HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0320.2017 (98).ARBK0320-2017-ARBK_BuildingComments_3
Page: A6.2 DETAILS
File Name: ArchPlanSet.209EBleeker.2018.09.pdf
Subject: PlanCheck
Author: nickt
Color:
Provide fire caulk where fire
rated membrane (gyp board)
terminates at concrete/
ArchPlanSet.209EBleeker.2018.09.pdf (1)
Page: 1
File Name: RESCheck.209EBleeker.2018.09.pdf
Subject: PlanCheck
Author: nickt
Color:
Revise Rescheck R values to
match your details on the plans.
Wall assemblies on plans are
calling for R38.5 and R25 cavity
insulation. 10/A5.2 calls for R-60
cavity insulation in the overhang
floor.
RESCheck.209EBleeker.2018.09.pdf (1)
Page: 2
File Name: R-REMP.209EBleeker.2018.09.pdf
Subject: PlanCheck
Author: nickt
Color:
You have entered all of your
panels together in the same
group. You have panels facing
south, east, and west (0, 45, 45
from south); and at 6:12 or
12:12. Revise REMPworksheet
to match your roof plan. For the
DC side capacity, mulitply the
number of panels in a group by
the panel rating (335w). For
Inverter capacity, multiply the
number of panels in a group by
the inverter rating (320w).
R-REMP.209EBleeker.2018.09.pdf (1)
6
A6.2
FIRE SEPERATION DETAIL
1-1/2" = 1'-0"
Provide fire caulk
where fire rated
membrane (gyp board)
terminates at concrete/
Conditioned Floor Area:7,594 ft2
Glazing Area 14%
Climate Zone:7 (9922 HDD)
Permit Date:
Construction Site:
209 E. Bleeker St.Aspen, CO 81611
Owner/Agent:
Cathedral Cutthroat LLC5601 High Dr.
Mission Hills, KS 66208
Designer/Contractor:
Arliss MerrellResource Engineering Group
502 Whiterock Ave.
Crested Butte, CO 81224merrell@reginc.com
Permit Number:
Compliance: Passes using UA trade-off
4.1% Better Than Code Maximum UA:1187 Your UA:1138
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Compliance:
Envelope Assemblies
Assembly Gross AreaorPerimeter
CavityR-Value Cont.R-Value U-Factor UA
Ceiling: Other 4,448 0.017 75
Wall-North: Wood Frame, 16" o.c.2,146 35.7 0.0 0.045 76
Window-North: Wood Frame 466 0.350 163
Wall-East: Wood Frame, 16" o.c.2,573 35.7 0.0 0.045 101
Window-East: Wood Frame 320 0.350 112
Wall-South: Wood Frame, 16" o.c.2,113 35.7 0.0 0.045 78
Window-South: Wood Frame 376 0.350 131
Wall-West: Wood Frame, 16" o.c.2,516 35.7 0.0 0.045 107
Window-West: Wood Frame 145 0.350 51
Wall-North Cabin: Wood Frame, 16" o.c.287 22.7 0.0 0.055 12
Window-North Cabin: Wood Frame 62 0.350 22
Wall-East Cabin: Wood Frame, 16" o.c.349 22.7 0.0 0.055 15
Window-East Cabin: Wood Frame 68 0.350 24
Wall-South Cabin: Wood Frame, 16" o.c.273 22.7 0.0 0.055 12
Window-South Cabin: Wood Frame 59 0.350 21
Wall-West Cabin: Wood Frame, 16" o.c.390 22.7 0.0 0.055 20
Project Title: 209 E Bleeker
Data filename:Page 1 of10
09/24/18Report date:
Revise Rescheck R
values to match your
details on the plans.
Wall assemblies on
plans are calling for
R38.5 and R25
cavity insulation.
10/A5.2 calls for
R-60 cavity
insulation in the
overhang floor.
Parcel ID #:
Collector
Aspect,
Degress from
True South
Collector Tilt,
Degrees From
Horizontal
Solar
Orientation
Adjustment
Factor
DC side capacity
(kW)
Inverter capacity
(kW)
kW for
credit
kW Mitigation
Credit
Collector Group 1 60 45 89.60%6.03 6.03 6.03 5.40 kWCollector Group 2 0 0 87.00%0 0 0 0.00 kWCollector Group 3 0 0 87.00%0 0 0 0.00 kWCollector Group 4 87.00%0 0.00 kWCollector Group 5 87.00%0 0.00 kWCollector Group 6 87.00%0 0.00 kWCollector Group 7 87.00%0 0.00 kWCollector Group 8 87.00%0 0.00 kWCollector Group 9 87.00%0 0.00 kWCollector Group 10 87.00%0 0.00 kWCollector Group 11 87.00%0 0.00 kWCollector Group 12 87.00%0 0.00 kWCollector Group 13 87.00%0 0.00 kWCollector Group 14 87.00%0 0.00 kWCollector Group 15 87.00%0 0.00 kWCollector Group 16 87.00%0 0.00 kWCollector Group 17 87.00%0 0.00 kWCollector Group 18 87.00%0 0.00 kWCollector Group 19 87.00%0 0.00 kWCollector Group 20 87.00%0 0.00 kW
Total:5.40 kW
$ Mitigation Credit:37,092.50$
Instructions:
1)
2)
3)DC side capacity is the total labled panel output kW in a group.
4)Inverter capacity is the recommended input power in kW of your inverter(s).
5)
6)
7)
8)
PV WORKSHEET
City of Aspen Version 11.1 Updated March 28 2017
Permit Number: 0320-2017-ARBK2737 073 20 002
Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically
calculated.
PROJECT ADDRESS:
The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and
CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP fee.
Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels) with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, you
might have just one group.
209 E. Bleeker Street
The kW mitigation credit is totalled and multiplied by $6865.32/kW to get the $ Mitigation Credit
You will be given credit for the lesser of the labeled panel output or the inverter.
The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
You have entered all of your panels
together in the same group. You have
panels facing south, east, and west (0,
45, 45 from south); and at 6:12 or 12:12.
Revise REMPworksheet to match your
roof plan. For the DC side capacity,
mulitply the number of panels in a group
by the panel rating (335w). For Inverter
capacity, multiply the number of panels
in a group by the inverter rating (320w).
Note added to
detail 9/A6.2
Roof plan (A2.4) revised
to only show required
solar panels per REMP
worksheet
See revised
assemblies on
sheets A5.1 & A5.2
11/15/2018