HomeMy WebLinkAboutFile Documents.210 W Main St.0064-2020-BCHO (7) KIM RAYMOND ARCHITECTS + INTERIORS
King Louise – Employee Housing Project
210 E. Main St. Aspen, CO 81611
CHANGE ORDER 1 – 08/28/20
ITEMS:
1. Unit 102: Reconfiguration of Powder Room
Sheet A.2.06: Powder Room layout.
2. Unit 203 New Windows:
Sheet A.3.04: South Elevation Upper Windows: New windows: 203-01B, 203-02B, 203-03B, 203-
04B, 203-05B, 209-9B.
- HPC Approval: email dated May 20th 2020 (Attached)
Sheet A.3.04: Elevation South and West
3. South Main Entrance Overhang
Sheets: A.2.07, A.2.09, A.3.03, A.3.04, A.4.03, A.4.04.
- HPC Approval: email dated July 10th, 2020 (Attached)
4. Stairs Detail
Sheets: A.2.06, A.2.07, A.3.03.
5. Wall Sconces at Second and Third Floor entry doors
Sheets: A.8.03, A.8.04, A.6.09 (specification)
6. Drop Ceilings in closets
Sheets: A.8.03, A.8.04.
7. Fire Windows:
Sheets: - A2.06: Windows 101-06
- A.2.07: Windows 201-12 and 202-12
- A.2.08: Windows 301-12 and 302-12
- A.3.05: 101-06, 201-12, 202-12, 301-12 and 302-12.
8. Updated Structural Plans (Attached)
09/09/2020