Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Sub Permit.427 Rio Grande Pl.0016.2019 (4).ACBK
2/14/25,3:33 PM 0032-2021-ELEC--Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0032-2021-ELEC Number 0032-2021-ELEC Record Type Electrical Address 427 RIO GRANDE PL Owner Renee Espinoza Original Number 21-0286 Status Issued Type Electrical Reason for Cancel or Comp!. Review Fail Applicant AARON SAI A7AR Aspen Internal? No Account ATLASTA SOLAR CENTER LLC Is This Associated wla Building Yes Permit? Project Master Building Permit 0016.2019.ACBK Land Use Planning Application Supplemental Permit? No Permit Contractor ATLASTA SOLAR CENTER LLC Supplemental/Addendum Master Permit Valid Business License on Account HPC-ZON-EH-UTIL Review Imported HPC-ZON-EH-UTIL Review-2 Util Rev, Required Submissions Eng Review Documents Resubmitted Parks-Prkng-San Review Conditional Inspections Conditional Final Insp Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 ,/ Conditional Flat Fee Formula SupN,UEA, Price Book 2021 Conditional Tiered Fee Formula ECY, Discount All Fees(%) Conditional Tiered SqFt Fee Fee Discount Reason Formula Dates New Application Date 2/18/2021 Last Activity Date 5/28/2021 Application Complete Date 2/19/2021 Expiration Date 10/12/2021 Application Accepted Date 2/19/2021 Due Date Issue Date 4/5/2021 Override Expiration Date Days to Issue 45 Milestone Current Days in Applicant Hand Close/CO Issuance Date Milestone Current Days in City Hands Job Location Address 427 RIO GRANDE PL,ASPEN:273707306852 Legal Description Subdivision:RIO GRANDE Lot:2 PARKING GARAGE Site Address Display on Map Eden Address Historic Property? No Historic District? No Zoning Lot 2 HPC Certificate of Appropriateness? Zone District HOA/Covenant Deed Restricted? Work Details Use of Building Commercial Work in a Setback? No Use Class Commercial Exterior Lighting Added or No Changed? Class of Work New Photovoltaic Installation Yes Valuation $97,850.00 City of Aspen Electrical Service? YES Reason for Valuation Change New or Upgraded Service? NO Sq Ft of Building Work Area 1,818 Other Distributed Energy System? Description 425 RIO GRANDE PL System Size in kW 30.275 KW ballast roof mounted,grid tied solar system.50- Hyundai 350 watt panels.35-Hyundai 365 watt panels.85- Enphase IQ7a inverters. https://cityofaspen.my.salesforce.com/a034o00000FNrPIAAL/p 1/6 2/14/25,3:33 PM 0032-2021-ELEC—Salesforce-Enterprise Edition Work Affects Exterior of Building? No Battery Storage? Affects Parking/Alleys/Loading? No Permit Comments 3/15/2021-Per Erin with Atlasta Solar indicated job location is new city hall building,which has address of 427 Rio Grande and NOT 450 Durant.His#is 970-822-7261.Lee L. Code Editions MEP Other Code Editions Financials Total Fees $1,000.00 Total Payments $1,000.00 Total Balance $0.00 System Information Created By AARON SALAZAR,2/18/2021 10:58 AM Last Modified By Aspen Avocette,9/28/2024 1:57 AM Number 0032-2021-ELEC Contact IDs 0034o00001i14bFAAQ VIP Form Tool VIP VIP Permit Application Foreign Form Language Template VIP 2/18/2021 VIP I{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"}, Submitted 1:52 PM Template {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"}, Status {"parentCategoryld":"a2E6A000000UwvgUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Uz2P {"parentCategoryld":nul I,"isSubmit":n u II,"isCu rrent":n u II,"categoryStatusLabels":n u II,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"}, {"parentCategoryld":nul I,"isSubmit":n u II,"isCurrent":n u II,"categoryStatusLabels":n u II,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"}, {"parentCategoryld":nul I,"isSubmit"arue,"isCurrent":nu II,"categoryStatusLabels":nu II,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email:Electrical permit 0032-2021-ELEC-427 Rio Grande PI-Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/5/2021 Days in Applicant's Hands To:aaron@atlastasolar.com CC: BCC: Attachment:0032-2021-ELEC-427 Rio Grande Pl.pdf Subject:Electrical permit 0032-2021-ELEC-427 Rio Grande PI-Issued Body: Comments Good Afternoon, Please find attached your issued electrical permit for 427 Rio Grande PI. If you have any questions please let us know. Kind regards, Lilly Culver Email:Permit Fees Due Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/15/2021 Days in Applicant's Hands Comments To:aaron@atlastasolar.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due Body: If you have not already paid the fees due on your permit 0032-2021-ELEC,at 450 E.Durant,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or a-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,130 S Galena St.,3rd Floor •Parking Reservation permits:Parking Department,130 S Galena St,1st Floor •Pitkin County Water Permit:Utility Billing.,130 S Galena,1st Floor •ROW and encroachments:201 N Mill St.,Suite 203 •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor https://cityofaspen.my.salesforce.com/a034o00000FNrPIAAL/p 2/6 2/14/25,3:33 PM 0032-2021-ELEC—Salesforce-Enterprise Edition Current Amount Due:$1,000.00 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees" under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 5/28/2021 Days in Applicant's Hands Comments Permit Review Type Building Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 3/12/2021 Days in Applicant's Hands Comments Contacts AARON SALAZAR Account ATLASTA SOLAR CENTER LLC Type Applicant Active Contractor License Count 1.00 Number 0033880 Account ATLASTA SOLAR CENTER LLC Type Contractor Active Contractor License Count 1.00 Number 0033881 Fees 0056271 Type PV Installation Fee Total $1,000.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files Aspen City Office Solar One Line-Approved by Utilities Application for PV Installation Revised Last Modified 4/8/2021 5:04 PM Last Modified 4/8/2021 5:04 PM Created By Robert Gregor(OoO 2/12-2/17/24) Created By Robert Gregor(000 2/12-2/17/24) Interconnection Agreement-CoA Offices-425 Rio Grande PI 0032-2021-ELEC-427 Rio Grande PI Last Modified 4/8/2021 5:03 PM Last Modified 4/5/2021 12:47 PM Created By Robert Gregor(0o0 2/12-2/17/24) Created By Lilly Culver MEP_Permit_Letter_20210405.docx Permit Application 2021-02-18 20:52:13.pdf Last Modified 4/5/2021 12:46 PM Last Modified 2/18/2021 1:52 PM Created By Lilly Culver Created By AARON SALAZAR Inspections INS-0002397-21 Status Pending Type Electric Subtype Rough Electrical Requested Date Scheduled Start Date Completed Date Owner Last Name https://cityofaspen.my.salesforce.com/a034o00000FNrPIAAL/p 3/6 2/14/25,3:33 PM 0032-2021-ELEC—Salesforce-Enterprise Edition Permit Inspection Round Initial Inspection Closed FALSE INS-0002398-21 Status Pending Type Electric Subtype Construction Service Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Initial Inspection Closed FALSE INS-0002399-21 Status Pending Type Electric Subtype Permanent Service Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Initial Inspection Closed FALSE INS-0002400-21 Status Pending Type Electric Subtype Special Electrical Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Initial Inspection Closed FALSE I N S-0002401-21 Status Pending Type Electric Subtype Underground Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Initial Inspection Closed FALSE INS-0002402-21 Status Pass/Accepted Type Electric Subtype Rough Electrical Requested Date 5/13/2021 11:00 AM Scheduled Start Date 5/13/2021 Completed Date 5/13/2021 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0002403-21 Status Accepted as Noted Type Electric Subtype Final Electrical Requested Date 5/27/2021 10:30 AM Scheduled Start Date 5/27/2021 Completed Date 5/27/2021 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE Milestones Review Round 1-0032-2021-ELEC Status Approved Due Date Created Date 2/19/2021 Payments PY-008388 Related To 0032-2021-ELEC Amount $1,000.00 Created Date 4/5/2021 Payment Source R-0007999 Receipt-Amount Remaining R-0007999:$0 https://cityofaspen.my.salesforce.com/a034o00000FNrPIAAL/p 4/6 2/14/25,3:33 PM 0032-2021-ELEC—Salesforce-Enterprise Edition Reviews REV-017216 Milestone Review Round 1-0032-2021-ELEC Status Approved with Conditions Type Utilities Due Date Completed Date 2/26/2021 6:17 PM Owner Alias LLede On Hold Created Date 2/19/2021 REV-017217 Milestone Review Round 1-0032-2021-ELEC Status Approved Type MEPs Due Date Completed Date 3/12/2021 8:41 AM Owner Alias MMill On Hold Created Date 2/19/2021 Submissions Application for Photovoltaic(PV)Installation Form Actions Upload Submission Date Status Pending Required Description City of Aspen Electric Load Form—Application for Service Actions Submission Date 2/24/2021 12:17 PM Status Pending Required Description Homeowner Association Compliance Form Actions Submission Date 2/18/2021 12:47 PM Status Pending Required ✓ Description Aspen Civic Space Specs-LD.pdf Actions Submission Date 2/23/2021 9:41 AM Status Pending Required Description 425 Rio Grande Aspen Electric Load Form-Application for Service MSB2.pdf Actions Submission Date 2/24/2021 12:17 PM Status Pending Required Description load Form CCE04112019_AspenElectricalService.pdf Actions Submission Date 2/24/2021 12:17 PM Status Pending Required Description Application for PV Installation.pdf Actions Submission Date 3/8/2021 9:57 AM Status Pending Required Description Unirac RMDT.pdf Actions Submission Date 3/11/2021 11:12 AM Status Pending Required Description Hyundai-Green-Energy-HiA-360-385HI-solar-panel-datasheet.pdf https://cityofaspen.my.salesforce.com/a034o00000FNrPIAAL/p 5/6 2/14/25,3:33 PM 0032-2021-ELEC—Salesforce-Enterprise Edition Actions Submission Date 3/11/2021 11:12 AM Status Pending Required Description Hyu ndai-RI-Series-4BB-solar-panel-Datasheet.pdf Actions Submission Date 3/11/2021 11:12 AM Status Pending Required Description IQ7A-DS-EN-US.pdf Actions Submission Date 3/11/2021 11:12 AM Status Pending Required Description IQ7-IQ7pl us-DS-E N-US.pdf Actions Submission Date 3/11/2021 11:12 AM Status Pending Required Description Line Drawing Revised.pdf Actions Submission Date 4/5/2021 10:46 AM Status Pending Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a034o00000FNrPIAAL/p 6/6