HomeMy WebLinkAboutFile Documents.427 Rio Grande Pl.0016.2019 (4).ACBK 0016.2019
Plan Set.Arch.425 Rio Grande Place.2019.03.pdf(18)
Page:A0.8-PROJECT SF CALCULATIONS
EN
Checkmark: Unchecked These ramps count as FA
Author:jimp
File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
These ramps count
Mini aM
Page:A0.8-PROJECT SF CALCULATIONS
Checkmark: Unchecked These stairs count as FA on this level
Author:jimp
A on this leelun`as File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
Bit
;, EXISTING PARKING
GARAGE-SEE TABLE ON
NISHEET AO 9
itQ Page:A0.9-GROSS BUILDING AREASNet Leasable?
Checkmark: Unchecked
rAuthor:jimp
File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
IN.Lemio 1-}-'''''''''''''
AN Li
Page:A0.9-GROSS BUILDING AREAS This is shown as FA in existing sheet.
r"r..� Checkmark: Unchecked Please reconcile.
11,■ Author:jimp
_ File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
r 4
ti r
a
`t- r,
Page:A0.9-GROSS BUILDING AREAS
Checkmark: Unchecked The gross square footage for the City
Author:jimp Offices is larger than the 37,080 sq ft. in
File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf the approvals. There is a provision
�i1P p�rewmm as e .�—.. however to increase the allowance by
10%. I understand that this design is in
flux right now. If you decide to move
forward with a square footage above
37,080 then please let me know and we
will determine the process to amend the
approvals to match the new square
footage before permit issuance.
Page:A0.9-GROSS BUILDING AREAS
m,. E, —,.i Checkmark: Unchecked This should be 3708=2806+902 (grand
.-- Author:jimp staircase)
tos w z„
. > , I"" File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
-, me, :::u...., Page:A1.1 -ARCHITECTURAL SITE PLAN
ii"i.::: . ;� Checkmark: Unchecked Exterior stairs are always counted as
6.' deck. Since these seem to be on the City
� is Author:jimp
rw�_,c '� % File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf property, even if they are in an easement,
-ry`. they will need to be included in the new
\ c> buildings deck totals.
Page:A1.2- INTERPOLATED ARCHITECTURAL SITE PLAN
mi Can you please provide north-south and
.. ,,.
ice+ Checkmark: Unchecked
��i� east-west sections through this point
•��i Author:jimp
�� File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf showing interpolated grade. Because this
v
.�wrL e7.u �e�
411 eGei$I�, point is within the footprint of the building,
,•.,.,m ,= as per 26.575.020.F.3.b), height will be
_; 4. measured from natural grade.
Page:A1.2- INTERPOLATED ARCHITECTURAL SITE PLAN
;: ° ;a®IMI. Checkmark: Unchecked This column not needed
® Author:jimp
® File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
Y
Page:A1.2- INTERPOLATED ARCHITECTURAL SITE PLAN These grades do not match what is
Checkmark: Unchecked
_ -� Author:jimp shown on the North elevation on sheet
File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf A3.1.That sheet shows a natural
elevation of at least a foot lower. Also,
the natural grade should be the same for
each point based on the elevation.
Page:A1.2- INTERPOLATED ARCHITECTURAL SITE PLAN
None of the natural grades being shown
Checkmark: Unchecked for these heightpoints alongthe street
At... - Author:jimp g
• _�.� match what is beingshown as natural
al •..•\ . File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
�F . ••.. (interpolated)grade on the elevations.
calE '••• Please amend.
'la l
_ . 4 1p
Page:A1.2- INTERPOLATED ARCHITECTURAL SITE PLAN Please move this column to the end of the
- °°- °a`-`-maim 1d°. . a Checkmark: Unchecked chart
Author:jimp
® File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
— ®!`�
G
Page:A1.2- INTERPOLATED ARCHITECTURAL SITE PLAN The code measures height from Natural
Checkmark: Unchecked
Author:jimp Grade-rather than existing grade. In this
i..,: ., File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf case, natural grade is interpolated
Ii
m > p (historic)grade. Please update the chart
to reflect this.
77 I Page:A2.2-MAIN LEVEL REFERENCEFLOOR PLAN
■ Checkmark: Unchecked Showers and lockers from approvals?
's r 'i I Author:jimp
$ i i File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
r
0-',,. Page:A2.4-UPPER LEVEL REFERENCEFLOOR PLAN
NE
Checkmark: Unchecked Kitchen from approvals?
Author:jimp
File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
-I;-',
111
Page:A3.1 -EXTERIOR ELEVATIONS
Checkmark: Unchecked Signs cannot be approved with the
• Author:jimp Building Permit. These will need to be
c: 1041= submitted as part of a separate Sign
��: -= j— File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf
_ mo Permit.
in:..uu.
jinni III1-1I
- Page:A3.1 -EXTERIOR ELEVATIONS
..= -- �::■.::■■■ Checkmark: Unchecked Signs cannot be approved with the
1111R11111 ammAuthor:jimp Building Permit. These will need to be
Monew:. .�. File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf submitted as part of a separate Sign
MU"1t�ii�illl�� Permit.
,I�=�,�-,::hI I; Page:A3.1 -EXTERIOR ELEVATIONS
llholieli Signs cannot be approved with the
Checkmark: Unchecked
111 jl1 711E l Ilii` li Building Permit. These will need to be
LI::::::, : -_ Author:jimp
 submitted as part of a separate Sign
File Name: Plan Set.Arch.425 Rio Grande Place.2019.03.pdf Permit.
o
1TION
Plan Set.Landscape.425 Rio Grande Place.2019.03.pdf(3)
Page: L7-04-SITE DETAILS
Checkmark: Unchecked We will require more information on the
Author:jimp height of these walls. If the specific
File Name: Plan Set.Landscape.425 Rio Grande height of each wall is listed somewhere
j x,_ 3 else, please reference the exact location
--_ Place.2019.03.pdf
in your responses. If not, please label the
M „IiL 01! ! highest point with TOW and BOW.
Page: L7-06 SITE DETAILS We will require cut sheets and pictures for
® Checkmark: Unchecked
each of these fixtures to show code
Author:jimp
_. t File Name: Plan Set.Landscape.425 Rio Grande compliance with the City of Aspen
Place.2019.03.pdf Lighting Code. Please not specifically
with the bench light,that any linear
---- M lighting is prohibited in the City.
Page: L7-07-SITE DETAILS
Checkmark: Unchecked Signage cannot be approved as a part of
Author:jimp the building permit. You will need to
fy File Name: Plan Set.Landscape.425 Rio Grande submit a separate sign permit
y� ; ,R ' � Place.2019.03.pdf