Loading...
HomeMy WebLinkAboutFile Documents.230 E Hopkins Ave.0046-2020-BCHO (9) Page 1 of 2 13th January 2021 Nick Thompson, Plans Examiner, City of Aspen Phone 970-429-2757, Fax 970-920-5440 nick.thompson@cityofaspen.com Lauren Litchet, Permit Coordinator, City of Aspen lauren.litchet@cityofaspen.com City of Aspen Building Department 517 E. Hopkins Ave Garden Level Aspen, CO 81611 PROJECT: Mountain Forge Renovation and Addition ADDRESS: 230-234 E. Hopkins Ave, Aspen, CO 81611 PERMIT: 0089.2018.ACBK SUBJECT: Responses to Building Department Comments_Change Order 001 CC: Madigan+Co (General Contractor) 1) Page: A7.01 Closed cell spray foam requires a thermal barrier; 2015 IBC 2603.4. Response: Wall type W8 (sim) shall only be installed as an exterior furred wall (with closed cell spray foam cavity insulation) over 8” concrete or 7 5/8” CMU (wall type W14 sim. / A7.02), located along Grid 6 at the concrete stair core. Concrete and CMU shall act as thermal barrier. 02/01/2021 Page 2 of 2 2) Page: A7.03: Any change in snowmelted area should be shown on revised mechanical and snowmelt plans. Response: No change to snowmelted area. Radiant tubing shown in assembly to ensure GC coordinated all necessary snowmelt locations per Permit approved plans. 3) Page: A0.6z: This section should only show occupant counts that have their own toilet room requirements taken care of. The mechanical room does not so remove it. This will leave 39 occupants remaining- 20 female, 20 male Response: See updated sheet A0.6z and plumbing calculations. Updated Comm. Unit occupant countl, 34 remaining occupants – 17 female, 17 male 4) Page: A3.0: Provide an updated interior lighting COMcheck Response: See updated lighting COMcheck 02/01/2021