Loading...
HomeMy WebLinkAboutMaster Permit.208 E Main St.0044.2017.ARBK 2/10/25,4:20 PM 0044.2017.ARBK-Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0044.2017.ARBK Number 0044.2017.ARBK Record Type Building- Imported Address 208 E MAIN ST Owner Sydney Fallon Original Number 0044.2017.ARBK Status Closed- Final Type Building Reason for Cancel or Comp!.Review Fail Applicant ADAM ROTHBERG Aspen Internal? Account ROTHBERG DEVELOPMENT INC Required Bond Amount Project Total Available Bond Amount Land Use Planning Is This Associated w/a Application Building Permit? Permit Contractor ROTHBERG DEVELOPMENT INC Master Building Permit Valid Business Bluebeam Project Id 882-325-699 License on Account Imported HPC-ZON-EH-UTIL HPC Rev, Review Required HPC-ZON-EH-UTIL Submissions Review-2 Documents Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Resubmitted Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Approved Covid-19 Parks-Prkng-San Parks Rev,Parks Fee,Water-LSE Plan Review Rev,Parking Rev,San Rev, Conditional HPC Insp,Parks lnsp, Inspections Conditional Final Insp HPC Final,Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parking Final,Parks Final,Water-LSE Final,San Final, Action Items Hold All Reviews Create Fees Hold Reason Create Fees 2 ,/ Utility Review Type Minor Price Book EDEN Conditional Flat Fee FP, Applicant is a Formula Nonprofit? Conditional Tiered Fee Eligible for Small Formula Lodge Program? Conditional Tiered MAC, Discount All Fees(%) SqFt Fee Formula Fee Discount Reason CO/LOC? CO CO Status if Issued Applicable https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 1/25 2/10/25,4:20 PM 0044.2017.ARBK-Salesforce-Enterprise Edition Queue Score Queue Designation Milestone Current Days in Applicant Hand Queue Score 0 Milestone Current Days in City Hands Last Date Received Milestone-Total Days from Applicant in Applicant Hand Milestone-Total Days in City Hands Dates New Application Date 11/13/2019 TCO Issuance Date Application Complete Close/CO Issuance 11/7/2022 Date Date Application Accepted 4/3/2017 Expiration Date 2/26/2023 Date Issue Date 1/22/2019 Override Expiration Date Last Activity Date 8/30/2022 Basic Information Description Applicant: Census Code 101 -Single Family Residences Adam Rothberg Rothberg Development REMOVE NON-HISTORIC ADDITION IN THE BACK OF THE PROPERTY AND REPLACE IT WITH A RESIDENTIAL UNIT WITH BASEMENT. HISTORIC SHED WILL BE MOVED AND RELOCATED IN THE SAME SITE//BEN- JOHN//CITY HALL BIN 2 Use of Building Single Family Interior Remodel Only Use Class Class of Work Permit Comments Job Location Address 208 E MAIN ST,ASPEN : Lot 273707399800 Site Address Display on Map Legal Description Historic Property? Yes Eden Address 208 E MAIN ST Historic District? Yes HPC - Planning -Zoning Details Zone District MU HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of Yes Appropriateness? ADU Sq Ft Work Involves a Land Yes Use Approval? Deed Restricted? No Located in a PD? No https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 2/25 2/10/25,4:20 PM 0044.2017.ARBK-Salesforce-Enterprise Edition #of Dwellings Adds/Changes Floor No Area? Category of Zoning Commercial Occupancy or Use Yes Fee Change? Zoning Work Level Major Zoning Fee Work Affects Exterior Yes of Building? Building Project Details Valuation $2,144,412.00 Lot Size Sq.Ft. 3,000 Reason for Valuation Soil Disturbance Sq Ft 1,800 Change Unit Sq.Ft. 3,574 Affected Area Sq Ft 1,800 Building Footprint Sq Existing Hardscape Ft Footprint Sq Ft Sq Ft of Building Work 3,574 Existing Hardscape% 0% Area of Lot Building Fire Area Sq 3,613 Con Mit Sq Ft Total 5,374 Ft Utility Review Sq. Ft. 1,800 Utility Review Sq Ft 1,800 Total %of Interior being 100% Altered New Sq. Ft. 3,574 Scope of Work Details Work Changes Building Yes Work Affects Yes Footprint? Tree/Drip Line? Work Changes Yes Located Within City No Fenestration/Thrml Mall Boundaries? Envelop? Requires Asbestos Yes Adjacent to City Open No Test? Space? Photovoltaic Installation No Impacts City No Trails/Parks? Work Yes Work Subject to Water No Adds/Removes/Changes Efficient L.O.? Plumbing Fixt? Restaurant/Food No Involves Impact on Yes Service Involved? Sewer? Change of Restaurant No Prevents Access to No Ownership? Sewer Main? Affects Yes Sewer Easements No Parking/Alleys/Loading? Affected? Building Description Code Editions 2015 IRC Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Occupancy Load Total Pool Sq Ft https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 3/25 2/10/25,4:20 PM 0044.2017.ARBK-Salesforce-Enterprise Edition Fire Sprinkler Amount of Onsite Existing? Renewable Generation? Fire Sprinkler Yes CO Description Required? Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor #Wood Fireplaces 2nd Floor #Gas Log Fireplaces 3rd Floor #Gas Appliances Additional Open Text Field For Comments Financials Total Fees $0.00 Total Payments Fees Due at Current Total Balance $0.00 Status System Information Number 0044.2017.ARBK Community Visibility ,/ Created By Ruth Kinney, 7/27/2019 1:51 PM Contact IDs 0036A00000ZPoKsQAL,0036A00000ZPoKsQAL IsTestData? Last Modified By Aspen Avocette, 9/28/2024 1:49 AM VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Certificate of Occupancy: Permit 0044.2017.ARBK at 208 E MAIN ST,ASPEN : 273707399002 Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/7/2022 Days in Applicant's Hands Comments To: adamrothberg@comcast.net CC: BCC: Attachment: 208 E Main-0044-2017-ARBK_CO Final.pdf,208 E Main St-City_Use_Tax_- _FRR_Transmittal_to_Owner_20221107(1).pdf,208 E Main St-City_Use_Tax_- _FRR_Notice_to_Contractor_20221107(1).pdf Subject: Certificate of Occupancy: Permit 0044.2017.ARBK at 208 E MAIN ST,ASPEN : 273707399002 https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 4/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Body: "Hello ADAM ROTHBERG, Please find attached your issued certificate of occupancy for the completed project at 208 E MAIN ST,ASPEN : 273707399002. Additionally,you will find attached the owner and the contractors city use tax letters and tax reconciliation forms. Please distribute these as necessary. If you have any questions, please let us know. Email: Utility Connection Permit Final Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/12/2022 Days in Applicant's Hands To: adamrothberg@comcast.net CC: BCC: Attachment: 208 E. Main St. Final UCP Signed.pdf Subject: Utility Connection Permit Final Body: Hello ADAM ROTHBERG, Attached is your final Utility Connection Permit for the completed project at 208 E MAIN ST associated with permit#: 0044.2017.ARBK. After review, please print, have signed by owner, and notarized. Once signed and notarized, please Comments return UCP with payment, if applicable,to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively,you may upload the signed and notarized copy of the UCP as a SCANNED(not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a"push" notification that these permit requirements are complete. Please reach out with any questions or concerns. Thank you Adam. Steve Wilson Email: COVID-19 Safety Plan Approval Type Billable Assigned To Steve Feder Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/27/2020 Days in Applicant's Hands Comments To: adamrothberg@comcast.net CC: BCC: https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 5/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200427.pdf Subject: COVID-19 Safety Plan Approval Body: Dear ADAM ROTHBERG, Thank you for submitting a COVID-19 Site Safety Plan for 0044.2017.ARBK at 208 E MAIN ST. City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re- commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. Email: Important! Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Rebecca Wallace Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/18/2019 Days in Applicant's Hands To: adamrothberg@comcast.net CC: BCC: Attachment: --none-- Subject: Important! Your City of Aspen permit has been moved to new permitting system Body: Dear ADAM ROTHBERG, As you may know,the City of Aspen has been transitioning to a new online-based permitting system, Salesforce.Thank you for your patience during this transition,which is now complete. Your permit is now operational in Salesforce.Your project located at 208 E MAIN ST,ASPEN : 273707399002 will retain its original permit number, 0044.2017.ARBK and you will use this number to find your permit in Salesforce. If you have not already done so, you must register in Salesforce before you are able to access your permit information, upload new documents, request inspections, or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: Comments https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system. Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenter/View/4254/Request-an-Inspection?bidld= If you have additional questions that are not addressed at the above links,you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Sincerely, John Barker City of Aspen Permit Inspection Type Inspection Billable Assigned To Ric Bennett https://cityofaspen.my.salesforce.com/a033s00000kZs01AAC/p 6/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/19/2021 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/12/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/2/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/30/2020 Days in Applicant's Hands Comments Contacts ADAM ROTHBERG Account ROTHBERG DEVELOPMENT INC Type Contractor Active Contractor License Count 1.00 Number 0012773 ADAM ROTHBERG Account ROTHBERG DEVELOPMENT INC Type Applicant https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 7/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Active Contractor License Count 1.00 Number 0023658 Files 208 E Main St-City_Use_Tax_- 208 E Main St-City_Use_Tax_- _FRR_Notice_to_Contractor_20221107 (1) _FRR_Transmittal_to_Owner_20221107 (1) Last Modified 11/7/2022 8:15 AM Last Modified 11/7/2022 8:15 AM Created By Savannah Pope Created By Savannah Pope City_Use_Tax_- City_Use_Tax_- FRRNotice toContractor 20221107.docx FRR Transmittal to Owner 20221107.docx Last Modified 11/7/2022 8:13 AM Last Modified 11/7/2022 8:12 AM Created By Savannah Pope Created By Savannah Pope 208 E Main-0044-2017-ARBK CO Final IRC CO Letter 20220830.docx Last Modified 11/7/2022 8:12 AM Last Modified 8/30/2022 1:30 PM Created By Savannah Pope Created By Savannah Pope Z-203 HEIGHT OVER TOPOGRAPHY_HCEMARKUP 208 E Main-ASBUILT_stamped8-16-22 Last Modified 8/17/2022 8:14 AM Last Modified 8/17/2022 8:14 AM Created By Bob Narracci Created By Bob Narracci 208 E. Main St. Final Count Sheet 208 E. Main St. Final UCP Signed Last Modified 5/12/2022 2:05 PM Last Modified 5/12/2022 1:55 PM Created By Steve Wilson Created By Steve Wilson APPROVAL_NOTICE_COVID- 0006.2017.OSLU performance bond 19_SITE_SAFETY_PLAN_20200427.pdf Last Modified 11/18/2019 6:00 AM Last Modified 4/27/2020 3:55 PM Created By Rebecca Wallace Created By Steve Feder 0044.2017.ARBK inspections 0044.2017.ARBK fees Last Modified 11/18/2019 5:55 AM Last Modified 11/18/2019 5:55 AM Created By Rebecca Wallace Created By Rebecca Wallace Inspections INS-0005002-19 Status Pass/Accepted Type HPC Subtype Requested Date 6/2/2022 1:30 PM Scheduled Start Date Completed Date 6/3/2022 Owner Last Name Simon Permit Inspection Round Final Inspection Closed TRUE INS-0005003-19 Status Pass/Accepted Type Parks Subtype Requested Date 6/28/2022 9:30 AM Scheduled Start Date Completed Date https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 8/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0005004-19 Status Pass/Accepted Type Concrete Subtype Bond Beam Requested Date 8/13/2020 3:42 PM Scheduled Start Date 8/13/2020 Completed Date 8/13/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005006-19 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 9/20/2021 10:00 AM Scheduled Start Date 9/20/2021 Completed Date 9/20/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005007-19 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 7/21/2021 10:00 AM Scheduled Start Date 7/21/2021 Completed Date 7/21/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005008-19 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 3/2/2020 6:39 AM Scheduled Start Date 3/2/2020 Completed Date 3/2/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0005011-19 Status Pass/Accepted Type Building Subtype Rough Framing Requested Date 5/19/2021 1:45 PM https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 9/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Scheduled Start Date 5/19/2021 Completed Date 5/19/2021 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE INS-0005013-19 Status Pass/Accepted Type Building &Referral Inspection Status Subtype Requested Date 6/27/2022 10:00 AM Scheduled Start Date 6/27/2022 Completed Date 6/27/2022 Owner Last Name Cline Permit Inspection Round Final Inspection Closed TRUE INS-0005016-19 Status Partial/Non-Complete Type Concrete Subtype Wall Core Requested Date 3/12/2020 9:00 AM Scheduled Start Date 3/12/2020 Completed Date 3/12/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005022-19 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 1/30/2020 6:58 AM Scheduled Start Date 1/30/2020 Completed Date 1/30/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0005024-19 Status Partial/Non-Complete Type Zoning Subtype Requested Date 6/14/2022 1:38 PM Scheduled Start Date Completed Date 6/14/2022 Owner Last Name Narracci Permit Inspection Round Final Inspection Closed TRUE INS-0005026-19 Status Partial/Non-Complete Type Building https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 10/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Subtype Special Building Inspection Requested Date 12/12/2019 7:25 AM Scheduled Start Date 12/12/2019 Completed Date 12/12/2019 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0005028-19 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 6/9/2021 1:30 PM Scheduled Start Date 6/10/2021 Completed Date 6/10/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0005031-19 Status Pass/Accepted Type Fire Subtype Requested Date 6/28/2022 9:00 AM Scheduled Start Date Completed Date 6/28/2022 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0006718-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/23/2020 1:07 PM Scheduled Start Date 4/27/2020 Completed Date 4/27/2020 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0011461-20 Status Closed -Not Needed Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 5/19/2022 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0013958-20 https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 11/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Status Pass/Accepted Type Engineering Dev Subtype Requested Date 6/28/2022 9:00 AM Scheduled Start Date Completed Date 8/19/2022 Owner Last Name Roedel Permit Inspection Round Final Inspection Closed TRUE INS-0013957-20 Status Closed -Not Needed Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 5/19/2022 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0013959-20 Status Accepted as Noted Type Engineering Erosion&Sediment Subtype Requested Date 6/28/2022 9:00 AM Scheduled Start Date Completed Date 6/28/2022 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0003515-21 Status Closed -Not Needed Type Water Efficient Landscaping Subtype Requested Date 6/28/2022 9:00 AM Scheduled Start Date Completed Date 6/28/2022 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0003517-21 Status Closed -Not Needed Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 5/19/2022 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 12/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition INS-0003518-21 Status Closed -Not Needed Type Parking Subtype Requested Date 6/28/2022 9:00 AM Scheduled Start Date Completed Date 7/8/2022 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0003520-21 Status Pass/Accepted Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date 5/9/2022 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0003524-21 Status Partial/Non-Complete Type Zoning Subtype Requested Date 6/14/2022 9:00 AM Scheduled Start Date Completed Date 6/14/2022 Owner Last Name Narracci Permit Inspection Round Final Inspection Closed TRUE INS-0003525-21 Status Pass/Accepted Type Building &Referral Inspection Status Subtype Requested Date 6/28/2022 9:15 AM Scheduled Start Date Completed Date 6/28/2022 Owner Last Name Cline Permit Inspection Round Final Inspection Closed TRUE INS-0004381-21 Status Pass/Accepted Type Engineering CMP Subtype Requested Date 6/28/2022 9:00 AM Scheduled Start Date Completed Date 7/7/2022 Owner Last Name Kishbaugh (No longer working for City, contact Aaron Reed) Permit Inspection Round https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 13/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Closed TRUE INS-0002758-22 Status Partial/Non-Complete Type Zoning Subtype Requested Date 6/28/2022 9:30 AM Scheduled Start Date Completed Date 8/9/2022 Owner Last Name Narracci Permit Inspection Round Re-Inspection Closed TRUE INS-0003616-22 Status Pass/Accepted Type Zoning Subtype Requested Date Scheduled Start Date Completed Date 8/17/2022 Owner Last Name Permit Inspection Round Re-Inspection Closed TRUE INS-0003829-22 Status Re-Inspection Required Type Building Subtype Final Building Requested Date 8/22/2022 9:53 AM Scheduled Start Date 8/22/2022 Completed Date 8/22/2022 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0003860-22 Status Pass/Accepted Type Building Subtype Final Building Requested Date 8/30/2022 12:25 PM Scheduled Start Date 8/30/2022 Completed Date 8/30/2022 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE MEP Permit Inspections INS-0005103-19 Status Failed/Rejected Type Electric Subtype Rough Electrical Permit 0055.2019.AELE Requested Date 1/21/2020 10:30 AM Scheduled Start Date 1/22/2020 Completed Date 1/22/2020 https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 14/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Owner Alias TParr Closed TRUE INS-0005111-19 Status Pass/Accepted Type Plumbing Subtype Plumbing Underground Permit 0071.2019.ASPL Requested Date 5/6/2020 11:00 AM Scheduled Start Date 5/6/2020 Completed Date 5/6/2020 Owner Alias steve f Closed TRUE INS-0005112-19 Status Partial/Non-Complete Type Plumbing Subtype Final Plumbing Permit 0071.2019.ASPL Requested Date 5/3/2022 11:35 AM Scheduled Start Date 5/3/2022 Completed Date 5/3/2022 Owner Alias BClin Closed TRUE INS-0005115-19 Status Accepted as Noted Type Plumbing Subtype Plumbing Gas Pipe Permit 0071.2019.ASPL Requested Date 3/23/2022 7:53 AM Scheduled Start Date 3/23/2022 Completed Date 3/23/2022 Owner Alias steve f Closed TRUE INS-0005116-19 Status Accepted as Noted Type Plumbing Subtype Plumbing Waste&Vent Permit 0071.2019.ASPL Requested Date 1/13/2021 2:04 PM Scheduled Start Date 1/13/2021 Completed Date 1/13/2021 Owner Alias steve f Closed TRUE INS-0005118-19 Status Accepted as Noted Type Plumbing Subtype Plumbing Water Pipe Permit 0071.2019.ASPL Requested Date 3/23/2022 7:54 AM https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 15/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Scheduled Start Date 3/23/2022 Completed Date 3/23/2022 Owner Alias steve f Closed TRUE INS-0008136-20 Status Partial/Non-Complete Type Mechanical Subtype Final Mechanical Permit 0100-2020-MECH Requested Date 6/3/2022 1:52 PM Scheduled Start Date 6/3/2022 Completed Date 6/3/2022 Owner Alias steve f Closed TRUE INS-0010497-20 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0100-2020-MECH Requested Date 10/8/2020 9:00 AM Scheduled Start Date 10/8/2020 Completed Date 10/8/2020 Owner Alias steve f Closed TRUE INS-0011413-20 Status Partial/Non-Complete Type Mechanical Subtype In-Floor Heat Permit 0118.2019.AMEC Requested Date 12/3/2020 12:00 PM Scheduled Start Date 12/3/2020 Completed Date 12/3/2020 Owner Alias MMill Closed TRUE INS-0014116-20 Status Pass/Accepted Type Mechanical Subtype Rough Mechanical Permit 0100-2020-MECH Requested Date 12/18/2020 9:53 AM Scheduled Start Date 12/18/2020 Completed Date 12/18/2020 Owner Alias steve f Closed TRUE INS-0016493-20 Status Accepted as Noted Type Electric Subtype Rough Electrical https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 16/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Permit 0194-2020-ELEC Requested Date 4/16/2021 10:00 AM Scheduled Start Date 4/16/2021 Completed Date 4/16/2021 Owner Alias RBenn Closed TRUE INS-0016495-20 Status Pass/Accepted Type Electric Subtype Permanent Service Permit 0194-2020-ELEC Requested Date 8/3/2021 9:30 AM Scheduled Start Date 8/31/2021 Completed Date 8/31/2021 Owner Alias RBenn Closed TRUE INS-0016498-20 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0194-2020-ELEC Requested Date 4/26/2022 10:45 AM Scheduled Start Date 4/26/2022 Completed Date 4/26/2022 Owner Alias BClin Closed TRUE INS-0016817-20 Status Partial/Non-Complete Type Mechanical Subtype In-Floor Heat Permit 0118.2019.AMEC Requested Date 3/4/2021 1:00 PM Scheduled Start Date 3/4/2021 Completed Date 3/4/2021 Owner Alias steve f Closed TRUE INS-0002302-21 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0043-2021-ELEC Requested Date 4/22/2021 10:00 AM Scheduled Start Date 4/22/2021 Completed Date 4/22/2021 Owner Alias RBenn Closed TRUE INS-0002307-21 Status Pass/Accepted https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 17/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Type Electric Subtype Final Electrical Permit 0043-2021-ELEC Requested Date 4/27/2022 10:00 AM Scheduled Start Date 4/27/2022 Completed Date 4/27/2022 Owner Alias RBenn Closed TRUE INS-0006345-21 Status Pass/Accepted Type APECC Subtype Snowmelt Permit 0118.2019.AMEC Requested Date 9/22/2021 10:30 AM Scheduled Start Date 9/22/2021 Completed Date 9/22/2021 Owner Alias steve f Closed TRUE INS-0006493-21 Status Pass/Accepted Type Mechanical Subtype Rough Mechanical Permit 0234-2021-MECH Requested Date 9/30/2021 9:21 AM Scheduled Start Date 9/30/2021 Completed Date 9/30/2021 Owner Alias RBenn Closed TRUE INS-0000632-22 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0194-2020-ELEC Requested Date 2/22/2022 10:30 AM Scheduled Start Date 2/22/2022 Completed Date 2/22/2022 Owner Alias RBenn Closed TRUE INS-0002530-22 Status Pass/Accepted Type Mechanical Subtype Final Mechanical Permit 0100-2020-MECH Requested Date 6/13/2022 3:28 PM Scheduled Start Date 6/13/2022 Completed Date 6/13/2022 Owner Alias BClin Closed TRUE https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 18/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition INS-0002717-22 Status Pass/Accepted Type Mechanical Subtype Final Mechanical Permit 0118.2019.AMEC Requested Date 6/13/2022 6:12 AM Scheduled Start Date 6/13/2022 Completed Date 6/13/2022 Owner Alias BClin Closed TRUE INS-0002718-22 Status Pass/Accepted Type Plumbing Subtype Final Plumbing Permit 0071.2019.ASPL Requested Date 6/13/2022 6:18 AM Scheduled Start Date 6/13/2022 Completed Date 6/13/2022 Owner Alias BClin Closed TRUE INS-0002719-22 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0194-2020-ELEC Requested Date 6/13/2022 6:18 AM Scheduled Start Date 6/13/2022 Completed Date 6/13/2022 Owner Alias RBenn Closed TRUE INS-0003643-22 Status Re-Inspection Required Type Mechanical Subtype Final Mechanical Permit 0234-2021-MECH Requested Date 8/11/2022 11:30 AM Scheduled Start Date 8/11/2022 Completed Date 8/11/2022 Owner Alias Steve f Closed TRUE INS-0003667-22 Status Accepted as Noted Type Mechanical Subtype Final Mechanical Permit 0234-2021-MECH Requested Date 8/30/2022 12:01 PM Scheduled Start Date 8/30/2022 Completed Date 8/30/2022 Owner Alias steve f https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 19/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Closed TRUE Milestones Review Round 1 -0044.2017.ARBK Status Approved Due Date Created Date 11/18/2019 Related Permits 0055.2019.AELE Type Electrical Address 208 E MAIN ST Work Type New Status Closed -Final Applicant JOHN J MILLER Issue Date 11/18/2019 Last Activity Date 1/23/2020 0118.2019.AMEC Type Mechanical Address 208 E MAIN ST Work Type New Status Closed -Final Applicant TANYA MOSER Issue Date 11/19/2019 Last Activity Date 6/13/2022 0071.2019.ASPL Type Plumbing Address 208 E MAIN ST Work Type New Status Closed -Final Applicant TANYA MOSER Issue Date 11/18/2019 Last Activity Date 6/13/2022 0195.2019.ARBK Type Change Order Address 208 E MAIN ST Work Type New Status Closed -Final Applicant ADAM ROTHBERG Issue Date 11/27/2019 Last Activity Date 0010-2020-ENTP Type Encroachment-Temporary Address 208 E MAIN ST Work Type New Status Issued Applicant ADAM ROTHBERG Issue Date 1/15/2020 Last Activity Date https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 20/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition 0100-2020-MECH Type Mechanical Address 208 E MAIN ST Work Type New Status Closed -Final Applicant Debbie Cary Issue Date 5/27/2020 Last Activity Date 6/13/2022 0051-2020-ENTP Type Encroachment-Temporary Address 208 E MAIN ST Work Type New Status Issued Applicant ADAM ROTHBERG Issue Date 6/19/2020 Last Activity Date 0056-2020-BCHO Type Change Order Address 208 E MAIN ST Work Type New Status Closed -Final Applicant PATRICIA WEBER Issue Date 4/16/2021 Last Activity Date 4/16/2021 0063-2020-ENTP Type Encroachment-Temporary Address 208 E MAIN ST Work Type New Status Issued Applicant ADAM ROTHBERG Issue Date 8/21/2020 Last Activity Date 0194-2020-ELEC Type Electrical Address 208 E MAIN ST Work Type New Status Closed -Final Applicant JOHN J MILLER Issue Date 12/16/2020 Last Activity Date 6/13/2022 0043-2021-ELEC Type Electrical Address 208 E MAIN ST Work Type New Status Closed -Final Applicant BRYCE HALVERSON Issue Date 3/12/2021 Last Activity Date 4/27/2022 https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 21/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition 0043-2021-RWRG Type Right of Way Address 208 E MAIN ST Work Type New Status Closed -Final Applicant ADAM ROTHBERG Issue Date 6/25/2021 Last Activity Date 10/22/2021 0073-2021-ENTP Type Encroachment-Temporary Address 208 E MAIN ST Work Type New Status Issued Applicant ADAM ROTHBERG Issue Date 6/10/2021 Last Activity Date 0090-2021-ENTP Type Encroachment-Temporary Address 208 E MAIN ST Work Type New Status Issued Applicant ADAM ROTHBERG Issue Date 7/13/2021 Last Activity Date 0100-2021-RWRG Type Right of Way Address 208 E MAIN ST Work Type New Status Closed -Final Applicant ADAM ROTHBERG Issue Date 10/8/2021 Last Activity Date 11/11/2021 0234-2021-M E C H Type Mechanical Address 208 E MAIN ST Work Type New Status Closed -Final Applicant LINDSEY LATHAM Issue Date 9/28/2021 Last Activity Date 8/30/2022 21-3091 Type Right of Way Address 208 E MAIN ST Work Type New Status Cancelled Applicant ADAM ROTHBERG Issue Date Last Activity Date https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 22/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition 0584-2021-CPRK Type Parking Reservation Address 208 E MAIN ST Work Type New Status Closed -Final Applicant ADAM ROTHBERG Issue Date 10/26/2021 Last Activity Date 0033-2022-ENTP Type Encroachment-Temporary Address 208 E MAIN ST Work Type New Status Issued Applicant ADAM ROTHBERG Issue Date 4/11/2022 Last Activity Date Reviews REV-008869 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type Parks Due Date Completed Date 11/18/2019 5:49 AM Owner Alias DRade On Hold Created Date 11/18/2019 REV-008872 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type Sanitation Due Date Completed Date 11/18/2019 5:48 AM Owner Alias PMohr On Hold Created Date 11/18/2019 REV-008873 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type HPC Due Date Completed Date 11/18/2019 5:40 AM Owner Alias ASimo On Hold Created Date 11/18/2019 REV-008874 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type Engineering Water Due Date https://cityofaspen.my.salesforce.com/a033s00000kZsO1AAC/p 23/25 2/10/25,4:20 PM 0044.2017.ARBK-Salesforce-Enterprise Edition Completed Date 11/18/2019 5:46 AM Owner Alias SWilson On Hold Created Date 11/18/2019 REV-008875 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type Engineering CMP Due Date Completed Date 11/18/2019 5:51 AM Owner Alias Engineering CMP-Review On Hold Created Date 11/18/2019 REV-008876 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type Engineering Dev Due Date Completed Date 11/18/2019 5:42 AM Owner Alias HGugl On Hold Created Date 11/18/2019 REV-008877 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type Engineering Erosion &Sediment Due Date Completed Date 11/18/2019 5:43 AM Owner Alias AReed On Hold Created Date 11/18/2019 REV-008879 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type Zoning Due Date Completed Date 11/18/2019 5:39 AM Owner Alias JPome On Hold Created Date 11/18/2019 REV-008880 Milestone Review Round 1 -0044.2017.ARBK Status Approved Type Building Due Date Completed Date 11/18/2019 5:44 AM Owner Alias BMuhi On Hold https://cityofaspen.my.salesforce.com/a033s00000k2s01AAC/p 24/25 2/10/25,4:20 PM 0044.2017.ARBK—Salesforce-Enterprise Edition Created Date 11/18/2019 Submissions COVID 19 Site Safety Plan.PDF Actions Submission Date 4/23/2020 1:05 PM Status Pending Required Description COVID 19 Site Safety Plan.PDF Actions Submission Date 4/27/2020 3:30 PM Status Pending Required Description Copyright©2000-2025 salesforce.com, inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000k2s01AAC/p 25/25