HomeMy WebLinkAboutFile Documents.427 Rio Grande Pl.0016.2019 (3).ACBK 0016.2019.ACBK_MEP&EN ERGY_BuildingCommentsl
Comcheck Envelope.425 Rio Grande Place.2019.03.pdf(4)
Subject: PlanCheck
n��COMcheckSoftwareVesion4.1.1.0 Page Label: 1 The interior lighting and
v I envelo�m^ a'e"a,��om��^^°°^ tificatE Author:justinh mechanical ComCheck shows
°° uses reduced lighting power density
R°°°°M°ae° File Name: Comcheck Envelope.425 Rio Grande
^° °^'w°"°° ^° °^°°° as the additional efficiency
Place.2019.03.pdf
requ re°men,s,°r Mean-silo
Color • package option. Revise this to
11 be consistent with that as the
plans do not show that you meet
Additional°X Malley Pm re the requirements for the on-site
renewable energy option.
Subject: PlanCheck
Page Label: 1 1)No exterior wall assemblies or
Author:justinh vertical fenestration are being
File Name: Comcheck Envelope.425 Rio Grande accounted for on this report,
Place.2019.03.pdf revise to accurately despite the
Color: • entire thermal envelope.
_.m ~-~°•�=�-�=-a~==. -°~ 2) Identify all assemblies with a
mk level or compass orientation in
the description so that I can tell
which plan assemblies these are
meant to show(north exterior
wall, lower level floor, etc.).
3)Submit the entire report,
you've only submitted pages 1-2
of 12.
4)Revise all assemblies to
match the corresponding
architectural details, be sure you
are entering the insulation types
correctly(spray foam interrupted
by framing is cavity insulation,
not continuous insulation).
Subject: PlanCheck
Page Label: 1 Provide a spec on the proposed
oe°°a,xN qm ma, skylight that has a compliant
=TVT"" Author:justinh
File Name: Comcheck Envelope.425 Rio Grande haze factor per IECC
penC8161 Place.2019.03.pdf C402.4.2.2.
Buildingar Color: ■
Mcheck Software Version 4.1.1.0 Subject: PlanCheck
nrelope Compliance Certificate Page Label: 1 Fully fill out these portions of the
Author:justinh project information on all
ComCheck reports(address,
File Name: Comcheck Envelope.425 Rio Grande
„rcc c°mcnaax rev°ro
Place.2019.03.pdf phone number, etc.)
Color: ■
Comcheck Lighting.425 Rio Grande Place.2019.03.pdf(2)
IlMericr LigM1tlng Compliance Subject: PlanCheck
1 Certificate Page Label: 1 1)Fixture A is a 20.5 W fixture at
Author:justinh the lumen package highlighed
File Name: Comcheck Lighting.425 Rio Grande on the cutsheet.
-- °_ Place.2019.03.pdf 2)Fixture D appears to be a 48
• --- •- Color: • W fixture(12W/ft at the high
:m..;_ _ ,._ •___ . output option)per the cutsheet.
LLS 3)Provide a spec for the driver
for fixture J,the driver will be
what determines the wattage
maximum for this fixture.
Identify the quantity of proposed
drivers and use that as the
quantity for the fixture.
4)Provide a cutsheet for fixture
Q, none currently provided
5)Please revise the fixture
counts for fixtures C and D for
accuracy, I am counting 122 of
C and 13 of D.
Subject: PlanCheck
-Cutsheet for fixture SB does not
Page Label: 2 give a maximum fixture wattage,
--�- Author:justinh submit documentation of the
File Name: Comcheck Lighting.425 Rio Grande
Place.2019.03.pdf fixture wattage claimed here for
Color: • that fixture.
Comcheck Mech.425 Rio Grande Place.2019.03.pdf(5)
Subject: PlanCheck
Page Label: 1 Per the Mechanical ComCheck
eck re Version 4.0.81 only one piece of equipment
apicalcai Compliance Certificate Author:justinh
File Name: Comcheck Mech.425 Rio Grande actually has an efficiency
Per M1e MecM1enicel ComCM1eck only one pie�of eQuipment requirement(electric storage
aeaallyM1asaneRe`,Zerageireme (ger"peorage Place.2019.03.pdf
a.er,,a"°'harpia°a=araM1aingsM1maa^°' water heater), all other pieces
this.I do
not understand
Can your
equipment
Color: •
this.I do not untlers�antl how visually all of your egulDmeM
,a.emp r°managy odaa clencyreQUlremeMa. are being shown as not having
=pe^ m a°^ any efficiency requirement. Can
w'•'. you please explain this, I do not
understand how virtually all of
your equipment is exempt from
energy code efficiency
requirements.
-tea=-�.- -•°—,— Subject: PlanCheck
� Page Label: 1 WWHP 3 has cooling capacity of
v m Author:justinh 721 kBtu/h per the mechanical
File Name: Comcheck Mech.425 Rio Grande schedule.
Place.2019.03.pdf
Color: •
Subject: PlanCheck
„_ Page Label: 1 Mechanical schedule does not
Author:justinh show a CUH 11 or 12 (CUH-10
File Name: Comcheck Mech.425 Rio Grande is repeated in the schedule)and
°°— Place.2019.03.pdf I do not see where CUH-5 or 6 is
._,.._. -. Color: • accounted for. Please revise.
Subject: PlanCheck
Page Label: 2 Return fan cfm does not match
Author:justinh what is shown in the mechanical
File Name: Comcheck Mech.425 Rio Grande schedule.
m:�..,tam Place.2019.03.pdf
Color: ■
4 2.0.1—
Subject: PlanCheck
Page Label: 2 I can not find this piece of
Author:justinh equipment in any of the
4 .
File Name: Comcheck Mech.425 Rio Grande mechanical schedules, please
115322222- Place.2019.03.pdf revise or clarify.
Color: •
CREMP.425 Rio Grande Place.2019.03.pdf(1)
-,ma, Subject: PlanCheck
Page Label: 1 Provide a snowmelt plan,what is
Provide a snowman plan.what is curtently
mechanical sdecl ledcesnotmachwhat .,m. 'e�ew�, Author:justinh currently shown in the
you are showing here.Your square File Name: CREMP.425 Rio Grande Place.2019.03.pdf mechanical plans and
youareshowingbeaccuursantl Ptl"p' "
consistent in an relevant plan ..°' Wee mechanical schedule does not
sets/schedules.Provide a spec on the m Color: •
proposed boiler,I could not locate it on the °
mechanical schedules. Now, =com°, _ . ,o match what you are showing
here.Your square footages need
°'°°°`w" to be accurate and consistent in
all relevant plan sets/schedules.
.,=m.,< a,o „O!oo, Provide a spec on the proposed
boiler, I could not locate it on the
mechanical schedules.
JUSTIN Plan Set.Arch.425 Rio Grande Place.2019.03.pdf(6)
o t ...,. Subject: PlanCheck
EVATION Provide calculations
3EO__ �, ___ Page Label:A3.1 EXTERIOR ELEVATIONS
to
Author:justinh demonstrating that total vertical
File Name: JUSTIN Plan Set.Arch.425 Rio Grande fenestration area is less than
CT) Q CT) 4 Q C Place.2019.03.pdf 30%of the gross above-grade
1
Color: • wall area per IECC C402.4.1.
fl
.., . ;rlaaaaaammaaaaa:Ia mumanin
f'�II�!;Ih..a...■ rr.n■■■■
...MEN'
Subject: PlanCheck
Page Label:A3.2- EXTERIOR ELEVATIONS Calculate the projection factor
ION Author:justinh for your south, east and west
File Name: JUSTIN Plan Set.Arch.425 Rio Grande facing windows and demonstrate
Calculate the projection factor for your south east Place.2019.03.pdf that you are meeting the solar
and west facing windows and demonstrate that you heat gain coefficient(SHGC)
meeting the solar heat gain coeficient(SHGC) Color: •
are meeting
IECC°'02A.3. requirement of IECC C402.4.3.
Subject: PlanCheck
Y m m J m,I qq)i Page Label:A5.3-WALL SECTIONS You have thermal bridging in
'i ma. Author:justinh many of these similar locations.
ii I File Name: JUSTIN Plan Set.Arch.425 Rio Grande Revise all wall sections and
oIr l .I: applicable details to demonstrate
ColorPlace.2019.03.pdf how thermal bridging will be
;a , E l ' Color: •
Iola .• r avoided.
la
roc: _.,
Subject: PlanCheck
Page Label:A9.1 - ROOF, WALL,AND FLOOR Provide documentation that you
.
am, ASSEMBLIES can apply spray foam over your
r'''' Author:justinh spray applied fireproofing.
File Name: JUSTIN Plan Set.Arch.425 Rio Grande
_,AND BMWS.BED
dlll!iill1 MEDIA Place.2019.03.pdf
/ FILTER ` tf °I Color: ■
fin-n n i-
a�Eao a� .r
„ 6� �a.a�a:
�� tea.
------ It
a Subject: PlanCheck
Page Label:A10.3-WINDOW SCHEDULE You cannot mix prescriptive and
Author:justinh total UA alternative(ComCheck)
��-- ® ~" compliance methods,your
File Name: JUSTIN Plan Set.Arch.425 Rio Grande
„ `— --__ 7.:, r Place.2019.03.pdf envelope must fully comply with
Color: • one method or the other.
Specific window U value
information needs to be entered
into the ComCheck.
'—'-i- ---- — Subject: PlanCheck
WARNNPage Label: A10.5-DOOR SCHEDULE All doors opening into or out of
MNELEVATOR
RATED DOORS TO BE 90 Author:justinh a vestibule shall be equipped
File Name: JUSTIN Plan Set.Arch.425 Rio Grande with self closing devices. Note
All doors opening into or out of Place.2019.03.pdf this on the door schedule.
a vestibule shall be equipped
with self-closing devices. Note Color: •
this on the door schedule.
Plan Set.Electrical.425 Rio Grande Place.2019.03.pdf(1)
Subject: PlanCheck
Page Label: E6.0- ELECTRICAL SCHEDULES Per the envelopeoComCheck
Author:justinh skylight area is 4/o of the roof
File Name: Plan Set.Electrical.425 Rio Grande area,which requires daylight
responsive controls for all
Color:
lighting within the skylight
e MKK Color: •
daylight zone per IECC
C402.4.1.2. Please note that
am o= this will be required at TI.