Loading...
HomeMy WebLinkAboutSub Permit.427 Rio Grande Pl.0016.2019 (8).ACBK 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0038-2020-BCHO Number 0038-2020-BCHO Record Type Change Order Address 427 RIO GRANDE PL Owner Sydney Fallon Original Number 20-1555 Status Closed-Final Type Change Order Reason for Cancel or Compl. Review Fail Applicant NICK KETPURA Aspen Internal? No Account CHARLES CUNNIFFE ARCHITECTS Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 312-286-247 Master Building Permit 0016.2019.ACBK HPC-ZON-EH-UTIL Review EH-Rcyl Rev, Permit Contractor SHAW CONSTRUCTION LLC HPC-ZON-EH-UTIL Review-2 Valid Business License on Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Util Account Rev,Eng-Wtr Rev, Imported Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,Parking Rev,San Rev, Required Submissions Conditional Inspections Documents Resubmitted Conditional Final Insp Approved Covid-19 Plan Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 ,/ Conditional Flat Fee Formula FP, Price Book 2020 Conditional Tiered Fee Formula Applicant is a Nonprofit? Yes Conditional Tiered SqFt Fee Discount All Fees(%) Formula Fee Discount Reason Queue Score Project Designation Milestone Current Days in Applicant Hand Queue Designation Milestone Current Days in City Hands Queue Score 0 Milestone-Total Days in Applicant Hand Last Date Received from Milestone-Total Days in City Applicant Hands Dates New Application Date 6/23/2020 TCO Issuance Date Application Complete Date 6/25/2020 Close/CO Issuance Date 10/11/2022 Application Accepted Date 6/25/2020 Last Activity Date Issue Date 3/17/2021 Expiration Date Days to Issue 265 Due Date Override Expiration Date Basic Information Description Change Order#02-Core and Shell Refinement Package Census Code **Change Order Narrative Provided for updated drawings/information. Use of Building Commercial Use Class Commercial Class of Work Addition Permit Comments Job Location Address 427 RIO GRANDE PL,ASPEN:273707306852 Lot 2 https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 1/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Site Address Display on Map Legal Description Subdivision:RIO GRANDE Lot:2 PARKING GARAGE Historic Property? No Eden Address Historic District? No HPC-Planning-Zoning Details Zone District HOA/Covenant HOA/Covenant Approval Not Required Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Use Yes Approval? Deed Restricted? No Located in a PD? Yes #of Dwellings 0 Adds/Changes Floor Area? Category of Zoning Fee Change Order Occupancy or Use Change? No Zoning Work Level Work Affects Exterior of Building? Building Project Details Valuation $0.00 Lot Size Sq.Ft. 0 Reason for Valuation Change Valuation entered by applicant was the valuation of the Soil Disturbance Sq Ft 42,842 master permit. Unit Sq.Ft. 193,941 Affected Area Sq Ft 42,842 Building Footprint Sq Ft Existing Hardscape Footprint Sq 29,332 Ft Sq Ft of Building Work Area 40,712 Existing Hardscape%of Lot #Error! Building Fire Area Sq Ft Con Mit Sq Ft Total 83,554 Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 42,842 of Interior being Altered 100% New Sq.Ft. 40,712 Scope of Work Details Work Changes Building Yes Work Affects Tree/Drip Line? Yes Footprint? Work Changes Yes Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? Yes Adjacent to City Open Space? No Photovoltaic Installation Yes Impacts City Trails/Parks? Yes Work Adds/Removes/Changes Yes Work Subject to Water Efficient Yes Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? Yes Involved? Change of Restaurant No Prevents Access to Sewer Main? No Ownership? Affects Parking/Alleys/Loading? Yes Sewer Easements Affected? Yes Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Size of Existing Domestic Water Irrigation? Line Irrigated Area Sq Ft Number of Meters Proposed Identify ALL Sources of Water Size of Existing Fire Suppression Line Is There a Pool,Spa or Water Size of Proposed Domestic Feature? Water Line Summary of Prior Water Fees Size of Proposed Fire Paid Suppression Line https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 2/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Building Description Code Editions 2015 IBC Required Special Inspections High-Strength Bolting;Epoxy Anchors;Structural Steel Welding;Permanent Micropiles;Sprayed Fire-Resistants; Other Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type IIB Total Spa Sq Ft Fire Sprinkler Existing? Yes Total Pool Sq Ft Fire Sprinkler Required? Yes Amount of Onsite Renewable Generation? Fire Sprinkler Type NFPA 13 CO Description Fire Alarms Installed? NFPA 72 Basement #Wood Fireplaces 1st Floor #Gas Log Fireplaces 2nd Floor #Gas Appliances 3rd Floor Open Text Field For Comments Additional Financials Total Fees $3,600.00 Total Payments $3,600.00 Total Balance $0.00 System Information Number 0038-2020-ECHO Community Visibility ,/ Bluebeam Project Id 312-286-247 Contact IDs 0036A00000mXQWjQAO BB Project Name 427 RIO GRANDE PL-0038-2020-ECHO Last Modified By Aspen Avocette,9/28/2024 1:34 AM Created By NICK KETPURA,6/23/2020 1:23 PM VIP Form Tool VIP 6/23/2020 VIP Permit Application Submitted 1:49 PM Form Template VIP VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"}, Foreign Template {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAs"}, Language Status {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvVUAS"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"}, {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAs"}, {"parentCategoryld":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email:COA Building Department Staff Changes Type Billable Assigned To AnnMarie Prince Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/2/2022 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC: BCC: Attachment:--none-- Subject:COA Building Department Staff Changes Body: Dear Salesforce Applicant, The Building Department has had a change of staffing and would like to let you know that your Permit Owner for permit number 0038-2020-BCHO may have changed. https://cityofaspen.my.Salesforce.com/a033s00000uUTKLAA4/p 3/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Emmy Garrigus has moved to the position of Plans Examiner and is no longer the owner of many permits.Sydney Fallon is now taking on much of this role as the new Building Support Specialist. Please contact the appropriate owner for questions related to this specific permit (the owner is identified under the permit details.) Moving forward,please contact Sydney Fallon,Building Support Specialist I (970)309-5894 I buildingsupport@aspen.gov for the following: All new applications Schedule a pre-submittal meeting Permit application requirements or completeness review questions Help submitting responses to comments and change orders Please contact your reviewers directly for any questions regarding their comments. Reviewers can be viewed in Salesforce following the instructions here. And remember,Permit Status information is available 24/7 via the Salesforce Portal.For instructions click here. Thank you. **DO NOT REPLY TO THIS EMAIL** Email:Drop Box Link for 0038-2020-BCHO Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/19/2021 Days in Applicant's Hands To:nickk@cunniffe.com CC: BCC: Attachment:--none-- Subject:Drop Box Link for 0038-2020-BCHO Body: Comments Good Afternoon, Please see below: https://www.d ropbox.com/s h/35paw2udij hg2vo/AABI4g83BC6Vwc37aFKZH d Rua?d1=0 Warmest Regards, Lisa Guida Email:Building Permit 0038-2020-BCHO-427 RIO GRANDE PL,ASPEN:273707306852-Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/17/2021 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC: BCC: Attachment:--none-- Subject:Building Permit 0038-2020-BCHO-427 RIO GRANDE PL,ASPEN:273707306852-Issued Body: Dear NICK KETPURA, Please find attached your issued building permit 0038-2020-BCHO for 427 RIO GRANDE PL,ASPEN:273707306852 and City use tax exemption letter& Covid-19 site safety plan approval notice(if applicable) https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 4/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Below is a link to your plans and information regarding inspections.Please print these 24x36 in color and keep them on site at all times.As a reminder these drop box links do expire so please download the plans as soon as you get them. https://www.d ropbox.com/s h/vmjvnomztezvv03/AACe-PsOFd H GmY7vS F4pSpiea?d I=0 If you have any questions please let us know. Kind regards, Lisa Guida City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Permit Fees Due Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/1/2021 Days in Applicant's Hands To:nickk@cunniffe.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due Body: If you have not already paid the fees due on your permit 0038-2020-BCHO,at 427 RIO GRANDE PL,ASPEN:273707306852,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,130 S Galena St.,3rd Floor •Parking Reservation permits:Parking Department,130 S Galena St,1st Floor •Pitkin County Water Permit:Utility Billing.,130 S Galena,1st Floor Comments •ROW and encroachments:201 N Mill St.,Suite 203 •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$3,600.00 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email:Building Comments-0038-2020-BCHO-427 RIO GRANDE PL Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/3/2021 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC:denis.murray@cifyofaspen.com;john.barker@cityofaspen.com BCC: Attachment:0039-2020-BCOM_Bu ildi ngCom ments_2.pdf Subject:Building Comments-0038-2020-BCHO-427 RIO GRANDE PL Body: Hello NICK KETPURA, I finished this comment letter some time ago and I apologize that it did not get sent to you sooner.Let me know what I can do to help you to get these items addressed.I can make time to meet with you to go over the items and I will prioritize your next response. I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 5/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:427 RIO GRANDE PL Permit Number:0038-2020-BCHO Permit Coordinator:John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner Community Development 130 S Galena St. Aspen,CO 81611 p:970.429.2757 c:970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Engineering Comments-0038-2020-BCHO-427 RIO GRANDE PL Type Billable Assigned To Hailey Roedel Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/11/2020 Days in Applicant's Hands To:nickk@cunniffe.com CC: BCC: Attachment:C-Civil-Change Order 02_ENG COMMENTS.pdf,Engineering)-427 Rio Grande-0038-2020-BCHO.pdf Subject:Engineering Comments-0038-2020-BCHO-427 RIO GRANDE PL Body: Nick, Could you provide a response to Engineering Comments from the last round of review?I know most of these transformer items were worked out in the field with Justin Forman and Ron Christian,but to hold the project to the same standards and documentation requirements as all projects I still need a Comments formal response in writing.I have reattached the comments for you here.The water quality question on the trash enclosure also needs to be addressed. Thanks. Hailey Guglielmo,PE Project Manager Engineering Department 201 N Mill St.Ste 203 Aspen,CO 81611 p:970.309-0771 Email:Building Comments-0038-2020-BCHO-427 RIO GRANDE PL Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/21/2020 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC:denis.murray@cityofaspen.com;lauren.litchet@cityofaspen.com BCC: Attachment:0038-2020-BC H O_Bu ildi ngCom ments_1 version2.pdf Subject:Building Comments-0038-2020-BCHO-427 RIO GRANDE PL Body: Hello NICK KETPURA, https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 6/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition While reviewing the interiors permit I noticed a change to the shell that I had previously missed.I'm sending a new comment letter with an added item highlighted in yellow. I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:427 RIO GRANDE PL Permit Number:0038-2020-BCHO Permit Coordinator:John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner Community Development 130 S Galena St. Aspen,CO 81611 p:970.429.2757 c:970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Building Comments-0038-2020-BCHO-427 RIO GRANDE PL Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/21/2020 Days in Applicant's Hands Comments To:nickk@cunniffe.com CC:denis.murray@cityofaspen.com;lauren.litchet@cityofaspen.com BCC: Attachment:0038-2020-BC H O_Bu ildi ngCom ments_1.pdf Subject:Building Comments-0038-2020-BCHO-427 RIO GRANDE PL Body: Hello NICK KETPURA, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:427 RIO GRANDE PL Permit Number:0038-2020-BCHO Permit Coordinator:John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner Community Development 130 S Galena St. Aspen,CO 81611 p:970.429.2757 c:970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 7/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Engineering Comments-0038-2020-BCHO-427 RIO GRANDE PL Type Billable Assigned To Halley Roedel Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/27/2020 Days in Applicant's Hands To:nickk@cunniffe.com CC:dannys@rfeng.biz;hailey.guglielmo@cityofaspen.com BCC: Attachment:C-Civil-Change Order 02_ENG COMMENTS.pdf,Engineering)-427 Rio Grande-0038-2020-BCHO.pdf Subject:Engineering Comments-0038-2020-BCHO-427 RIO GRANDE PL Body: Hello NICK KETPURA, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded your comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Comments Address:427 RIO GRANDE PL Permit Number:0038-2020-BCHO Permit Coordinator:John Barker These design documents have been reviewed for conformance to the Engineering Design Standards and URMP as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Engineering Review is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Permit Review Type Engineering Billable Assigned To Hailey Roedel Number of Hours 5.00 Total Cost $1,625.00 Fee Generated Date Start Date Completed Date 9/20/2021 Days in Applicant's Hands Comments Permit Review Type Building Billable ✓ Assigned To Denis Murray Number of Hours 10.00 Total Cost $3,250.00 Fee Generated Date 3/1/2021 Start Date Completed Date 3/1/2021 Days in Applicant's Hands Comments Permit Review Type Zoning Billable ✓ Assigned To Jim Pomeroy Number of Hours 1.00 Total Cost $325.00 Fee Generated Date 10/24/2020 Start Date Completed Date 10/23/2020 Days in Applicant's Hands Comments Permit Review https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 8/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Type Engineering Billable Assigned To Halley Roedel Number of Hours 4.00 Total Cost $1,300.00 Fee Generated Date Start Date Completed Date 7/27/2020 Days in Applicant's Hands Comments Contacts NICK KETPURA Account CHARLES CUNNIFFE ARCHITECTS Type Applicant Active Contractor License Count 0.00 Number 0028234 Account SHAW CONSTRUCTION LLC Type Contractor Active Contractor License Count 2.00 Number 0028235 Fees 0050112 Type Change Order Fee Total $25.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0054108 Type Zoning Hourly Fee Total $325.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0056487 Type Building Hourly Review Fee Total $3,250.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files 0039-2020-BCOM_BuildingComments_2 C-Civil-Change Order 02_ENG COMMENTS Last Modified 2/3/2021 12:06 PM Last Modified 12/11/2020 1:40 PM Created By Nick Thompson Created By Halley Roedel Engineering)-427 Rio Grande-0038-2020-BCHO 0038-2020-BCHO_BuildingComments_1version2 Last Modified 12/11/2020 1:40 PM Last Modified 8/21/2020 5:12 PM Created By Hailey Roedel Created By Nick Thompson 0038-2020-BCHO_BuildingComments_1 Permit Application 2020-06-23 19:50:03.pdf Last Modified 8/21/2020 11:55 AM Last Modified 6/23/2020 1:50 PM Created By Nick Thompson Created By NICK KETPURA Milestones Review Round 1-0038-2020-BCHO Status Not Approved Due Date Created Date 6/25/2020 https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 9/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Review Round 2-0038-2020-BCHO Status Approved Due Date Created Date 11/23/2020 Payments PY-008206 Related To 0038-2020-BCHO Amount $3,600.00 Created Date 3/17/2021 Payment Source R-0007826 Receipt-Amount Remaining R-0007826:$0 Reviews REV-016280 Milestone Review Round 2-0038-2020-BCHO Status Approved Type Building Due Date Completed Date 2/3/2021 12:01 PM Owner Alias NThom On Hold Created Date 11/23/2020 REV-016281 Milestone Review Round 2-0038-2020-BCHO Status Approved Type Engineering Dev Due Date Completed Date 12/11/2020 1:41 PM Owner Alias HGugl On Hold Created Date 11/23/2020 REV-013757 Milestone Review Round 1-0038-2020-BCHO Status Approved Type Parks Due Date Completed Date 8/19/2020 10:55 PM Owner Alias DRade On Hold Created Date 6/25/2020 REV-013758 Milestone Review Round 1-0038-2020-BCHO Status Approved Type Parking Due Date Completed Date 6/29/2020 3:02 PM Owner Alias Parking-Review On Hold Created Date 6/25/2020 REV-013759 Milestone Review Round 1-0038-2020-BCHO Status Closed-Not Needed Type Water Efficient Landscaping Due Date Completed Date 6/25/2020 10:05 AM Owner Alias Water Efficient Landscaping-Review On Hold Created Date 6/25/2020 REV-013760 Milestone Review Round 1-0038-2020-BCHO Status Closed-Not Needed Type Sanitation Due Date Completed Date 6/25/2020 10:05 AM Owner Alias Sanitation-Review On Hold Created Date 6/25/2020 REV-013761 https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 10/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Milestone Review Round 1-0038-2020-BCHO Status Approved Type Recycling Due Date Completed Date 8/21/2020 9:52 AM Owner Alias EH Recycling-Review On Hold Created Date 6/25/2020 REV-013762 Milestone Review Round 1-0038-2020-BCHO Status Closed-Not Needed Type Engineering Water Due Date Completed Date 6/25/2020 10:05 AM Owner Alias Engineering Water-Review On Hold Created Date 6/25/2020 REV-013763 Milestone Review Round 1-0038-2020-BCHO Status Closed-Not Needed Type Fire Due Date Completed Date 8/21/2020 11:56 AM Owner Alias Fire-Review On Hold Created Date 6/25/2020 REV-013764 Milestone Review Round 1-0038-2020-BCHO Status Approved Type Zoning Due Date Completed Date 10/23/2020 11:40 AM Owner Alias JPome On Hold Created Date 6/25/2020 REV-013765 Milestone Review Round 1-0038-2020-BCHO Status Closed-Re-Review Created Type Building Due Date Completed Date 8/21/2020 11:56 AM Owner Alias NThom On Hold Created Date 6/25/2020 REV-013766 Milestone Review Round 1-0038-2020-BCHO Status Closed-Re-Review Created Type Engineering Dev Due Date Completed Date 7/27/2020 3:12 PM Owner Alias HGugl On Hold Created Date 6/25/2020 Submissions CO2 Narrative-Arch+Civil.docx Actions Submission Date 6/23/2020 1:39 PM Status Required Description CO2 Narrative-Electrical.docx Actions Submission Date 6/23/2020 1:39 PM Status Required Description CO2 Narrative-Mechanical.docx https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 11/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Actions Submission Date 6/23/2020 1:39 PM Status Required Description CO2 Narrative-Plumbing.docx Actions Submission Date 6/23/2020 1:39 PM Status Required Description CO2 Narrative-Structural.pdf Actions Submission Date 6/23/2020 1:39 PM Status Required Description A-Architecture-Change Order 02.pdf Actions Submission Date 6/23/2020 1:39 PM Status Required Description 0016.2019.ACBK-Drainage Report-Change Order 02.pdf Actions Submission Date 6/23/2020 1:39 PM Status Required Description C-Civil-Change Order 02.pdf Actions Submission Date 6/23/2020 1:39 PM Status Required Description COMcheck Envelope.425 Rio Grande Place.2020.04.13.pdf Actions Submission Date 6/23/2020 1:43 PM Status Required Description E-Electrical-Change Order 02.pdf Actions Submission Date 6/23/2020 1:43 PM Status Required Description M-Mechanical-Change Order 02.pdf Actions Submission Date 6/23/2020 1:43 PM Status Required Description P-Plumbing-Change Order 02.pdf Actions Submission Date 6/23/2020 1:43 PM Status Required Description S-Structural-Change Order 02.pdf Actions Submission Date 6/23/2020 1:43 PM Status https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 12/13 2/14/25,3:32 PM 0038-2020-BCHO—Salesforce-Enterprise Edition Required Description CO2 Narrative-Arch+Civil.pdf Actions Submission Date 6/24/2020 12:55 PM Status Required Description CO2 Narrative-Electrical.pdf Actions Submission Date 6/24/2020 12:55 PM Status Required Description CO2 Narrative-Mechanical.pdf Actions Submission Date 6/24/2020 12:55 PM Status Required Description CO2 Narrative-Plumbing.pdf Actions Submission Date 6/24/2020 12:55 PM Status Required Description CO2 Narrative-Arch+Civil.pdf Actions Submission Date 6/24/2020 2:02 PM Status Required Description CO2 Narrative-Electrical.pdf Actions Submission Date 6/24/2020 2:02 PM Status Required Description CO2 Narrative-Mechanical.pdf Actions Submission Date 6/24/2020 2:02 PM Status Required Description CO2 Narrative-Plumbing.pdf Actions Submission Date 6/24/2020 2:02 PM Status Required Description CO2 Narrative-Structural.pdf Actions Submission Date 6/24/2020 2:02 PM Status Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000uUTKLAA4/p 13/13