Loading...
HomeMy WebLinkAboutFile Documents.210 W Main St.0064-2020-BCHO0064-2020-BCHO_BuildingComments_1 Subject: PlanCheck Page: 1 Page Index: 1 Author: nickt Color: File Name: 9001_MPE-all_09-25-20_stamped-signed.pdf Revise mechanical drawings to cloud all changes. 9001_MPE-all_09-25-20_stamped-signed.pdf (8) Subject: PlanCheck Page: 1 Page Index: 1 Author: nickt Color: File Name: 9001_MPE-all_09-25-20_stamped-signed.pdf The backgrounds in the basement do not match the approved architecturals. Subject: PlanCheck Page: 2 Page Index: 2 Author: nickt Color: File Name: 9001_MPE-all_09-25-20_stamped-signed.pdf Revise the mechanical drawings to show the routing of the boiler flues correctly on each floor. The various stories appear to show conflicting routing locations. Subject: PlanCheck Page: 2 Page Index: 2 Author: nickt Color: File Name: 9001_MPE-all_09-25-20_stamped-signed.pdf Outside air intake opening must be 10' from property lines. 2015 IMC 401.4. Subject: PlanCheck Page: 2 Page Index: 2 Author: nickt Color: File Name: 9001_MPE-all_09-25-20_stamped-signed.pdf Outside air intake opening must be 10' from property lines. 2015 IMC 401.4. Revise mechanical drawings to cloud all changes. The backgrounds inthe basement do notmatch the approvedarchitecturals. Revise the mechanical drawings to show the routing of the boiler flues correctly on each floor. The various stories appear to show conflicting routing locations. Outside air intake opening must be 10' from property lines. 2015 IMC 401.4. Outside air intake opening must be 10' from property lines. 2015 IMC 401.4. Subject: PlanCheck Page: 2 Page Index: 2 Author: nickt Color: File Name: 9001_MPE-all_09-25-20_stamped-signed.pdf Revise the architectural drawings to clearly detail a shaft enclosure for the boiler flues. Include sheet A6.14 and revise it to show the actual proposed design. Show it connecting 4 stories, which requires a 2 hour fire rating. Show the horizontal portion and provide a listed horizontal shaft assembly. Revise the vertical shaft assemblies to separate the shaft from the rest of the building construction on all four sides. 2015 IBC 713. Subject: PlanCheck Page: 3 Page Index: 3 Author: nickt Color: File Name: 9001_MPE-all_09-25-20_stamped-signed.pdf Outside air intake opening must be 10' from property lines. 2015 IMC 401.4. Subject: PlanCheck Page: 4 Page Index: 4 Author: nickt Color: File Name: 9001_MPE-all_09-25-20_stamped-signed.pdf Outside air intake opening must be 10' from property lines. 2015 IMC 401.4. Revise the architectural drawings to clearly detail a shaft enclosure for the boiler flues. Include sheet A6.14 and revise it to show the actual proposed design. Show it connecting 4 stories, which requires a 2 hour fire rating. Show the horizontal portion and provide a listed horizontal shaft assembly. Revise the vertical shaft assemblies to separate the shaft from the rest of the building construction on all four sides. 2015 IBC 713. Outside air intakeopening must be 10'from property lines.2015 IMC 401.4. Outside air intakeopening must be 10'from property lines.2015 IMC 401.4.