Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Master Permit.210 W Main St.0056.2019.ARBK
2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0056.2019.ARBK Number 0056.2019.ARBK Record Type Building-Imported Address 210 W MAIN ST Owner Fernando Cruz Original Number 0056.2019.ARBK Status Closed- Final Type Building Reason for Cancel or Comp!.Review Fail Applicant DAVID GRABARKIEWICZ Aspen Internal? Account KEELTY CONSTRUCTION INC Required Bond Amount Project Total Available Bond Amount Land Use Planning Is This Associated w/a Application Building Permit? Permit Contractor KEELTY CONSTRUCTION INC Master Building Permit Valid Business License Bluebeam Project Id 267-435-618 on Account Imported j HPC-ZON-EH-UTIL HPC Rev,EH-Rcyl Rev, Review Required Submissions HPC-ZON-EH-UTIL Review-2 Documents Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Resubmitted Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Approved Covid-19 Parks-Prkng-San Parks Rev,Parks Fee,Water-LSE Plan Review Rev,Parking Rev,San Rev, Conditional HPC Insp,Parks Insp, Inspections Conditional Final Insp HPC Final,EH-Rcyl Final,Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parking Final,Parks Final,Water-LSE Final,San Final, Action Items Hold All Reviews Create Fees Hold Reason Create Fees 2 Utility Review Type Major Price Book EDEN Conditional Flat Fee Applicant is a Formula Nonprofit? Conditional Tiered Fee Eligible for Small Formula Lodge Program? Conditional Tiered MAR, Discount All Fees(%) SqFt Fee Formula Fee Discount Reason CO/LOC? CO Status if Applicable Issued Queue Score https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 1/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Queue Designation Milestone Current Days in Applicant Hand Queue Score 0 Milestone Current Days in City Hands Last Date Received Milestone-Total Days from Applicant in Applicant Hand Milestone-Total Days in City Hands Dates New Application Date 3/6/2019 TCO Issuance Date Application Complete 3/6/2019 Close/CO Issuance 1/6/2021 Date Date Application Accepted 3/16/2019 Expiration Date 2/6/2023 Date Issue Date 12/2/2019 Override Expiration Date Last Activity Date 8/10/2022 Basic Information Description Applicant: Census Code 105-Five or More Family Residences David D'La Abre Keelty Contsruction DEMO EXISITING BUILDING TO CONSTRUCT 8 AN UNITS//JOHN//BB 267435618 ***PHASED PERMIT*** PHASE 1 ISSUED(SITE PREP DEMO SHORING): 9/26/19 Use of Building Multi-Family Interior Remodel Only Use Class Residential Class of Work New Permit Comments TCO Condition-Zoning: Parking spaces must be striped prior to receiving final Certificate of Occupancy. Job Location Address 210 W MAIN ST,ASPEN : 273512440009 Lot P Site Address Display on Map Legal Description Historic Property? No Eden Address 210 W MAIN ST Historic District? Yes HPC - Planning -Zoning Details Zone District MU HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of Yes Appropriateness? ADU Sq Ft Work Involves a Land Yes Use Approval? Deed Restricted? Yes Located in a PD? No #of Dwellings Adds/Changes Floor Yes Area? https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 2/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Category of Zoning Residential Occupancy or Use Yes Fee Change? Zoning Work Level Major Zoning Fee Work Affects Exterior Yes of Building? Building Project Details Valuation $3,000,000.00 Lot Size Sq.Ft. 6,000 Reason for Valuation Soil Disturbance Sq Ft 6,000 Change Unit Sq.Ft. 10,817 Affected Area Sq Ft 6,000 Building Footprint Sq Existing Hardscape Ft Footprint Sq Ft Sq Ft of Building Work 3,680 Existing Hardscape% 0% Area of Lot Building Fire Area Sq 3,680 Con Mit Sq Ft Total 9,680 Ft Utility Review Sq.Ft. 3,680 Utility Review Sq Ft 6,000 Total %of Interior being 100% Altered New Sq.Ft. 3,680 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Yes Footprint? Line? Work Changes Yes Located Within City No Fenestration/Thrml Mall Boundaries? Envelop? Requires Asbestos Yes Adjacent to City Open No Test? Space? Photovoltaic Installation No Impacts City No Trails/Parks? Work Yes Work Subject to Water Yes Adds/Removes/Changes Efficient L.O.? Plumbing Fixt? Restaurant/Food No Involves Impact on Yes Service Involved? Sewer? Change of Restaurant No Prevents Access to No Ownership? Sewer Main? Affects Yes Sewer Easements No Parking/Alleys/Loading? Affected? Building Description Code Editions 2015 IBC Required Special High-Strength Bolting; Structural Steel Inspections Welding Other Code Editions Energy Code RESCheck UAAlternative Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Occupancy Load Total Pool Sq Ft Fire Sprinkler Amount of Onsite Existing? Renewable Generation? Fire Sprinkler Yes CO Description Required? https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 3/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Fire Sprinkler Type NFPA 13 R Basement Mechanical, storage Fire Alarms Installed? NFPA 72 1st Floor Units 101, 102, 103. Units 101 and 103 are Type B Accessible #Wood Fireplaces 2nd Floor Units 201,202,203 #Gas Log Fireplaces 3rd Floor Units 301, 302 #Gas Appliances Additional Open Text Field For Units 101 and 103 are Type B Accessible Comments Financials Total Fees $0.00 Total Payments Fees Due at Current Total Balance $0.00 Status System Information Number 0056.2019.ARBK Community 1 Visibility Created By Ruth Kinney, Contact 0033s000010e9liAA1,0033s0000100jS9AA1,0033s0000107PdyAAE,0036A00000cvZF3QAM 7/27/2019 1:50 IDs PM IsTestData? Last Fernando Cruz, 12/2/2024 4:47 PM Modified By VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Certificate of Occupancy -210 W Main St-0056.2019.ARBK-Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/6/2021 Days in Applicant's Hands Comments To: david@keeltyconstruction.com CC: BCC: Attachment:210 W Main St-0056.2019.ARBK-CO Final.pdf, City_Use_Tax_to_Owner_210 W Main St -0056.2019.ARBK.pdf, Notice_to_Contractor_210 W Main St-0056.2019.ARBK.pdf, 1-County Use Tax Final Return Template(PDF).pdf, 1-City Final Return_Use Tax.pdf Subject: Certificate of Occupancy-210 W Main St-0056.2019.ARBK-Issued Body: Good Morning, Please find attached your issued Certificate of Occupancy for the project completed at 210 W Main St. https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 4/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Additionally you can find, attached,yours and the owner of the property's City use tax letters and tax reconciliation forms. If you have any questions or concerns please let us know. Kind regards, Lilly Culver Email: Certificate of Occupancy -210 W Main St-0056.2019.ARBK-Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/6/2021 Days in Applicant's Hands To: davidg@keeltyconstruction.com CC: BCC: Attachment: 210 W Main St-0056.2019.ARBK-CO Final.pdf, City_Use_Tax_to_Owner_210 W Main St -0056.2019.ARBK.pdf, Notice_to_Contractor_210 W Main St-0056.2019.ARBK.pdf, 1-County Use Tax Final Return Template(PDF).pdf, 1-City Final Return_Use Tax.pdf Subject: Certificate of Occupancy-210 W Main St-0056.2019.ARBK-Issued Body: Comments Good Morning, Please find attached your issued Certificate of Occupancy for the project completed at 210 W Main St. Additionally you can find, attached,yours and the owner of the property's City use tax letters and tax reconciliation forms. If you have any questions or concerns please let us know. Kind regards, Lilly Culver Email: 210 W. Main Street/Permit 0056.2019.ARBK Type Billable Assigned To Bob Narracci Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/23/2020 Days in Applicant's Hands Comments To: davidg@keeltyconstruction.com CC:John.Barker@cityofaspen.com; Bob.Narracci@cityofaspen.com; Stephen.Kanipe@cityofaspen.com BCC: Attachment: --none-- Subject:210 W. Main Street/Permit 0056.2019.ARBK Body: Good Evening David, I have signed off for Zoning on the final inspection for this project. Thank you, Bob Narracci https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 5/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Bob Narracci Community Development Department Zoning Administrator 130 S. Galena St. Aspen, CO 81611 p: 970.429.2754 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable,the information and opinions contained in the email are based on current zoning,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email: COVID-19 Safety Plan Approval Type Billable Assigned To Aaron Reed Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/23/2020 Days in Applicant's Hands To: davidg@keeltyconstruction.com CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200423.pdf Subject: COVID-19 Safety Plan Approval Body: Comments Dear DAVID GRABARKIEWICZ, Thank you for submitting a COVID-19 Site Safety Plan for 0056.2019.ARBK at 210 W MAIN ST. City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re-commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan,as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. Email: Building Permit#0056.2019.ARBK- Issued Type Billable Assigned To Sara Nester Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/2/2019 Days in Applicant's Hands Comments To: davidg@keeltyconstruction.com CC: BCC: Attachment: Building Permit 0056.2019.ARBK.pdf, Use Tax 0056.2019.ARBK.pdf Subject: Building Permit#0056.2019.ARBK-Issued Body: https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 6/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Good morning, Please see the attached issued Building Permit and Use Tax Letter. Below is the link to your building plans. Please print these off 24x36 in color and keep them on site at all times.As a reminder dropbox links do expire so please download the plans as soon as you get them. https://www.dropbox.com/sh/dozszsg0w85gjid/AABO_glyzvuG7f39egW0Cx2Qa?d 1=0 Kind Regards, Sara Email: Important!Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To John Barker Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/15/2019 Days in Applicant's Hands To: davidg@keeltyconstruction.com CC: kim@krai.us BCC: Attachment: --none-- Subject: Important!Your City of Aspen permit has been moved to new permitting system Body: Dear DAVID GRABARKIEWICZ, As you may know,the City of Aspen has been transitioning to a new online-based permitting system, Salesforce.Thank you for your patience during this transition,which is now complete.Your permit is now operational in Salesforce.Your project located at 210 W MAIN ST,ASPEN : 273512440009 will retain its original permit number,0056.2019.ARBK and you will use this number to find your permit in Comments Salesforce. If you have not already done so,you must register in Salesforce before you are able to access your permit information, upload new documents,or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support If you have additional questions that are not addressed at the above link,you may reach out directly to city staff for assistance at sfsupport@cityofaspen.com. Sincerely, John Barker City of Aspen Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 10/13/2020 Days in Applicant's Hands Comments https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 7/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 9/30/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 9/14/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/25/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/19/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 8/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Fee Generated Date Start Date Completed Date 8/19/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/4/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/3/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/3/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/29/2020 Days in Applicant's Hands Comments Permit Inspection https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 9/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/28/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/24/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 7/21/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/27/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 10/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 5/21/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/18/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/25/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 1/8/2020 Days in Applicant's Hands Comments Contacts MICHAEL CHARLES Account KEELTY CONSTRUCTION INC Type Representative Active Contractor License Count 1.00 Number 0024687 DAVID DE L'ARBRE Account KEELTY CONSTRUCTION INC Type Contractor Active Contractor License Count 1.00 Number 0026781 TORY NEU Account KEELTY CONSTRUCTION INC Type Representative https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 11/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Active Contractor License Count 1.00 Number 0020000 DAVID GRABARKIEWICZ Account KEELTY CONSTRUCTION INC Type Applicant Active Contractor License Count 1.00 Number 0022555 Fees 0068971 Type Use Tax Deposit-City of Aspen Total $30,450.00 Waived/Refunded Amt $30,450.00 Discount$ Outstanding $0.00 Fee Due At Closed-Final Show in Cart Paid in Full ✓ Fee Paid Date/Time Files 210 W Main St-0056.2019.ARBK-CO Final City_Use_Tax_to_Owner_210 W Main St- Last Modified 1/6/2021 5:49 AM 0056.2019.ARBK Created By Lilly Culver Last Modified 1/6/2021 5:48 AM Created By Lilly Culver Notice_to_Contractor_210 W Main St-0056.2019.ARBK Last Modified 1/6/2021 5:47 AM 1-County Use Tax Final Return Template (PDF) Created By Lilly Culver Last Modified 1/6/2021 5:47 AM Created By Lilly Culver 1-City Final Return_Use Tax Last Modified 1/6/2021 5:47 AM IBC_CO_Letter Template_20210105.docx Created By Lilly Culver Last Modified 1/5/2021 1:23 PM Created By Lilly Culver 20201210143128865 Last Modified 12/28/2020 7:23 AM 20201223 Maintenance Plan Created By MICHAEL CHARLES Last Modified 12/24/2020 11:56 AM Created By MICHAEL CHARLES MEMO Asbuilt Drainage 2020 12 23 Last Modified 12/24/2020 11:56 AM 210 W MAIN AS-BUILT 12-22-20 Created By MICHAEL CHARLES Last Modified 12/24/2020 11:56 AM Created By MICHAEL CHARLES U CP_Water_Fi nal_20201217.docx Last Modified 12/16/2020 7:35 PM APPROVAL_NOTICE_COVID- Created By Steve Wilson 19_SITE_SAFETY_PLAN_20200423.pdf Last Modified 4/23/2020 8:44 AM COA COVID-19 Plan (1) Created By Aaron Reed Last Modified 4/23/2020 8:31 AM Created By MICHAEL CHARLES Use Tax 0056.2019.ARBK Last Modified 12/2/2019 11:48 AM Building Permit 0056.2019.ARBK Created By Sara Nester Last Modified 12/2/2019 11:48 AM Created By Sara Nester Building_Permit_20191202.docx Last Modified 12/2/2019 11:45 AM City_Use_Tax_Letter_20191202.docx Created By Sara Nester https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 12/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Last Modified 12/2/2019 11:39 AM 0056.2019.ARBK fees Created By Sara Nester Last Modified 11/15/2019 11:57 AM Created By John Barker Inspections I N S-0007496-19 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 5/13/2020 12:00 PM Scheduled Start Date 5/13/2020 Completed Date 5/13/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0007497-19 Status Pass/Accepted Type Concrete Subtype Footings Requested Date Scheduled Start Date 12/4/2019 Completed Date 12/4/2019 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE I N S-0007499-19 Status Pass/Accepted Type Concrete Subtype Pads Requested Date Scheduled Start Date 1/24/2020 Completed Date 1/24/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0007500-19 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 5/8/2020 10:00 AM Scheduled Start Date 5/8/2020 Completed Date 5/8/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE I N S-0007504-19 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/19/2020 10:00 AM Scheduled Start Date 8/19/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 13/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 8/19/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE I N S-0007507-19 Status Accepted as Noted Type APECC Subtype Glazing Requested Date 10/12/2020 10:00 AM Scheduled Start Date 10/12/2020 Completed Date 10/12/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0007509-19 Status Pass/Accepted Type APECC Subtype Radon Requested Date 5/21/2020 8:00 AM Scheduled Start Date 5/21/2020 Completed Date 5/21/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0007510-19 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 7/28/2020 12:00 PM Scheduled Start Date 7/28/2020 Completed Date 7/28/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0007511-19 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date Scheduled Start Date 12/23/2019 Completed Date 12/23/2019 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0007515-19 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 7/21/2020 9:00 AM Scheduled Start Date 7/21/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 14/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 7/21/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0007516-19 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 9/11/2020 6:37 AM Scheduled Start Date 9/11/2020 Completed Date 9/11/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0007517-19 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 7/24/2020 11:00 AM Scheduled Start Date 7/24/2020 Completed Date 7/24/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0011444-19 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 1/7/2020 6:46 AM Scheduled Start Date 1/7/2020 Completed Date 1/7/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0000286-20 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 3/11/2020 1:00 PM Scheduled Start Date 3/12/2020 Completed Date 3/12/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0006518-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/22/2020 6:40 PM Scheduled Start Date https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 15/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 4/23/2020 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE I N S-0004548-20 Status Accepted as Noted Type Concrete Subtype Walls Requested Date 3/18/2020 10:00 AM Scheduled Start Date 3/18/2020 Completed Date 3/18/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0007345-20 Status Pass/Accepted Type Building Subtype Rough Framing Requested Date 5/12/2020 9:00 AM Scheduled Start Date 5/12/2020 Completed Date 5/12/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE I N S-0007455-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 5/14/2020 7:00 AM Scheduled Start Date 5/14/2020 Completed Date 5/15/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0007624-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 5/20/2020 8:00 AM Scheduled Start Date 5/20/2020 Completed Date 5/20/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0007902-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 5/27/2020 9:00 AM Scheduled Start Date 5/27/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 16/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 5/27/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0008152-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 6/15/2020 8:00 AM Scheduled Start Date 6/15/2020 Completed Date 6/15/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0009066-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 7/29/2020 9:00 AM Scheduled Start Date 7/29/2020 Completed Date 7/29/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010551-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/14/2020 8:00 AM Scheduled Start Date 8/14/2020 Completed Date 8/14/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010703-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 7/28/2020 11:30 AM Scheduled Start Date 7/28/2020 Completed Date 7/28/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010822-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 8/4/2020 8:00 AM Scheduled Start Date 8/4/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 17/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 8/4/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0010824-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 8/3/2020 8:30 AM Scheduled Start Date 8/3/2020 Completed Date 8/3/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010867-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 7/31/2020 8:00 AM Scheduled Start Date 7/31/2020 Completed Date 8/3/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0010934-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/4/2020 8:00 AM Scheduled Start Date 8/4/2020 Completed Date 8/4/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010992-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 8/25/2020 6:58 AM Scheduled Start Date 8/26/2020 Completed Date 8/26/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0011006-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 8/18/2020 10:00 AM Scheduled Start Date 8/18/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 18/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 8/18/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011076-20 Status Pass/Accepted Type Building Subtype Drywall Requested Date 8/11/2020 8:00 AM Scheduled Start Date 8/11/2020 Completed Date 8/11/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0011412-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/18/2020 6:03 AM Scheduled Start Date 8/18/2020 Completed Date 8/18/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011665-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 9/2/2020 8:00 AM Scheduled Start Date 9/2/2020 Completed Date 9/2/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0011666-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/20/2020 12:00 PM Scheduled Start Date 8/20/2020 Completed Date 8/20/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0011677-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/24/2020 8:00 AM Scheduled Start Date 8/24/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 19/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 8/24/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0011751-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/25/2020 8:00 AM Scheduled Start Date 8/25/2020 Completed Date 8/25/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011967-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 8/26/2020 7:00 AM Scheduled Start Date 8/26/2020 Completed Date 8/26/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0012033-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 9/2/2020 8:00 AM Scheduled Start Date 9/2/2020 Completed Date 9/2/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0012052-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 9/4/2020 10:00 AM Scheduled Start Date 9/4/2020 Completed Date 9/4/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0012053-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 9/14/2020 8:00 AM Scheduled Start Date 9/14/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 20/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 9/14/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0012270-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 9/14/2020 8:00 AM Scheduled Start Date 9/14/2020 Completed Date 9/14/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0012271-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 9/9/2020 8:00 AM Scheduled Start Date 9/9/2020 Completed Date 9/9/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0012307-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 9/30/2020 8:00 AM Scheduled Start Date 9/30/2020 Completed Date 9/30/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012419-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 10/21/2020 8:00 AM Scheduled Start Date 10/21/2020 Completed Date 10/21/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0012653-20 Status Pass/Accepted Type Building Subtype Special Building Inspection Requested Date 9/23/2020 8:00 AM Scheduled Start Date 9/23/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 21/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 9/23/2020 Owner Last Name Kanipe Permit Inspection Round Re-Inspection Closed TRUE INS-0013379-20 Status Pass/Accepted Type Parks Subtype Requested Date 11/21/2020 9:49 AM Scheduled Start Date Completed Date 11/23/2020 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0013380-20 Status Pass/Accepted Type Water Efficient Landscaping Subtype Requested Date 11/21/2020 9:55 AM Scheduled Start Date Completed Date 11/25/2020 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0013381-20 Status Pass/Accepted Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date 10/21/2020 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0013382-20 Status Pass/Accepted Type Recycling Subtype Requested Date Scheduled Start Date 12/8/2020 Completed Date 12/10/2020 Owner Last Name Tsevdos Permit Inspection Round Final Inspection Closed TRUE INS-0013383-20 Status Pass/Accepted Type HPC Subtype Requested Date 12/2/2020 2:00 PM Scheduled Start Date 12/7/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 22/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 12/7/2020 Owner Last Name Simon Permit Inspection Round Final Inspection Closed TRUE INS-0013384-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date 11/21/2020 9:52 AM Scheduled Start Date Completed Date 12/16/2020 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0013386-20 Status Pass/Accepted Type Engineering Erosion &Sediment Subtype Requested Date 11/21/2020 9:51 AM Scheduled Start Date Completed Date 11/23/2020 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0013385-20 Status Pass/Accepted Type Engineering Dev Subtype Requested Date 12/28/2020 9:41 AM Scheduled Start Date Completed Date 12/30/2020 Owner Last Name Murray Permit Inspection Round Final Inspection Closed TRUE INS-0013650-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 11/6/2020 10:00 AM Scheduled Start Date Completed Date 11/11/2020 Owner Last Name Thompson Permit Inspection Round Re-Inspection Closed TRUE INS-0015803-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 11/16/2020 8:00 AM Scheduled Start Date 11/17/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 23/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 11/17/2020 Owner Last Name Thompson Permit Inspection Round Re-Inspection Closed TRUE INS-0016421-20 Status Partial/Non-Complete Type Zoning Subtype Requested Date 12/2/2020 1:00 PM Scheduled Start Date 12/4/2020 Completed Date 12/4/2020 Owner Last Name Varga Permit Inspection Round Final Inspection Closed TRUE INS-0016630-20 Status Pass/Accepted Type Building Subtype Special Building Inspection Requested Date 12/15/2020 7:00 AM Scheduled Start Date 12/15/2020 Completed Date 12/15/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0016844-20 Status Re-Inspection Required Type Zoning Subtype Requested Date 12/10/2020 9:00 AM Scheduled Start Date 12/10/2020 Completed Date 12/10/2020 Owner Last Name Varga Permit Inspection Round Re-Inspection Closed TRUE INS-0017233-20 Status Pass/Accepted Type Zoning Subtype Requested Date Scheduled Start Date Completed Date 12/23/2020 Owner Last Name Narracci Permit Inspection Round Re-Inspection Closed TRUE INS-0017755-20 Status Pass/Accepted Type Building Subtype Special Insp. Requested Date 12/22/2020 8:00 AM Scheduled Start Date 12/22/2020 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 24/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 12/22/2020 Owner Last Name Feder Permit Inspection Round Closed TRUE INS-0017819-21 Status Pass/Accepted Type Building Subtype Final Building Requested Date 12/30/2020 1:44 PM Scheduled Start Date 12/30/2020 Completed Date 12/30/2020 Owner Last Name Feder Permit Inspection Round Closed TRUE MEP Permit Inspections I N S-0004539-19 Status Accepted as Noted Type Electric Subtype Permanent Service Permit 0133.2019.AELE Requested Date 10/14/2020 1:00 PM Scheduled Start Date 10/15/2020 Completed Date 10/15/2020 Owner Alias MMill Closed TRUE INS-0005606-20 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0031-2020-ELEC Requested Date 7/20/2020 7:00 AM Scheduled Start Date 7/20/2020 Completed Date 7/20/2020 Owner Alias MMill Closed TRUE INS-0005608-20 Status Pass/Accepted Type Electric Subtype Permanent Service Permit 0031-2020-ELEC Requested Date 10/14/2020 6:52 AM Scheduled Start Date 10/15/2020 Completed Date 10/15/2020 Owner Alias MMill Closed TRUE INS-0005610-20 Status Failed/Rejected Type Electric Subtype Underground Permit 0031-2020-ELEC Requested Date 7/10/2020 6:41 AM https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 25/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Scheduled Start Date 7/10/2020 Completed Date 7/10/2020 Owner Alias MMill Closed TRUE INS-0005611-20 Status Partial/Non-Complete Type Electric Subtype Final Electrical Permit 0031-2020-ELEC Requested Date 12/2/2020 12:44 PM Scheduled Start Date 12/3/2020 Completed Date 12/3/2020 Owner Alias MMill Closed TRUE INS-0005056-20 Status Partial/Non-Complete Type Mechanical Subtype Mechanical Ventilation Permit 0066-2020-MECH Requested Date 7/30/2020 11:00 AM Scheduled Start Date 7/30/2020 Completed Date 7/30/2020 Owner Alias steve f Closed TRUE INS-0005060-20 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0066-2020-MECH Requested Date 7/20/2020 10:00 AM Scheduled Start Date 7/20/2020 Completed Date 7/21/2020 Owner Alias MMill Closed TRUE INS-0005201-20 Status Partial/Non-Complete Type Mechanical Subtype Final Mechanical Permit 0066-2020-MECH Requested Date 12/10/2020 11:00 AM Scheduled Start Date 12/10/2020 Completed Date 12/10/2020 Owner Alias MMill Closed TRUE INS-0008041-20 Status Accepted as Noted Type Plumbing Subtype Final Plumbing Permit 0046-2020-PLUM Requested Date 12/4/2020 6:40 AM https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 26/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Scheduled Start Date 12/4/2020 Completed Date 12/4/2020 Owner Alias steve f Closed TRUE I N S-0008042-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Gas Tag Permit 0046-2020-PLUM Requested Date 10/21/2020 6:59 AM Scheduled Start Date 10/21/2020 Completed Date 10/21/2020 Owner Alias steve f Closed TRUE I N S-0008044-20 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Gas Tag Permit 0046-2020-PLUM Requested Date 10/28/2020 6:43 AM Scheduled Start Date 10/28/2020 Completed Date 10/28/2020 Owner Alias steve f Closed TRUE INS-0010055-20 Status Accepted as Noted Type Mechanical Subtype Final Mechanical Permit 0099-2020-MECH Requested Date 12/4/2020 6:41 AM Scheduled Start Date 12/4/2020 Completed Date 12/4/2020 Owner Alias steve f Closed TRUE INS-0010708-20 Status Partial/Non-Complete Type Mechanical Subtype Rough Mechanical Permit 0066-2020-MECH Requested Date 8/13/2020 10:00 AM Scheduled Start Date 8/14/2020 Completed Date 8/14/2020 Owner Alias steve f Closed TRUE INS-0016823-20 Status Partial/Non-Complete Type Electric Subtype Final Electrical Permit 0031-2020-ELEC Requested Date 12/7/2020 10:00 AM https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 27/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Scheduled Start Date 12/7/2020 Completed Date 12/7/2020 Owner Alias MMill Closed TRUE INS-0016904-20 Status Accepted as Noted Type Electric Subtype Final Electrical Permit 0031-2020-ELEC Requested Date 12/9/2020 10:00 AM Scheduled Start Date 12/10/2020 Completed Date 12/10/2020 Owner Alias MMill Closed TRUE INS-0017226-20 Status Accepted as Noted Type Mechanical Subtype Final Mechanical Permit 0066-2020-MECH Requested Date 12/11/2020 6:08 PM Scheduled Start Date 12/11/2020 Completed Date 12/11/2020 Owner Alias MMill Closed TRUE Milestones Review Round 1 -0056.2019.ARBK Status Approved Due Date Created Date 11/14/2019 Permit History 12/2/2024 4:47 PM User Fernando Cruz Action Changed Owner from Lilly Culver to Fernando Cruz. Related Permits 0031-2020-ELEC Type Electrical Address 210 W MAIN ST Work Type New Status Closed-Final Applicant KRISTINA L KEEGAN Issue Date 6/2/2020 Last Activity Date 12/11/2020 0002-2020-RWRG Type Right of Way Address 210 W MAIN ST Work Type New Status Closed-Final Applicant Jason Rutherford Issue Date 6/12/2020 Last Activity Date 12/22/2022 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 28/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition 0066-2020-MECH Type Mechanical Address 210 W MAIN ST Work Type New Status Closed-Final Applicant JOSH ANTHES Issue Date 3/25/2020 Last Activity Date 12/14/2020 0133.2019.AELE Type Electrical Address 210 W MAIN ST Work Type New Status Expired Applicant KRISTINA L KEEGAN Issue Date 8/7/2019 Last Activity Date 10/15/2020 0012-2020-ENTP Type Encroachment-Temporary Address 210 W MAIN ST Work Type New Status Issued Applicant MICHAEL CHARLES Issue Date 1/21/2020 Last Activity Date 0046-2020-P LU M Type Plumbing Address 210 W MAIN ST Work Type New Status Closed-Final Applicant GREG MCCLAIN Issue Date 7/8/2020 Last Activity Date 12/6/2020 0099-2020-MECH Type Mechanical Address 210 W MAIN ST Work Type New Status Closed-Final Applicant GREG MCCLAIN Issue Date 7/8/2020 Last Activity Date 12/6/2020 0088-2020-ELEC Type Electrical Address 210 W MAIN ST Work Type New Status Cancelled Applicant JEFF KUBICA Issue Date Last Activity Date 0061-2020-ENTP https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 29/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Type Encroachment-Temporary Address 210 W MAIN ST Work Type New Status Issued Applicant MICHAEL CHARLES Issue Date 8/3/2020 Last Activity Date 0064-2020-BCHO Type Change Order Address 210 W MAIN ST Work Type New Status Closed-Final Applicant PATRICIA WEBER Issue Date 12/1/2020 Last Activity Date 0072-2020-ENTP Type Encroachment-Temporary Address 210 W MAIN ST Work Type New Status Issued Applicant MICHAEL CHARLES Issue Date 9/17/2020 Last Activity Date 0078-2020-ENTP Type Encroachment-Temporary Address 210 W MAIN ST Work Type New Status Issued Applicant MICHAEL CHARLES Issue Date 9/30/2020 Last Activity Date 0084-2020-ENTP Type Encroachment-Temporary Address 220 W MAIN ST 210 Work Type New Status Issued Applicant MICHAEL CHARLES Issue Date 10/21/2020 Last Activity Date Reviews REV-008612 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Parks Due Date Completed Date 11/15/2019 12:00 PM Owner Alias DRade On Hold Created Date 11/14/2019 REV-008613 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 30/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Parking Due Date Completed Date 11/15/2019 10:29 AM Owner Alias Parking-Review On Hold Created Date 11/14/2019 REV-008614 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 8/22/2019 8:13 AM Owner Alias rmagi On Hold Created Date 11/14/2019 REV-008615 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Sanitation Due Date Completed Date 11/15/2019 12:02 PM Owner Alias CStra On Hold Created Date 11/14/2019 REV-008616 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Recycling Due Date 11/26/2019 Completed Date 11/26/2019 1:20 PM Owner Alias EH Recycling -Review On Hold Created Date 11/14/2019 REV-008617 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type HPC Due Date Completed Date 11/15/2019 12:03 PM Owner Alias ASimo On Hold Created Date 11/14/2019 REV-008618 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Engineering Water Due Date https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 31/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Completed Date 11/15/2019 12:03 PM Owner Alias SWilson On Hold Created Date 11/14/2019 REV-008619 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Engineering CMP Due Date Completed Date 11/15/2019 12:04 PM Owner Alias PHarr On Hold Created Date 11/14/2019 REV-008620 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Engineering Dev Due Date Completed Date 11/15/2019 12:05 PM Owner Alias PMurr On Hold Created Date 11/14/2019 REV-008621 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Engineering Erosion &Sediment Due Date Completed Date 11/15/2019 12:06 PM Owner Alias AReed On Hold Created Date 11/14/2019 REV-008622 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Fire Due Date Completed Date 11/25/2019 2:42 PM Owner Alias NThom On Hold Created Date 11/14/2019 REV-008623 Milestone Review Round 1 -0056.2019.ARBK Status Approved with Conditions Type Zoning Due Date Completed Date 11/15/2019 12:06 PM Owner Alias SVarg On Hold Created Date 11/14/2019 https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 32/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition REV-008624 Milestone Review Round 1 -0056.2019.ARBK Status Approved Type Building Due Date Completed Date 11/25/2019 2:42 PM Owner Alias NThom On Hold Created Date 11/14/2019 Submissions COA COVID-19 Plan.pdf Actions Upload Submission Date Status Required Description COA COVID-19 Plan.pdf Actions Upload Submission Date Status Required Description COA COVID-19 Plan (1).pdf Actions Upload Submission Date Status Required Description COA COVID-19 Plan (1).pdf Actions Upload Submission Date Status Required Description Keelty COVID Plan City of Aspen King Louise.pdf Actions Upload Submission Date Status Required Description Keelty COVID Plan City of Aspen King Louise.pdf Actions Upload Submission Date Status Required Description Keelty COVID Plan City of Aspen King Louise.pdf Actions Upload https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 33/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition Submission Date Status Required Description COA COVID-19 Plan (1).pdf Actions Upload Submission Date Status Required Description COA COVID-19 Plan (1).pdf Actions Upload Submission Date Status Required Description COA COVID-19 Plan (1).pdf Actions Upload Submission Date Status Required Description covid-19 safety plan.pdf Actions Upload Submission Date Status Required Description COA COVID-19 Plan Keelty Construction - King Louise 0056.2019.ARBK 1.pdf Actions Upload Submission Date Status Required Description COA COVID-19 Plan Keelty Construction - King Louise 0056.2019.ARBK 1.pdf Actions Upload Submission Date Status Required Description COA COVID-19 Plan Keelty Construction -King Louise 0056.2019.ARBK 1.pdf Actions Upload Submission Date Status Required Description https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 34/35 2/10/25,2:47 PM 0056.2019.ARBK-Salesforce-Enterprise Edition COA COVID-19 Plan Keelty Construction - King Louise 0056.2019.ARBK.pdf Actions Upload Submission Date Status Required Description MEMO Asbuilt Drainage 2020 12 23.pdf Actions Submission Date 12/24/2020 11:53 AM Status Required Description 20201223 Maintenance Plan.pdf Actions Submission Date 12/24/2020 11:53 AM Status Required Description 210 W MAIN AS-BUILT 12-22-20.pdf Actions Submission Date 12/24/2020 11:53 AM Status Required Description 20201210143128865.pdf Actions Submission Date 12/28/2020 7:23 AM Status Required Description Copyright©2000-2025 salesforce.com, inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000kZrtIAAC/p 35/35