Loading...
HomeMy WebLinkAboutMaster Permit.230 E Hopkins Ave.0089.2018.ACBKClose Window Print This Page Expand All | Collapse All 0089.2018.ACBK Number 0089.2018.ACBK Record Type Building - Imported 230 E HOPKINS AVE Owner Fernando Cruz Original Number 0089.2018.ACBK Status Closed - Final Type Building Reason for Cancel or Compl. Review Fail Applicant DANA ELLIS ROWLAND & BROUGHTON ARCHITECTURE & URBAN DESIGN INC Required Bond Amount Project Land Use Planning Application Permit Contractor MADIGAN & COMPANY Master Building Permit Valid Business License on Account Bluebeam Project Id 970-904-194 Imported HPC-ZON-EH-UTIL Review Required Submissions HPC-ZON-EH-UTIL Review-2 Documents Resubmitted Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,Parking Rev,San Rev, Conditional Inspections Parks Insp, Conditional Final Insp Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parking Final,Parks Final,Water-LSE Final,San Final, Action Items Hold Reason Minor EDEN Conditional Flat Fee Formula FP,Applicant is a Nonprofit? Conditional Tiered Fee Formula Eligible for Small Lodge Program? Conditional Tiered SqFt Fee Formula MAC,Discount All Fees (%) Fee Discount Reason CO Status if Applicable Issued Queue Score Queue Designation Queue Score 0 Milestone Current Days in City Hands Last Date Received from Applicant Milestone - Total Days in Applicant Hand Milestone - Total Days in City Hands Dates 11/14/2019 TCO Issuance Date 10/8/2021 9/5/2018 Close/CO Issuance Date Address Aspen Internal? Account Total Available Bond Amount Is This Associated w/a Building Permit? Approved Covid-19 Plan Hold All Reviews Create Fees Create Fees 2 Utility Review Type Price Book CO/LOC? Milestone Current Days in Applicant Hand New Application Date Application Complete Date 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 1/46 9/5/2018 Expiration Date 8/14/2022 9/27/2019 2/15/2022 Basic Information Description Applicant: Dana Ellis Rowland & Broughton Contractor: Brent Tardie Madigan & co. EXTERIOR AND INTERIOR REMODEL OF EXISTING MIXED-USE BUILDING. ADDITION TO ALLEY (N) SIDE OF BUILDING // LAUREN// BB 970-904-194 SUBMITTAL COMPLETE 10/09/2018 Census Code 437 - Additions Alterations and Conversion- Nonresidential and Non-housekeeping Use of Building Mixed-Use Use Class Class of Work NOTE: the CoO issued and dated 10/8/21 is for the ADU only. Job Location Address 230 E HOPKINS AVE, ASPEN : 273707328008 Lot Site Address Display on Map Legal Description Historic Property?No 230 E HOPKINS AVE Historic District?No HPC - Planning - Zoning Details Zone District MU HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU?No HPC Certificate of Appropriateness? No ADU Sq Ft Work Involves a Land Use Approval? No Deed Restricted?No Located in a PD?No # of Dwellings Yes Category of Zoning Fee Commercial Yes Zoning Work Level Major Zoning Fee Yes Building Project Details $6,640,000.00 6,000 Reason for Valuation Change 6,000 10,909 6,000 6,000 0% 10,909 12,000 932 6,000 60% 0 Scope of Work Details Work Changes Building Footprint? Yes Yes Application Accepted Date Issue Date Override Expiration Date Last Activity Date Interior Remodel Only Permit Comments Eden Address Adds/Changes Floor Area? Occupancy or Use Change? Work Affects Exterior of Building? Valuation Lot Size Sq. Ft. Soil Disturbance Sq Ft Unit Sq. Ft.Affected Area Sq Ft Building Footprint Sq Ft Existing Hardscape Footprint Sq Ft Sq Ft of Building Work Area Existing Hardscape % of Lot Building Fire Area Sq Ft Con Mit Sq Ft Total Utility Review Sq. Ft.Utility Review Sq Ft Total % of Interior being Altered New Sq. Ft. Work Affects Tree/Drip Line? 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 2/46 Yes Located Within City Mall Boundaries? No Yes Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks?No Yes No No Yes Change of Restaurant Ownership? No Prevents Access to Sewer Main? No Yes Sewer Easements Affected?No Building Description Code Editions 2015 IBC Required Special Inspections Energy Code Compliance Building Type (IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Occupancy Load 85 Total Pool Sq Ft Fire Sprinkler Existing? Amount of Onsite Renewable Generation? Fire Sprinkler Required?Yes CO Description Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor # Wood Fireplaces 2nd Floor # Gas Log Fireplaces 3rd Floor # Gas Appliances Additional Open Text Field For Comments Financials $5,000.00 Total Payments $5,000.00 Total Balance $0.00 System Information Number 0089.2018.ACBK Community Visibility Created By Ruth Kinney, 7/27/2019 1:49 PM 0036A00000ZPoFqQAL,0033s00000yLibNAAS,0036A00000ua0WxQAI,0036A00000abpRjQAI,0033s000012KbqfAAC IsTestData?Last Modified By Fernando Cruz, 11/27/2024 2:54 PM VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Utility Connection Permit Final Type Billable Assigned To Aaron Reed Work Changes Fenestration/Thrml Envelop? Requires Asbestos Test? Work Adds/Removes/Changes Plumbing Fixt? Work Subject to Water Efficient L.O.? Restaurant/Food Service Involved? Involves Impact on Sewer? Affects Parking/Alleys/Loading? Other Code Editions Total Fees Fees Due at Current Status Contact IDs 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 3/46 Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/7/2022 Days in Applicant's Hands Comments To: dana.ellis@rowlandbroughton.com CC: BCC: Attachment: UCP_Water_Final__230 E Hopkins Mtn Forge.pdf Subject: Utility Connection Permit Final Body: Hello DANA ELLIS, Attached is your final Utility Connection Permit for the completed project at 230 E HOPKINS AVE associated with permit #: 0089.2018.ACBK. After review, please print, have signed by owner, and notarized. Once signed and notarized, please return UCP with payment, if applicable, to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively, you may upload the signed and notarized copy of the UCP as a SCANNED (not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a “push” notification that these permit requirements are complete. Please reach out with any questions or concerns. Email: COVID-19 Safety Plan Approval Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/27/2020 Days in Applicant's Hands Comments To: dana@rowlandbroughton.com CC: BCC: Attachment: --none-- Subject: COVID-19 Safety Plan Approval Body: Dear DANA ELLIS, Thank you for submitting a COVID-19 Site Safety Plan for 0089.2018.ACBK at 230 E HOPKINS AVE. City staff has reviewed and approved the safety plan. Attached is the COVID-19 Approval Notice to re-commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements, will result in a site shut down. We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. Kind regards, Lilly Culver Email: COVID-19 Safety Plan Approval Type Billable Assigned To Phil LeHue Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/24/2020 Days in Applicant's Hands Comments To: dana@rowlandbroughton.com CC: gibb@madiganco.co; brent@madiganco.co BCC: Attachment: --none-- Subject: COVID-19 Safety Plan Approval Body: Dear DANA ELLIS, Thank you for submitting a COVID-19 Site Safety Plan for 0089.2018.ACBK at 230 E HOPKINS AVE. City staff has reviewed and 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 4/46 approved the safety plan. Attached is the COVID-19 Approval Notice to re-commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements, will result in a site shut down. We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. City of Aspen Engineering Department 970-920-5080 cmphelp@cityofaspen.com www.cityofaspen.com/covidconstruction Email: COVID-19 Safety Plan Approval Type Billable Assigned To Phil LeHue Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/24/2020 Days in Applicant's Hands Comments To: dana@rowlandbroughton.com CC: BCC: Attachment: --none-- Subject: COVID-19 Safety Plan Approval Body: Dear DANA ELLIS, Thank you for submitting a COVID-19 Site Safety Plan for 0089.2018.ACBK at 230 E HOPKINS AVE. City staff has reviewed and approved the safety plan. Attached is the COVID-19 Approval Notice to re-commence construction. Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement. Please adhere to all aspects of the plans to keep all employees and the community safe. Failure to adhere to the plan, as well as County requirements, will result in a site shut down. We thank you for your efforts to keep the community safe, and please let us know if you have any further questions. City of Aspen Engineering Department 970-920-5080 cmphelp@cityofaspen.com www.cityofaspen.com/covidconstruction Email: Important! Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Bonnie Muhigirwa Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/22/2019 Days in Applicant's Hands Comments To: dana@rowlandbroughton.com CC: brent@madiganco.co BCC: Attachment: --none-- Subject: Important! Your City of Aspen permit has been moved to new permitting system Body: Dear DANA ELLIS, As you may know, the City of Aspen has been transitioning to a new online-based permitting system, Salesforce. Thank you for your patience during this transition, which is now complete. Your permit is now operational in Salesforce. Your project located at 230 E HOPKINS AVE, ASPEN : 273707328008 will retain its original permit number, 0089.2018.ACBK and you will use this number to find your permit in Salesforce. If you have not already done so, you must register in Salesforce before you are able to access your permit information, upload new documents, request inspections, or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system. Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenter/View/4254/Request-an-Inspection?bidId= 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 5/46 If you have additional questions that are not addressed at the above links, you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Sincerely, Lauren Litchet City of Aspen Bonnie Muhigirwa Plans Examiner Community Development 130 S Galena St. Aspen, CO 81611 p 970.429.2787 c 970.309.5119 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contained in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/29/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/29/2021 Days in Applicant's Hands Comments Permit Review Type Zoning Billable Assigned To Sophie Varga Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 10/4/2021 Days in Applicant's Hands Comments Permit Review Type Zoning Billable Assigned To Sophie Varga Number of Hours 2.00 Total Cost $650.00 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 6/46 Fee Generated Date Start Date Completed Date 10/1/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 9/23/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 9/9/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 9/8/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/23/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 4/16/2021 Days in Applicant's Hands Comments 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 7/46 Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 4/6/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/24/2021 Days in Applicant's Hands Comments Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/15/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 9/16/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/19/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 8/46 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/25/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/18/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 6/14/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 1.00 Total Cost $325.00 Fee Generated Date Start Date Completed Date 4/1/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/14/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 10/1/2020 Days in Applicant's Hands 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 9/46 Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 8/11/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/20/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/27/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/20/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 5/12/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 10/46 Assigned To MITCH MILLER Number of Hours 75.00 Total Cost $24,375.00 Fee Generated Date Start Date Completed Date 5/5/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/25/2020 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To MITCH MILLER Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 3/24/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/12/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.75 Total Cost $243.75 Fee Generated Date Start Date Completed Date 3/10/2020 Days in Applicant's Hands Comments Permit Review Type Zoning Billable Assigned To Sophie Varga Number of Hours 0.10 Total Cost $32.50 Fee Generated Date Start Date 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 11/46 Completed Date 2/14/2020 Days in Applicant's Hands Comments Permit Review Type Zoning Billable Assigned To Sophie Varga Number of Hours 0.25 Total Cost $81.25 Fee Generated Date Start Date Completed Date 1/8/2020 Days in Applicant's Hands Comments Permit Review Type Zoning Billable Assigned To Sophie Varga Number of Hours 2.00 Total Cost $650.00 Fee Generated Date Start Date Completed Date 1/8/2020 Days in Applicant's Hands Comments Contacts CHRIS MADIGAN Account MADIGAN & COMPANY Type Contractor Active Contractor License Count 1.00 Number 0022475 DANA ELLIS Account ROWLAND & BROUGHTON ARCHITECTURE & URBAN DESIGN INC Type Applicant Active Contractor License Count 0.00 Number 0022477 BRENT TARDIE Account MADIGAN & COMPANY Type Representative Active Contractor License Count 1.00 Number 0024399 GIBB KENTZ Account MADIGAN & COMPANY Type Representative Active Contractor License Count 1.00 Number 0024494 JOHN ROWLAND Account ROWLAND & BROUGHTON ARCHITECTURE & URBAN DESIGN INC Type Architect Active Contractor License Count 0.00 Number 0041424 Fees 0066360 Type Temporary Certificate of Occupancy Total $5,000.00 Waived/Refunded Amt Discount $ Outstanding $0.00 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 12/46 Fee Due At Issued Show in Cart Paid in Full Fee Paid Date/Time Files Certificate of Occupancy for 230 E Hopkins Ave - 0089.2018.ACBK - Issued Last Modified 3/4/2022 1:53 PM Created By Lilly Culver 230 E Hopkins - 0089.2018.ACBK _ Final CO Last Modified 3/4/2022 1:40 PM Created By Lilly Culver City_Use_Tax_-_FRR_Notice_to_Contractor__20220304.docx Last Modified 3/4/2022 1:28 PM Created By Lilly Culver UCP_Water_Final__230 E Hopkins Mtn Forge Last Modified 2/7/2022 12:32 PM Created By Aaron Reed 230 E Hopkins WELS Water Budget RM Last Modified 2/2/2022 2:15 PM Created By Rick Magill Mountain Forge Plan Scan pg L601 asbuilt (002) Last Modified 2/1/2022 4:17 PM Created By Rick Magill Temp Heat Permit 320 E Hopkins Ave_Bldg Permit 0089-2018.ACBK Last Modified 10/14/2020 1:08 PM Created By Jan Legersky APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN__20200424.pdf Last Modified 4/24/2020 12:31 PM Created By Phil LeHue 0089.2018.acbk fees Last Modified 11/22/2019 9:16 AM Created By John Barker 230 E Hopkins Ave - 0089.2018.ACBK - City_Use_Tax_to_Contractor Last Modified 3/4/2022 1:42 PM Created By Lilly Culver 230 E Hopkins Ave - 0089.2018.ACBK - City_Use_Tax_to_Owner__20220304 Last Modified 3/4/2022 1:39 PM Created By Lilly Culver City_Use_Tax_-__FRR_Transmittal_to_Owner__20220304.docx Last Modified 3/4/2022 1:26 PM Created By Lilly Culver UCP_Water_Final__20220207.docx Last Modified 2/7/2022 8:21 AM Created By Aaron Reed Elevator Permit - 0089.2018.ACBK - 230 E Hopkins Last Modified 2/2/2022 10:03 AM Created By Lilly Culver 230 E Hopkins 0089-2018-ACBK - TCO Last Modified 10/21/2021 7:22 AM Created By Renee Espinoza Elevator Permit 20-133 - 230 E Hopkins Ave - 0089.2018.ACBK Last Modified 9/16/2020 12:02 PM Created By Lilly Culver 0089.2018.acbk inspections Last Modified 11/22/2019 9:17 AM Created By John Barker Inspections INS-0006014-19 Status Pass/Accepted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 9/9/2021 Owner Last Name Radeck Permit Inspection Round Initial Inspection Closed TRUE INS-0006015-19 Status Partial/Non-Complete Type Concrete Subtype Bond Beam Requested Date 8/19/2020 8:30 AM Scheduled Start Date 8/19/2020 Completed Date 8/19/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 13/46 INS-0006018-19 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 11/19/2020 9:00 AM Scheduled Start Date 11/19/2020 Completed Date 11/19/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006019-19 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 3/9/2020 8:00 AM Scheduled Start Date 3/9/2020 Completed Date 3/9/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006020-19 Status Partial/Non-Complete Type Concrete Subtype Piers Requested Date Scheduled Start Date 11/11/2019 Completed Date 11/11/2019 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006022-19 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 8/31/2020 8:30 AM Scheduled Start Date 8/31/2020 Completed Date 8/31/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006024-19 Status Pass/Accepted Type Building Subtype Final Building Requested Date 2/14/2022 9:00 AM Scheduled Start Date 2/14/2022 Completed Date 2/14/2022 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0006026-19 Status Accepted as Noted Type Building Subtype Special Insp. Requested Date 3/24/2020 9:30 AM Scheduled Start Date 3/24/2020 Completed Date 3/24/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 14/46 INS-0006027-19 Status Partial/Non-Complete Type Concrete Subtype Wall Core Requested Date 5/20/2020 12:00 PM Scheduled Start Date 5/20/2020 Completed Date 5/20/2020 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0006029-19 Status Pass/Accepted Type APECC Subtype Glazing Requested Date 9/14/2021 9:00 AM Scheduled Start Date 9/14/2021 Completed Date 9/14/2021 Owner Last Name Hahn Permit Inspection Round Initial Inspection Closed TRUE INS-0006031-19 Status Pass/Accepted Type APECC Subtype Radon Requested Date 8/11/2020 9:00 AM Scheduled Start Date 8/11/2020 Completed Date 8/11/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006033-19 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 1/21/2020 7:07 AM Scheduled Start Date 1/21/2020 Completed Date 1/21/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006035-19 Status Partial/Non-Complete Type Zoning Subtype Requested Date 9/30/2021 3:00 PM Scheduled Start Date 9/30/2021 Completed Date 9/30/2021 Owner Last Name Varga Permit Inspection Round Midpoint Inspection Closed TRUE INS-0006036-19 Status Pass/Accepted Type APECC Subtype Spa Requested Date 2/14/2022 9:00 AM Scheduled Start Date 2/14/2022 Completed Date 2/14/2022 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 15/46 INS-0006037-19 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 2/4/2021 10:00 AM Scheduled Start Date 2/4/2021 Completed Date 2/4/2021 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006039-19 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 11/9/2020 10:00 AM Scheduled Start Date 11/9/2020 Completed Date 11/9/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006041-19 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 8/12/2020 8:14 AM Scheduled Start Date 8/12/2020 Completed Date 8/12/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE INS-0006042-19 Status Pass/Accepted Type Fire Subtype Requested Date 9/29/2021 2:00 PM Scheduled Start Date Completed Date 10/6/2021 Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE INS-0006064-19 Status Accepted as Noted Type Zoning Subtype Requested Date Scheduled Start Date Completed Date 11/13/2019 Owner Last Name Varga Permit Inspection Round Midpoint Inspection Closed TRUE INS-0001261-20 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 3/12/2020 11:24 AM Scheduled Start Date 3/12/2020 Completed Date 3/12/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 16/46 INS-0006475-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/23/2020 10:36 AM Scheduled Start Date Completed Date 4/24/2020 Owner Last Name LeHue Permit Inspection Round Final Inspection Closed TRUE INS-0002188-20 Status Accepted as Noted Type Zoning Subtype Requested Date Scheduled Start Date Completed Date 9/25/2020 Owner Last Name Narracci Permit Inspection Round Midpoint Inspection Closed TRUE INS-0004309-20 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 3/25/2020 8:30 AM Scheduled Start Date 3/25/2020 Completed Date 3/25/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0004553-20 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 5/11/2020 2:00 PM Scheduled Start Date 5/11/2020 Completed Date 5/11/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0007184-20 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 5/5/2020 12:00 PM Scheduled Start Date 5/5/2020 Completed Date 5/5/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0007236-20 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 5/8/2020 10:00 AM Scheduled Start Date 5/8/2020 Completed Date 5/8/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 17/46 INS-0007346-20 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 5/12/2020 10:00 AM Scheduled Start Date 5/12/2020 Completed Date 5/12/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0007424-20 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 7/20/2020 9:00 AM Scheduled Start Date 7/20/2020 Completed Date 7/20/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0007444-20 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 12/10/2020 9:00 AM Scheduled Start Date 12/10/2020 Completed Date 12/10/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0007897-20 Status Partial/Non-Complete Type Concrete Subtype Wall Core Requested Date 5/27/2020 2:00 PM Scheduled Start Date 5/27/2020 Completed Date 5/27/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0008145-20 Status Partial/Non-Complete Type Concrete Subtype Wall Core Requested Date 6/18/2020 9:00 AM Scheduled Start Date 6/18/2020 Completed Date 6/18/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0010527-20 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 9/24/2020 8:30 AM Scheduled Start Date 9/24/2020 Completed Date 9/24/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 18/46 INS-0011354-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 8/18/2020 9:00 AM Scheduled Start Date 8/18/2020 Completed Date 8/18/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0011667-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 8/31/2020 8:30 AM Scheduled Start Date 8/31/2020 Completed Date 8/31/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0011748-20 Status Partial/Non-Complete Type Concrete Subtype Bond Beam Requested Date 9/8/2020 9:00 AM Scheduled Start Date 9/8/2020 Completed Date 9/8/2020 Owner Last Name Parry Permit Inspection Round Re-Inspection Closed TRUE INS-0012172-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 10/14/2020 10:00 AM Scheduled Start Date 10/14/2020 Completed Date 10/14/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0012176-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 9/16/2020 8:30 AM Scheduled Start Date 9/16/2020 Completed Date 9/16/2020 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0012342-20 Status Partial/Non-Complete Type Concrete Subtype Bond Beam Requested Date 9/30/2020 9:00 AM Scheduled Start Date 9/30/2020 Completed Date 9/30/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 19/46 INS-0012886-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 9/30/2020 9:00 AM Scheduled Start Date 9/30/2020 Completed Date 9/30/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0013302-20 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 12/15/2020 9:00 AM Scheduled Start Date 12/15/2020 Completed Date 12/15/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0013393-20 Status Pass/Accepted Type Parks Subtype Requested Date 9/9/2021 10:00 AM Scheduled Start Date Completed Date 9/10/2021 Owner Last Name Radeck Permit Inspection Round Final Inspection Closed TRUE INS-0013394-20 Status Pass/Accepted Type Water Efficient Landscaping Subtype Requested Date 10/6/2021 8:30 AM Scheduled Start Date Completed Date 10/7/2021 Owner Last Name Magill Permit Inspection Round Final Inspection Closed TRUE INS-0013395-20 Status Partial/Non-Complete Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date 9/23/2021 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0013396-20 Status Failed/Rejected Type Engineering Water Subtype Requested Date 9/15/2021 2:00 PM Scheduled Start Date Completed Date 9/30/2021 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 20/46 INS-0013397-20 Status Pass/Accepted Type Engineering Dev Subtype Requested Date Scheduled Start Date Completed Date 10/1/2021 Owner Last Name Young Permit Inspection Round Final Inspection Closed TRUE INS-0013398-20 Status Pass/Accepted Type Engineering Erosion & Sediment Subtype Requested Date 9/16/2021 9:30 AM Scheduled Start Date Completed Date 9/16/2021 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0013716-20 Status Partial/Non-Complete Type Concrete Subtype Bond Beam Requested Date 10/2/2020 12:49 PM Scheduled Start Date 10/2/2020 Completed Date 10/2/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0013717-20 Status Partial/Non-Complete Type Concrete Subtype Structural Slabs Requested Date 1/20/2021 3:48 PM Scheduled Start Date 1/19/2021 Completed Date 1/19/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0014372-20 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 11/6/2020 10:00 AM Scheduled Start Date 11/6/2020 Completed Date 11/6/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0015639-20 Status Failed/Rejected Type Building Subtype Rough Framing Requested Date 8/17/2021 9:30 AM Scheduled Start Date 8/17/2021 Completed Date 8/17/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 21/46 INS-0015756-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 11/19/2020 9:00 AM Scheduled Start Date 11/19/2020 Completed Date 11/19/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0016339-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 12/8/2020 9:00 AM Scheduled Start Date 12/8/2020 Completed Date 12/8/2020 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0016340-20 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 3/23/2021 9:00 AM Scheduled Start Date 3/23/2021 Completed Date 3/23/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0017093-20 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 3/15/2021 10:30 AM Scheduled Start Date 3/15/2021 Completed Date 3/15/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0000574-21 Status Pass/Accepted Type Concrete Subtype Structural Slabs Requested Date 9/8/2021 1:00 PM Scheduled Start Date 9/8/2021 Completed Date 9/8/2021 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE INS-0001181-21 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 3/16/2021 10:00 AM Scheduled Start Date 3/16/2021 Completed Date 3/16/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 22/46 INS-0002468-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 4/16/2021 9:00 AM Scheduled Start Date 4/16/2021 Completed Date 4/16/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0002544-21 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 7/1/2021 9:00 AM Scheduled Start Date 7/1/2021 Completed Date 7/1/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0002912-21 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 4/5/2021 9:00 AM Scheduled Start Date 4/5/2021 Completed Date 4/6/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0003144-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 3/31/2021 1:37 PM Scheduled Start Date 4/1/2021 Completed Date 4/1/2021 Owner Last Name Feder Permit Inspection Round Closed TRUE INS-0003145-21 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 3/31/2021 1:40 PM Scheduled Start Date 4/1/2021 Completed Date 4/1/2021 Owner Last Name Feder Permit Inspection Round Closed TRUE INS-0003157-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 4/26/2021 9:00 AM Scheduled Start Date 4/26/2021 Completed Date 4/26/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 23/46 INS-0003158-21 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Requested Date 10/1/2021 11:00 AM Scheduled Start Date 10/1/2021 Completed Date 10/1/2021 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE INS-0003277-21 Status Partial/Non-Complete Type Building Subtype Drywall Requested Date 4/28/2021 8:30 AM Scheduled Start Date 4/28/2021 Completed Date 4/28/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0003498-21 Status Pass/Accepted Type APECC Subtype Insulation Requested Date 9/1/2021 10:00 AM Scheduled Start Date 9/1/2021 Completed Date 9/1/2021 Owner Last Name Kanipe Permit Inspection Round Re-Inspection Closed TRUE INS-0003667-21 Status Partial/Non-Complete Type APECC Subtype Insulation Requested Date 7/8/2021 11:00 AM Scheduled Start Date 7/8/2021 Completed Date 7/9/2021 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE INS-0003726-21 Status Pass/Accepted Type Building Subtype Drywall Requested Date 7/20/2021 10:00 AM Scheduled Start Date 7/20/2021 Completed Date 7/20/2021 Owner Last Name MILLER Permit Inspection Round Re-Inspection Closed TRUE INS-0004909-21 Status Pass/Accepted Type Building Subtype Special Building Inspection Requested Date 10/28/2021 9:00 AM Scheduled Start Date 10/28/2021 Completed Date 10/28/2021 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 24/46 INS-0006397-21 Status Pass/Accepted Type Sanitation Subtype Requested Date 1/27/2022 10:00 AM Scheduled Start Date Completed Date 2/3/2022 Owner Last Name Strait Permit Inspection Round Re-Inspection Closed TRUE INS-0006423-21 Status Accepted as Noted Type APECC Subtype Pool Requested Date 2/14/2022 9:00 AM Scheduled Start Date 2/14/2022 Completed Date 2/14/2022 Owner Last Name Feder Permit Inspection Round Closed TRUE INS-0006534-21 Status Pass/Accepted Type Engineering Water Subtype Requested Date 1/31/2022 10:15 AM Scheduled Start Date Completed Date 2/7/2022 Owner Last Name Reed Permit Inspection Round Re-Inspection Closed TRUE INS-0006535-21 Status Partial/Non-Complete Type Zoning Subtype Requested Date Scheduled Start Date 10/7/2021 Completed Date 10/7/2021 Owner Last Name Varga Permit Inspection Round Midpoint Inspection Closed TRUE INS-0006584-21 Status Pass/Accepted Type Building Subtype Special Building Inspection Requested Date 12/9/2021 1:23 PM Scheduled Start Date 12/9/2021 Completed Date 12/9/2021 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE INS-0006595-21 Status Pass/Accepted Type Zoning Subtype Requested Date 2/9/2022 11:00 AM Scheduled Start Date 2/9/2022 Completed Date 2/9/2022 Owner Last Name Varga Permit Inspection Round Final Inspection Closed TRUE 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 25/46 INS-0000136-22 Status Accepted as Noted Type Building & Referral Inspection Status Subtype Requested Date 1/24/2022 8:55 AM Scheduled Start Date 1/24/2022 Completed Date 1/24/2022 Owner Last Name Feder Permit Inspection Round Closed TRUE INS-0000294-22 Status Pass/Accepted Type Building Subtype Special Building Inspection Requested Date 1/28/2022 10:00 AM Scheduled Start Date 1/28/2022 Completed Date 1/31/2022 Owner Last Name Cline Permit Inspection Round Initial Inspection Closed TRUE INS-0000463-22 Status Pass/Accepted Type Utilities Subtype Requested Date 2/9/2022 9:00 AM Scheduled Start Date Completed Date 2/14/2022 Owner Last Name Gregor Permit Inspection Round Closed TRUE MEP Permit Inspections INS-0003511-19 Type Engineering ROW/Encr/Gr Subtype Status Pass/Accepted Permit 0056-2019-RWRG Due Date Priority 2 Normal Owner Alias rflin Closed TRUE INS-0002837-20 Type Engineering ROW/Encr/Gr Subtype Status Pass/Accepted Permit 0002-2020-RWEM Due Date Priority 2 Normal Owner Alias rflin Closed TRUE INS-0004102-20 Type Plumbing Subtype Plumbing Underground Status Partial/Non-Complete Permit 0021-2020-PLUM Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0004103-20 Type Plumbing 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 26/46 Subtype Final Plumbing Status Partial/Non-Complete Permit 0021-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004106-20 Type Plumbing Subtype Plumbing Waste & Vent Status Partial/Non-Complete Permit 0021-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004107-20 Type Plumbing Subtype Plumbing Waste & Vent Status Partial/Non-Complete Permit 0021-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004108-20 Type Plumbing Subtype Plumbing Waste & Vent Status Partial/Non-Complete Permit 0021-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004109-20 Type Plumbing Subtype Plumbing Water Pipe Status Partial/Non-Complete Permit 0021-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004160-20 Type Mechanical Subtype Mechanical Ventilation Status Partial/Non-Complete Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004162-20 Type Mechanical Subtype Mechanical Gas Pipe Status Partial/Non-Complete Permit 0058-2020-MECH Due Date Priority 2 Normal 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 27/46 Owner Alias steve f Closed TRUE INS-0004163-20 Type Plumbing Subtype Plumbing Water Pipe Status Partial/Non-Complete Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004164-20 Type Mechanical Subtype Rough Mechanical Status Partial/Non-Complete Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004165-20 Type Mechanical Subtype Mechanical Flues Status Accepted as Noted Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004168-20 Type APECC Subtype Snowmelt Status Partial/Non-Complete Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0004169-20 Type Mechanical Subtype In-Floor Heat Status Partial/Non-Complete Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0007819-20 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0009337-20 Type Mechanical 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 28/46 Subtype Rough Mechanical Status Partial/Non-Complete Permit 0118-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0009494-20 Type Mechanical Subtype Final Mechanical Status Partial/Non-Complete Permit 0118-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0010459-20 Type Electric Subtype Rough Electrical Status Partial/Non-Complete Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0010461-20 Type Electric Subtype Permanent Service Status Failed/Rejected Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0010464-20 Type Electric Subtype Final Electrical Status Partial/Non-Complete Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0010465-20 Type Electric Subtype Bonding Status Pass/Accepted Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias BClin Closed TRUE INS-0014932-20 Type Mechanical Subtype Mechanical Ventilation Status Pass/Accepted Permit 0226-2020-MECH Due Date Priority 2 Normal 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 29/46 Owner Alias MMill Closed TRUE INS-0014944-20 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0226-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0017117-20 Type Plumbing Subtype Plumbing Waste & Vent Status Accepted as Noted Permit 0021-2020-PLUM Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0000568-21 Type APECC Subtype Snowmelt Status Accepted as Noted Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias MMill Closed TRUE INS-0000764-21 Type Electric Subtype Rough Electrical Status Partial/Non-Complete Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0001018-21 Type Mechanical Subtype In-Floor Heat Status Pass/Accepted Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0001376-21 Type Mechanical Subtype Rough Mechanical Status Partial/Non-Complete Permit 0118-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0002057-21 Type Electric 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 30/46 Subtype Rough Electrical Status Partial/Non-Complete Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0002346-21 Type Electric Subtype Rough Electrical Status Pass/Accepted Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0004577-21 Type Electric Subtype Permanent Service Status Pass/Accepted Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0006351-21 Type Plumbing Subtype Final Plumbing Status Accepted as Noted Permit 0021-2020-PLUM Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006352-21 Type Mechanical Subtype Final Mechanical Status Accepted as Noted Permit 0118-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0006422-21 Type Electric Subtype Final Electrical Status Partial/Non-Complete Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias RBenn Closed TRUE INS-0006467-21 Type Electric Subtype Final Electrical Status Re-Inspection Required Permit 0110-2020-ELEC Due Date Priority 2 Normal 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 31/46 Owner Alias BClin Closed TRUE INS-0000228-22 Type APECC Subtype Snowmelt Status Partial/Non-Complete Permit 0058-2020-MECH Due Date Priority 2 Normal Owner Alias steve f Closed TRUE INS-0000451-22 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0110-2020-ELEC Due Date Priority 2 Normal Owner Alias BClin Closed TRUE Milestones Review Round 1 - 0089.2018.ACBK Status Approved Due Date Created Date 11/22/2019 Payments PY-010687 Related To 0089.2018.ACBK Amount $5,000.00 Created Date 10/8/2021 Payment Source R-0010284 Receipt - Amount Remaining R-0010284: $0 Permit History 11/27/2024 2:54 PM User Fernando Cruz Action Changed Owner from Emmy Garrigus to Fernando Cruz. Related Permits 0029.2019.ACBK Type Building Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant Issue Date 5/1/2019 Last Activity Date 0108-2019-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant CHRIS MADIGAN Issue Date 10/4/2019 Last Activity Date 0112-2019-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 32/46 Applicant CHRIS MADIGAN Issue Date 10/11/2019 Last Activity Date 0056-2019-RWRG Type Right of Way Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant SHAY STUTSMAN Issue Date 10/25/2019 Last Activity Date 5/14/2020 19-2224 Type Right of Way Address 230 E HOPKINS AVE Work Type New Status Cancelled Applicant SHAY STUTSMAN Issue Date Last Activity Date 0002-2020-RWEM Type Right of Way Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 2/12/2020 Last Activity Date 12/22/2022 0019-2020-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant GIBB KENTZ Issue Date 3/3/2020 Last Activity Date 0021-2020-PLUM Type Plumbing Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant JASON MAK Issue Date 5/19/2020 Last Activity Date 2/3/2022 0058-2020-MECH Type Mechanical Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant JASON MAK Issue Date 5/19/2020 Last Activity Date 2/3/2022 0004-2020-RWRG Type Right of Way Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant CAROLYN DEVAN Issue Date 4/17/2020 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 33/46 Last Activity Date 12/22/2022 0014-2020-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant BRENT TARDIE Issue Date 1/28/2020 Last Activity Date 0032-2020-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Expired Applicant BRENT TARDIE Issue Date Last Activity Date 0037-2020-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant GIBB KENTZ Issue Date 5/21/2020 Last Activity Date 0043-2020-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant GIBB KENTZ Issue Date 6/2/2020 Last Activity Date 0118-2020-MECH Type Mechanical Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant Edward Murray Issue Date 6/23/2020 Last Activity Date 2/1/2022 0110-2020-ELEC Type Electrical Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant KRISTINA L KEEGAN Issue Date 7/20/2020 Last Activity Date 2/10/2022 0046-2020-BCHO Type Change Order Address 230 E HOPKINS AVE Work Type New Status Expired Applicant DANA ELLIS Issue Date 7/16/2021 Last Activity Date 7/16/2021 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 34/46 0070-2020-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant GIBB KENTZ Issue Date 9/8/2020 Last Activity Date 0093-2020-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant GIBB KENTZ Issue Date 10/30/2020 Last Activity Date 0226-2020-MECH Type Mechanical Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant HOPE FRIEND Issue Date 10/27/2020 Last Activity Date 2/4/2022 0107-2020-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant GIBB KENTZ Issue Date 12/28/2020 Last Activity Date 0011-2021-ENTP Type Encroachment - Temporary Address 230 E HOPKINS AVE Work Type New Status Issued Applicant GIBB KENTZ Issue Date 2/13/2021 Last Activity Date 0016-2021-BCHO Type Change Order Address 230 E HOPKINS AVE Work Type New Status Cancelled Applicant DANA ELLIS Issue Date Last Activity Date 0045-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant BRENT TARDIE Issue Date 5/3/2021 Last Activity Date 0052-2021-CPRK Type Parking Reservation 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 35/46 Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 4/14/2021 Last Activity Date 0091-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 4/14/2021 Last Activity Date 0099-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 4/14/2021 Last Activity Date 0100-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 4/14/2021 Last Activity Date 0110-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 4/27/2021 Last Activity Date 0127-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 5/3/2021 Last Activity Date 0126-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 5/3/2021 Last Activity Date 0157-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 36/46 Status Closed - Final Applicant GIBB KENTZ Issue Date 7/22/2021 Last Activity Date 0164-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 6/1/2021 Last Activity Date 0172-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 6/28/2021 Last Activity Date 0173-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 6/28/2021 Last Activity Date 0185-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 6/28/2021 Last Activity Date 0080-2021-PLUM Type Plumbing Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant JASON MAK Issue Date 6/14/2021 Last Activity Date 0211-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 6/28/2021 Last Activity Date 0212-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 37/46 Issue Date 6/28/2021 Last Activity Date 0261-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 7/27/2021 Last Activity Date 0276-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 7/27/2021 Last Activity Date 0284-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 7/27/2021 Last Activity Date 0387-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 9/1/2021 Last Activity Date 0421-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 9/1/2021 Last Activity Date 0424-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 9/1/2021 Last Activity Date 0533-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 10/18/2021 Last Activity Date 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 38/46 0729-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 1/3/2022 Last Activity Date 0744-2021-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 1/3/2022 Last Activity Date 0037-2022-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 2/9/2022 Last Activity Date 0050-2022-CPRK Type Parking Reservation Address 230 E HOPKINS AVE Work Type New Status Closed - Final Applicant GIBB KENTZ Issue Date 2/9/2022 Last Activity Date Reviews REV-009208 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Parks Due Date Completed Date 11/22/2019 9:20 AM Owner Alias DRade On Hold Created Date 11/22/2019 REV-009210 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 11/22/2019 9:22 AM Owner Alias rmagi On Hold Created Date 11/22/2019 REV-009211 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Sanitation Due Date Completed Date 11/22/2019 9:23 AM Owner Alias Sanitation - Review On Hold Created Date 11/22/2019 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 39/46 REV-009212 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Engineering Water Due Date Completed Date 11/22/2019 9:25 AM Owner Alias SWilson On Hold Created Date 11/22/2019 REV-009213 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Engineering CMP Due Date Completed Date 11/22/2019 9:26 AM Owner Alias Engineering CMP - Review On Hold Created Date 11/22/2019 REV-009214 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Engineering Dev Due Date Completed Date 11/22/2019 9:29 AM Owner Alias PMurr On Hold Created Date 11/22/2019 REV-009215 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Engineering Erosion & Sediment Due Date Completed Date 11/22/2019 9:32 AM Owner Alias AReed On Hold Created Date 11/22/2019 REV-009216 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Fire Due Date Completed Date 11/22/2019 9:34 AM Owner Alias NThom On Hold Created Date 11/22/2019 REV-009217 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Zoning Due Date Completed Date 11/22/2019 9:37 AM Owner Alias SVarg On Hold Created Date 11/22/2019 REV-009218 Milestone Review Round 1 - 0089.2018.ACBK Status Approved Type Building 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 40/46 Due Date Completed Date 11/22/2019 9:38 AM Owner Alias NThom On Hold Created Date 11/22/2019 Submissions Covid -19 Plan Actions Submission Date 4/23/2020 12:10 PM Status Pending Required Description 90.As-Built Survey.230 E Hopkins.20210930.pdf Actions Upload Submission Date Status Required Description 0016-2021-BCHO _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0021-2020-PLUM _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0029.2019.ACBK _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0046-2020-BCHO _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0058-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0080-2021-PLUM _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0089.2018.ACBK _ Salesforce - Enterprise Edition.pdf Actions Upload 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 41/46 Submission Date Status Required Description 0110-2020-ELEC _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0118-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0226-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 230 E Hopkins - 0089.2018.ACBK _ Final CO.pdf Actions Upload Submission Date Status Required Description 0016-2021-BCHO _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0021-2020-PLUM _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0029.2019.ACBK _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0046-2020-BCHO _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0058-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 42/46 Status Required Description 0080-2021-PLUM _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0089.2018.ACBK _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0110-2020-ELEC _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0118-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0226-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 230 E Hopkins - 0089.2018.ACBK _ Final CO.pdf Actions Upload Submission Date Status Required Description 0016-2021-BCHO _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0021-2020-PLUM _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0029.2019.ACBK _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 43/46 Required Description 0046-2020-BCHO _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0058-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0080-2021-PLUM _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0089.2018.ACBK _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0110-2020-ELEC _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0118-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 0226-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Upload Submission Date Status Required Description 230 E Hopkins - 0089.2018.ACBK _ Final CO.pdf Actions Upload Submission Date Status Required Description 0016-2021-BCHO _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 44/46 Description 0021-2020-PLUM _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 0029.2019.ACBK _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 0046-2020-BCHO _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 0058-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 0080-2021-PLUM _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 0089.2018.ACBK _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 0110-2020-ELEC _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 0118-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 0226-2020-MECH _ Salesforce - Enterprise Edition.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 45/46 230 E Hopkins - 0089.2018.ACBK _ Final CO.pdf Actions Submission Date 3/4/2022 2:05 PM Status Required Description Copyright © 2000-2024 salesforce.com, inc. All rights reserved. 11/27/24, 2:54 PM 0089.2018.ACBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrjEAAS/p 46/46