HomeMy WebLinkAboutFile Documents.203 E Hallam St.0174.2018 (19).ARBK1      Drainage Report 203 EAST HALLAM ST. ASPEN, CO August 16, 2018 Prepared by Richard Goulding, P.E. Roaring Fork Engineering 592 Highway 133 Carbondale, CO 81623 1/7/2019 Reviewed by Engineering 02/12/2019 12:23:35 PM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. 2      Drainage Report 203 EAST HALLAM ST. ASPEN, CO I HEREBY AFFIRM THAT THIS REPORT FOR THE IMPROVEMENTS AT 203 E. HALLAM ST. WAS PREPARED BY ME FOR THE OWNERS THEREOF IN ACCORDANCE WITH THE PROVISIONS OF THE CITY OF ASPEN URBAN RUNOFF MANAGEMENT PLAN AND APPROVED VARIANCES AND EXCEPTIONS LISTED THERETO. I UNDERSTAND THAT IT IS THE POLICY OF THE CITY OF ASPEN THAT THE CITY OF ASPEN DOES NOT AND WILL NOT ASSUME LIABILITY FOR DRAINAGE FACILITIES DESIGNED BY OTHERS. RICHARD GOULDING, P.E. RFE Project # 2018-40 1/7/2019 3      Table of Contents 1.0 General .................................................................................................................................................... 4  1.1 Existing Site ......................................................................................................................................... 4  1.2 Proposed Conditions ........................................................................................................................... 4  2.0 Drainage Basins and Sub‐basins .............................................................................................................. 5  2.1 Drainage Basins and Storage ............................................................................................................... 5  3.0 Peak Flows ............................................................................................................................................... 6        1/7/2019 4      1.0 General 1.1 Existing Site The following report is an evaluation of the property at 203 E. Hallam St. This report highlights the  changes to the property since the date of the previously submitted drainage report of July 14, 2015.  Since this date, the property has changed ownership. This report discusses the changes to the  landscaped areas of the residence and the addition of a rooftop deck.  The property is located in Northern Aspen, or the “West End”, on the southeast corner of E. Hallam St.  and N. Aspen St. The parcel is a 6,000 square foot lot with an existing 3,291 square foot single family  residence. The property is accessed from the 20‐foot alley right of way on the south side of the  residence. The property is relatively flat, with a gentle slope to the northwest. A large impervious patio  is located on the northwest side of the residence. Electrical, phone, television cable, and gas are located  in the alleyway, while water and sewer are located in the E. Hallam St. right of way.  A Geotechnical Report was completed on January 8, 2015, by HP Geotech, which identified in soil  consisting of gravel and cobble. A percolation test was also conducted on January 6, 2015 with results  varying from 0.3 minute per inch (MPI) to a max percolation rate of 0.5 MPI. This maximum reading was  taken after 42 minutes.   1.2 Proposed Conditions The original project, completed in 2015, was classified as a ‘Major Project’ as per Table 1.1 of the City of  Aspen’s (COA) Urban Runoff Management Plan (URMP). This classification was the result of the  proposed development exceeding 1000 square feet (sf) and disturbing an area of approximately 5,000  sf, which is over 50% of the site. The current project consists of changes to the landscape plan and as  such is only classified as a Minor Project per comments provided via email from the City of Aspen on July  20, 2018. The intent of this report is to demonstrate compliance with the requirements of the URMP.  The Low Impact Design (LID) Principles in the introduction of the manual were used as a guide  throughout the design process.   The proposed development consists of changes to the patio areas on the southwest and eastern sides of  the property, and the addition of a rooftop deck. The existing patio/lawn area on the southwest side of  the residence will be demolished and a Dasso Deck will be installed. This area will include a firepit  surrounded by seating along with a platform for a landscape feature. Access panels to the existing  drywells have been incorporated into the design of this side of the residence. All existing trees will be  salvaged and replanted on the property. New concrete stepping stones will be installed to provide a  walkway from the south side of the property to the sidewalk on the western side.  On the eastern side of the property, the existing hardscape will be demolished and replaced. A new hot  tub, and raised planter boxes will also be installed. Also, on the east side of the residence, the existing  softscape will be removed and replaced with a dog run made of artificial turf. Documentation for the  dog run product (K9 Grass) can be found in the Landscape plans.  1/7/2019 5      Finally, a rooftop deck will be installed on the existing roof. The deck will be accessed through a staircase  and a hatch as shown on the Architectural drawings. The footprint of the deck is over existing structure  so the amount of impervious area is not increased. Other efforts have been made to break up  continuous impervious area by using spaced pavers for walkways the allow for infiltration between  them. The new decking and dog run turf is also pervious.  2.0 Drainage Basins and Sub‐basins   The site was divided into two major drainage basins. A Drainage Exhibit is provided within the Civil Permit  Set. The sub‐basins were created to calculate the concentrated flow from each impervious area, including  patios, decks and roofs. The impervious area of each basin was used to test the existing infrastructure for  capacity.   2.1 Drainage Basins and Storage Basin 1 is 3,829 square feet (sf), 100% impervious, and consists the entire roof area, the north and west  patios, and the western walkways. Runoff from this basin will be collected and conveyed to a drywell,  which has capacity for the Total Detention of this basin. The Total Detention is calculated below.     The drywell has adequate capacity. Calculations are shown below.    Basin 2 is 260 sf and is 100% impervious. It is located on the eastern side of the residence and consists of  the new hot tub, dog run and planters. A new trash enclosure is also proposed.  The runoff from Basin 2  is diverted north and into a level spreader. This level spreader is a nine‐foot‐long perforated 4” diameter  PVC pipe bedded in screened rock. This level spreader disperses runoff into the lawn and eventually into  the curb and gutter of East Hallam St. if the flows are to become large enough. The level spreader is  existing and was approved by the COA during the Certificate of Occupancy process of the previous  development of this property. The Water Quality Capture Volume (WQVC) calculation for this basin is  shown below.   Full Detention Storage Basin Total Area Impervious Area Impervious Full Detention Depth Factor of Safety Required Storage BMP (ft2)(ft2) (%) (in) F.O.S. (ft 3) 1 3829.00 3829.00 100.00% 1.23 1 392 Exiting Drywell Drywell Storage Drywell  Basins Diameter Storage Depth Perforated Depth Internal Volume External (18" of Screened Rock) Volume Total Capacity Required Capacity (Name) (#) D (ft) H (ft) P (ft) π*H*(D/2) 2) (ft3) 0.3*π*P*((D/2)+1.5) 2 ‐ (D/2)2) (ft3)(ft3)(ft3) Existing Drywell 1 6 10.7 4 303 113 416 392 1/7/2019 6        For the previous building permit this level spreader was said to handle a 981‐sf tributary basin that was  46.92% impervious. The level spreader was installed per the approved design with the perforated pipe  being backfilled with screened rock. The 41.9 cf screened rock bed is 9 feet long 16 inches wide and 3.5  feet deep. This surrounding screened rock provides 12.6 cubic feet of storage. There is also 10 feet from  the level spreader to the edge of the property.   3.0 Peak Flows The FAA Rational Method was used to calculate the peak flows for each basin for the 100‐year storm  event. The below equation was derived by the City of Aspen to estimate the Intensity for the Aspen  area.   I = 88.8P1/(10+Td )1.052  Td = Time of Concentration (minutes)  P1= 1‐hour Rainfall Depth (in)   I= Rainfall intensity (inches per hour)    Actual Td on the site is significantly less than 5 minutes and equations used to calculate rainfall intensity  are only valid for a Time of Concentration of greater than 5 minutes therefore, the smallest valid Time of  Concentration (5min.) value was used.  The 1‐hour Rainfall depth (P1) was determined from NOAA Atlas  14 Volume 8 as 1.23 inches for the 100‐year event.   The soil and surface type along with the square footage was then used to calculate the peak flow using  the following equation.     Qp= Peak Discharge (cfs)  C= Runoff Coefficient (Unitless)   I= Rainfall intensity (inches per hour)  A= Area (Acres)     Peak flow values were used to test the capacity of the proposed conveyance structures, such as inlets  and piping. The tables below contain the peak flows for developed and undeveloped conditions for a  100‐year storm.  WQCV WQCV Required Basin Total Area Impervious Area Impervious WQCV Tbl. Val. Volume BMP (ft2)(ft2) (%) (in) (ft 3) 2 260.00 260.00 100.00% 0.255 5.5 Existing Level Spreader 1/7/2019 7        The conveyance system’s capacity has not been reduced from the existing conditions previously  approved for the development. The total 100‐year peak flows of the site have not increased as a result  of these landscape and grading improvements.   100 Year Peak Discharge Developed Calculations  1 Hour(P 1)1.23 Return Period 100 Basin ID Total Area  Imp. Area  Impervious  C Value Time of C Intensity Q Max See(D1) (ft 2)(ft2)(%)From Table (Td) I=88.8P 1/(10+Td)1.052 (ft3/sec) 1 3829.00 3829.00 100.00% 0.950 5 6.33 0.528 2 260.00 260.00 100.00% 0.950 5 6.33 0.036 100 Year Peak Discharge Pre Development Calculations  1 Hour(P 1)1.23 Return Period 100 Basin ID Total Area  Imp. Area  Impervious  C Value Time of C Intensity Q Max See(D1) (ft 2)(ft2)(%)From Table (Td) I=88.8P 1/(10+Td)1.052 (ft3/sec) 1 3829.00 0.00 0.00% 0.350 5 6.33 0.195 2 260.00 0.00 0.00% 0.350 5 6.33 0.013 1/7/2019