Loading...
HomeMy WebLinkAboutFile Documents.210 W Main St.0064-2020-BCHO (7) KIM RAYMOND ARCHITECTS + INTERIORS King Louise – Employee Housing Project 210 E. Main St. Aspen, CO 81611 CHANGE ORDER 1 – 08/28/20 ITEMS: 1. Unit 102: Reconfiguration of Powder Room Sheet A.2.06: Powder Room layout. 2. Unit 203 New Windows: Sheet A.3.04: South Elevation Upper Windows: New windows: 203-01B, 203-02B, 203-03B, 203- 04B, 203-05B, 209-9B. - HPC Approval: email dated May 20th 2020 (Attached) Sheet A.3.04: Elevation South and West 3. South Main Entrance Overhang Sheets: A.2.07, A.2.09, A.3.03, A.3.04, A.4.03, A.4.04. - HPC Approval: email dated July 10th, 2020 (Attached) 4. Stairs Detail Sheets: A.2.06, A.2.07, A.3.03. 5. Wall Sconces at Second and Third Floor entry doors Sheets: A.8.03, A.8.04, A.6.09 (specification) 6. Drop Ceilings in closets Sheets: A.8.03, A.8.04. 7. Fire Windows: Sheets: - A2.06: Windows 101-06 - A.2.07: Windows 201-12 and 202-12 - A.2.08: Windows 301-12 and 302-12 - A.3.05: 101-06, 201-12, 202-12, 301-12 and 302-12. 8. Updated Structural Plans (Attached) 09/09/2020