Loading...
HomeMy WebLinkAboutFile Documents.230 E Hopkins Ave.0046-2020-BCHO (6) Page 1 of 2 LETTER 9 June 2020 Sophie Varga, Zoning Enforcement Officer City of Aspen Community Development 130 S. Galena St. Aspen, Colorado 81611 RE: 230 E. Hopkins Ave, Aspen CO 81611 Setback Encroachment for additional 5/8” type X GWB Dear Sophie, Rowland+Broughton is seeking an exemption to the 5’-0” building setback for a portion of the property currently under construction at 230 E. Hopkins Ave. Below you will find a summation of this item and why the exemption is necessary to maintain the appropriate fire ratings and ensure the life safety of both the occupants of this building and the neighboring property. Background information: 1. During the design process it was determined that the existing Mountain Forge building was constructed partially over the property line to the west. 2. With the agreement of the neighbors, a lot line adjustment was made to modify the western property line such that it moved west on the south side of the lot to accommodate the existing Mountain Forge Building, and jogs East in the northern portion of the property to give the same area back to the neighboring property. See Exhibit 1 (Survey). 3. North of the property line jog the existing wall framing and exterior sheathing will remain in place. Due to the lot line adjustment the portion of the existing building identified in Exhibit 2 is now an existing non-conformity relative to the 5’-0” side yard setback requirement. 4. Per Table 602 of the 2015 IBC, Fire-resistance rating requirements for exterior walls based on fire separation distance, a 1-hour fire resistance rating is required for any portion of the building that is within 5’-0” of the adjacent property line. See Exhibit 3 (Table 602). 5. 2015 IECC Insulation requirements at exterior walls require R-20 cavity + R3.8 continuous exterior insulation. See Exhibit 4 (2015 IECC Table C402.1.3) Proposed Solution: 1. We are proposing adding an additional layer of 5/8” Type X glass matt sheathing in between the existing exterior plywood sheathing and new exterior wood siding (replacing the existing exterior wood siding). See Exhibit 5 (W8(F)SIM assembly detail). This solution would require an exemption to the zoning setback requirement to allow the additional 5/8” additional encroachment beyond the existing non-conformity. 2. In Lieu of increasing the existing setback non-conformity beyond the required 5/8” for item 1 above, we are proposing over insulating the cavity to R-39 at this location and omitting the continuous exterior insulation component of the IECC requirements at this location only. This 08/06/2020 Page 2 of 2 will require a Building Department Exemption from the prescriptive IECC requirements for the area of concern. Our intent with this proposal is to minimize additional setback encroachment beyond the existing non- conformity while providing appropriate fire resistance ratings required by current building code. We believe that this proposal meets the intent of all applicable building and zoning regulations while limiting any non-conformities. Please be in touch with any questions or concerns. Respectfully submitted, Jonathan Rice Architectural Designer rowland+broughton 970.544.9006 studio 970.429.8763 direct Dana Ellis AIA / NCARB / LEED AP / Studio Leader rowland+broughton 970.544.9006 studio 203.610.7633 cell 08/06/2020