Loading...
HomeMy WebLinkAboutFile Documents.230 E Hopkins Ave.0089.2018 (11).ACBK Page 1 of 1 MEMORANDUM Project: 230 E. Hopkins Avenue Subject: Water Line Sizing Date: 14 August 2019 The water line size for 230 E. Hopkins must be 4” based on the fire suppression system requirements. See full calculations provided by Kubed, included. The domestic water requirement is for a 2” meter assembly and the fire suppression system requires a 4” line based on a total flow of 449.8 gpm. 08/14/2019 Reviewed by Engineering 08/23/2019 3:30:45 PM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data.