Loading...
HomeMy WebLinkAboutFile Documents.233 W Hallam St.0077.2019 (9).ARBK 223 W. Hallam St.KIM RAYMOND ARCHITECTS+INTERIORS 223 W. Hallam St. April 11th, 2019 KIM RAYMOND ARCHITECTURE+INTERIORS No. 12. TO: City of Aspen Building Department SUBJECT: Change Order 2 - Master Bedroom Roof Pitch 2019-Change Order 2 Upper Level Master Bedroom: roof pitch over sliding doors. HPC approved. The approved roof (per Building Permit) had a pitch of 8:12 with a snow fence and a gutter directing water to a downspout, all in original Civil plans. We requested HPC to allow us to change this same roof area to a 6:12 pitch. We are using the same snow fence, gutter and downspout (so Civil plans remain the same, with roof area and water direction). This allowed us to upen up that window to the views, while keeping the same ridge height, area and drainage system. 04/11/2019