Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Master Permit.209 E Bleeker St.0320.2017 (2).ARBK
Close Window Print This Page Expand All | Collapse All 0320.2017.ARBK Number 0320.2017.ARBK Record Type Building - Imported 209 E BLEEKER ST Owner Fernando Cruz Original Number 74768 Status Closed - Final Type Building Reason for Cancel or Compl. Review Fail Applicant MICHAEL MONSAURET No STEEPLECHASE CONSTRUCTION Required Bond Amount Project 209 E Bleeker Duplex Land Use Planning Application Permit Contractor Master Building Permit Valid Business License on Account Bluebeam Project Id 636-259-750 Imported HPC-ZON-EH-UTIL Review HPC Rev, Required Submissions HPC-ZON-EH-UTIL Review-2 Documents Resubmitted Eng Review Eng-CMP Rev,Eng-Dev Rev,Util-Dev Maj,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,San Rev, Conditional Inspections HPC Insp,Parks Insp, Conditional Final Insp HPC Final,Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parks Final,Water-LSE Final,San Final, Action Items Hold Reason Major EDEN Conditional Flat Fee Formula FP,Applicant is a Nonprofit? No Conditional Tiered Fee Formula Eligible for Small Lodge Program? No Conditional Tiered SqFt Fee Formula MAR,Discount All Fees (%) Fee Discount Reason CO CO Status if Applicable Issued Address Aspen Internal? Account Total Available Bond Amount Is This Associated w/a Building Permit? Approved Covid-19 Plan Hold All Reviews Create Fees Create Fees 2 Utility Review Type Price Book CO/LOC? 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 1/27 Queue Score Queue Designation Queue Score 0 Milestone Current Days in City Hands Last Date Received from Applicant Milestone - Total Days in Applicant Hand Milestone - Total Days in City Hands Dates 12/15/2017 TCO Issuance Date 12/15/2017 Close/CO Issuance Date 12/9/2024 12/15/2017 Expiration Date 12/27/2021 1/2/2019 2/16/2024 Basic Information Description Applicant: Steve Waldeck Steeplechase Construction Unit A HISTORIC RESTORATION AND NEW CONSTRUCTION -- DUPLEX//BEN-JOHN//BLUEBEAM 636- 259-750 Census Code 103 - Two Family Residences Use of Building Duplex Use Class Residential Class of Work New Job Location Address 209 E BLEEKER ST, ASPEN : 273707320002 Lot C & D Site Address Display on Map Legal Description Historic Property?Yes 209 E BLEEKER ST Historic District?No HPC - Planning - Zoning Details Zone District R-6 HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU?No HPC Certificate of Appropriateness? Yes ADU Sq Ft Work Involves a Land Use Approval? Yes Deed Restricted?No Located in a PD?No # of Dwellings Yes Milestone Current Days in Applicant Hand New Application Date Application Complete Date Application Accepted Date Issue Date Override Expiration Date Last Activity Date Interior Remodel Only Permit Comments Eden Address Adds/Changes Floor Area? 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 2/27 Category of Zoning Fee Residential Yes Zoning Work Level Major Zoning Fee Yes Building Project Details $5,326,762.00 6,000 Reason for Valuation Change 6,000 8,279 6,000 8,279 0% 8,279 14,279 6,000 6,000 100% 8,279 Scope of Work Details Work Changes Building Footprint? Yes Yes Yes Located Within City Mall Boundaries? No Yes Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Yes Yes No Yes Change of Restaurant Ownership? No Prevents Access to Sewer Main? No No Sewer Easements Affected? No Building Description Code Editions 2015 IRC Required Special Inspections Energy Code Compliance Building Type (IRC) Total Snowmelt Sq Ft 500 Construction Type VB Total Spa Sq Ft Occupancy Load Total Pool Sq Ft Fire Sprinkler Existing? Amount of Onsite Renewable Generation? Occupancy or Use Change? Work Affects Exterior of Building? Valuation Lot Size Sq. Ft. Soil Disturbance Sq Ft Unit Sq. Ft.Affected Area Sq Ft Building Footprint Sq Ft Existing Hardscape Footprint Sq Ft Sq Ft of Building Work Area Existing Hardscape % of Lot Building Fire Area Sq Ft Con Mit Sq Ft Total Utility Review Sq. Ft.Utility Review Sq Ft Total % of Interior being Altered New Sq. Ft. Work Affects Tree/Drip Line? Work Changes Fenestration/Thrml Envelop? Requires Asbestos Test? Work Adds/Removes/Changes Plumbing Fixt? Work Subject to Water Efficient L.O.? Restaurant/Food Service Involved? Involves Impact on Sewer? Affects Parking/Alleys/Loading? Other Code Editions 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 3/27 Fire Sprinkler Required? Yes CO Description Fire Sprinkler Type Basement Fire Alarms Installed? 1st Floor # Wood Fireplaces 2nd Floor # Gas Log Fireplaces 3rd Floor # Gas Appliances Additional Open Text Field For Comments Financials $0.00 Total Payments Total Balance $0.00 System Information Number 0320.2017.ARBK Community Visibility Created By Ruth Kinney, 7/27/2019 1:48 PM 0038X00003eEBlXQAW,0033s000010ds8sAAA IsTestData?Last Modified By Fernando Cruz, 1/1/2025 2:57 PM VIP Form Tool VIP Submitted VIP Template Status VIP Foreign Language VIP Form Template Permit Application Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email: Certificate of Occupancy: Permit 0320.2017.ARBK at 209 E BLEEKER ST, ASPEN : 273707320002 Type Billable Assigned To Emily Page Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/15/2024 Days in Applicant's Hands Comments To: michael@trekbuilders.com CC: will@steeplechaseconstruction.com BCC: Attachment: Building_-_CO_City_Use_Tax_-_Final_Return_Reconciliation__20240315.pdf, Building_-_CO_City_Use_Tax_-_FRR_Notice_to_Contractor__03202017ARBK.pdf, 209 E Bleeker St - 0320.2017.ARBK_CO V1.pdf Subject: Certificate of Occupancy: Permit 0320.2017.ARBK at 209 E BLEEKER ST, ASPEN : 273707320002 Body: Hello MICHAEL MONSAURET, Total Fees Fees Due at Current Status Contact IDs 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 4/27 Hello, I noticed that Bonnie issued a CO but did not include tax documents. See attached. Best, Emily Please find attached your issued certificate of occupancy for the completed project at 209 E BLEEKER ST, ASPEN : 273707320002. Additionally, you will find attached the owner and the contractor ’s city use tax letters and tax reconciliation forms. Please distribute these as necessary. If you have any questions, please let us know. Email: Important! Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Bonnie Muhigirwa Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/15/2019 Days in Applicant's Hands Comments To: michael@steeplechaseconstruction.com CC: BCC: Attachment: --none-- Subject: Important! Your City of Aspen permit has been moved to new permitting system Body: Dear MICHAEL MONSAURET, As you may know, the City of Aspen has been transitioning to a new online-based permitting system, Salesforce. Thank you for your patience during this transition, which is now complete. Your permit is now operational in Salesforce. Your project located at 209 E BLEEKER ST, ASPEN : 273707320002 will retain its original permit number, 0320.2017.ARBK and you will use this number to find your permit in Salesforce. If you have not already done so, you must register in Salesforce before you are able to access your permit information, upload new documents, request inspections, or otherwise track the status of your permit. Instructions on how to register and navigate the new permitting system can be found at this link: https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system. Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/DocumentCenter/View/4254/Request-an-Inspection?bidId= If you have additional questions that are not addressed at the above links, you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Sincerely, John Barker City of Aspen Bonnie Muhigirwa Plans Examiner Community Development 130 S Galena St. Aspen, CO 81611 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 5/27 p 970.429.2787 c 970.309.5119 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contained in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Contacts William Johnson Account STEEPLECHASE CONSTRUCTION Type Contractor Active Contractor License Count 1.00 Number 0011733 MICHAEL MONSAURET Account STEEPLECHASE CONSTRUCTION Type Applicant Active Contractor License Count 1.00 Number 0023377 Files Building_-_CO_City_Use_Tax_- _Final_Return_Reconciliation__20240315.pdf Last Modified 3/15/2024 3:24 PM Created By Emily Page 209 E Bleeker St - 0320.2017.ARBK_CO V1 Last Modified 3/15/2024 3:22 PM Created By Emily Page 0320.2017.arbk inspections Last Modified 12/15/2019 6:46 AM Created By Bonnie Muhigirwa Building_-_CO_City_Use_Tax_- _FRR_Notice_to_Contractor__03202017ARBK Last Modified 3/15/2024 3:23 PM Created By Emily Page Building_- _Expired_Permit_City_Use_Tax__20230728.pdf Last Modified 7/28/2023 6:47 AM Created By Renee Espinoza 0320.2017.arbk fees Last Modified 12/15/2019 6:46 AM Created By Bonnie Muhigirwa Inspections INS-0009775-19 Status Pass/Accepted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 2/16/2024 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0009780-19 Status Pass/Accepted Type Concrete 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 6/27 Subtype Footings Requested Date 5/28/2020 6:59 AM Scheduled Start Date 5/28/2020 Completed Date 5/28/2020 Owner Last Name Feder OOO thru 1/27 Permit Inspection Round Initial Inspection Closed TRUE INS-0009783-19 Status Accepted as Noted Type Building Subtype Special Building Inspection Requested Date 3/22/2022 9:30 AM Scheduled Start Date 3/22/2022 Completed Date 3/22/2022 Owner Last Name Feder OOO thru 1/27 Permit Inspection Round Initial Inspection Closed TRUE INS-0009787-19 Status Accepted as Noted Type Building Subtype Special Insp. Requested Date Scheduled Start Date 2/7/2020 Completed Date 2/7/2020 Owner Last Name Feder OOO thru 1/27 Permit Inspection Round Initial Inspection Closed TRUE INS-0009798-19 Status Accepted as Noted Type Building Subtype Special Building Inspection Requested Date 6/30/2021 1:23 PM Scheduled Start Date 6/30/2021 Completed Date 6/30/2021 Owner Last Name Feder OOO thru 1/27 Permit Inspection Round Initial Inspection Closed TRUE INS-0009800-19 Status Pass/Accepted Type APECC Subtype Insulation Requested Date 6/24/2022 9:30 AM Scheduled Start Date 6/24/2022 Completed Date 6/24/2022 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE INS-0009803-19 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 7/27 Status Pass/Accepted Type Fire Subtype Requested Date Scheduled Start Date Completed Date 12/19/2023 Owner Last Name Smith Permit Inspection Round Final Inspection Closed TRUE INS-0013291-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 2/13/2024 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0004819-21 Status Accepted as Noted Type Water Efficient Landscaping Subtype Requested Date Scheduled Start Date Completed Date 2/16/2024 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0004823-21 Status Pass/Accepted Type Parks Subtype Requested Date Scheduled Start Date Completed Date 2/16/2024 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0004824-21 Status Pass/Accepted Type Engineering Water Subtype Requested Date Scheduled Start Date Completed Date 2/16/2024 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 8/27 INS-0004826-21 Status Pass/Accepted Type Utilities Subtype Requested Date Scheduled Start Date Completed Date 2/15/2024 Owner Last Name Gregor Permit Inspection Round Final Inspection Closed TRUE INS-0004829-21 Status Pass/Accepted Type Fire Subtype Requested Date Scheduled Start Date Completed Date 12/19/2023 Owner Last Name Smith Permit Inspection Round Final Inspection Closed TRUE INS-0001867-22 Status Partial/Non-Complete Type Building Subtype Rough Framing Requested Date 5/2/2022 10:00 AM Scheduled Start Date 5/2/2022 Completed Date 5/2/2022 Owner Last Name Cline Permit Inspection Round Initial Inspection Closed TRUE INS-0001972-22 Status Pass/Accepted Type Building Subtype Special Building Inspection Requested Date 5/5/2022 10:00 AM Scheduled Start Date 5/5/2022 Completed Date 5/5/2022 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE MEP Permit Inspections INS-0009398-19 Status Partial/Non-Complete Type Building Subtype Drywall Permit 0007.2018.ARBK Requested Date 6/29/2022 9:30 AM Scheduled Start Date 6/29/2022 Completed Date 6/29/2022 Owner Alias RBenn 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 9/27 Closed TRUE INS-0009402-19 Status Partial/Non-Complete Type Building Subtype Rough Framing Permit 0007.2018.ARBK Requested Date 5/2/2022 10:30 AM Scheduled Start Date 5/2/2022 Completed Date 5/2/2022 Owner Alias BClin Closed TRUE INS-0009404-19 Status Pass/Accepted Type Building Subtype Final Building Permit 0007.2018.ARBK Requested Date 2/13/2024 7:00 AM Scheduled Start Date 2/13/2024 Completed Date 2/16/2024 Owner Alias JNye Closed TRUE INS-0009406-19 Status Accepted as Noted Type Building Subtype Special Insp. Permit 0007.2018.ARBK Requested Date Scheduled Start Date 2/7/2020 Completed Date 2/7/2020 Owner Alias steve f Closed TRUE INS-0009417-19 Status Accepted as Noted Type Building Subtype Special Building Inspection Permit 0007.2018.ARBK Requested Date 3/28/2022 1:00 PM Scheduled Start Date 3/28/2022 Completed Date 3/28/2022 Owner Alias steve f Closed TRUE INS-0009419-19 Status Pass/Accepted Type APECC Subtype Insulation Permit 0007.2018.ARBK Requested Date 9/6/2022 8:00 AM Scheduled Start Date 9/6/2022 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 10/27 Completed Date 9/6/2022 Owner Alias RBenn Closed TRUE INS-0009848-19 Status Pending Type Mechanical Subtype Mechanical Ventilation Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009849-19 Status Pending Type Mechanical Subtype Mechanical Kitchen Hood Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009850-19 Status Pending Type Mechanical Subtype Mechanical Gas Pipe Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009851-19 Status Pending Type Mechanical Subtype Mechanical Gas log Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009852-19 Status Pending Type Mechanical Subtype Rough Mechanical Permit 0125.2019.AMEC 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 11/27 Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009853-19 Status Pending Type Mechanical Subtype Mechanical Flues Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009854-19 Status Pending Type Mechanical Subtype Final Mechanical Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009855-19 Status Pending Type Mechanical Subtype Mechanical Gas Tag Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009856-19 Status Pending Type Mechanical Subtype Mechanical Combustion Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009857-19 Status Pending Type Mechanical 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 12/27 Subtype In-Floor Heat Permit 0125.2019.AMEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0009863-19 Status Partial/Non-Complete Type Mechanical Subtype Mechanical Flues Permit 0150.2019.AMEC Requested Date 8/27/2020 11:00 AM Scheduled Start Date 8/27/2020 Completed Date 8/27/2020 Owner Alias MMill Closed TRUE INS-0009867-19 Status Partial/Non-Complete Type Mechanical Subtype In-Floor Heat Permit 0150.2019.AMEC Requested Date 8/4/2020 5:47 PM Scheduled Start Date 8/4/2020 Completed Date 8/5/2020 Owner Alias TParr Closed TRUE INS-0009869-19 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Water Pipe Permit 0090.2019.ASPL Requested Date 8/27/2020 11:00 AM Scheduled Start Date 8/27/2020 Completed Date 8/27/2020 Owner Alias MMill Closed TRUE INS-0009871-19 Status Accepted as Noted Type Plumbing Subtype Plumbing Waste & Vent Permit 0090.2019.ASPL Requested Date 8/17/2022 3:29 PM Scheduled Start Date 8/17/2022 Completed Date 8/17/2022 Owner Alias steve f Closed TRUE INS-0009872-19 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 13/27 Status Accepted as Noted Type Plumbing Subtype Plumbing Gas Pipe Permit 0090.2019.ASPL Requested Date 8/17/2022 3:39 PM Scheduled Start Date 8/17/2022 Completed Date 8/17/2022 Owner Alias steve f Closed TRUE INS-0009875-19 Status Accepted as Noted Type Plumbing Subtype Final Plumbing Permit 0090.2019.ASPL Requested Date 12/28/2023 12:00 PM Scheduled Start Date 12/28/2023 Completed Date 12/28/2023 Owner Alias steve f Closed TRUE INS-0009876-19 Status Partial/Non-Complete Type Plumbing Subtype Plumbing Underground Permit 0090.2019.ASPL Requested Date 4/19/2021 6:52 AM Scheduled Start Date 4/19/2021 Completed Date 4/19/2021 Owner Alias steve f Closed TRUE INS-0010532-19 Status Pending Type Electric Subtype Rough Electrical Permit 0164-2019-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0010537-19 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0164-2019-ELEC Requested Date 2/15/2024 3:21 PM Scheduled Start Date 2/15/2024 Completed Date 2/15/2024 Owner Alias JNye Closed TRUE 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 14/27 INS-0001353-20 Status Accepted as Noted Type Mechanical Subtype Rough Mechanical Permit 0022-2020-MECH Requested Date 8/17/2022 9:00 AM Scheduled Start Date 8/17/2022 Completed Date 8/17/2022 Owner Alias steve f Closed TRUE INS-0001355-20 Status Partial/Non-Complete Type Mechanical Subtype Final Mechanical Permit 0022-2020-MECH Requested Date 1/9/2024 11:00 AM Scheduled Start Date 1/9/2024 Completed Date 1/9/2024 Owner Alias RBenn Closed TRUE INS-0007096-20 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0056-2020-ELEC Requested Date 7/15/2022 9:30 AM Scheduled Start Date 7/15/2022 Completed Date 7/15/2022 Owner Alias RBenn Closed TRUE INS-0007098-20 Status Accepted as Noted Type Electric Subtype Permanent Service Permit 0056-2020-ELEC Requested Date 11/20/2023 10:00 AM Scheduled Start Date 11/20/2023 Completed Date 11/20/2023 Owner Alias RBenn Closed TRUE INS-0007101-20 Status Failed/Rejected Type Electric Subtype Final Electrical Permit 0056-2020-ELEC Requested Date 1/9/2024 1:00 PM Scheduled Start Date 1/9/2024 Completed Date 1/9/2024 Owner Alias JNye 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 15/27 Closed TRUE INS-0010997-20 Status Accepted as Noted Type Mechanical Subtype Final Mechanical Permit 0150.2019.AMEC Requested Date 10/20/2023 11:15 AM Scheduled Start Date 12/28/2023 Completed Date 12/29/2023 Owner Alias steve f Closed TRUE INS-0011015-20 Status Partial/Non-Complete Type Mechanical Subtype In-Floor Heat Permit 0150.2019.AMEC Requested Date 12/7/2020 5:34 PM Scheduled Start Date 12/8/2020 Completed Date 12/8/2020 Owner Alias MMill Closed TRUE INS-0012080-20 Status Re-Inspection Required Type Mechanical Subtype Mechanical Flues Permit 0150.2019.AMEC Requested Date 8/17/2022 3:16 PM Scheduled Start Date 8/17/2022 Completed Date 8/17/2022 Owner Alias steve f Closed TRUE INS-0017099-20 Status Partial/Non-Complete Type Mechanical Subtype In-Floor Heat Permit 0150.2019.AMEC Requested Date 10/5/2021 9:45 AM Scheduled Start Date 10/5/2021 Completed Date 10/5/2021 Owner Alias steve f Closed TRUE INS-0006637-21 Status Partial/Non-Complete Type Mechanical Subtype In-Floor Heat Permit 0150.2019.AMEC Requested Date 2/1/2022 9:00 AM Scheduled Start Date 2/1/2022 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 16/27 Completed Date 2/1/2022 Owner Alias steve f Closed TRUE INS-0001810-22 Status Partial/Non-Complete Type Building Subtype Special Building Inspection Permit 0007.2018.ARBK Requested Date 4/28/2022 8:30 AM Scheduled Start Date 4/28/2022 Completed Date 4/28/2022 Owner Alias steve f Closed TRUE INS-0003284-22 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0056-2020-ELEC Requested Date 10/17/2022 1:24 PM Scheduled Start Date 10/17/2022 Completed Date 10/17/2022 Owner Alias BClin Closed TRUE INS-0000754-23 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0048-2022-ELEC Requested Date 2/24/2023 12:50 PM Scheduled Start Date 2/24/2023 Completed Date 2/24/2023 Owner Alias JNye Closed TRUE INS-0004655-22 Status Partial/Non-Complete Type Electric Subtype Rough Electrical Permit 0048-2022-ELEC Requested Date 10/12/2022 8:56 AM Scheduled Start Date 10/12/2022 Completed Date 10/12/2022 Owner Alias RBenn Closed TRUE INS-0004718-22 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0048-2022-ELEC 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 17/27 Requested Date 11/29/2022 12:00 PM Scheduled Start Date 11/29/2022 Completed Date 11/29/2022 Owner Alias RBenn Closed TRUE INS-0004800-22 Status Pending Type Electric Subtype Rough Electrical Permit 0056-2020-ELEC Requested Date Scheduled Start Date Completed Date Owner Alias MEPs - Inspection Closed FALSE INS-0003376-23 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0022-2021-ELEC Requested Date 7/6/2023 7:42 AM Scheduled Start Date 7/7/2023 Completed Date 7/7/2023 Owner Alias JNye Closed TRUE INS-0004320-23 Status Partial/Non-Complete Type Building Subtype Drywall Permit 0007.2018.ARBK Requested Date 8/30/2023 8:20 AM Scheduled Start Date 8/30/2023 Completed Date 8/30/2023 Owner Alias JNye Closed TRUE INS-0004332-23 Status Partial/Non-Complete Type APECC Subtype Snowmelt Permit 0150.2019.AMEC Requested Date 8/30/2023 8:30 AM Scheduled Start Date 8/30/2023 Completed Date 8/30/2023 Owner Alias JNye Closed TRUE INS-0003921-22 Status Pass/Accepted Type Electric 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 18/27 Subtype Rough Electrical Permit 0048-2022-ELEC Requested Date 8/30/2022 9:30 AM Scheduled Start Date 8/30/2022 Completed Date 8/30/2022 Owner Alias BClin Closed TRUE INS-0005830-22 Status Partial/Non-Complete Type APECC Subtype Insulation Permit 0007.2018.ARBK Requested Date 12/8/2022 9:00 AM Scheduled Start Date 12/8/2022 Completed Date 12/8/2022 Owner Alias RBenn Closed TRUE INS-0005889-22 Status Partial/Non-Complete Type APECC Subtype Insulation Permit 0007.2018.ARBK Requested Date 12/13/2022 8:56 AM Scheduled Start Date 12/13/2022 Completed Date 12/13/2022 Owner Alias steve f Closed TRUE INS-0000682-23 Status Accepted as Noted Type Electric Subtype Rough Electrical Permit 0048-2022-ELEC Requested Date 2/20/2023 1:35 PM Scheduled Start Date 2/21/2023 Completed Date 2/21/2023 Owner Alias JNye Closed TRUE INS-0006135-23 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0022-2021-ELEC Requested Date 12/29/2023 11:00 AM Scheduled Start Date 12/29/2023 Completed Date 12/29/2023 Owner Alias RBenn Closed TRUE INS-0006274-23 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 19/27 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0048-2022-ELEC Requested Date 1/17/2024 10:04 AM Scheduled Start Date 1/17/2024 Completed Date 1/17/2024 Owner Alias JNye Closed TRUE INS-0000141-24 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0056-2020-ELEC Requested Date 1/16/2024 1:00 PM Scheduled Start Date 1/16/2024 Completed Date 1/16/2024 Owner Alias JNye Closed TRUE INS-0000147-24 Status Pass/Accepted Type Mechanical Subtype Final Mechanical Permit 0022-2020-MECH Requested Date 2/12/2024 9:00 AM Scheduled Start Date 2/12/2024 Completed Date 2/12/2024 Owner Alias RBenn Closed TRUE INS-0000706-24 Status Pass/Accepted Type Mechanical Subtype Final Mechanical Permit 0022-2020-MECH Requested Date 2/16/2024 11:51 AM Scheduled Start Date 2/16/2024 Completed Date 2/16/2024 Owner Alias JNye Closed TRUE INS-0001099-23 Status Pass/Accepted Type APECC Subtype Insulation Permit 0007.2018.ARBK Requested Date 2/27/2023 9:00 AM Scheduled Start Date 3/20/2023 Completed Date 3/20/2023 Owner Alias RBenn Closed TRUE 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 20/27 INS-0001883-23 Status Pass/Accepted Type Building Subtype Drywall Permit 0007.2018.ARBK Requested Date 5/4/2023 8:17 AM Scheduled Start Date 5/4/2023 Completed Date 5/4/2023 Owner Alias steve f Closed TRUE INS-0001955-23 Status Pass/Accepted Type Building Subtype Drywall Permit 0007.2018.ARBK Requested Date 5/8/2023 10:02 AM Scheduled Start Date 5/9/2023 Completed Date 5/9/2023 Owner Alias steve f Closed TRUE INS-0002149-23 Status Partial/Non-Complete Type Building Subtype Rough Framing Permit 0007.2018.ARBK Requested Date 5/16/2023 7:05 AM Scheduled Start Date 5/16/2023 Completed Date 5/16/2023 Owner Alias RBenn Closed TRUE INS-0002299-23 Status Pass/Accepted Type Building Subtype Drywall Permit 0007.2018.ARBK Requested Date 5/24/2023 7:09 AM Scheduled Start Date 5/23/2023 Completed Date 5/23/2023 Owner Alias JNye Closed TRUE INS-0002413-23 Status Pass/Accepted Type Building Subtype Drywall Permit 0007.2018.ARBK Requested Date 5/31/2023 9:00 AM Scheduled Start Date 5/31/2023 Completed Date 5/31/2023 Owner Alias JNye 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 21/27 Closed TRUE INS-0003008-23 Status Accepted as Noted Type Building Subtype Rough Framing Permit 0007.2018.ARBK Requested Date 6/21/2023 9:54 AM Scheduled Start Date 6/21/2023 Completed Date 6/21/2023 Owner Alias RBenn Closed TRUE Milestones Review Round 1 - 0320.2017.ARBK Status Approved Due Date Created Date 12/15/2019 Permit History 1/1/2025 2:57 PM User Fernando Cruz Action Changed Owner from Sydney Fallon to Fernando Cruz. 12/9/2024 9:50 AM User Renee Espinoza Action Changed Status from Ready for Closure to Closed - Final. 12/4/2024 4:05 PM User Fernando Cruz Action Changed Owner from Fernando Cruz to Sydney Fallon. 12/4/2024 4:05 PM User Fernando Cruz Action Changed Status from Closed - Final to Ready for Closure. 12/1/2024 3:28 PM User Fernando Cruz Action Changed Owner from Sydney Fallon to Fernando Cruz. 3/15/2024 3:37 PM User Emily Page Action Changed Status from Ready for Closure to Closed - Final. 3/15/2024 3:21 PM User Emily Page Action Changed Status from Issued to Ready for Closure. 1/30/2024 6:00 PM User Sydney Fallon Action Changed Status from Expired to Issued. Related Permits 0007.2018.ARBK 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 22/27 Type Building Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant STEVE WALDECK Issue Date 1/2/2019 Last Activity Date 2/16/2024 0001.2019.AELE Type Electrical Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant KELLY CROWNHART Issue Date 2/4/2019 Last Activity Date 0125.2019.AMEC Type Mechanical Address 209 E BLEEKER ST Work Type New Status Cancelled Applicant EDWARD GUNTLE Issue Date Last Activity Date 12/15/2019 0150.2019.AMEC Type Mechanical Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant TANYA MOSER Issue Date 7/25/2019 Last Activity Date 12/29/2023 0075.2019.ASPL Type Plumbing Address 209 E BLEEKER ST Work Type New Status Cancelled Applicant EDWARD GUNTLE Issue Date Last Activity Date 0090.2019.ASPL Type Plumbing Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant TANYA MOSER Issue Date 7/25/2019 Last Activity Date 12/29/2023 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 23/27 0099-2019-ENTP Type Encroachment - Temporary Address 209 E BLEEKER ST Work Type New Status Issued Applicant MAIGIN STONE Issue Date 9/30/2019 Last Activity Date 0164-2019-ELEC Type Electrical Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant Lindsay Dudycha Issue Date 12/30/2019 Last Activity Date 2/15/2024 0022-2020-MECH Type Mechanical Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant EDDIE MURRAY Issue Date 1/28/2020 Last Activity Date 2/16/2024 0033-2020-FIRE Type Fire Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant TRAVIS FISCUS Issue Date 6/5/2020 Last Activity Date 0056-2020-ELEC Type Electrical Address 209 E BLEEKER ST Unit A Work Type New Status Closed - Final Applicant KELLY CROWNHART Issue Date 5/18/2020 Last Activity Date 1/16/2024 0061-2020-BCHO Type Change Order Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant MELANIE NOONAN Issue Date 11/10/2020 Last Activity Date 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 24/27 0002-2021-BCHO Type Change Order Address 209 E BLEEKER ST Work Type New Status Expired Applicant MELANIE NOONAN Issue Date 9/2/2021 Last Activity Date 9/2/2021 0022-2021-ELEC Type Electrical Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant MATT HECK Issue Date 5/10/2021 Last Activity Date 12/29/2023 0002-2022-BCHO Type Change Order Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant MELANIE NOONAN Issue Date 4/18/2022 Last Activity Date 4/18/2022 0012-2022-UTWC Type Utility Water Connection Address 209 E BLEEKER ST Work Type New Status Issued Applicant MELANIE NOONAN Issue Date 3/18/2022 Last Activity Date 2/13/2024 0048-2022-ELEC Type Electrical Address 209 E BLEEKER ST Work Type New Status Closed - Final Applicant GLENN MURDZIA Issue Date 4/29/2022 Last Activity Date 1/18/2024 Reviews REV-010155 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Parks Due Date Completed Date 11/12/2018 6:47 AM Owner Alias BCarl On Hold 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 25/27 Created Date 12/15/2019 REV-010156 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Water Efficient Landscaping Due Date Completed Date 7/5/2018 6:48 AM Owner Alias rmagi On Hold Created Date 12/15/2019 REV-010157 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Sanitation Due Date Completed Date 11/7/2018 6:49 AM Owner Alias PMohr On Hold Created Date 12/15/2019 REV-010158 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type HPC Due Date Completed Date 11/30/2018 6:50 AM Owner Alias ASimo On Hold Created Date 12/15/2019 REV-010159 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Engineering Water Due Date Completed Date 11/30/2018 6:51 AM Owner Alias SWilson On Hold Created Date 12/15/2019 REV-010160 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Engineering CMP Due Date Completed Date 11/21/2018 6:52 AM Owner Alias Engineering CMP - Review On Hold Created Date 12/15/2019 REV-010161 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 26/27 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Engineering Dev Due Date Completed Date 11/22/2018 6:54 AM Owner Alias PMurr On Hold Created Date 12/15/2019 REV-010162 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Engineering Erosion & Sediment Due Date Completed Date 1/9/2018 6:55 AM Owner Alias AReed On Hold Created Date 12/15/2019 REV-010163 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Fire Due Date Completed Date 11/19/2018 6:56 AM Owner Alias NThom On Hold Created Date 12/15/2019 REV-010164 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Zoning Due Date Completed Date 11/15/2018 6:58 AM Owner Alias JPome On Hold Created Date 12/15/2019 REV-010165 Milestone Review Round 1 - 0320.2017.ARBK Status Approved Type Building Due Date Completed Date 11/19/2018 6:57 AM Owner Alias NThom On Hold Created Date 12/15/2019 Copyright © 2000-2025 salesforce.com, inc. All rights reserved. 1/28/25, 5:24 PM 0320.2017.ARBK ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000kZrdtAAC/p 27/27