Loading...
HomeMy WebLinkAboutFile Documents.546 McSkimming Rd.0142.2018 (19).ARBKG DN UP SNOWMELT PLAN L.1.01 0'00'00' SCALE: 3/16"=1'-0" N O R T H ISSUE & REVISION DATES Plot Date: 11/28/19 Project #: 346 Drawn By: EW Checked By: GT PERMIT SET 25% DRAFT PHASE 2 PERMIT - WELS PHASE 2 PERMIT PRICING SET 04/16/2019 06/13/2019 08/05/2019 08/09/2019                                                  0,0,0 ▪ MAIN LEVEL LOWER LEVEL SNOWMELTED CONCRETE AUTOCOURT 1197.47 SF SNOWMELTED TILED TERRACE 76.20 SF SNOWMELTED CONCRETE PATH 470.79 SF SNOWMELTED ASPHALT DRIVEWAY 75.71 SF SNOWMELTED CONCRETE 184.22 SF SNOWMELTED TILE 46.63 SF (needs to coincide w/ tile pattern or tile will crack and break) SNOWMELTED CONCRETE & STEP 43.87 SF SNOWMELT: 2,328.59 SF PERMITTED SNOWMELT: 2,163.55 SF DIF: 165.04 SF DECK OVERHEAD SNOWMELTED TILE 280.37 SF ZONE 1 ZONE 2 ZONE 3 ZONE 4 for snowmelt coordination 01/22/2020 01/22/20 CONCRETECRET ZONE 1ZZZOZOONONNNENE E E 111 C URT SF SNOWMELTED CCC UAUTOCOUTOCOU 1197.47 S U S AUTOCOUUUUU S U S UUU SNOWMELTEDDSSNOWWMEELTEEDDMMELTSNNTNTEDNOWMT TILED TERRACETILED TERRACETILEDD TTEERRAACCEETLRLTER 76.20 SF776.200 SSFF2F2F SNOWMELTED TILETED TIL 280.37 SF280 ZONE 4E44NZ4NEZOOEEOE4ON4ZONE44NZOEONE4EO4ZONNZOEEENONE444ZZZOZOZOONONNENEE E 4444 E A B C D I H G F E M L K J P O N RQ V U T S JUNCTION BOX #1 JUNCTION BOX #2 REVISION 5) 03/19/2020 JUNCTION BOX #5 JUNCTION BOX #6 JUNCTION BOX #1 (Zone 1) - Cables = A,B,C,D - Circuits = Two (2) 240Vac 50A, One (1) 240Vac 30A JUNCTION BOX #2 (Zone 1) - Cables = E,F,G,H,I,J,K - Circuits = One (1) 240Vac 50A, Two (2) 240Vac 40A JUNCTION BOX #3 (Zone 2) - Cables = L,M,R,S,T - Circuits = One (1) 240Vac 40A, One (1) 240Vac 30A JUNCTION BOX #4 (Zone 2) - Cables = N,O,P,Q - Circuits = One (1) 240Vac 50A JUNCTION BOX #5 (Zone 3) - Cables = U,V - Circuits = One (1) 240Vac 40A JUNCTION BOX #6 (Zone 4) - Cables = W,X,Y - Circuits = One (1) 240Vac 40A, One (1) 240Vac 30A Anticipated Total Load = 335 amps JUNCTION BOX #3 Details: - Each colored area represents a different HottWire cable. - HottWire cables should not be run through expansion joints. - Each HottWire cable will have a pair of Cold Leads that will need to be run through conduit back to a junction box for connection to power that was run through Relay Panel from circuit breakers. - Some circuits will have multiple HottWire cables connected to them IIIH QQQQQQQ X Y ZONE 1 ZONE 2 ZONE 4 JUNCTION BOX #4 ZONE 3 Snowmelt is hydronic Here HYDRONICALLY W ,W (Area W is on Zone 3)