12/22/2020 1:00 PM Scheduled Start Date 12/22/2020 Completed Date 12/22/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0017311-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 1/5/2021 10:00 AM Scheduled Start Date 1/5/2021 Completed Date 1/5/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0017452-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 1/11/2021 11:00 AM Scheduled Start Date 1/11/2021 Completed Date 1/11/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0017758-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 1/6/2021 10:00 AM Scheduled Start Date 1/6/2021 Completed Date 1/6/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0017759-20 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 44/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 1/15/2021 9:30AM Scheduled Start Date 1/15/2021 Completed Date 1/15/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0000213-21 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 3/1/2021 11:00AM Scheduled Start Date 3/1/2021 Completed Date 3/1/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0000234-21 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 1/8/2021 9:30 AM Scheduled Start Date 1/8/2021 Completed Date 1/8/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0000246-21 Status Pending Type APECC Subtype Foundation Insulation Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Re-Inspection Closed FALSE INS-0000249-21 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 1/12/2021 10:00 AM Scheduled Start Date 1/12/2021 Completed Date 1/12/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0000390-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 1/14/2021 10:00 AM Scheduled Start Date 1/14/2021 Completed Date 1/14/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE I NS-0000391-21 Status Partial/Non-Complete https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 45/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Type Building Subtype Drywall Requested Date 1/26/2021 10:00 AM Scheduled Start Date 1/26/2021 Completed Date 1/26/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0000394-21 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 1/19/2021 9:30 AM Scheduled Start Date 1/19/2021 Completed Date 1/19/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0000490-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 4/1/2021 1:00 PM Scheduled Start Date 4/1/2021 Completed Date 4/1/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0000497-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 1/29/2021 9:30 AM Scheduled Start Date 1/29/2021 Completed Date 1/30/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0000559-21 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 1/20/2021 10:00 AM Scheduled Start Date 1/20/2021 Completed Date 1/20/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0000575-21 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 2/23/2021 10:00 AM Scheduled Start Date 2/23/2021 Completed Date 2/23/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0000820-21 Status Partial/Non-Complete Type Building https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 46/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Subtype Drywall Requested Date 2/8/2021 10:30 AM Scheduled Start Date 2/8/2021 Completed Date 2/8/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0001015-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 2/2/2021 10:30 AM Scheduled Start Date 2/2/2021 Completed Date 2/2/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0001060-21 Status Pending Type APECC Subtype Insulation Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Re-Inspection Closed FALSE INS-0001191-21 Status Accepted as Noted Type APECC Subtype Insulation Requested Date 2/4/2021 8:10 AM Scheduled Start Date 2/4/2021 Completed Date 2/5/2021 Owner Last Name Kanipe Permit Inspection Round Closed TRUE INS-0001247-21 Status Pass/Accepted Type Building Subtype Drywall Requested Date 2/18/2021 10:30 AM Scheduled Start Date 2/18/2021 Completed Date 2/18/2021 Owner Last Name Kanipe Permit Inspection Round Re-Inspection Closed TRUE INS-00 01 659-21 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 3/16/2021 10:00 AM Scheduled Start Date 3/16/2021 Completed Date 3/16/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0001878-21 Status Partial/Non-Complete Type Building Subtype Drywall https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 47/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Requested Date 3/11/2021 11:30 AM Scheduled Start Date 3/11/2021 Completed Date 3/11/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0002325-21 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 3/16/2021 10:00 AM Scheduled Start Date 3/16/2021 Completed Date 3/16/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0002535-21 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 3/30/2021 8:33 AM Scheduled Start Date 3/30/2021 Completed Date 3/30/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0002536-21 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 3/18/2021 11:30 AM Scheduled Start Date 3/18/2021 Completed Date 3/18/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0002668-21 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 4/14/2021 9:00 AM Scheduled Start Date 4/14/2021 Completed Date 4/15/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0003112-21 Status Pending Type Building Subtype Rough Framing Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Re-Inspection Closed FALSE INS-0003168-21 Status Pending Type APECC Subtype Insulation Requested Date https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 48/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Re-Inspection Closed FALSE INS-0003474-21 Status Pending Type Building Subtype Drywall Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Re-Inspection Closed FALSE INS-0006105-21 Status Accepted as Noted Type APECC Subtype Glazing Requested Date 9/9/2021 10:18 AM Scheduled Start Date 9/10/2021 Completed Date 9/10/2021 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE I NS-0006791-21 Status Pending Type Utilities Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Closed FALSE INS-0006907-21 Status Pending Type Building Subtype Special Building Inspection Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Closed FALSE INS-0006722-24 Status Pending Type Fire Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006723-24 Status Pending Type Zoning Subtype Requested Date Scheduled Start Date https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 49/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006724-24 Status Pending Type Building&Referral Inspection Status Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006725-24 Status Pending Type Water Efficient Landscaping Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006726-24 Status Pending Type Engineering Dev Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006727-24 Status Pending Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006728-24 Status Pending Type Parking Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006729-24 Status Pending Type Recycling Subtype Requested Date Scheduled Start Date Completed Date https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 50/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006730-24 Status Pending Type Parks Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE I NS-0006731-24 Status Pending Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006732-24 Status Pending Type Engineering Erosion&Sediment Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE INS-0006733-24 Status Pending Type Utilities Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE MEP Permit Inspections INS-0005484-19 Status Partial/Non-Complete Type Concrete Subtype Bond Beam Permit 0005.2018.ACBK Requested Date Scheduled Start Date 2/5/2020 Completed Date 2/5/2020 Owner Alias MMill Closed TRUE INS-0005493-19 Status Pass/Accepted Type Building Subtype Final Building Permit 0005.2018.ACBK Requested Date 11/4/2021 1:00 PM Scheduled Start Date 11/4/2021 Completed Date 11/29/2021 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 51/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Owner Alias steve f Closed TRUE INS-0005496-19 Status Partial/Non-Complete Type Concrete Subtype Wall Core Permit 0005.2018.ACBK Requested Date 1/28/2020 7:28 AM Scheduled Start Date 1/28/2020 Completed Date 1/28/2020 Owner Alias MMill Closed TRUE INS-0005502-19 Status Partial/Non-Complete Type Concrete Subtype Walls Permit 0005.2018.ACBK Requested Date 12/10/2019 7:01 AM Scheduled Start Date 12/10/2019 Completed Date 12/10/2019 Owner Alias steve f Closed TRUE INS-0005504-19 Status Pass/Accepted Type Zoning Subtype Permit 0005.2018.ACBK Requested Date Scheduled Start Date 10/29/2021 Completed Date 10/29/2021 Owner Alias JPome Closed TRUE I NS-0005511-19 Status Pass/Accepted Type Fire Subtype Permit 0005.2018.ACBK Requested Date Scheduled Start Date Completed Date 9/2/2021 Owner Alias jlage Closed TRUE INS-0008617-19 Status Pending Type Electric Subtype Rough Electrical Permit 0145-2019-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-00 0861 8-1 9 Status Pending Type Electric Subtype Construction Service Permit 0145-2019-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 52/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Closed FALSE INS-00 0861 9-1 9 Status Pending Type Electric Subtype Permanent Service Permit 0145-2019-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0008620-19 Status Pending Type Electric Subtype Special Electrical Permit 0145-2019-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0008621-19 Status Partial/Non-Complete Type Electric Subtype Underground Permit 0145-2019-ELEC Requested Date 3/11/2020 1:00 PM Scheduled Start Date 3/11/2020 Completed Date 3/11/2020 Owner Alias MMill Closed TRUE INS-0008622-19 Status Pending Type Electric Subtype Final Electrical Permit 0145-2019-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0008623-19 Status Partial/Non-Complete Type Electric Subtype Bonding Permit 0145-2019-ELEC Requested Date 1/6/2020 10:00 AM Scheduled Start Date 1/6/2020 Completed Date 1/6/2020 Owner Alias MMill Closed TRUE INS-001 01 52-1 9 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 8/20/2020 6:55 AM Scheduled Start Date 8/20/2020 Completed Date 8/20/2020 Owner Alias TParr Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 53/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition INS-0010153-19 Status Partial/Non-Complete Type Electric Subtype Construction Service Permit 0156-2019-ELEC Requested Date 1/20/2020 10:37 AM Scheduled Start Date 1/22/2020 Completed Date 1/22/2020 Owner Alias TParr Closed TRUE INS-DO1 01 54-1 9 Status Pass/Accepted Type Electric Subtype Permanent Service Permit 0156-2019-ELEC Requested Date 6/17/2020 10:30 AM Scheduled Start Date 6/17/2020 Completed Date 6/17/2020 Owner Alias TParr Closed TRUE INS-DO1 01 55-1 9 Status Re-Inspection Required Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 10/1/2020 9:00 AM Scheduled Start Date 10/1/2020 Completed Date 10/1/2020 Owner Alias MMill Closed TRUE INS-0010156-19 Status Partial/Non-Complete Type Electric Subtype Underground Permit 0156-2019-ELEC Requested Date 8/18/2020 9:00 AM Scheduled Start Date 8/18/2020 Completed Date 8/18/2020 Owner Alias MMill Closed TRUE INS-0010157-19 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 10/13/2020 10:00 AM Scheduled Start Date 10/13/2020 Completed Date 10/13/2020 Owner Alias MMill Closed TRUE INS-0010158-19 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 11/19/2020 10:00 AM Scheduled Start Date 11/19/2020 Completed Date 11/19/2020 Owner Alias MMill Closed TRUE INS-0006215-20 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 54/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Status Partial/Non-Complete Type Plumbing Subtype Plumbing Underground Permit 0033-2020-PLUM Requested Date 5/28/2020 8:50 PM Scheduled Start Date 5/29/2020 Completed Date 5/29/2020 Owner Alias steve f Closed TRUE INS-0006217-20 Status Accepted as Noted Type Plumbing Subtype Plumbing Gas Pipe Permit 0033-2020-PLUM Requested Date 6/18/2021 12:00 PM Scheduled Start Date 6/18/2021 Completed Date 6/21/2021 Owner Alias MMill Closed TRUE INS-0006218-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Waste&Vent Permit 0033-2020-PLUM Requested Date 11/17/2020 3:08 PM Scheduled Start Date 11/18/2020 Completed Date 11/18/2020 Owner Alias steve f Closed TRUE INS-0006219-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Gas Pipe Permit 0033-2020-PLUM Requested Date 2/17/2021 12:00 PM Scheduled Start Date 2/17/2021 Completed Date 2/17/2021 Owner Alias steve f Closed TRUE INS-0006220-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Waste&Vent Permit 0033-2020-PLUM Requested Date 7/13/2020 5:05 PM Scheduled Start Date 7/14/2020 Completed Date 7/14/2020 Owner Alias MMill Closed TRUE I NS-0006221-20 Status Partial/Non-Complete Type APECC Subtype Insulation Permit 0033-2020-PLUM Requested Date 12/22/2020 10:00 AM Scheduled Start Date 12/22/2020 Completed Date 12/22/2020 Owner Alias steve f Closed TRUE INS-0006222-20 Status Partial/Non-Complete https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 55/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Type Plumbing Subtype Plumbing Water Pipe Permit 0033-2020-PLUM Requested Date 11/17/2020 3:03 PM Scheduled Start Date 11/18/2020 Completed Date 11/18/2020 Owner Alias steve f Closed TRUE INS-0006265-20 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0075-2020-MECH Requested Date 5/20/2020 6:42 AM Scheduled Start Date 5/20/2020 Completed Date 5/20/2020 Owner Alias steve f Closed TRUE INS-0006269-20 Status Partial/Non-Complete Type Mechanical Subtype In-Floor Heat Permit 0075-2020-MECH Requested Date 6/30/2020 10:52 PM Scheduled Start Date 7/1/2020 Completed Date 7/1/2020 Owner Alias MMill Closed TRUE INS-0006270-20 Status Partial/Non-Complete Type Mechanical Subtype In-Floor Heat Permit 0075-2020-MECH Requested Date 11/16/2020 8:11 AM Scheduled Start Date 11/16/2020 Completed Date 11/16/2020 Owner Alias MMill Closed TRUE INS-0006279-20 Status Failed/Rejected Type Mechanical Subtype Final Mechanical Permit 0075-2020-MECH Requested Date 10/15/2021 9:13 AM Scheduled Start Date 10/15/2021 Completed Date 10/15/2021 Owner Alias steve f Closed TRUE INS-0002635-20 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0036-2020-MECH Requested Date 5/19/2020 3:42 PM Scheduled Start Date 5/20/2020 Completed Date 5/20/2020 Owner Alias steve f Closed TRUE I NS-0002641-20 Status Accepted as Noted Type Mechanical https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 56/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Subtype Final Mechanical Permit 0036-2020-MECH Requested Date 10/14/2021 10:00 AM Scheduled Start Date 10/14/2021 Completed Date 10/14/2021 Owner Alias steve f Closed TRUE INS-0008266-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Underground Permit 0033-2020-PLUM Requested Date 12/16/2020 12:00 PM Scheduled Start Date 12/16/2020 Completed Date 12/16/2020 Owner Alias steve f Closed TRUE INS-0008267-20 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0075-2020-MECH Requested Date 11/24/2020 7:30 AM Scheduled Start Date 11/24/2020 Completed Date 11/24/2020 Owner Alias MMill Closed TRUE I NS-0009861-20 Status Partial/Non-Complete Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date 11/30/2020 3:37 PM Scheduled Start Date 12/1/2020 Completed Date 12/1/2020 Owner Alias steve f Closed TRUE INS-0011668-20 Status Partial/Non-Complete Type Electric Subtype Underground Permit 0156-2019-ELEC Requested Date 11/24/2020 4:54 PM Scheduled Start Date 11/25/2020 Completed Date 11/25/2020 Owner Alias MMill Closed TRUE INS-0013773-20 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 12/15/2020 10:00 AM Scheduled Start Date 12/15/2020 Completed Date 12/15/2020 Owner Alias MMill Closed TRUE INS-0014367-20 Status Partial/Non-Complete Type Electric Subtype Permanent Service https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 57/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit 0156-2019-ELEC Requested Date 12/17/2020 10:00 AM Scheduled Start Date 12/17/2020 Completed Date 12/17/2020 Owner Alias MMill Closed TRUE INS-0016249-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Waste&Vent Permit 0033-2020-PLUM Requested Date 1/5/2021 12:00 AM Scheduled Start Date 1/5/2021 Completed Date 1/5/2021 Owner Alias MMill Closed TRUE INS-0016250-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Water Pipe Permit 0033-2020-PLUM Requested Date 12/14/2020 12:00 PM Scheduled Start Date 12/14/2020 Completed Date 12/14/2020 Owner Alias steve f Closed TRUE INS-0016350-20 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 1/5/2021 10:00 AM Scheduled Start Date 1/5/2021 Completed Date 1/5/2021 Owner Alias MMill Closed TRUE INS-0016547-20 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0075-2020-MECH Requested Date 12/14/2020 12:00 PM Scheduled Start Date 12/14/2020 Completed Date 12/14/2020 Owner Alias steve f Closed TRUE INS-0016615-20 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 4/29/2021 10:30 AM Scheduled Start Date 4/29/2021 Completed Date 4/29/2021 Owner Alias RBenn Closed TRUE INS-0016692-20 Status Partial/Non-Complete Type APECC Subtype Snowmelt Permit 0075-2020-MECH https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 58/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Requested Date 12/2/2020 6:39 PM Scheduled Start Date 12/3/2020 Completed Date 12/3/2020 Owner Alias MMill Closed TRUE INS-0016826-20 Status Partial/Non-Complete Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date 12/14/2020 12:00 PM Scheduled Start Date 12/14/2020 Completed Date 12/14/2020 Owner Alias steve f Closed TRUE INS-0017307-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Water Pipe Permit 0033-2020-PLUM Requested Date 1/5/2021 12:00 PM Scheduled Start Date 1/5/2021 Completed Date 1/5/2021 Owner Alias MMill Closed TRUE INS-0017308-20 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0075-2020-MECH Requested Date 7/2/2021 6:37 PM Scheduled Start Date 7/2/2021 Completed Date 7/6/2021 Owner Alias MMill Closed TRUE INS-0017309-20 Status Partial/Non-Complete Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date 3/11/2021 11:30 AM Scheduled Start Date 3/11/2021 Completed Date 3/11/2021 Owner Alias steve f Closed TRUE INS-0017632-20 Status Partial/Non-Complete Type Electric Subtype Permanent Service Permit 0156-2019-ELEC Requested Date 2/26/2021 10:00 AM Scheduled Start Date 2/26/2021 Completed Date 2/26/2021 Owner Alias MMill Closed TRUE INS-0017760-20 Status Partial/Non-Complete Type APECC Subtype Insulation Permit 0033-2020-PLUM Requested Date 1/26/2021 12:00 AM https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 59/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Scheduled Start Date 1/26/2021 Completed Date 1/26/2021 Owner Alias MMill Closed TRUE INS-0000211-21 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Waste&Vent Permit 0033-2020-PLUM Requested Date 3/17/2021 12:00 PM Scheduled Start Date 3/18/2021 Completed Date 3/18/2021 Owner Alias MMill Closed TRUE INS-0000212-21 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 1/19/2021 12:00 PM Scheduled Start Date 1/19/2021 Completed Date 1/19/2021 Owner Alias MMill Closed TRUE I NS-0000221-21 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Water Pipe Permit 0033-2020-PLUM Requested Date 1/26/2021 10:59 AM Scheduled Start Date 1/27/2021 Completed Date 1/27/2021 Owner Alias MMill Closed TRUE INS-0000558-21 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 1/22/2021 10:00 PM Scheduled Start Date 1/22/2021 Completed Date 1/22/2021 Owner Alias MMill Closed TRUE INS-0000765-21 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 1/27/2021 11:00 AM Scheduled Start Date 1/27/2021 Completed Date 1/27/2021 Owner Alias MMill Closed TRUE INS-00 0081 9-21 Status Accepted as Noted Type APECC Subtype Insulation Permit 0033-2020-PLUM Requested Date 2/17/2021 5:26 PM Scheduled Start Date 2/18/2021 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 60/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Completed Date 2/18/2021 Owner Alias SKani Closed TRUE INS-0000836-21 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Water Pipe Permit 0033-2020-PLUM Requested Date 3/17/2021 12:00 PM Scheduled Start Date 3/18/2021 Completed Date 3/18/2021 Owner Alias MMill Closed TRUE INS-0000837-21 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 2/1/2021 10:00 AM Scheduled Start Date 2/1/2021 Completed Date 2/1/2021 Owner Alias MMill Closed TRUE INS-0001039-21 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 2/9/2021 10:00 AM Scheduled Start Date 2/9/2021 Completed Date 2/9/2021 Owner Alias MMill Closed TRUE INS-0001297-21 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 2/19/2021 10:00 AM Scheduled Start Date 2/19/2021 Completed Date 2/19/2021 Owner Alias MMill Closed TRUE INS-0001484-21 Status Partial/Non-Complete Type Plumbing Subtype Final Plumbing Permit 0033-2020-PLUM Requested Date 7/21/2021 10:00 AM Scheduled Start Date 7/21/2021 Completed Date 7/21/2021 Owner Alias steve f Closed TRUE INS-00 01 51 2-21 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 3/5/2021 11:00 AM Scheduled Start Date 3/5/2021 Completed Date 3/5/2021 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 61/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Owner Alias RBenn Closed TRUE INS-0001851-21 Status Accepted as Noted Type Electric Subtype Permanent Service Permit 0156-2019-ELEC Requested Date 3/11/2021 4:16 PM Scheduled Start Date 3/12/2021 Completed Date 3/15/2021 Owner Alias RBenn Closed TRUE INS-0002058-21 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 3/15/2021 4:17 PM Scheduled Start Date 3/16/2021 Completed Date 3/16/2021 Owner Alias RBenn Closed TRUE INS-0002328-21 Status Pass/Accepted Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date 5/7/2021 10:00 AM Scheduled Start Date 5/7/2021 Completed Date 5/7/2021 Owner Alias MMill Closed TRUE INS-0002397-21 Status Pending Type Electric Subtype Rough Electrical Permit 0032-2021-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0002398-21 Status Pending Type Electric Subtype Construction Service Permit 0032-2021-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0002399-21 Status Pending Type Electric Subtype Permanent Service Permit 0032-2021-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 62/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Closed FALSE I N S-0002400-21 Status Pending Type Electric Subtype Special Electrical Permit 0032-2021-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE I NS-0002401-21 Status Pending Type Electric Subtype Underground Permit 0032-2021-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0002402-21 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0032-2021-ELEC Requested Date 5/13/2021 11:00 AM Scheduled Start Date 5/13/2021 Completed Date 5/13/2021 Owner Alias MMill Closed TRUE INS-0002403-21 Status Accepted as Noted Type Electric Subtype Final Electrical Permit 0032-2021-ELEC Requested Date 5/27/2021 10:30 AM Scheduled Start Date 5/27/2021 Completed Date 5/27/2021 Owner Alias MMill Closed TRUE INS-0003010-21 Status Accepted as Noted Type Electric Subtype Rough Electrical Permit 0034-2021-ELEC Requested Date 3/29/2021 12:55 PM Scheduled Start Date 3/30/2021 Completed Date 3/30/2021 Owner Alias RBenn Closed TRUE I NS-0003011-21 Status Pending Type Electric Subtype Construction Service Permit 0034-2021-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 63/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition INS-0003012-21 Status Accepted as Noted Type Electric Subtype Permanent Service Permit 0034-2021-ELEC Requested Date 7/15/2021 3:30 PM Scheduled Start Date Completed Date 7/16/2021 Owner Alias RBenn Closed TRUE INS-0003013-21 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0034-2021-ELEC Requested Date 4/29/2021 12:00 PM Scheduled Start Date 4/30/2021 Completed Date 4/30/2021 Owner Alias RBenn Closed TRUE INS-0003014-21 Status Pending Type Electric Subtype Underground Permit 0034-2021-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0003015-21 Status Re-Inspection Required Type Electric Subtype Final Electrical Permit 0034-2021-ELEC Requested Date 8/12/2021 12:29 PM Scheduled Start Date 8/12/2021 Completed Date 8/12/2021 Owner Alias RBenn Closed TRUE INS-0003016-21 Status Pending Type Electric Subtype Bonding Permit 0034-2021-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0003472-21 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 4/15/2021 1:00 PM Scheduled Start Date 4/15/2021 Completed Date 4/16/2021 Owner Alias RBenn Closed TRUE INS-0003957-21 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 64/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Status Accepted as Noted Type Electric Subtype Special Electrical Permit 0156-2019-ELEC Requested Date 5/13/2021 9:45 AM Scheduled Start Date 5/13/2021 Completed Date 5/13/2021 Owner Alias MMill Closed TRUE INS-0004149-21 Status Accepted as Noted Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date 5/21/2021 8:00 AM Scheduled Start Date 5/21/2021 Completed Date 5/21/2021 Owner Alias MMill Closed TRUE INS-0004159-21 Status Pass/Accepted Type Electric Subtype Underground Permit 0156-2019-ELEC Requested Date 5/21/2021 10:00 AM Scheduled Start Date 5/21/2021 Completed Date 5/21/2021 Owner Alias MMill Closed TRUE INS-0004207-21 Status Failed/Rejected Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 5/25/2021 9:45 AM Scheduled Start Date 5/25/2021 Completed Date 5/25/2021 Owner Alias MMill Closed TRUE INS-0004288-21 Status Re-Inspection Required Type Electric Subtype Rough Electrical Permit 0034-2021-ELEC Requested Date 5/27/2021 4:00 PM Scheduled Start Date 5/28/2021 Completed Date 5/28/2021 Owner Alias MMill Closed TRUE INS-0004303-21 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0034-2021-ELEC Requested Date 6/7/2021 1:32 PM Scheduled Start Date 6/8/2021 Completed Date 6/8/2021 Owner Alias RBenn Closed TRUE I NS-0004501-21 Status Pass/Accepted https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 65/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Type Electric Subtype Rough Electrical Permit 0156-2019-ELEC Requested Date 6/10/2021 10:00 AM Scheduled Start Date 6/10/2021 Completed Date 6/10/2021 Owner Alias RBenn Closed TRUE INS-0004583-21 Status Accepted as Noted Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date 6/15/2021 9:00 AM Scheduled Start Date 6/15/2021 Completed Date 6/16/2021 Owner Alias MMill Closed TRUE INS-0004585-21 Status Pass/Accepted Type Electric Subtype Permanent Service Permit 0156-2019-ELEC Requested Date 6/15/2021 10:30 AM Scheduled Start Date 6/15/2021 Completed Date 6/15/2021 Owner Alias RBenn Closed TRUE INS-0004646-21 Status Accepted as Noted Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date 6/18/2021 12:00 PM Scheduled Start Date 6/18/2021 Completed Date 6/21/2021 Owner Alias MMill Closed TRUE INS-0004678-21 Status Pass/Accepted Type Electric Subtype Permanent Service Permit 0156-2019-ELEC Requested Date 6/22/2021 10:00 AM Scheduled Start Date 6/22/2021 Completed Date 6/22/2021 Owner Alias RBenn Closed TRUE INS-0004956-21 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0075-2020-MECH Requested Date 8/6/2021 2:00 PM Scheduled Start Date 8/6/2021 Completed Date 8/6/2021 Owner Alias steve f Closed TRUE INS-0004993-21 Status Failed/Rejected Type APECC https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 66/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Subtype Snowmelt Permit 0075-2020-MECH Requested Date 7/9/2021 8:19 AM Scheduled Start Date 7/9/2021 Completed Date 7/9/2021 Owner Alias steve f Closed TRUE INS-0005036-21 Status Pending Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date Scheduled Start Date Completed Date Owner Alias Building-Inspection Closed FALSE INS-0005252-21 Status Failed/Rejected Type Plumbing Subtype Final Plumbing Permit 0033-2020-PLUM Requested Date 8/25/2021 11:07 AM Scheduled Start Date 8/25/2021 Completed Date 8/25/2021 Owner Alias steve f Closed TRUE INS-0005654-21 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0034-2021-ELEC Requested Date 8/16/2021 11:29 AM Scheduled Start Date 8/17/2021 Completed Date 8/17/2021 Owner Alias RBenn Closed TRUE INS-0005670-21 Status Accepted as Noted Type APECC Subtype Snowmelt Permit 0075-2020-MECH Requested Date 8/13/2021 9:00 AM Scheduled Start Date 8/13/2021 Completed Date 8/13/2021 Owner Alias RBenn Closed TRUE INS-0005759-21 Status Partial/Non-Complete Type Electric Subtype Final Electrical Permit 0156-2019-ELEC Requested Date 11/3/2021 10:00 AM Scheduled Start Date 11/3/2021 Completed Date 8/18/2021 Owner Alias RBenn Closed TRUE INS-0005788-21 Status Pass/Accepted Type Electric Subtype Final Electrical https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 67/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Permit 0156-2019-ELEC Requested Date 8/25/2021 10:30 AM Scheduled Start Date 8/25/2021 Completed Date 8/25/2021 Owner Alias RBenn Closed TRUE I NS-0005791-21 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0156-2019-ELEC Requested Date 8/31/2021 10:15 AM Scheduled Start Date 8/31/2021 Completed Date 8/31/2021 Owner Alias RBenn Closed TRUE INS-0005874-21 Status Failed/Rejected Type Plumbing Subtype Final Plumbing Permit 0033-2020-PLUM Requested Date 10/15/2021 9:35 AM Scheduled Start Date 10/15/2021 Completed Date 10/15/2021 Owner Alias steve f Closed TRUE INS-0006486-21 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0156-2019-ELEC Requested Date 9/29/2021 10:15 AM Scheduled Start Date 9/29/2021 Completed Date 9/29/2021 Owner Alias RBenn Closed TRUE INS-0006904-21 Status Pending Type Plumbing Subtype Final Plumbing Permit 0033-2020-PLUM Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0006920-21 Status Pending Type Mechanical Subtype Final Mechanical Permit 0075-2020-MECH Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE I N S-0006921-21 Status Pending Type Mechanical Subtype Final Mechanical Permit 0075-2020-MECH https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 68/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0006923-21 Status Pending Type Plumbing Subtype Final Plumbing Permit 0033-2020-PLUM Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0007262-21 Status Pending Type Electric Subtype Final Electrical Permit 0156-2019-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs-Inspection Closed FALSE INS-0007267-21 Status Accepted as Noted Type Plumbing Subtype Plumbing Water Pipe Permit 0033-2020-PLUM Requested Date 11/5/2021 10:39 AM Scheduled Start Date 11/5/2021 Completed Date 11/5/2021 Owner Alias steve f Closed TRUE I NS-0000301-22 Status Pass/Accepted Type Mechanical Subtype Rough Mechanical Permit 0075-2020-MECH Requested Date 1/27/2022 10:00 AM Scheduled Start Date 1/27/2022 Completed Date 1/27/2022 Owner Alias BCIin Closed TRUE INS-0002768-23 Status Failed/Rejected Type APECC Subtype Foundation Insulation Permit 0004.2018.ACBK Requested Date 6/13/2023 2:21 PM Scheduled Start Date 6/13/2023 Completed Date 6/13/2023 Owner Alias RBenn Closed TRUE Milestones Review Round 1 -0016.2019.ACBK Status Not Approved Due Date Created Date 11/17/2019 Review Round 2.0-0016.2019.ACBK https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 69/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Status Not Approved Due Date Created Date 12/4/2019 Review Round 3-0016.2019.ACBK Status Approved Due Date Created Date 3/10/2020 Open Activities Permit Review Type Building Status In Progress Assigned To Nick Thompson Start Date Completed Date Comments Payments PY-005633 Related To 0016.2019.ACBK Amount $570,473.31 Created Date 3/12/2020 Payment Source R-0005337 Receipt-Amount Remaining R-0005337:$0 Permit History 12/9/2024 10:36 AM User Renee Espinoza Action Changed Owner from Fernando Cruz to Sydney Fallon. 12/9/2024 10:35 AM User Renee Espinoza Action Changed Status from Closed-Final to Issued. 12/2/2024 4:46 PM User Fernando Cruz Action Changed Status from Issued to Closed-Final. 12/2/2024 4:45 PM User Fernando Cruz Action Changed Owner from Sydney Fallon to Fernando Cruz. Related Permits 0004.2018.ACBK Type Building Address 427 RIO GRANDE PL Work Type New Status Issued Applicant NICK KETPURA Issue Date 4/12/2019 Last Activity Date 6/15/2023 0005.2018.ACBK Type Building Address 427 RIO GRANDE PL Work Type New Status Issued Applicant Issue Date 1/29/2019 Last Activity Date 8/22/2022 0036-2020-MECH Type Mechanical Address 427 RIO GRANDE PL Work Type New Status Closed-Final Applicant GREGORY C MARTIN https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 70/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Issue Date 3/2/2020 Last Activity Date 10/14/2021 0025-2020-BCHO Type Change Order Address 427 RIO GRANDE PL Work Type New Status Closed-Final Applicant NICK KETPURA Issue Date 8/26/2020 Last Activity Date 0156-2019-ELEC Type Electrical Address 427 RIO GRANDE PL Work Type New Status Issued Applicant CODY FLEMING Issue Date 12/17/2019 Last Activity Date 11/4/2021 0145-2019-ELEC Type Electrical Address 425 RIO GRANDE PL Work Type New Status Issued Applicant CODY FLEMING Issue Date 12/5/2019 Last Activity Date 3/18/2020 0033-2020-PLUM Type Plumbing Address 427 RIO GRANDE PL Work Type New Status Issued Applicant JOHN MURRAY Issue Date 4/14/2020 Last Activity Date 11/7/2021 0075-2020-MECH Type Mechanical Address 427 RIO GRANDE PL Work Type New Status Issued Applicant JOHN MURRAY Issue Date 4/15/2020 Last Activity Date 1/27/2022 20-0842 Type Change Order Address 427 RIO GRANDE PL Work Type New Status Cancelled Applicant NICK KETPURA Issue Date Last Activity Date 20-1225 Type Change Order Address 427 RIO GRANDE PL Work Type New Status Cancelled Applicant NICK KETPURA Issue Date Last Activity Date 0038-2020-BCHO https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 71/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Type Change Order Address 427 RIO GRANDE PL Work Type New Status Closed-Final Applicant NICK KETPURA Issue Date 3/17/2021 Last Activity Date 0061-2020-FIRE Type Fire Address 427 RIO GRANDE PL Work Type New Status Closed-Final Applicant RYAN CLAY Issue Date 8/14/2020 Last Activity Date 20-2192 Type Change Order Address 427 RIO GRANDE PL Work Type New Status Cancelled Applicant NICK KETPURA Issue Date Last Activity Date 0034-2021-ELEC Type Electrical Address 427 RIO GRANDE PL Work Type New Status Closed-Final Applicant Ember Shannnon Sage Jones Issue Date 3/29/2021 Last Activity Date 8/17/2021 0032-2021-ELEC Type Electrical Address 427 RIO GRANDE PL Work Type New Status Issued Applicant AARON SALAZAR Issue Date 4/5/2021 Last Activity Date 5/28/2021 0038-2021-RW RG Type Right of Way Address 427 RIO GRANDE PL Work Type New Status Closed-Final Applicant PERRY KLEESPIES Issue Date 5/19/2021 Last Activity Date 9/11/2023 Reviews REV-011907 Milestone Review Round 3-0016.2019.ACBK Status Approved Type Engineering Water Due Date Completed Date 3/12/2020 11:44 AM Owner Alias SWilson On Hold Created Date 3/10/2020 REV-011908 Milestone Review Round 3-0016.2019.ACBK Status Approved Type Zoning https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 72/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Due Date Completed Date 3/11/2020 8:57 AM Owner Alias JPome On Hold Created Date 3/10/2020 REV-011909 Milestone Review Round 3-0016.2019.ACBK Status Approved Type Building Due Date Completed Date 3/10/2020 3:03 PM Owner Alias NThom On Hold Created Date 3/10/2020 REV-009757 Milestone Review Round 2.0-0016.2019.ACBK Status Approved Type Recycling Due Date Completed Date 3/9/2020 1:31 PM Owner Alias NTsev On Hold Created Date 12/4/2019 REV-009758 Milestone Review Round 2.0-0016.2019.ACBK Status Approved Type Engineering Water Due Date Completed Date 3/12/2020 8:52 AM Owner Alias SWilson On Hold Created Date 12/4/2019 REV-009759 Milestone Review Round 2.0-0016.2019.ACBK Status Approved Type Engineering Dev Due Date Completed Date 1/2/2020 1:39 PM Owner Alias HGugl On Hold Created Date 12/4/2019 REV-009760 Milestone Review Round 2.0-0016.2019.ACBK Status Closed-Not Needed Type Fire Due Date Completed Date 3/5/2020 3:57 PM Owner Alias Fire-Review On Hold Created Date 12/4/2019 REV-009761 Milestone Review Round 2.0-0016.2019.ACBK Status Closed-Re-Review Created Type Zoning Due Date Completed Date 12/4/2019 9:20 AM Owner Alias JPome On Hold Created Date 12/4/2019 https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 73/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition REV-009762 Milestone Review Round 2.0-0016.2019.ACBK Status Closed-Re-Review Created Type Building Due Date Completed Date 3/10/2020 8:22 AM Owner Alias NThom On Hold Created Date 12/4/2019 REV-008831 Milestone Review Round 1 -0016.2019.ACBK Status Approved Type Parks Due Date Completed Date 11/10/2019 6:32 PM Owner Alias DRade On Hold Created Date 11/17/2019 REV-008832 Milestone Review Round 1 -0016.2019.ACBK Status Approved Type Parking Due Date Completed Date 11/18/2019 10:51 AM Owner Alias Parking-Review On Hold Created Date 11/17/2019 REV-008833 Milestone Review Round 1 -0016.2019.ACBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 11/17/2019 6:33 PM Owner Alias rmagi On Hold Created Date 11/17/2019 REV-008834 Milestone Review Round 1 -0016.2019.ACBK Status Approved Type Sanitation Due Date Completed Date 11/17/2019 6:31 PM Owner Alias CStra On Hold Created Date 11/17/2019 REV-008835 Milestone Review Round 1 -0016.2019.ACBK Status Closed-Re-Review Created Type Recycling Due Date Completed Date 12/4/2019 9:14 AM Owner Alias EH Recycling-Review On Hold Created Date 11/17/2019 REV-008836 Milestone Review Round 1 -0016.2019.ACBK Status Closed-Re-Review Created Type Engineering Water Due Date Completed Date 12/4/2019 9:14 AM https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 74/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Owner Alias Engineering Water-Review On Hold Created Date 11/17/2019 REV-008837 Milestone Review Round 1 -0016.2019.ACBK Status Approved Type Engineering CMP Due Date Completed Date 11/17/2019 6:33 PM Owner Alias Engineering CMP-Review On Hold Created Date 11/17/2019 REV-008838 Milestone Review Round 1 -0016.2019.ACBK Status Closed-Re-Review Created Type Engineering Dev Due Date Completed Date 10/31/2019 10:43 AM Owner Alias HGugl On Hold Created Date 11/17/2019 REV-008839 Milestone Review Round 1 -0016.2019.ACBK Status Approved with Conditions Type Engineering Erosion&Sediment Due Date Completed Date 12/4/2019 7:27 AM Owner Alias AReed On Hold Created Date 11/17/2019 REV-008840 Milestone Review Round 1 -0016.2019.ACBK Status Closed-Re-Review Created Type Fire Due Date Completed Date 12/4/2019 9:16 AM Owner Alias Fire-Review On Hold Created Date 11/17/2019 REV-008841 Milestone Review Round 1 -0016.2019.ACBK Status Closed-Re-Review Created Type Zoning Due Date Completed Date 11/18/2019 11:53 AM Owner Alias JPome On Hold Created Date 11/17/2019 REV-008842 Milestone Review Round 1 -0016.2019.ACBK Status Closed-Re-Review Created Type Building Due Date Completed Date 12/4/2019 9:16 AM Owner Alias Building-Review On Hold Created Date 11/17/2019 Submissions COVID Site Safety Plan.pdf Actions https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 75/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Submission Date 4/23/2020 12:11 PM Status Required Description COVID Site Safety Plan(1)Rev.1.pdf Actions Submission Date 4/23/2020 5:13 PM Status Required Description 425 Rio Grande Aspen Electric Load Form-Application for Service MSB1.pdf Actions Submission Date 1/19/2021 3:04 PM Status Required Description 425 Rio Grande Aspen Electric Load Form-Application for Service MSB2.pdf Actions Submission Date 1/19/2021 3:04 PM Status Required Description Kumar Special Inspection Compliance Report signed.pdf Actions Upload Submission Date Status Required Description 210907 KLA Structural Closeout Letter with Special Inspection Template-Aspen C Actions Upload Submission Date Status Required Description CTL Thompson Special Inspection GS06369.000 Completion of Services.pdf Actions Upload Submission Date Status Required Description Kumar Special Inspection Compliance Report signed.pdf Actions Upload Submission Date Status Required Description 210907 KLA Structural Closeout Letter with Special Inspection Template-Aspen C Actions Upload Submission Date Status Required Description CTL Thompson Special Inspection GS06369.000 Completion of Services.pdf Actions Upload Submission Date Status Required https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 76/77 2/14/25,3:27 PM 0016.2019.ACBK—Salesforce-Enterprise Edition Description 210907 KLA Structural Closeout Letter with Special Inspection Template-Aspen C Actions Upload Submission Date Status Required Description 210907 KLA Structural Closeout Letter with Special Inspection Template-Aspen C Actions Upload Submission Date Status Required Description 210907 KLA Structural Closeout Letter with Special Inspection Template-Aspen C Actions Upload Submission Date Status Required Description CTL Thompson Special Inspection GS06369.000 Completion of Services.pdf Actions Upload Submission Date Status Required Description Kumar Special Inspection Compliance Report signed.pdf Actions Upload Submission Date Status Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000kZrtkAAC/p 77/77