HomeMy WebLinkAboutFile Documents.134 Maple Ln.0138.2019 (21).ARBK0138-2019-ARBK_134 Maple Ln_BuildingComment1
Subject: PlanCheck
Page Label: 9
Author: justinh
File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf
Color:
Skylights on roofs with a pitch
flatter than 3:12 require a 4" curb
per IRC 308.6.8, please note this
requirement with your other
skylight notes.
134 MAPLE_BLDG PERMIT DRAWINGS.pdf (4)
Subject: PlanCheck
Page Label: 9
Author: justinh
File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf
Color:
This pitch is shown in the wrong
direction, please revise.
Subject: PlanCheck
Page Label: 12
Author: justinh
File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf
Color:
I believe you mean to be
specifying DensDeck rather than
DensGlass. Provide
documentation that this is a
class A roof assembly (ESR
report, UL listing, etc.) and
revise if needed.
Subject: PlanCheck
Page Label: 12
Author: justinh
File Name: 134 MAPLE_BLDG PERMIT DRAWINGS.pdf
Color:
The max U value of .28 also
applies to all new exterior doors
(including the new garage door),
please revise this note to be for
both windows and doors.
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: 134Maple_AsbestosReport.pdf
Color:
Please provide the actual full
inspection report from Ecos for
this asbestos test. This lab test
report does not describe where
the test samples were taken or
even provide the address that
the samples were taken from.
134Maple_AsbestosReport.pdf (1)
2x
2
-
9
55 sq ft
1
2
1a
3
12'12'
1'-4 Min.
17'-4"6'-8"
"
7
3
/
4
"
2024
212322
2 3 4
D
C
NEW Membrane roof
3:12
Deciduous Canopy
1:12
Upper wall windows
Velux 2222 VCM U= .55 Max. (nice catch John ;-)
Laminated glazing w/ min. .015" butyral inner layer
eq
'
d
ra
i
n
s
t
o
y
a
r
d
,
fl
o
w
t
o
b
i
o
-
r
e
t
e
n
t
i
o
n
d
i
t
c
h
MP Boat
Roof slopes to west
Roof slopes to west
NEW ROOF FRAMING
NG
EXISTING LVL FRAMED ROOF TO REMAIN
ACEMENT
GARAGE
DEMO ROOF
RE
Skylights on roofs with
a pitch flatter than
3:12 require a 4" curb
per IRC 308.6.8,
please note this
requirement with your
other skylight notes.
1
1a
22
'
1
2'5'-5 3/4"
2'7'-10 3/4"
2'-5 1/5'-6"
5'-9 1/4"
2'
1'-1 1/4"
60°
96°
66°
D
1
+ gutter/downspout
to remain with increased
s.
, now with roof pitch change and additions
= 1,779sf (88.9% of Total Drainage)
D
r
a
i
n
a
g
e
RO
O
F
P
I
T
C
H
S
Q
U
A
R
E
TO
6
0
°
S
P
R
I
N
G
P
O
I
N
T
3.75
:
1
2
OVER FRA
a = 311.1 sf and much of the increase in the
he roof pitches to better manage runoff.
N
FR
VA
L
L
E
Y
@ F.O.Stud
(SE
T
R
A
F
T
E
R
S
@
9
6
.
1
8
°
OFF
V
A
L
L
E
Y
A
N
G
L
E
)
This pitch is shown in
the wrong direction,
please revise.
6"
1
T.O. OLD SLAB96'-9 1/2"
New 4" Slab over Radon/Moisture barrierover 2" rigid insulation @ Garage Extensio(provide hydronic heat tubes for future he
GARAGE
3:12 PITCHPER PLAN
1
TYPICAL BUILDING SYSTEMS
Roof:GenFlex TPO membrane roof over DensGlas over Ice + water system @ low sloped areasover 5/8" CDX Plywood over 9 ½” LVLs per struct dwgs.Provide 7 1/2" blown rigid foam (R-49 min.) in all ceiling cavities and at wall to ceiling perimeter
Ceiling:⅝” Type X drywall, textured, primed and painted with 2 coats or ¾” T+G Pine
Fascia:Metal drip edge to match roof or eq.
Soffit:1x6 T+G Spruce/Pine.
Exterior Framed Walls:2x6 OR 2x4 studs w/ 1 1/2” ZIP Sheathing or eq. ,Hybrid Wall Insulation (2"Rigid + 3 1/2" Batt)Exterior F. O. stud = Ext. F.O. concrete Fnd typical (obviously, not at cantilevered areas)Exterior Siding: RS Spruce Pine or Salvage metal, or corrugated Galvanized Metalover 1/4" furring over building wrap.Field verify details w/ Arch.
Exterior Flashing:Flashing details as req’d for proper performance. Match roofing or be compatible. Verify w/ samples andpricing
Interior Walls:Typical interior walls to be sheathed w/ 5/8" drywall , textured, primed and painted with 2 coats or ¾”TNG Pine.Baseboard to be 1x4 finished wood.
Windows and Doors:Overall U Value = R.35
Framed Floors:Floor framing to be 3/4" T+G Plywood or OSB over floor joists per struct.
ENERGY CODE COMPLIANCE
Prescriptive Approach USING THIS TABLE
Thermal Envelope Components.
ROOF:
R-49 rigid spray foam 7.25" Min. depth
WALLS:
R-5 C.I. Ext. w/ R-15 rigid + R-13 Batt
R-15 Warm'nDry ext. C.I. Basement + Garage Fnd.
Max. U=.28 Windows
FLOORS:R-38 Batt over Exterior SpaceR-19 Batt min between conditioned spacesR-10 Rigid below Basement + Garage slab
I believe you mean to
be specifying
DensDeck rather than
DensGlass. Provide
documentation that
this is a class A roof
assembly (ESR report,
UL listing, etc.) and
revise if needed.
6"
T.O. OLD SLAB96'-9 1/2"
New 4" Slab over Radon/Moisture barrier
over 2" rigid insulation @ Garage Extension(provide hydronic heat tubes for future heat syste
GARAGE
3:12
SCALE: 1/4" = 1'-0"
1 1
A7
ver Ice + water system @ low sloped areas
ruct dwgs.ll ceiling cavities and at wall to ceiling perimeter
d with 2 coats or ¾” T+G Pine
q. ,Hybrid Wall Insulation (2"Rigid + 3 1/2" Batt)
al (obviously, not at cantilevered areas), or corrugated Galvanized Metal
. Match roofing or be compatible. Verify w/ samples and
wall , textured, primed and painted with 2 coats or ¾”
over floor joists per struct.
eq. (R-15 continuous min) fnd waterproof system.above grade, install aluminum wrapped rigid panels R-21
ver 2” Rigid Insl. (R-10 min) over compacted gravel
Thermal Envelope Components.
ROOF:
R-49 rigid spray foam 7.25" Min. depth
WALLS:
R-5 C.I. Ext. w/ R-15 rigid + R-13 Batt
R-15 Warm'nDry ext. C.I. Basement + Garage Fnd.
Max.U=.28 Windows
FLOORS:
R-38 Batt over Exterior Space
R-19 Batt min between conditioned spaces
R-10 Rigid below Basement + Garage slab
The max U value of
.28 also applies to all
new exterior doors
(including the new
garage door), please
revise this note to be
for both windows and
doors.
780 Simms Street
Suite 104Golden, CO, 80401303.232.3746 Certificate of Analysis www.aerobiology.net
Client Name ECOS Date Collected:Street address 6690 HWY 82 Date Received:11/13/15City, State ZIP Glenwood Springs, CO 81601 Date Analyzed:11/13/15
Attn: Mercedes Fradl 200860-0 Date Reported:11/16/15
Client Project Name: Beyer Project ID:15029641
Job ID:
Test Requested:3002, Asbestos in Bulk Samples
Method:Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993.
Non-Asbestos Non-Fibrous MatrixFiberMaterialMaterialClientPercentagePercentageComposition
P = PerliteB = BinderD=Diatoms
NTR = Non-Asbestiform TRNAC = Non-Asbestiform AC
780 Simms Street, Suite 104, Golden, CO, 80401, 303.232.3746
134 A1
134 A2
134 A3
N
N
2%
94%
2%
N
N
Trace=Less Than 1%
N
N
94%
2%
2%
ND=None Detected
CHRY=Chrysotile M = MicaCR = Crocidolite T = TarTR = Tremolite
A = Amosite Q = QuartzAC = Actinolite C = CarbonatesAN = Anthophyllite G = Gypsum
G
ND 100 C
ND
99 1
15 85
C
ND
15 85 G
ND 100 C
ND
ND 100
ND 100 C
ND
100 C
99 1
ND 15 85 G
Asbestos Percentage
White Texture w/White Paint NDN5%
95%
Asbestos Detected
White/Tan Drywall
Laboratory Analyst Ron WeyandAsbestos Laboratory SupervisorCharles Brogan
White Joint Compound
White/Tan Drywall
White Tape
15029641-3D
15029641-3B
15029641-3C
White/Tan Drywall15029641-2D
White Texture w/White Paint15029641-3A
NVLAP Lab Code
15029641-2B
15029641-2C
2%
N 2%
15029641-2A
N
Lab Sample Number
N
White Tape
White Joint Compound
White Texture w/White Paint
Sample Identification Physical Description of Sample/Layer Homo-geneous
(Y/N)
Layer Percentage
15029641-1A
15029641-1B
Page 1 of 4
Note: All Areas of house to be demolished have NOT been altered
or changed since this original inspection
Please provide the
actual full inspection
report from Ecos for
this asbestos test.
This lab test report
does not describe
where the test
samples were taken or
even provide the
address that the
samples were taken
from.
* A note has been added to show skylight curbs.
*Arrow direction has been changed
*Good Catch. Documentation has been added to show class A roof assembly.
* Note has been changed on the plans.
* Please see new asbestos test from ECOS
Redline Answers to Comments
08/29/2019
Subject: PlanCheck
Page Label: 1
Author: justinh
File Name: 134Maple_StructuralDrawings.pdf
Color:
Please provide information
regarding how these columns
are to be attached to the
adjacent structure above and
footings below.
134Maple_StructuralDrawings.pdf (2)
Subject: PlanCheck
Page Label: 2
Author: justinh
File Name: 134Maple_StructuralDrawings.pdf
Color:
You list an option for steel
construction for this beam but no
detailing for that option is
provided nor is structrual steel
mentioned in any of your general
notes. Provide the associated
detailing and information for this
structural steel option (will most
likely also require a special
inspection agreement) or
remove this option from the plan.
7
/
8
"
10
'
-
5
7
/
8
"
T.O.W. = 96' - 6" T.O.SLAB
91' - 8"
EXISTING
UNDERPINNING
V.I.F.
4" CONCRETE SLAB W/
#4 @ 1' - 6" O.C. OVER
4" COMPACTED SOIL OR GRAVEL
PROVIDE CONTROL JOINT
@ 12' - 0" O.C. MAX.
T.O.W. = 94' - 8"
T.O.F. = 91' - 2"
3'-9 7/8"2'-4"1'-4 1/8"
90.0
90.00°84.89°
20
'
-
1
0
1
/
8
"
34
'
-
7
3
/
4
"
3'-0 1/4"13'-8"7'-4 1/4"4'-7 1/8"2'-2"
/
E
S6.1
2
S6.1
4
T.O.W. = 99' - 8"
B.O.W. = 95' - 6"
T.O.W. = 96' - 6"
3'-0"
4"8"2'-0"
3'
-
0
5
S6.1 5
S6.1 T.O.W. = 96' - 6"
7
S6.1
6
S6.1
SIM
Abv.AAbv.AAbv.B
Please provide
information regarding
how these columns
are to be attached to
the adjacent structure
above and footings
below.
2 3
B
C
D
@ 16" O.C.
2 x 6
@ 16" O.C.
ADD 2x6
@ 16" O.C.
3 - 2 x 82 - 9 1/2" LVL
EX
I
S
T
I
N
G
1
0
x
3
S
T
E
E
L
17
7
B
e
a
m
EX
I
S
T
I
N
G
1
0
x
3
S
T
E
E
L
EX
I
S
T
I
N
G
1
0
x
3
S
T
E
E
L
3 - 2 x 8
2 -
9
1
/
2
"
L
V
L
[9
9
'
1
"
]
05
9
B
e
a
m
HUC410 x SKR5
2 - 9 1/2" LVL
[99'1"]
060 Beam
2 -
9
1
/
2
"
L
V
L
[1
0
9
'
0
"
]
06
2
B
e
a
m
Opt: W4x13 or
3 - 9 1/2" LVL9.65.0
R4
W8
R6
W8
2 -
9
1
/
2
"
L
V
L
06
6
B
e
a
m
13
13
0.91.5
2-2x6
@ 16" O.C.
R2
W10
HUC410 x SKL5
2 - 9 1/2" LVL
2 - 9 1/2" LVL
073 Beam
07
4
B
e
a
m
T.O.PLY
100' - 0"
OPT 5 1/2" LVL
8
S6.1
You list an option for steel
construction for this beam but no
detailing for that option is provided nor
is structrual steel mentioned in any of
your general notes. Provide the
associated detailing and information
for this structural steel option (will
most likely also require a special
inspection agreement) or remove this
option from the plan.
* Attachment details have been added.
*Steel construction option has been removed from the plan.
08/29/2019