Loading...
HomeMy WebLinkAboutFile Documents.535 E Hyman Ave.0093.2018.ACBK0093-2018-ACBK_BuildingComment1 Subject: PlanCheck Page Label: 1 Author: justinh File Name: Elect COMMCheck.521 E Hyman.2018.11.01.pdf Please completely fill out this portion of the project information on both the Mechanical and Interior lighting ComChecks. Elect COMMCheck.521 E Hyman.2018.11.01.pdf (1) Subject: PlanCheck Page Label: 5 Author: justinh File Name: Plan Set.521 E Hyman.2018.11.02.pdf The original plans for this building showed a future lift within your space to provide an accessible route to the second floor. IBC 1104.5 would require your accessible route to the second floor to be located within your unit unless all occupants were required to leave you unit to access the second floor. In order to have this route considered you will need to submit a formal request to the chief building official to have this accepted as an alternate means of compliance stating why the future lift was removed and clearly outlining how this route will comply (doors unlocked to common area elevator at all times of business operation for unassisted access, etc.) Plan Set.521 E Hyman.2018.11.02.pdf (6) Subject: PlanCheck Page Label: 5 Author: justinh File Name: Plan Set.521 E Hyman.2018.11.02.pdf Provide an elevation showing your compliant bench and hanger/hook heights. Subject: PlanCheck Page Label: 6 Author: justinh File Name: Plan Set.521 E Hyman.2018.11.02.pdf Please submit a special inspection and testing agreement for the intemenscent paint application and the welding shown in your plan. Please note that this paint application must be continuous from base to beam everywhere you note the removal of the existing monocote. COMcheck Software Version 4.0.8.1 Interior Lighting Compliance Project Title: 2015 IECC Project Type:Alteration Construction Site: 535 E. HOPKINS AVE. ASPEN, CO 81611 Owner/Agent:Design BG B 251 200 FOR 970- Project Information Energy Code: BENTON TI Allowed Interior Lighting Power A Area Category B Floor Area (ft2) Please completely fill out this portion of the project information on both the Mechanical and Interior lighting ComChecks. 0" ESIDENTIALUNIT 1 OPEN STAIR #2 BENTON SECOND FLOOR 6 BENTON LANDING 5 BENTON STORAGE 7 ALL MERCHANDISE DISPLAYEDON LANDING TO BE AVAILABLE INACCESSIBLE LOCATIONS COMM. ELEV.FOR ACCESSTO 1ST FLOOR BENTON MECHANICAL 7B A B C EXIT FROMSECOND FLOOR EXIT FROMBASEMENT SHAFT TRAVEL DISTANCEEXIT I = 32' - 9" 70 EXIT C OCCUPANTS 7 (11' - 5")(16' - 9") TRAVEL DISTANCE TO EXIT I = 46' - 8" TRAVEL DISTA EXIT I = 96' - 4 (12' - 6") EXIT A OCCUPANTS 89 EXIT B FROM BASEMENTOCCUPANTS 46 (26'-6") (9' - 4") (5'-9") (7' - 3") (19' - 6") (6'-4") (2'-7") (2'-0") (5'-11") (4'-2") (15' - 0") (29' - 8") (5' - 10 (23' - 4") 13+3=164 16+1+2=19 12 (3' - 0") EXIT B EXIT A (3' - 0") (1' - 8")(1' - 6") (3' - 6") OCCUPANCY MAREA 794 sq.ft. GROSS @ 60 sq.ft.OCCUPANT LOAD = 14 6+5+7=18 18+1=19 GREATER THAN 1/3 DIAGONAL 36' - 4" 13 3 70+19=89 (8'-8") 14 TRAVEL DISTANCE 75'-3" (7' - 5") (14'-4") 7 7 (15'-8")(4'-8") (9'-3") 14 14 7 COMM. ELEV.FOR ACCESS TO2ND FLOOR WALL @ 30" A.F.F. FORREDUCED VERTICALCLEARANCEPROTECTION PER ANSIA117.1, 307.4REFER TO SECTION1/A407 HANDRAILSPER IBC 1014 PATH 2' - 8" CHANGING 1 The original plans for this building showed a future lift within your space to provide an accessible route to the second floor. IBC 1104.5 would require your accessible route to the second floor to be located within your unit unless all occupants were required to leave you unit to access the second floor. In order to have this route considered you will need to submit a formal request to the chief building official to have this accepted as an alternate means of compliance stating why the future lift was removed and clearly outlining how this route will comply (doors unlocked to common area elevator at all times of business operation for unassisted access, etc.) SHAFT (12' - 10") - 5") AVEL DISTANCE TOT I = 96' - 4" 26 (6' - 4") (4' - 8") TRAVEL DISTANCE TOEXIT J = 76' - 0" 13 RESTROOM 4 R 2' - 6 " R 2 ' - 6 " ACCESSIBLE RESTROOMPER ANSI A-117.1, CHPT 6 ACCESSIBLECHANGING ROOM PER ANSI A117.1, CHPT803 (1'-0") (9'-2") (9'-10") (4'-1") (4'-8") (8'-11") (1'-6") (5'-1") 13 34" HIGH POINT OF SALE COUNTERATH - 8" 30" X 48" CLEAR FLOOR SPACE CHANGING 1 RESTROOM BACK OF HOUSE ISSUE: 521 E. HYMAN AVE. ASPEN, COLORADO BUILD'G PERMIT 9/11/18 TENANT REV. 11/02/18 Provide an elevation showing your compliant bench and hanger/hook heights. A RESIDENTIAL UNIT 1 2 A-307 2 A-407 2 A-407 6 A-603 P0 BENTON LANDING 5 STAIR 5A F.V. EXISTING STAIRTO MAINTAIN 7" MAX. RISE, 11" MAX RUN;ADJUST AS REQ'D 2 A-408 2 A-408 REMOVE MONOCOTE FROM COLUMNS, APPLYINTEMENSCENT PAINT FOR1-HOUR FIRE RATING ILDING - SECOND FLOOR Please submit a special inspection and testing agreement for the intemenscent paint application and the welding shown in your plan. Please note that this paint application must be continuous from base to beam everywhere you note the removal of the existing monocote. Subject: PlanCheck Page Label: 19 Author: justinh File Name: Plan Set.521 E Hyman.2018.11.02.pdf The cutsheets provided do not match the input watts shown for D2 or D3, and no cutsheet was provided for D4. Explain or revise the input watts for D2 and D3 and provide a cutsheet on D4. Subject: PlanCheck Page Label: 21 Author: justinh File Name: Plan Set.521 E Hyman.2018.11.02.pdf Show the retail floor areas you are claiming on the ComCheck, these need to correspond to actual displays/shelving that showcase the retail on display. Show how all retail lighting is independently controlled from the general lighting per IECC C405.4.2.2.1, these two types of lighting cannot be on the same switch. As currently shown I don't think you have compliant general lighting if all the track lighting (retail) was turned off. Revise the ComCheck if needed. Subject: PlanCheck Page Label: 21 Author: justinh File Name: Plan Set.521 E Hyman.2018.11.02.pdf All lighting needs to be accounted for on the ComCheck, this is the initial occupation of the space so there are not exceptions for any "existing lighting" not being altered. You need to account for these fixtures and areas in the ComCheck. PROVIDE TENANT SUBMETER;COORDINATE WITH BUILDING SUBMETERSYSTEM. REPLACE (E) CIRCUIT BREAKER WITHNEW 225/3 CIRCUIT BREAKER. MATCH EXISTING RATINGS. LABEL CBACCORDINGLY. WIRING SCHEDULE - COPPER AMPS (2WG)(3WG)(4WG) 120/208V, 3PH, 4W 225 225/3 CB 22,000 AD DESCRIPTION LOAD NO.A B C ST FLOOR CNTR 1420 2 ST FLOOR WEST 1500 4 ST FLOOR SOUTH 148 6 ST FLOOR NORTH 1200 8 ND FLOOR 1537 10 OH 256 12 WINDOW 1 1800 14 WINDOW 2 1800 16 MATIC DOOR 1200 18 RIOR SIGN 500 20 E 22 E 24 769.6 26 769.6 28 374.4 30 374.4 32 MPER 60 34 ER 150 36 100 38 URTAIN 1020 40 1400 42 GENERAL NOTES: SPECIFIC NOTES: LUMINAIRE SCHEDULE TYPE DESCRIPTION MOUNTING LUMENOUTPUT COLOR TEMP. (K)INPUT WATTS VOLT MANUFACTURER CATALOG NUMBER SPECIFICNOTESTYPE D1 DIMMING DECORATIVE LED PENDANT PENDANT LED 623 3000k 9 120 MODERNA P500000-009-30 D2 DIMMING DECORATIVE LED SCONCE WALL LED 636 3000K 11 MVOLT DWELED BY WAC LIGHTING WS-69815 D3 DIMMING DECORATIVE PENDANT-SECOND FLOOR PENDANT HALOPIN G9 QT-14 --750 120 NEMO CROWN MAJOR SUPPLIED BY TENANT D4 RECESSED LINEAR WALL-TO-CEILING TRIMLESS LED RECESSED LED 248 LM/FT 3000K 4.4W PER FOOT 120 BIRCHWOOD BY LEVITON JAK-LED-225-TL-SLO-30-MTR-R-FW-120-D1 T1 2.5A CURRENT LIMITED 8FT TRACK LIGHITNG AND 6 TRACK HEADS SURFACE LED 2176 PER HEAD 3000K 35W PER HEAD 120 WAC LIGHTING WT8-WT-WEDL2A (TRACK)WTK-1035N-930-WT (HEAD) T2 2.5A CURRENT LIMITED 12FT TRACK LIGHITNG AND 6 TRACK HEADS SURFACE LED 2176 PER HEAD 3000K 35W PER HEAD 120 WAC LIGHTING WT12-WT-WEDL2A (TRACK)WTK-1035N-930-WT (HEAD) T3 2.5A CURRENT LIMITED 16FT TRACK LIGHITNG AND 8 TRACK HEADS SURFACE LED 2176 PER HEAD 3000K 35W PER HEAD 120 WAC LIGHTING WT16-WT-WEDL2A (TRACK)WTK-1035N-930-WT (HEAD) X1 EXIT SIGN, GREEN LETTERING, WHITE HOUSING, BATTERY BACKUP, AND SELF DIAGNOSTICS SURFACE LED --4.3 120 EELP EDG-1-G-C-A-EM-SD X2 EGRESS FIXTURE, WHITE HOUSING, BATTERY BACKUP, AND SELF DIAGNOSTICS SURFACE LED --4.3 120 LITHONIA AFN X PREM GENERAL NOTES: A.THE LUMINAIRE SCHEDULE CAN NOT BE USED INDEPENDENTLY OF THE DRAWINGS AND SPECIFICATIONS TO OBTAIN LUMINAIRE COSTS. THE INDIVIDUAL ESTABLISHING LUMINAIRE COSTS SHALL NOT QUOTE PRICING WITHOUT FIRST SEEING APPLICABLE ELECTRICAL DRAWINGS AND ELECTRICAL DIVISION SPECIFICATIONS. THE CONTRACTOR IS REPONSIBLE FOR PROVIDING NECESSARY DRAWINGS AND SPECIFICATIONS TO THEINDIVIDUAL QUOTING LUMINAIRE PRICING. B.REFER TO DRAWINGS FOR FIXTURES REQUIRING EMERGENCY BATTERY BACKUP OPTION (SHOWN BY HATCH IN/OVER SYMBOL). MINIMUM LIGHT OUTPUT FOR EM BALLAST SHALL BE 600 LUMENS. C.ALL FLUORESCENT LAMPS ARE TO BE 3500° KELVIN COLOR TEMPERATURE SPECIFIC NOTES: (1) CIRCUIT SPECIFIC NOTES BEN-40 - MECH SP A C E H1 M M M M 15 0 / 3 40 0 / 3 40 0 / 3 10 0 / 3 10 0 / 3 10 0 / 3 10 0 / 3 10 0 / 3 22 5 / 3 10 0 / 3 10 0 / 3 10 0 / 3 M M M M 40 0 ( 4 W G ) 40 0 ( 4 W G ) 15 0 ( 4 W G ) MECH2 30 0 / 3 30 0 ( 4 W G ) E N L ATS 400A, 208Y/120V3ø/4P M M M M M M M M DEMAND STYLE (kW/kWh) METERS. E-MON D-MON CLASS 2000 METERS, AMPERAGES AS NECESSARY. TENANT SUBMETER FURNISHED BY TENANT, TYPICAL. F6 F7 F8 F9 H2 22 5 ISSUE: DESCRIPTION: SEPT. 11, 2018 ALBUQUERQUE | AVON | DENVER | FO Project No. 9203.12 Co NOV. 2, 2018 TENANT REVISI ELECTRICAL ONE-LINE DIAGRAM The cutsheets provided do not match the input watts shown for D2 or D3, and no cutsheet was provided for D4. Explain or revise the input watts for D2 and D3 and provide a cutsheet on D4. B Show the retail floor areas you are claiming on the ComCheck, these need to correspond to actual displays/shelving that showcase the retail on display. Show how all retail lighting is independently controlled from the general lighting per IECC C405.4.2.2.1, these two types of lighting cannot be on the same switch. As currently shown I don't think you have compliant general lighting if all the track lighting (retail) was turned off. Revise the ComCheck if needed. 45 C BENTON SECOND FLOOR T3 T3 1 2 OS S OS D 4 D 3 D 4 D3 D 3 a c b b a c 4 7 T2 T1 T1 T2 T2 T3 T3 X2 X2 X2 X2 X2 8 8 8 12 TC a 10 DL 9 D1 D1 D 3d D 4d D 3e d3 8 8 8 D4D4 11 S3 S3 b5 b5 b56 6S12 X1 X1 X1 All lighting needs to be accounted for on the ComCheck, this is the initial occupation of the space so there are not exceptions for any "existing lighting" not being altered. You need to account for these fixtures and areas in the ComCheck.