HomeMy WebLinkAboutFile Documents.401 Eagle Park Dr.0035.2019.ACBK 0035-2019-ACBK_BuildingComments_1
Mill Building - Utility Access Gate & Ladder_4_16_19.pdf(3)
Page: 1 Handrail extensions must project
File Name: Mill Building- Utility Access Gate&
Ladder 4 16 19.pdf horizontally for 12"at the top of
♦ _ - — — the ships ladder and extend at a
44 .«r Subject: PlanCheck slope(not horizontally)at the
iu, Author: nickt
>�•,_ //\ Color: • bottom for the distance of one
f �;
tread. 2015 IBC 1014.6
� �
PROPOSED 6°---""- Page: 1 Show and dimension on the
BOLLARDS File Name: Mill Building- Utility Access Gate&
5„ Ladder_4_16_19.pdf working space in front of electric
.,„. ASPHP Subject: PlanCheck equipment per 2017 NEC
ALLES Author: nickt 110.26.
fti ExIsr WALL Color: •
�y RETAI
•;��/ ��y�s '� WALL
i ai par..,_
r'w` �j ` �it i �� af444
4 Page: 1
// w Ships ladders shall
III II - File Name: Mill Building Utility Access Gate& have a minimum tread depth of
j 1 Ladder_4_16_19.pdf
'� Subject PlanCheck 5 inches(127 mm). The
,,, „ __ ` Author: nickt
tread shall be projected such
INNENUArsullColor: •gpm
that the total of the tread
„w,rtM.,o, depth plus the nosing projection
E;-~�= --1 is not less than 8 1/2 inches.
- 2015 IBC 1011.15.2