Subject: PlanCheck
Page: A.6.03 STAIR DETAIL: EXTERIOR
Page Index: 45
Author: nickt
Color:
File Name: 210 W. Main St. - PLAN SET Comments
Submittal 110219.pdf
Handrail required both sides of
stairs
210 W. Main St. - PLAN SET Comments Submittal 110219.pdf (3)
Subject: PlanCheck
Page: A.6.03 STAIR DETAIL: EXTERIOR
Page Index: 45
Author: nickt
Color:
File Name: 210 W. Main St. - PLAN SET Comments
Submittal 110219.pdf
Provide a letter addressed to the
building official requesting and
demonstrating need for
modification to the 12" handrail
extensions requirement (explain
why it is a hardship, impractical,
and how your 8" extensions will
be adequate for accessibility and
life safety) in accordance with
2015 IBC 104.10:
Where there are practical
difficulties
involved in carrying out the
provisions of this code, the
building official shall have the
authority to grant modifications
for individual cases, upon
application of the owner or
the owner’s authorized agent,
provided that the building official
shall first find that special
individual reason makes the
strict letter of this code
impractical, the modification is in
compliance with the intent and
purpose of this code and that
such modification does not
lessen health, accessibility, life
and fire safety or structural
requirements. The details of
action granting modifications
shall be recorded and entered in
the files of the department of
building safety.
Subject: PlanCheck
Page: A.6.03 STAIR DETAIL: EXTERIOR
Page Index: 45
Author: nickt
Color:
File Name: 210 W. Main St. - PLAN SET Comments
Submittal 110219.pdf
Handrail required on both sides
of stair at all exterior stairs. If
stair and guard are one and the
same, this can work at the stair
but not at the extensions
because at the landings the
guards must be 42" high and the
handrails between 34" and 38"
high.
C
1
2
3'-
4
1
/
4
"
4
3
/
4
"
3'-
4
1
/
4
"
1'-0"3'-6"
8"
T. SLAB89'-8"
HALLWAY
NOTE:18 RISERS TOGROUND FLOOR
1 2 3 4
56789101112
UP
131415161718
E
Handrail required both
sides of stairs
Scale: AS N
ISSUE
SCHEMAT
PERMIT SU
COMMEN
COMMEN
COMMEN
KI
N
G
L
O
U
I
S
E
H
O
U
S
I
N
G
21
0
W
E
S
T
M
A
I
N
S
T
R
E
E
T
ALL DESIGNS, IDEAS A AND PLANS INDICATE DRAWINGS AND SPECIF THE PROPERTY AND COPY RAYMOND ARCHITECT SHALL NEITHER BE USED O WORK NOR BE USED B PERSON FOR ANY USE WITHOUT WRITTEN WRITTEN DIMENSIONS P R E C E D E N C E O V E DIMENSIONS AND SHALL THE SITE . ANY DIM DISCREPANCY SHALL BE THE ATTENTION OF TH PRIOR TO COMMENCEME
DATE
11/22/18
KI
M
R
A
Y
M
O
N
D
A
R
C
H
I
T
E
C
T
S
,
I
N
C
.
03/05/19
07/01/19
09/16/19
11/01/19
UP
3536373839
39 38 37 36 35
D05 W/D
C
C
1
2
1
2
3'-
1
0
"
6"
3'-
2
"
2"
3'-8"
3'-
3
"
3'-
9
1
/
2
"
6"
3'-2
1
/
2
"
1"
4'-
5
"
8"3'-0"
T GYP.109'-4"T PLY
EXTEND HANDRAIL 8" TOTURN INTO GUARDRAIL
UTILITYDECK
E
E
5
192018
DN UP
17 16 15 14 212223242526
W/
D
W/
D
C
C
1
1
1
1
2
2
3'-
4
1
/
4
"
4 3
/
4
"
3'-
4
1
/
4
"
1'-0"3'-6"
3'-
4
1
/
4
"
3'-8"
7'-
1
"
1'-0"
3'-0"8"8"
8"
T. SLAB89'-8"
T. FF100'-0"
EXTEND HANDRAIL 1',TURN AND ATTACH TORAIL.
EXTEND HANDRAIL 8" TOTURN INTO GUARDRAIL
EXTEND GUARDRAIL8" TO TURNINTO HANDRAIL
UNITSTORAGE
HALLWAY
LAUNDRY
GROUND LEVEL
NOTE:18 RISERS TOGROUND FLOOR
1 2 3 4
56789101112
UP
131415161718
E
E
3 54
Provide a letter addressed to the building official requesting and
demonstrating need for modification to the 12" handrail
extensions requirement (explain why it is a hardship,
impractical, and how your 8" extensions will be adequate for
accessibility and life safety) in accordance with 2015 IBC
104.10:
Where there are practical difficulties
involved in carrying out the provisions of this code, the
building official shall have the authority to grant modifications
for individual cases, upon application of the owner or
the owner’s authorized agent, provided that the building official
shall first find that special individual reason makes the
strict letter of this code impractical, the modification is incompliance with the intent and purpose of this code and that
such modification does not lessen health, accessibility, lifeand fire safety or structural requirements. The details of
action granting modifications shall be recorded and entered inthe files of the department of building safety.
HANDRAIL
CONTINUOUSHANDRAIL
CONTINUOUSHANDRAIL
2728293031323334
DN UP
DN
3536373839404142
50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35
W/D
W/
D
C
C
1
1
2
1
2
3'-8 1/2"13'-9"(15 TREADS @ 1')1'-0"
3'-
1
0
"
6"
3'-
2
"
2"
3'-2 1/2"
3'-8 1/2"13'-9"(15 TREADS @ 1')3'-8"
1'-0"
3'-
3
"
3'-
9
1
/
2
"
6"
3'-
2
1
/
2
"
1"
4'-5"
4'-
5
"
8"3'-0 1/2"8"3'-0"
3'-0 1/2"8"
T. FF109'-2 1/2"
T. FF118'-8"
EXTEND HANDRAIL 8" TOTURN INTO GUARDRAIL
ENTRY
ENTRY
ENTRY
ENTRY
THIRD LEVEL
UTILITYDECK
E
E
3 54
1
1
3'-4
1
/
4
"
ST
GRO
Handrail required onboth sides of stair at allexterior stairs. If stair
and guard are one and
the same, this can
work at the stair but
not at the extensions
because at the
landings the guardsmust be 42" high and
the handrails between
34" and 38" high.
A.6.03+A.6.04: Updated plan
and section to show handrail on
both sides of stair.
A.6.03+A.6.04: Updated handrail and guardrail
details.
* See attached letter.
11/18/2019
Subject: PlanCheck
Page: M-5 MECHAMCALEQUPMENTU8T
Page Index: 5
Author: nickt
Color:
File Name: MECHANICAL
SET-9001_MP-all_revised_11-05-19_stamped-signed.pdf
This text is very difficult to read.
Could you replace with a better
resolution?
MECHANICAL SET-9001_MP-all_revised_11-05-19_stamped-signed.pdf (2)
Subject: PlanCheck
Page: P-1 BASB/BCT•50PLUMBNQ PLAN
Page Index: 6
Author: nickt
Color:
File Name: MECHANICAL
SET-9001_MP-all_revised_11-05-19_stamped-signed.pdf
The plumbing in this area is over
an unheated crawl and below an
unheated hallway that is open to
the outside air. It is unclear how
keeping the plumbing on one
side of the insulation or the other
will keep it from freezing.
This text is very
difficult to read. Could
you replace with abetter resolution?
The plumbing in this
area is over an
unheated crawl and
below an unheated
hallway that is open to
the outside air. It is
unclear how keeping
the plumbing on one
side of the insulation or
the other will keep it
from freezing.
* See attached document for Mechanical response and plans.
*See attached document for Mechanical response and plans.
11/18/2019