Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Sub Permit.427 Rio Grande Pl.0016.2019 (3).ACBK
2/14/25,3:29 PM 0025-2020-BCHO—Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0025-2020-BCHO Number 0025-2020-BCHO Record Type Change Order Address 427 RIO GRANDE PL Owner John Barker Original Number 20-0687 Status Closed-Final Type Change Order Reason for Cancel or Comp!. Review Fail Applicant NICK KETPURA Aspen Internal? No Account CHARLES CUNNIFFE ARCHITECTS Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 312-286-247 Master Building Permit 0016.2019.ACBK HPC-ZON-EH-UTIL Review EH-Rcyl Rev, Permit Contractor SHAW CONSTRUCTION LLC HPC-ZON-EH-UTIL Review-2 Valid Business License on Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev, Account Imported Parks-Prkng-San Review Water-LSE Rev,Parking Rev, Required Submissions Conditional Inspections Documents Resubmitted Conditional Final Insp Approved Covid-19 Plan ,/ Action Items Hold All Reviews Create Fees Hold Reason Create Fees 2 ,/ Conditional Flat Fee Formula Price Book 2020 Conditional Tiered Fee Formula Applicant is a Nonprofit? No Conditional Tiered SqFt Fee Discount All Fees(%) Formula Fee Discount Reason Queue Score Project Designation Milestone Current Days in Applicant Hand Queue Designation Milestone Current Days in City Hands Queue Score 0 Milestone-Total Days in Applicant Hand Last Date Received from Milestone-Total Days in City Applicant Hands Dates New Application Date 3/24/2020 TCO Issuance Date Application Complete Date 3/25/2020 Close/CO Issuance Date 2/24/2021 Application Accepted Date 3/25/2020 Last Activity Date Issue Date 8/26/2020 Expiration Date Days to Issue 154 Due Date Override Expiration Date Basic Information Description Change Order 01 Census Code **Change Order Stair 004 Revision Parking Garage Ramp Elimination Rio Grande Plaza Elevator Foundation Revision Use of Building Commercial Use Class Commercial Class of Work Other Permit Comments Job Location Address 427 RIO GRANDE PL,ASPEN:273707306852 Lot 2 https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 1/9 2/14/25,3:29 PM 0025-2020-BCHO—Salesforce-Enterprise Edition Site Address Display on Map Legal Description Subdivision:RIO GRANDE Lot:2 PARKING GARAGE Historic Property? No Eden Address Historic District? No HPC-Planning-Zoning Details Zone District HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of Yes Appropriateness? ADU Sq Ft Work Involves a Land Use Yes Approval? Deed Restricted? No Located in a PD? Yes #of Dwellings 0 Adds/Changes Floor Area? Category of Zoning Fee Change Order Occupancy or Use Change? No Zoning Work Level Work Affects Exterior of Building? Building Project Details Valuation $0.00 Lot Size Sq.Ft. 6,666 Reason for Valuation Change Not CO valuation, Soil Disturbance Sq Ft 42,842 Unit Sq.Ft. 193,941 Affected Area Sq Ft 42,842 Building Footprint Sq Ft Existing Hardscape Footprint Sq 29,332 Ft Sq Ft of Building Work Area 40,712 Existing Hardscape%of Lot 440% Building Fire Area Sq Ft Con Mit Sq Ft Total 83,554 Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 42,842 of Interior being Altered 0% New Sq.Ft. 40,712 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Line? No Footprint? Work Changes No Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? No Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes No Work Subject to Water Efficient No Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? No Involved? Change of Restaurant No Prevents Access to Sewer Main? No Ownership? Affects Parking/Alleys/Loading? Yes Sewer Easements Affected? No Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Size of Existing Domestic Water Irrigation? Line Irrigated Area Sq Ft Number of Meters Proposed Identify ALL Sources of Water Size of Existing Fire Suppression Line Is There a Pool,Spa or Water Size of Proposed Domestic Feature? Water Line Summary of Prior Water Fees Size of Proposed Fire Paid Suppression Line Building Description https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 2/9 2/14/25,3:29 PM 0025-2020-BCHO—Salesforce-Enterprise Edition Code Editions 2015 IBC Required Special Inspections High-Strength Bolting;Epoxy Anchors;Structural Steel Welding;Permanent Micropiles;Sprayed Fire-Resistants Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type IIB Total Spa Sq Ft Fire Sprinkler Existing? Total Pool Sq Ft Fire Sprinkler Required? Yes Amount of Onsite Renewable Generation? Fire Sprinkler Type NFPA 13 CO Description Fire Alarms Installed? NFPA 72 Basement #Wood Fireplaces 1st Floor #Gas Log Fireplaces 2nd Floor #Gas Appliances 3rd Floor Open Text Field For Comments Additional Financials Total Fees $0.00 Total Payments Total Balance $0.00 System Information Number 0025-2020-BCHO Community Visibility ,/ Bluebeam Project Id 312-286-247 Contact IDs 0036A00000mXQWjQAO,0033s000010dsAZAAY,0036A00000vw69JQAQ,0033s000010djMnAAI BB Project Name 427 RIO GRANDE PL-0025-2020- Last Modified By Aspen Avocette,9/28/2024 1:52 AM BCHO Created By NICK KETPURA,3/24/2020 7:04 AM VIP Form Tool VIP 3/24/2020 VIP Permit Application Submitted 12:10 PM Form Template VIP VIP [("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"), Foreign Template ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"), Language Status ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"}, ("parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvV UAS"}, ("parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"}, ("parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"}, ("parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwva UAC"), ("parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"), ("parentCategoryld":null,"isSubmintrue,"isCurrent":null,"categoryStatusLabels":nul l,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC")] Action Items View/Print Permit Link Attachment Activity History Email:Building Permit 0025-2020-BCHO-427 RIO GRANDE PL,ASPEN:273707306852-Issued Type Billable Assigned To Lisa Guida Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/26/2020 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200504.pdf Subject:Building Permit 0025-2020-BCHO-427 RIO GRANDE PL,ASPEN:273707306852-Issued Body: Dear NICK KETPURA, Please find attached your issued building permit 0025-2020-BCHO for 427 RIO GRANDE PL,ASPEN:273707306852 and City use tax exemption letter& Covid-19 site safety plan approval notice(if applicable) Below is a link to your plans and information regarding inspections.Please print these 24x36 in color and keep them on site at all times.As a reminder these drop box links do expire so please download the plans as soon as you get them. https://www.d ropbox.com/s h/vzx37j ir4teiw9h/AACyrlxkzz_kLGYgm95m N K68a?d1=0 If you have any questions please let us know. https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 3/9 2/14/25,3:29 PM 0025-2020-BCHO—Salesforce-Enterprise Edition Kind regards, Lisa Guida City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Permit Fees Due Type Billable Assigned To Denis Murray Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/21/2020 Days in Applicant's Hands To:nickk@cunniffe.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due Body: If you have not already paid the fees due on your permit 0025-2020-BCHO,at 427 RIO GRANDE PL,ASPEN:273707306852,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,130 S Galena St.,3rd Floor •Construction parking permits:Parking Department,201 N Mill St.,Garden Level •Pitkin County Water Permit(Landscape Efficiency):Utilities Dept.,500 Doolittle Dr. Comments •ROW and encroachments:201 N Mill St.,Suite 203 •Tree permits:Parks Dept.,130 S Galena St. •Utility Connection Permits:Utilities Dept.,500 Doolittle Dr. Current Amount Due:$1,325.00 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email:Building Comments-0025-2020-BCHO-427 RIO GRANDE PL Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/23/2020 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC:denis.murray@cityofaspen.com BCC: Attachment:0025-2020-BC H O_Bu ildi ngCom ments_1.pdf Subject:Building Comments-0025-2020-BCHO-427 RIO GRANDE PL Body: Hello NICK KETPURA, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:427 RIO GRANDE PL Permit Number:0025-2020-BCHO Permit Coordinator:John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 4/9 2/14/25,3:29 PM 0025-2020-BCHO—Salesforce-Enterprise Edition Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner Community Development 130 S Galena St. Aspen,CO 81611 p:970.429.2757 c:970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Engineering Comments-0025-2020-BCHO-427 Rio Grande Type Billable Assigned To Hailey Roedel Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/10/2020 Days in Applicant's Hands To:nickk@cunniffe.com CC:hailey.guglielmo@cityofaspen.com BCC: Attachment:--none-- Subject:Engineering Comments-0025-2020-BCHO-427 Rio Grande Body: For the micropile foundation wall,how is the system designed to avoid the permanent dewatering system below.There needs to be a guarantee grout will not travel to ACES again.How is this accomplished?Is the intent of this change order to address the issue? Note 3.4 on BY-7 states"Groundwater was assumed to be below the bottom of the micropiles."From previous experience we know this is not the case. Remove this note and ensure the design accounts for the groundwater. Please address with a memo explanation if the groundwater is accounted for.Give me a call if you would like to discuss. Thanks. Comments Hailey Guglielmo,PE Development Engineer Engineering Department 201 N Mill St.Ste 203 Aspen,CO 81611 p:970.429.2751 www.cityofaspen.com The City of Aspen is ramping up its efforts to minimize potential exposure to COVID-19 by pro-actively engaging in social distancing.If you need to contact us please do so by phone or email.Thank you for your understanding. Permit Review Type Zoning Billable ✓ Assigned To Jim Pomeroy Number of Hours 2.00 Total Cost $650.00 Fee Generated Date 2/25/2021 Start Date Completed Date 9/9/2020 Days in Applicant's Hands Comments Permit Review Type Engineering Billable Assigned To Hailey Roedel Number of Hours 4.00 Total Cost $1,300.00 Fee Generated Date https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 5/9 2/14/25,3:29 PM 0025-2020-BCHO—Salesforce-Enterprise Edition Start Date Completed Date 7/8/2020 Days in Applicants Hands Comments Permit Review Type Building Billable ✓ Assigned To Nick Thompson Number of Hours 3.00 Total Cost $975.00 Fee Generated Date 5/20/2020 Start Date Completed Date 5/19/2020 Days in Applicant's Hands Comments Permit Review Type Zoning Billable ✓ Assigned To Jim Pomeroy Number of Hours 1.00 Total Cost $325.00 Fee Generated Date 5/6/2020 Start Date Completed Date 5/5/2020 Days in Applicant's Hands Comments Contacts NICK KETPURA Account CHARLES CUNNIFFE ARCHITECTS Type Applicant Active Contractor License Count 0.00 Number 0026008 PERRY KLEESPIES Account SHAW CONSTRUCTION LLC Type Contractor Active Contractor License Count 2.00 Number 0026009 JACK HUGHES Account SHAW CONSTRUCTION LLC Type Contractor Active Contractor License Count 2.00 Number 0035530 BILLY SALLEE Account SHAW CONSTRUCTION LLC Type Contractor Active Contractor License Count 2.00 Number 0035529 Fees 0048073 Type Change Order Fee Total $25.00 Waived/Refunded Amt Discount$ $25.00 Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0048969 Type Zoning Hourly Fee Total $325.00 Waived/Refunded Amt Discount$ $325.00 Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 6/9 2/14/25,3:29 PM 0025-2020-BCHO—Salesforce-Enterprise Edition Fee Paid Date/Time 0049233 Type Building Hourly Review Fee Total $975.00 Waived/Refunded Amt Discount$ $975.00 Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0056394 Type Zoning Hourly Fee Total $650.00 Waived/Refunded Amt Discount$ $650.00 Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full ✓ Fee Paid Date/Time Files APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200504.pdf 0025-2020-BCHO_BuildingComments_1 Last Modified 5/4/2020 8:23 AM Last Modified 4/23/2020 9:46 AM Created By Patrick Harris Out of Office for the season,message @TimRohe for help. Created By Nick Thompson Permit Application 2020-03-24 18:10:24.pdf Last Modified 3/24/2020 12:10 PM Created By NICK KETPURA Milestones Review Round 1-0025-2020-BCHO Status Approved Due Date Created Date 3/25/2020 Review Round 2-0025-2020-BCHO Status Approved Due Date Created Date 5/5/2020 Related Permits 0139-2020-TREE Type Tree Address 455 RIO GRANDE PL Work Type New Status Closed-Final Applicant Robert Schober Issue Date 8/18/2020 Last Activity Date Reviews REV-013098 Milestone Review Round 2-0025-2020-BCHO Status Approved Type Building Due Date Completed Date 5/19/2020 3:54 PM Owner Alias NThom On Hold Created Date 5/19/2020 REV-012134 Milestone Review Round 1-0025-2020-BCHO Status Closed-Not Needed Type Parking Due Date Completed Date 3/25/2020 11:52 AM Owner Alias Parking-Review On Hold Created Date 3/25/2020 https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 7/9 2/14/25,3:29 PM 0025-2020-BCHO-Salesforce-Enterprise Edition REV-012135 Milestone Review Round 1-0025-2020-BCHO Status Closed-Not Needed Type Water Efficient Landscaping Due Date Completed Date 3/25/2020 11:52 AM Owner Alias Water Efficient Landscaping-Review On Hold Created Date 3/25/2020 REV-012136 Milestone Review Round 1-0025-2020-BCHO Status Closed-Not Needed Type Recycling Due Date Completed Date 3/25/2020 11:53 AM Owner Alias EH Recycling-Review On Hold Created Date 3/25/2020 REV-012137 Milestone Review Round 1-0025-2020-BCHO Status Closed-Not Needed Type Fire Due Date Completed Date 4/23/2020 9:45 AM Owner Alias Fire-Review On Hold Created Date 3/25/2020 REV-012138 Milestone Review Round 1-0025-2020-BCHO Status Approved Type Zoning Due Date Completed Date 5/5/2020 11:05 AM Owner Alias JPome On Hold Created Date 3/25/2020 REV-012139 Milestone Review Round 1-0025-2020-BCHO Status Approved Type Building Due Date Completed Date 4/23/2020 9:46 AM Owner Alias NThom On Hold Created Date 3/25/2020 REV-012140 Milestone Review Round 1-0025-2020-BCHO Status Approved Type Engineering Dev Due Date Completed Date 4/10/2020 8:53 AM Owner Alias HGugl On Hold Created Date 3/25/2020 REV-012664 Milestone Review Round 1-0025-2020-BCHO Status Approved Type Engineering CMP Due Date Completed Date 5/4/2020 8:22 AM Owner Alias PHarr On Hold Created Date 4/26/2020 Submissions Special Inspection and Testing Agreement.425 Rio Grande Place.2020.03.pdf Actions Submission Date 3/30/2020 7:38 AM Status https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 8/9 2/14/25,3:29 PM 0025-2020-BCHO—Salesforce-Enterprise Edition Required Description 0016.2019.ACBK-Change Order 01-Package.zip Actions Submission Date 3/24/2020 12:09 PM Status Required Description A-Architecture-Change Order 01.pdf Actions Submission Date 3/25/2020 9:05 AM Status Required Description S-Structural-Change Order 01.pdf Actions Submission Date 3/25/2020 9:05 AM Status Required Description 0016.2019.ACBK-Change Order 01-Application.pdf Actions Submission Date 3/25/2020 9:05 AM Status Required Description 0016.2019.ACBK-Change Order 01-Narrative.pdf Actions Submission Date 3/25/2020 9:05 AM Status Required Description COVID Site Safety Plan.pdf Actions Submission Date 4/23/2020 12:53 PM Status Required Description 0025-2020-BCHO_BuildingComments_1.pdf Actions Submission Date 4/28/2020 10:43 AM Status Required Description A2.11 -MIDDLE LEVEL PARTIAL FLOOR PLAN-AREA B.pdf Actions Submission Date 4/28/2020 10:43 AM Status Required Description A6.4-ELEVATOR SECTION&DETAILS.pdf Actions Submission Date 4/28/2020 10:43 AM Status Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000mVhhNAAS/p 9/9