MEMORANDUM
Project: 230 E. Hopkins Avenue
Subject: Water Line Sizing
Date: 14 August 2019
The water line size for 230 E. Hopkins must be 4” based on the fire suppression system requirements.
See full calculations provided by Kubed, included.
The domestic water requirement is for a 2” meter assembly and the fire suppression system requires a
4” line based on a total flow of 449.8 gpm.
08/14/2019
Reviewed by Engineering
08/23/2019 3:30:45 PM
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen. The review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Engineering
requirements." The issuance of a permit based
on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
documents and other data.