HomeMy WebLinkAboutFile Documents.233 W Hallam St.0077.2019 (9).ARBK 223 W. Hallam St.KIM RAYMOND ARCHITECTS+INTERIORS
223 W. Hallam St.
April 11th, 2019 KIM RAYMOND ARCHITECTURE+INTERIORS
No.
12.
TO: City of Aspen Building Department
SUBJECT: Change Order 2 - Master Bedroom Roof Pitch
2019-Change Order 2
Upper
Level
Master Bedroom: roof pitch over sliding doors. HPC approved.
The approved roof (per Building Permit) had a pitch of 8:12 with a snow fence
and a gutter directing water to a downspout, all in original Civil plans. We
requested HPC to allow us to change this same roof area to a 6:12 pitch. We are
using the same snow fence, gutter and downspout (so Civil plans remain the
same, with roof area and water direction).
This allowed us to upen up that window to the views, while keeping the same
ridge height, area and drainage system.
04/11/2019