Loading...
HomeMy WebLinkAboutFile Documents.203 E Hallam St.0174.2018 (16).ARBK June 12, 2018 Seth Hmielowski Z-Group Architects, P.C. 411 East Main Street, Suite 205 Aspen, Colorado 81611 970.925.3383 RE: Roof Deck Addition Styslinger Remodel – 203 E Hallam, Aspen, Colorado 81611 Seth, As requested, we have reviewed the architectural drawing A3.1, received via email on June 11, 2018 for structural implications of the proposed roof deck on the existing roof at the above site. The roof deck is proposed to be 2x wood decking over 2x wood sleepers and is specified to cover a portion of the east end of the flat roof area in the middle of the home. The deck is intended to be placed approximately between grids 2 and 3 and grids B and C as noted on sheet A3.1 referenced above. The new roof deck is proposed to be accessed through a new roof hatch of approximately 3’ x 8’ in size and located to the north of grid 3 between grids A and B, in an existing closet behind the stairs. The new roof hatch is to be cut into the roof framing in the bay defined above and shall be framed out with (2) 14” (2.0E) LVLs typical at its edges. The new LVL beam on the east side of the opening shall bear on the wall to the north and hang off the existing beam at grid 3 in an HU412 Simspon hanger. Provide IUS hangers to support cut rafters at edge of new opening and HU412 hangers at new framing beam to beam connections. The contractor shall temporarily shore the roof framing during construction as needed. As outlined above, the existing roof structure of 14” TJI 360 @ 16”o.c., or equal, is sufficient to support the new roof deck. Should you have any further questions or require any additional information regarding this matter, please contact our office. Sincerely, Evolve Structural Design LLC Steven R. Edmiston, P.E., S.E. Senior Engineer 06/27/2018