HomeMy WebLinkAboutFile Documents.802 W Main St.0170.2018 (5).ARBK0170-2018-ARBK_BuildingComments_5
Page: 7.6 ROOF ASSEMBLIES & DETAILS
File Name: Architectural Plans.802 West
Main.2018.011-BLUEBEAM.pdf
Subject: PlanCheck
Author: nickt
Color:
This suggests that the LVL
beams run past the rim board.
The rim board components must
be continuous (not interrupted by
the beams).
Architectural Plans.802 West Main.2018.011-BLUEBEAM.pdf (2)
Page: G1.15 ACCESSIBILITY
File Name: Architectural Plans.802 West
Main.2018.011-BLUEBEAM.pdf
Subject: PlanCheck
Author: nickt
Color:
Align the 30" dimension with the
oven clearspace.
5/
8
"
11
7/
8
"
3
/
4
"
3"
GL
1" APA RIM BOARD
1/2" TYPE X CONTINUOUS
GYP BOARD
(4) LVL BEAM BEYOND
R2 W4
W6
This suggests that the
LVL beams run past
the rim board. The rim
board components
must be continuous
(not interrupted by the
beams).
8
9
10
11
12
13
18
R
I
S
E
R
(
6
4
3
/
6
4
"
)
17
T
R
E
A
D
S
(
1
1
"
)
RG
DW
2'-1"
2'
-
6
"
60" CLR.
FROM PROJECTING
FINISH OR APPLIANCE
CL
CL
REF
CLCLCL
2'-1"
CL
19
20
21
22
23
24
25
18
R
I
S
E
R
(
6
5
3
/
6
4
"
)
17
T
R
E
A
D
S
(
1
1
"
)
2'-05/8"1'-3"1'-51/4"
5'-
1
"
30"x48"
56"x48"
"
30"x48"<-
3
0
"
x
4
8
"
30"x48"
<-5 60"x56"->
30
"
x
4
8
"
60"x56"->
1 BEDROOM UNIT
ANSI A117.1-2009
TYPE B, OPTION A
Align the 30"
dimension with the
oven clearspace.
The LVL beams are 2 separate beams. The rim boards
are continuous. The detail is accurate as drawn.
The dimension was a typo and has been omitted.
12/11/2018