HomeMy WebLinkAboutFile Documents.711 E Cooper Ave.0115.2018 (10).ACBK0115.2018.acbk_engineering2_711 e cooper
Page: [4] BG-City Market-LSeries-L200 LAYOUT
Author: pjm
File Name: Response Set.711 E. Cooper Ave.2018.10.08.pdf
The Association of Pedestrian
and Bicycle Professionals
standards for bike parking does
not appear to be met. A
minimum of 192" is required for
bike parking stalls to stack as
shown. Show that the standard
is met.
[4] BG-City Market-LSeries-L200 LAYOUT (1)
Page: C1.2 GRADING, DRAINAGE AND EROSION
CONTROL
Author: pjm
File Name: Response Set.711 E. Cooper Ave.2018.10.08.pdf
The bollards were originally
installed to provide a protected
area for pedestrians and display
items and the locations were
approved as part of the planned
development process. The
locations shown do not match
existing. Bollards shall remain at
existing distance away from the
building or a PD amendment
may be required.
C1.2 GRADING, DRAINAGE AND EROSION CONTROL (2)
Page: C1.2 GRADING, DRAINAGE AND EROSION
CONTROL
Author: pjm
File Name: Response Set.711 E. Cooper Ave.2018.10.08.pdf
Show adequate turning motions
in the parking area if the bollards
remain in existing locations. If
parking needs to be removed,
how many spaces will be
impacted?
Page: C1.4 UTILITY PLAN
Author: pjm
File Name: Response Set.711 E. Cooper Ave.2018.10.08.pdf
Add note: The conduit shall be
inspected by an electrician prior
to start of work to determine if
quality is acceptable to reuse. If
quality is not acceptable, new
plans will need to be submitted
to the City for review.
C1.4 UTILITY PLAN (2)
Page: C1.4 UTILITY PLAN
Author: pjm
File Name: Response Set.711 E. Cooper Ave.2018.10.08.pdf
Confirm that locates show there
is adequate conduit length to
accommodate the light pole
relocation shown.
NOTE
1. LAYOUT
UNLESS
11
'
-
0
"
3'
-
0
"
TY
P
.
5'
-
6
"
ADA VAN PARKING DETAIL
RE 6/C1.5
20'-0"
2'
-
0
"
4'-0"
11'-0
"
3'-3"
5'-0"
8'-
6
"
5'-
0
"
The Association of
Pedestrian and
Bicycle Professionals
standards for bike
parking does not
appear to be met. A
minimum of 192" is
required for bike
parking stalls to stack
as shown. Show that
the standard is met.
IRR IRR
AS
UT
T
O
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
D
XSD
XSD
XSD
XSD
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XE
L
XE
L
XE
L
XEL
XEL
XEL
XEL
XEL
X
16 17 18 19 20 21 22 23 24
1+00 1+501+53
TOW:7935.61'BOW:7934.11'
FG:7933.53'
TOC:7934.50'
LANDSCAPE AREAS (TYPICAL)REFERENCE LANDSCAPE DRAWINGS
POSED SITE WALLDETAIL 5/C1.5)
SUBJECT PROPERTY
26,999 SQ. FT. +/-
0.620 AC. +/-
BLOCK 10618.74'
ALLEY R.O.
W
.
PAVED SU
R
F
A
C
E
STREET/ALLEY
7934
793
5
ARCHITECT & LANDSCAPE ARCHITECT
EXISTING CLEANOUT(SEE NOTE 15 ON THISSHEET)
LAST
,
PLY
EXISTING CLEANOUT(SEE NOTE 15 ON THISSHEET)TOC:7934.13'TOC:7934.30'
TOC:7934.11'
TOW:7935.61'TOW:7934.78'
OPOSEDWCUT LINEYPICAL)
PROPOSED HANDICAP PARKING STRIPING(RE. DETAIL 6/C1.5)
PROPOSEDWALL STEP
PROPOSED MILLING EXTENTSRE: DETAIL 11/C1.6
EOA:7934.26'MATCH EX.EOA:7934.23'MATCH EX.
TOW:7935.61'BOW:7934.21'
0.9%1.2%
EOA:7933.85'MATCH EX.
BOW:7933.91'
FG:7933.08'
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
010 10 20
10
5
DRAINAGE DIRECTION/SLOPE
SPOT ELEVATION
EXAMPLE: TOP OF CONCRETE @ 7900.00' =
BOW = BOTTOM OF WALL
EOA = EDGE OF ASPHALT
EX = EXISTING GRADE
FFE = FINISHED FLOOR ELEVATION
FG = FINISHED GRADE
FL = FLOW LINE
GB = GRADE BREAK
HP = HIGH POINT
LP = LOW POINT
MATCH EX = MATCH EXISTING
RIM = RIM ELEVATION
TBC = TOP BACK OF CURB
TOC = TOP OF CONCRETE
SPOT ELEVATION LEGEND
XXX:XXX.XX'
2.0%
TOC:7900.00'
CONSENT OF THE PROPERTY OWNER INVOLVED.
9.ALL EXISTING AND PROPOSED GATE VALVES AND MANHOLE COVERS MUST BE ADJUSTED S
TOP IS SET 12" BELOW FINAL GRADE.
10.COMPACTION IN EXCAVATED AREAS SHALL BE 95% MODIFIED PROCTOR DENSITY.
11.CONTRACTOR SHALL PROTECT ALL EXISTING TREES THAT ARE TO REMAIN. A TREE PRO
MUST BE APPROVED BY CITY PARKS DEPARTMENT AND LANDSCAPE ARCHITECT PRIOR TO
CONSTRUCTION IF APPLICABLE.
12.THE UTILITIES AS SHOWN, MAY NOT REPRESENT ACTUAL FIELD CONDITIONS. IT IS THE R
OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATIONS OF U
TO CONSTRUCTION.
13.ALL SPOT ELEVATIONS AND GRADING CONCEPTS SHALL BE FIELD VERIFIED PRIOR TO C
ANY DEVIATIONS SHALL BE COORDINATED WITH THE ENGINEER OF RECORD AN
ARCHITECT.
14.NO CROSS CONNECTIONS BETWEEN FOUNDATION DRAINS AND SURFACE DRAINS SHALL BE
15.THE CONTRACTOR SHALL PROVIDE VIDEO OF THE STORM DRAIN SYSTEM CONNECTING
STORM SEWER FROM THE EXISTING BUILDING CLEANOUTS TO THE EXISTING MANHO
STREET.
16.CITY MARKET SHALL OBTAIN A STORM SEWER MAINTENANCE AGREEMENT WITH THE CITY
BE COORDINATED WITH THE ENGINEER OF RECORD.
SITE BEN
BASIS OF E
DREXEL BA
ON AN ELEV
NGS STATIO
BENCHMAR OF BLOCK 1
ASPEN BLO SHOWN ON
SOPRIS EN
The bollards were
originally installed to
provide a protected
area for pedestrians
and display items
and the locations
were approved as
part of the planned
development
process. The
locations shown do
not match existing.
Bollards shall remain
at existing distance
away from the
building or a PD
amendment may be
required.
XG
A
S
GAS XGAS
XUT XUTUTXUT
FO XFO
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XS
D
XE
L
XE
L
XEL
XE
L
XEL
XE
L
XE
L
XELXE
XEL
SUBJECT PROPERTY
26,999 SQ. FT. +/-
0.620 AC. +/-
BLOCK 10618.74'
ALLEY R.O
.
W
.
PAVED SU
R
F
A
C
E
SS TO STREET/ALLEY
7934
793
5
EXISTING CLEANOUT(SEE NOTE 15 ON THISSHEET)
NCH
1.6)
DRAINAG
SPOT ELE
EXAMPLE
BOW = BO
EOA = ED
EX = EXIS
FFE = FIN
FG = FINI
FL = FLOW
GB = GRA
HP = HIGH
LP = LOW
MATCH E
RIM = RIM
TBC = TO
TOC = TO
SPOT
15.THE
STOR
STRE
16.CITY
BE C
Show adequate
turning motions in the
parking area if the
bollards remain in
existing locations. If
parking needs to be
removed, how many
spaces will be
impacted?
XWL XWL XWL XWL XWL XWL XWL XWL XWL XW
XEL XEL XEL XEL XEL XEL XEL XEL XEL XEL XEL
XEL XEL XEL XEL XEL XEL XEL
X
E
L
XEL XEL XEL X
CONTRACTOR TO USE EXISTING CONDUIT IF
POSSIBLE TO PULL NEW ELECTRIC LINE FROM LIGHT
POLE TO LIGHT POLE. IF CONDUIT IS NOT IN PLACE
OR IS NOT USEABLE, CONTRACTOR TO INSTALL NEW
CONDUIT FROM POLE TO POLE (1 12" SCH 40 PVC).CONTRACTOR TO COORDINATE WITH ENGINEER ANDCITY OF ASPEN ELECTRIC DEPARTMENT.
COOPER AVENUE
EXISTING LIGHTPOLE TO REMAIN
Add note: The conduit
shall be inspected by
an electrician prior to
start of work to
determine if quality is
acceptable to reuse. If
quality is not
acceptable, new plans
will need to be
submitted to the City
for review.
L XWL XWL XWL XWL XWL XWL XWL XWL
2'
'
XSD
EL XEL XEL XEL XEL
X
E
L
XE
L XEL XEL XEL XEL XEL XEL XEL XEL
L UEL
EXISTING STREET LIGHT TO BE
REMOVED AND RELOCATED,ELECTRIC LINES TO BE RE-ROUTED
TO PROPOSED LOCATION AS SHOWN
PROPOSED ELECTRIC LINE, CONDUIT TO BE 1 12" SCH
40 PVC OR MATCH EXISTING SIZE. CONTRACTOR TO
LOCATE EXISTING LINE, USE EXISTING CONDUITWHERE POSSIBLE FOR NEW PULL, EXTEND OFFEXISTING CONDUIT IF USEABLE, AND PULL NEW LINE
FROM LIGHT POLE TO THE EAST. CONTRACTOR TOSWEEP CONDUIT AROUND PROPOSED CURB INLETBOX AS NECESSARY.CONTRACTOR TO
POSSIBLE TO PULL POLE TO LIGHT PO OR IS NOT USEAB
CONDUIT FROM P CONTRACTOR TO CITY OF ASPEN EL
Confirm that locates
show there is
adequate conduit
length to
accommodate the
light pole relocation
shown.