HomeMy WebLinkAboutFile Documents.230 E Hopkins Ave.0046-2020-BCHO (3) 0046-2020-BCHO_BuildingComments_3
30.Interior Lighting COMCheck.20210420.pdf(5)
Subject: PlanCheck
..µ....°—��°--°. °° .o., aw.m. Page: 1 I can't find an S4 sconce at
torlet"oeL�_Pow.
—wq��m m Page Index: 1 Comm Unit 4.
�'" `,, Author: nickt
I=an,fimnnsn„,_ Color: ■
�,E— ° mss. •ss
: File Name: 30.Interior Lighting COMCheck.20210420.pdf
- anxn- Subject: PlanCheck
Page: 1 I count 26 R3 and R4 fixtures in
Page Index: 1 Comm Unit 4.
m, --_ i. Author: nickt
wont 26 R3 end R6
b,9a�s.— fi ureslnCammUnit4. Color: •
ID:nw,°° .nV Wm,Per
. "" ` tc. File Name: 30.Interior Lighting COMCheck.20210420.pdf
.Ot,M Subject: PlanCheck
e� "` Page: 1 I count 20 R3 fixtures and 6
ms°.wT.w,Wattage Mon
°s°°s7°° Page Index: 1 unlabeled fixtures.These add up
u u Author: nickt to 26.
count 20 R3 fixtures 9 39 Color: •
and unlabeled J File Name: 30.Interior Lighting COMCheck.20210420.pdf
fixtures.These add up
to 26. Report
Subject: PlanCheck
Page: 2 I count 17 R3 fixtures in Corn
Page Index: 2 Unit 7.
I count 1T R3 fixtures
in Core Unit 7. Author: nickt
*an/Lamp,w...Per L.mn,auv. ,c%DI
Color: •
o ma ow ° 1° =, File Name: 30.Interior Lighting COMCheck.20210420.pdf
a
Subject: PlanCheck
Page: 2 Revise interior lighting comcheck
m�q"'� Page Index: 2 to include the following fixtures:
. - - Author: nickt
P
• . ° Color: ■ Basement, • . v File Name: 30.Interior Lighting COMCheck.20210420.pdfCorridor 017: 6x R3
...�t` ""'"mm` "' " mµ E— Stair 010: 3x S5,4x R3
Main level:
Stair: 3x S5,4x R3
Corridor: 12x R3&R4
Bathrooms:4x S6, 2x R3
2nd level:
Stair:4x S5,4xR3
Hall: 6x R3&R4
Mech room: ix T1
90.Architectural Drawings.20210518.pdf(14)
Subject: PlanCheck
# ' as a lit.
" =� �'' � comment not
4 � jT � I. Page:A2.1 PROPOSED•50LEVEL ONE•50FLOOR PLAN Previous 99 dessec:
v Page Index: 4
IF T*' "" ® s Author: nicktWho
r Update kitchen plan to match
I' .� !, Color: •
p
$s ' A9.16 drawings.
4
.l lye File Name: 90.Architectural Drawings.20210518.pdf
� , ', ,, W° You did not include A9.16 in this
rr'WhkirAnt sx submittal.
J.'' .,<,''.-'...0.-'-. -.-''AF Z—A.,1;,„....--(---rt[..:..:....
Subject: PlanCheck
Page:A2.1 PROPOSED•50LEVEL ONE•50FLOOR PLAN This submittal is incomplete. You
8 Ec Page Index: 4 must submit every single sheet
- in each set that has changed.
L'yo so„ - Author: nickt
,71:=nee, ea�n„n� Color: • For example, previously you
w :;^aria File Name: 90.Architectural Drawings.20210518.pdf submitted a changed A2.1 and
' tee'=' A9.1A.These must be included
I g °I �°^s^°�m°are `
r": I in your next submittal, along with
all other sheets that have
changed since the original
master permit.
is II`ii T rlra sl Subject: PlanCheck
E;�i. 1 e= Page:A2.1 PROPOSED•50LEVEL ONE•50FLOOR PLAN Previous comment not
®® Page Index: 4 addressed:
Ib4 Author: nickt Provide sheet A7.04A and
o ` r�. Color: •■
o I = ,z �7 1 _ update elevations and door and
irapili a 1 File Name: 90.Architectural Drawings.20210518.pdf
window schedules and any other
„' applicable drawings to match
o �{u � _ new door design. Cloud this
e=,NO ' `I �i� change and any others on all
0 ° �:. applicable sheets. Provide
U-factor(max 0.37 per 2015
IECC C402.4). Provide a
threshold detail (max 1/2"per
2015 IBC 1010.1.7).
Your response referenced
multiple sheets which were not
provided.
♦ ;AM]. !� =T t ::_: Subject: PlanCheck
cllm: 1:0 _ Previous comment not
NIPAi�v�� �:_ I ,�,� Page:A2.1 PROPOSED•50LEVEL ONE•50FLOOR PLAN
_, o tee► x� Page Index: 4 addressed:
r--�� � itro 'ir`� Author: nickt
rti r:_ ! Revise to match new layout and
r--- o .a-- � i Color: ■
i �l ! - File Name: 90.Architectural Drawings.20210518.pdf dimension 18"from door to
f counter for door maneuvering
I--e 1 a- a
al clearance. ICC A117.1-2009
', ,I m�e ' - section 404.2.3.1
—I 34,ca .�r- i War
This comment was made
regarding the door to Restroom
101 on sheet A9.1B.Your
response did not include sheet
A9.1 B.
i Subject: PlanCheck
1 �g 1440111 o 'a� \ Page:A2.1 PROPOSED•50LEVEL ONE•50FLOOR PLAN Previous comment not
-li - _k4l_ `ilj Page Index: 4 addressed:
e` `� ICI ■9� Author: nickt
n'�°` ram- Color: ■ Sink clear space may not
- no. gin encroach on dishwasher door
lllir 1 I '® File Name: 90.Architectural Drawings.20210518.pdf
it � -1 ulia opening. Practically this means
_ the center of the sink must be at
:map i.M i. Ala least 24"from the edge of the
I ICI dishwasher. ICC/A117.1-2009
section 804.5.3
This comment was made on
A9.16.Your response did not
include this sheet.
Subject: PlanCheck
._ Previous comment not
Page:A2.1 PROPOSED•50LEVEL ONE•50FLOOR PLAN
�� Page Index: 4 addressed:
S al I Author: nickt
AI Color: • You submitted a spec for aIC ° File Name: 90.Architectural Drawings.20210518.pdf microwave; indicate the location
"' "` of it in the drawings. Should be
on the counter to be within reach
ranges.
This comment was made on
A9.16.Your response did not
include this sheet.
Subject: PlanCheck
Page:A2.1 PROPOSED•50LEVEL ONE•50FLOOR PLAN Previous comment not
gE re66Bo P�Q f.
Page Index: 4
Author: nickt
addressed:
°
Provide interior elevations and
R g„ qp o; Color: • enlarged plan to demonstrate
File Name: 90.Architectural Drawings.20210518.pdf
accessibility as you have done
°m• re'WB'°° for the other toilet rooms.
'° A ...,,.,,.. _,. ��°�'"` This comment refers to
��' �.� Restroom 015 in the basement.
Your response references A9.1A
but this sheet was not submitted.
Subject: PlanCheck
W r' -- -- Page: POSED:ItwoDR PLAN Previous comment not
'ice ▪ -o g - Page Index: 6 addressed:
�I714 �d 0 - Author: nickt
` � ".. Commercial Unit 7 does has two
a Color: •
j - bathrooms, disqualifying it from
`® , °� ��mg _:o a File Name: 90.Architectural Drawings.20210518.pdf
• _ _I 1 the single person private office
®Ro accessibility exemption of 2015
• e�Hl4ki g ,; e
i �� �, in ra IBC 1109.2 exception 1. One of
4I®ham ' - the two toilet and bathing rooms
must be fully accessible. Revise
plans and enlarged plan and
interior elevations to
demonstrate compliance.
Sheet A9.1 D was not provided.
Ilip - Subject: PlanCheck
w ��� Previous comment not
h 1 O Page: :.2 POSED:ItwoDR PLAN
I� � I � � Page Index: 6 addressed:
'III;,�� ��.I- Author: nickt This window is now' a
I>L° -“Ir;7ME 0 Color: •■
o' I te� hazardous locati (shower)and
'\--- File Name: 90.Architectural Drawings.20210518.pdf must be safet glazed.2015 IBC
1 IMI
2406
,lity
ag - — °pl IN 6'-: You ave not provided updated
m A .1D orA8.0
1 .. ak i _T Subject: PlanCheck
- Handrails r both sides
III 111111k%
Page:A2.3 PROPOSED•50ROOF PLAN of all sta' s. Extensi ns and
____ Page Index: 8
returns equired. 20 5 IBC 1012,
imik■Y a Author. nickt 1014.
° Color: ■
h� ��1I L 1• p a b.
��,�,ium .72: = File Name: 90.Architectural Drawings.20210518.pdf
��i;i i�Oii, :1
1Wr" -1 1 telliill 11,....
i•711iiiiiiiiiiL In
v.
,�-IIA hi�lllii � • x ' j Page A2 3 PROPOSED•50ROOF PLAN
ct: PlanCheck
Glass guards must be laminated.
•' I4 i'c" ii }-�__ Page Index: 8 Ordinance 40, 2016
i -� a!a Author• nickt
444
t _ .� Color: ■
' xuil t�.:.� a WPE =g File Name: 90.Architectural Drawings.20210518.pdf
_ l
I 1 I I 11 I
p,l11 1.of 111 ram„ „®"� I �I Subject: PlanCheck
.'NIA Provide Spa/Pool section
-4 �� Page:A2.3 PROPOSED•50ROOF PLAN p
i r�®ni
II,iIP o ii Vl detailing guard extent and
Page Index. 8 height.
f I'4c"�1kI — ,- Author: nickt
II 11'` Color: ■
��i . _ File Name: 90.Architectural Drawings.20210518.pdf
' 1 I I I I 1 1
_ 1 4g.-- Subject: PlanCheck
�� I Indicate that all handrails return
i,.��l��l���l���� ��� , mk�N `: Page:A2.3 PROPOSED•50ROOF PLAN
�„ ,M,�. _ ► (to walkingsurface). 2015 IBC
�i�I=ii 111 ' = Page Index: 8
=/ I lion. °' 1014.
��" Author: nickt
• �Il,ia��, F: l � No' Color: •■
' Ii il _ File Name: 90.Architectural Drawings.20210518.pdf
I all
Subject: PlanCheck
Page:A2.4 PROPOSED•50UPPER ROOF PL/ To comply with City policy for
o e o 0 o Page Index: 9
fenestration U-factor
l ill .�-4=- r::I li ,� documentation, it appears
i _ ,i: 9. Iii =_ .' Author: nickt
3S = - -- you've submitted a calculation
,i, wq ; '' Color: •
i ;' := I from AIA Industries using the
File Name: 90.Architectural Drawings.20210518.pdf
___._A W,, _,_ Window program. This program
_ Il
a 'm is NFRC accredited so I think we
II1I. -• II3 �_� can accept it for documentation
T- .__-IM I i11 ` at permit. However, to document
the chain of custody and verify
that the right materials are
installed, an affidavit or other
evidence from the manufacturer
confirming compliance with the
simulation is required prior to
field inspection.
Please note on the plans that
you will provide verification from
the manufacturer documenting
chain of custody and that the
materials shipped are the same
as was calculated in the
submitted calculation. Note that
this must be submitted for
approval prior
to inspection.
90.Electrical Revisions.20210428.pdf(2)
3 o �� ®•R3 Subject: PlanCheck
o M Page: [7] 18009 el-E3.1 Revise to label light fixture types.
• Page Index: 7
Author: nickt
TR4
P73R3
®11
Color: •TR4File Name: 90.Electrical Revisions.20210428.pdf
-
t
TR4
_ 1 Revise label I'igM
® fixture types.
R3i ® R3 R3
-•ii _-___-_— Subject: PlanCheck Label these fixtures. R3?
1 I[ yes`~4®" Page: [7] 18009 el-E3.1
f' ®ri
Page Index: 7
�1 Author: nickt
�1 Color: ■
I II II File Name: 90.Electrical Revisions.20210428.pdf
I4 `-
][ ut