Loading...
HomeMy WebLinkAboutFile Documents.208 E Main St.0195.2019 (9).ARBK 208 E. Main St. Aspen, CO Change Order No. 2 – 08/26/19 Items submitted for change order: • Lower level foundation: was moved on the North and West side to be able to dig safely and provide accurate foundation. • Lover level: mechanical rooms where originally crawl space height. We need to make the floor full height. The FAR calculations were adjusted. • Main Level: The link to the Master Bedroom was widened for better circulation. • Fire Sprinklers: we need to take out the system and replace it with Fire Rated windows on the East and West elevations. 09/05/2019