Loading...
HomeMy WebLinkAboutFile Documents.427 Rio Grande Pl.0016.2019 (10).ACBK 0016-2019-ACBK_BuildingComments_8 COMcheck Envelope.425 Rio Grande Place.2020.03.06.pdf(2) Subject: PlanCheck °-"- :1 .00 00 oe; Page: 1 Roof 6 references detail aa.. Page Index: 1 R-5/A9.1 which shows R-10 — w o Author: nickt continuous and R-30 cavity �• eo Color: •■ insulation. Revise Comcheck to File Name: COMcheck Envelope.425 Rio Grande match (not R 40 cavity). "..„--- "°' - - a"= a Place.2020.03.06.pdf :w-= - Subject: PlanCheck .,.,.=7. °,��s °e ;e Page: 1 Floor 1 references detail ;v.���:"`__ a ea oa � m., Page Index: 1 C 3/A9.1 which shows R 20 ® �m Author: nickt continuous and R-20 cavity trgtEu® Color: •ut insulation. Revise Comcheck to File Name: COMcheck Envelope.425 Rio Grande match (not R 40 cavity). "' `"" "_°""`"` "" Place.2020.03.06.pdf Plan Set.Arch.425 Rio Grande Place.2020.03.06.pdf(2) Subject: PlanCheck Page:A0.8a COMCHECK EXHIBITS Roof 6 should include the area II Page Index: 16 of the skylight. The skylight is in it and COMcheck subtracts it. �� Author: nickt Roof 6 area would be closer to Color: • File Name: Plan Set.Arch.425 Rio Grande 526 sgft. Revise A0.8a and Place.2020.03.06.pdf Comcheck. - s -,v " Subject: PlanCheck - „. 1 Page:A5.4 WALL SECTIONS There doesn't appear to be I ,111. Page Index: 46 enough space to get R-40 cavity :� rmi Author: nickt insulation (Floor 6, Roof 5).The / „ . Color: • wall section shows what looks ,„m File Name: Plan Set.Arch.425 Rio Grande like R-13 batts in the cavity and Place.2020.03.06.pdf some amount of continuous insulation (R5? R10?). Revise IIICOMcheck to match. � � (This is at the bay window)