HomeMy WebLinkAboutFile Documents.427 Rio Grande Pl.0016.2019 (10).ACBK 0016-2019-ACBK_BuildingComments_8
COMcheck Envelope.425 Rio Grande Place.2020.03.06.pdf(2)
Subject: PlanCheck
°-"- :1 .00 00 oe; Page: 1 Roof 6 references detail
aa.. Page Index: 1 R-5/A9.1 which shows R-10
—
w o Author: nickt continuous and R-30 cavity
�• eo Color: •■ insulation. Revise Comcheck to
File Name: COMcheck Envelope.425 Rio Grande match (not R 40 cavity).
"..„--- "°' - - a"= a Place.2020.03.06.pdf
:w-= - Subject: PlanCheck
.,.,.=7. °,��s °e ;e Page: 1 Floor 1 references detail
;v.���:"`__ a ea oa � m., Page Index: 1 C 3/A9.1 which shows R 20
® �m Author: nickt continuous and R-20 cavity
trgtEu® Color: •ut
insulation. Revise Comcheck to
File Name: COMcheck Envelope.425 Rio Grande match (not R 40 cavity).
"' `"" "_°""`"` "" Place.2020.03.06.pdf
Plan Set.Arch.425 Rio Grande Place.2020.03.06.pdf(2)
Subject: PlanCheck
Page:A0.8a COMCHECK EXHIBITS Roof 6 should include the area
II Page Index: 16 of the skylight. The skylight is in
it and COMcheck subtracts it.
�� Author: nickt Roof 6 area would be closer to
Color: •
File Name: Plan Set.Arch.425 Rio Grande 526 sgft. Revise A0.8a and
Place.2020.03.06.pdf Comcheck.
- s -,v " Subject: PlanCheck
- „. 1 Page:A5.4 WALL SECTIONS There doesn't appear to be
I ,111. Page Index: 46 enough space to get R-40 cavity
:�
rmi Author: nickt insulation (Floor 6, Roof 5).The
/ „ . Color: • wall section shows what looks
,„m File Name: Plan Set.Arch.425 Rio Grande like R-13 batts in the cavity and
Place.2020.03.06.pdf some amount of continuous
insulation (R5? R10?). Revise
IIICOMcheck to match.
� � (This is at the bay window)