Loading...
HomeMy WebLinkAboutFile Documents.427 Rio Grande Pl.0016.2019 (3).ACBK 0016.2019.ACBK_MEP&EN ERGY_BuildingCommentsl Comcheck Envelope.425 Rio Grande Place.2019.03.pdf(4) Subject: PlanCheck n��COMcheckSoftwareVesion4.1.1.0 Page Label: 1 The interior lighting and v I envelo�m^ a'e"a,��om��^^°°^ tificatE Author:justinh mechanical ComCheck shows °° uses reduced lighting power density R°°°°M°ae° File Name: Comcheck Envelope.425 Rio Grande ^° °^'w°"°° ^° °^°°° as the additional efficiency Place.2019.03.pdf requ re°men,s,°r Mean-silo Color • package option. Revise this to 11 be consistent with that as the plans do not show that you meet Additional°X Malley Pm re the requirements for the on-site renewable energy option. Subject: PlanCheck Page Label: 1 1)No exterior wall assemblies or Author:justinh vertical fenestration are being File Name: Comcheck Envelope.425 Rio Grande accounted for on this report, Place.2019.03.pdf revise to accurately despite the Color: • entire thermal envelope. _.m ~-~°•�=�-�=-a~==. -°~ 2) Identify all assemblies with a mk level or compass orientation in the description so that I can tell which plan assemblies these are meant to show(north exterior wall, lower level floor, etc.). 3)Submit the entire report, you've only submitted pages 1-2 of 12. 4)Revise all assemblies to match the corresponding architectural details, be sure you are entering the insulation types correctly(spray foam interrupted by framing is cavity insulation, not continuous insulation). Subject: PlanCheck Page Label: 1 Provide a spec on the proposed oe°°a,xN qm ma, skylight that has a compliant =TVT"" Author:justinh File Name: Comcheck Envelope.425 Rio Grande haze factor per IECC penC8161 Place.2019.03.pdf C402.4.2.2. Buildingar Color: ■ Mcheck Software Version 4.1.1.0 Subject: PlanCheck nrelope Compliance Certificate Page Label: 1 Fully fill out these portions of the Author:justinh project information on all ComCheck reports(address, File Name: Comcheck Envelope.425 Rio Grande „rcc c°mcnaax rev°ro Place.2019.03.pdf phone number, etc.) Color: ■ Comcheck Lighting.425 Rio Grande Place.2019.03.pdf(2) IlMericr LigM1tlng Compliance Subject: PlanCheck 1 Certificate Page Label: 1 1)Fixture A is a 20.5 W fixture at Author:justinh the lumen package highlighed File Name: Comcheck Lighting.425 Rio Grande on the cutsheet. -- °_ Place.2019.03.pdf 2)Fixture D appears to be a 48 • --- •- Color: • W fixture(12W/ft at the high :m..;_ _ ,._ •___ . output option)per the cutsheet. LLS 3)Provide a spec for the driver for fixture J,the driver will be what determines the wattage maximum for this fixture. Identify the quantity of proposed drivers and use that as the quantity for the fixture. 4)Provide a cutsheet for fixture Q, none currently provided 5)Please revise the fixture counts for fixtures C and D for accuracy, I am counting 122 of C and 13 of D. Subject: PlanCheck -Cutsheet for fixture SB does not Page Label: 2 give a maximum fixture wattage, --�- Author:justinh submit documentation of the File Name: Comcheck Lighting.425 Rio Grande Place.2019.03.pdf fixture wattage claimed here for Color: • that fixture. Comcheck Mech.425 Rio Grande Place.2019.03.pdf(5) Subject: PlanCheck Page Label: 1 Per the Mechanical ComCheck eck re Version 4.0.81 only one piece of equipment apicalcai Compliance Certificate Author:justinh File Name: Comcheck Mech.425 Rio Grande actually has an efficiency Per M1e MecM1enicel ComCM1eck only one pie�of eQuipment requirement(electric storage aeaallyM1asaneRe`,Zerageireme (ger"peorage Place.2019.03.pdf a.er,,a"°'harpia°a=araM1aingsM1maa^°' water heater), all other pieces this.I do not understand Can your equipment Color: • this.I do not untlers�antl how visually all of your egulDmeM ,a.emp r°managy odaa clencyreQUlremeMa. are being shown as not having =pe^ m a°^ any efficiency requirement. Can w'•'. you please explain this, I do not understand how virtually all of your equipment is exempt from energy code efficiency requirements. -tea=-�.- -•°—,— Subject: PlanCheck � Page Label: 1 WWHP 3 has cooling capacity of v m Author:justinh 721 kBtu/h per the mechanical File Name: Comcheck Mech.425 Rio Grande schedule. Place.2019.03.pdf Color: • Subject: PlanCheck „_ Page Label: 1 Mechanical schedule does not Author:justinh show a CUH 11 or 12 (CUH-10 File Name: Comcheck Mech.425 Rio Grande is repeated in the schedule)and °°— Place.2019.03.pdf I do not see where CUH-5 or 6 is ._,.._. -. Color: • accounted for. Please revise. Subject: PlanCheck Page Label: 2 Return fan cfm does not match Author:justinh what is shown in the mechanical File Name: Comcheck Mech.425 Rio Grande schedule. m:�..,tam Place.2019.03.pdf Color: ■ 4 2.0.1— Subject: PlanCheck Page Label: 2 I can not find this piece of Author:justinh equipment in any of the 4 . File Name: Comcheck Mech.425 Rio Grande mechanical schedules, please 115322222- Place.2019.03.pdf revise or clarify. Color: • CREMP.425 Rio Grande Place.2019.03.pdf(1) -,ma, Subject: PlanCheck Page Label: 1 Provide a snowmelt plan,what is Provide a snowman plan.what is curtently mechanical sdecl ledcesnotmachwhat .,m. 'e�ew�, Author:justinh currently shown in the you are showing here.Your square File Name: CREMP.425 Rio Grande Place.2019.03.pdf mechanical plans and youareshowingbeaccuursantl Ptl"p' " consistent in an relevant plan ..°' Wee mechanical schedule does not sets/schedules.Provide a spec on the m Color: • proposed boiler,I could not locate it on the ° mechanical schedules. Now, =com°, _ . ,o match what you are showing here.Your square footages need °'°°°`w" to be accurate and consistent in all relevant plan sets/schedules. .,=m.,< a,o „O!oo, Provide a spec on the proposed boiler, I could not locate it on the mechanical schedules. JUSTIN Plan Set.Arch.425 Rio Grande Place.2019.03.pdf(6) o t ...,. Subject: PlanCheck EVATION Provide calculations 3EO__ �, ___ Page Label:A3.1 EXTERIOR ELEVATIONS to Author:justinh demonstrating that total vertical File Name: JUSTIN Plan Set.Arch.425 Rio Grande fenestration area is less than CT) Q CT) 4 Q C Place.2019.03.pdf 30%of the gross above-grade 1 Color: • wall area per IECC C402.4.1. fl .., . ;rlaaaaaammaaaaa:Ia mumanin f'�II�!;Ih..a...■ rr.n■■■■ ...MEN' Subject: PlanCheck Page Label:A3.2- EXTERIOR ELEVATIONS Calculate the projection factor ION Author:justinh for your south, east and west File Name: JUSTIN Plan Set.Arch.425 Rio Grande facing windows and demonstrate Calculate the projection factor for your south east Place.2019.03.pdf that you are meeting the solar and west facing windows and demonstrate that you heat gain coefficient(SHGC) meeting the solar heat gain coeficient(SHGC) Color: • are meeting IECC°'02A.3. requirement of IECC C402.4.3. Subject: PlanCheck Y m m J m,I qq)i Page Label:A5.3-WALL SECTIONS You have thermal bridging in 'i ma. Author:justinh many of these similar locations. ii I File Name: JUSTIN Plan Set.Arch.425 Rio Grande Revise all wall sections and oIr l .I: applicable details to demonstrate ColorPlace.2019.03.pdf how thermal bridging will be ;a , E l ' Color: • Iola .• r avoided. la roc: _., Subject: PlanCheck Page Label:A9.1 - ROOF, WALL,AND FLOOR Provide documentation that you . am, ASSEMBLIES can apply spray foam over your r'''' Author:justinh spray applied fireproofing. File Name: JUSTIN Plan Set.Arch.425 Rio Grande _,AND BMWS.BED dlll!iill1 MEDIA Place.2019.03.pdf / FILTER ` tf °I Color: ■ fin-n n i- a�Eao a� .r „ 6� �a.a�a: �� tea. ------ It a Subject: PlanCheck Page Label:A10.3-WINDOW SCHEDULE You cannot mix prescriptive and Author:justinh total UA alternative(ComCheck) ��-- ® ~" compliance methods,your File Name: JUSTIN Plan Set.Arch.425 Rio Grande „ `— --__ 7.:, r Place.2019.03.pdf envelope must fully comply with Color: • one method or the other. Specific window U value information needs to be entered into the ComCheck. '—'-i- ---- — Subject: PlanCheck WARNNPage Label: A10.5-DOOR SCHEDULE All doors opening into or out of MNELEVATOR RATED DOORS TO BE 90 Author:justinh a vestibule shall be equipped File Name: JUSTIN Plan Set.Arch.425 Rio Grande with self closing devices. Note All doors opening into or out of Place.2019.03.pdf this on the door schedule. a vestibule shall be equipped with self-closing devices. Note Color: • this on the door schedule. Plan Set.Electrical.425 Rio Grande Place.2019.03.pdf(1) Subject: PlanCheck Page Label: E6.0- ELECTRICAL SCHEDULES Per the envelopeoComCheck Author:justinh skylight area is 4/o of the roof File Name: Plan Set.Electrical.425 Rio Grande area,which requires daylight responsive controls for all Color: lighting within the skylight e MKK Color: • daylight zone per IECC C402.4.1.2. Please note that am o= this will be required at TI.