HomeMy WebLinkAboutFile Documents.208 E Main St.0195.2019 (9).ARBK
208 E. Main St. Aspen, CO
Change Order No. 2 – 08/26/19
Items submitted for change order:
• Lower level foundation: was moved on the North and West side to be able to dig safely and
provide accurate foundation.
• Lover level: mechanical rooms where originally crawl space height. We need to make the
floor full height. The FAR calculations were adjusted.
• Main Level: The link to the Master Bedroom was widened for better circulation.
• Fire Sprinklers: we need to take out the system and replace it with Fire Rated windows on the
East and West elevations.
09/05/2019