Loading...
HomeMy WebLinkAboutFile Documents.333 Park Ave.0141.2019 (14).ARBKJosh Rice, P.E. Woody Creek Engineering 308 South Galena Street Suite C Aspen, Colorado 81611 (970) 429-8297 May 9, 2019 Flynn Stewart-Severy F&M Architects PO Box 6762 15 Kearns Road, Suite D Snowmass Village, Colorado 81615 RE: 333 Park Ave., Aspen Demolition/Relocation Flynn: We understand that the historical structure located at 333 Park Avenue will be relocated to 931 Gibson Avenue and non-historical elements will be demolished. Following the relocation of the historical elements and the demolition of the non-historical elements, the site will be revegetated and all utilities abandoned. We have provided a grading and drainage report and erosion sediment control plan and details (see attached). The grading and drainage plan provides for a reconstructed grade approximately equal to its historical condition between the edge of the street and the top of slope setback. The proposed grading will cause runoff to sheet flow from the top of slope setback down gradient in a historical manner and will not increase runoff rates or cause harm to neighboring properties. The grading and drainage plan states that the plant selection will match the typical vegetation found between the top of slope and the Roaring Fork River. The plan states that vegetation will be irrigated until established. Irrigation will cease once the vegetation is established. All utilities will be abandoned during the regrading of the site except for the water service. A yard hydrant will be constructed in order to provide an irrigation source. Once the site is revegetated, the water service will also be abandoned. Sincerely, Josh Rice, P.E. Woody Creek Engineering, LLC Attachment 1/11/20185/24/2019 06/04/2019