SNOWMELT PLAN
L.1.01
0'00'00'
SCALE: 3/16"=1'-0"
N
O
R
T
H
ISSUE & REVISION DATES
Plot Date: 11/28/19 Project #: 346
Drawn By: EW Checked By: GT
PERMIT SET 25% DRAFT
PHASE 2 PERMIT - WELS
PHASE 2 PERMIT
PRICING SET
04/16/2019
06/13/2019
08/05/2019
08/09/2019
0,0,0
▪
MAIN LEVEL
LOWER LEVEL
SNOWMELTED CONCRETE
AUTOCOURT
1197.47 SF
SNOWMELTED
TILED TERRACE
76.20 SF
SNOWMELTED
CONCRETE PATH
470.79 SF
SNOWMELTED
ASPHALT DRIVEWAY
75.71 SF
SNOWMELTED
CONCRETE
184.22 SF
SNOWMELTED TILE
46.63 SF
(needs to coincide w/
tile pattern or tile will
crack and break)
SNOWMELTED
CONCRETE & STEP
43.87 SF
SNOWMELT: 2,328.59 SF
PERMITTED SNOWMELT: 2,163.55 SF
DIF: 165.04 SF
DECK OVERHEAD
SNOWMELTED TILE
280.37 SF
ZONE 1
ZONE 2
ZONE 3
ZONE 4
for snowmelt coordination 01/22/2020
01/22/20
CONCRETECRET
ZONE 1ZZZOZOONONNNENE E E 111
C
URT
SF
SNOWMELTED CCC
UAUTOCOUTOCOU
1197.47 S
U
S
AUTOCOUUUUU
S
U
S
UUU
SNOWMELTEDDSSNOWWMEELTEEDDMMELTSNNTNTEDNOWMT
TILED TERRACETILED TERRACETILEDD TTEERRAACCEETLRLTER
76.20 SF776.200 SSFF2F2F
SNOWMELTED TILETED TIL
280.37 SF280
ZONE 4E44NZ4NEZOOEEOE4ON4ZONE44NZOEONE4EO4ZONNZOEEENONE444ZZZOZOZOONONNENEE E 4444
E
A
B
C
D
I
H
G
F
E
M
L
K J
P
O
N
RQ
V
U
T
S
JUNCTION BOX #1
JUNCTION BOX #2
REVISION 5) 03/19/2020
JUNCTION BOX #5
JUNCTION BOX #6
JUNCTION BOX #1 (Zone 1)
- Cables = A,B,C,D
- Circuits = Two (2) 240Vac 50A, One (1) 240Vac 30A
JUNCTION BOX #2 (Zone 1)
- Cables = E,F,G,H,I,J,K
- Circuits = One (1) 240Vac 50A, Two (2) 240Vac 40A
JUNCTION BOX #3 (Zone 2)
- Cables = L,M,R,S,T
- Circuits = One (1) 240Vac 40A, One (1) 240Vac 30A
JUNCTION BOX #4 (Zone 2)
- Cables = N,O,P,Q
- Circuits = One (1) 240Vac 50A
JUNCTION BOX #5 (Zone 3)
- Cables = U,V
- Circuits = One (1) 240Vac 40A
JUNCTION BOX #6 (Zone 4)
- Cables = W,X,Y
- Circuits = One (1) 240Vac 40A, One (1) 240Vac 30A
Anticipated Total Load = 335 amps
JUNCTION BOX #3
Details:
- Each colored area represents a different HottWire cable.
- HottWire cables should not be run through expansion joints.
- Each HottWire cable will have a pair of Cold Leads that will
need to be run through conduit back to a junction box for
connection to power that was run through Relay Panel from
circuit breakers.
- Some circuits will have multiple HottWire cables connected to them
IIIH
QQQQQQQ
X
Y
ZONE 1
ZONE 2
ZONE 4
JUNCTION BOX #4
ZONE 3
Snowmelt
is hydronic
Here
HYDRONICALLY
W
,W (Area W is on Zone 3)