Loading...
HomeMy WebLinkAboutFile Documents.834 W Hallam St.0010.2018 (12).ARBKResidence 834 West Hallam Street Aspen, Colorado Temporary Micropile Wall* GRADE-1. Temporary Micropile Wall - Cover GRADE-2. Temporary Micropile Wall - Location GRADE-3. Temporary Micropile Wall - Profile GRADE-4. Temporary Micropile Wall - General Notes GRADE-5. Temporary Micropile Wall - Sections GRADE-6. Temporary Micropile Wall - Typical Sections and Details * These plans and specifications are designed to provide temporary excavation support with a finite design life during construction operations. Long-term earth pressure loads shall be included in the structural design. Temporary Micropile Wall Cover October 5, 2020 Residence 834 West Hallam Street 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 17-075G-D2 GRADE-1 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Set Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: Reviewed by Engineering 10/23/2020 10:43:22 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. N. 8TH STREET EXISTING DECIDUOUS TREE TO REMAIN EXISTING DECIDUOUS TREE TO BE EXISTING CONIFEROUS TREE TO BE PROPOSED 5" ROLL CURB PROPOSED CULVERT INLET TO CLEAR WALKWAY PROPERTY LINE SETBACK LINE 37 41 10'-83/8" SLOPE T.O.PAVERS 98'-05/8" 1/4" PER 1'-0"A T.O. CONC 98'-03/4" 37 42 41 PARKING 1 PARKING 237 98'-0" T.O. PLY 98'-1" T.O. FF 43 99'-11" T.O. PLY 100'-0" T.O. FF 99'-11" T.O. PLY 100'-0" T.O. FF 43 SLOPE 1/4" PER 1'-0" T.O. CONC 98'-03/4" ALLEY BLOCK 10 PARKING 3 SLOPE 1/4" PER 1'-0" .25:12 T.O.WOOD 100'-03/4" BUILDING A MAIN LEVEL T.O FF at 100' = 7918' BUILDING B MAIN LEVEL T.O FF at 98'-1" = 7916'-1" A T.O. SLAB 98'-11/4" B 15 B PARKING 4 42 43 .25:12 A 10'-0" FRONT YARD SETBACK T.O. SLAB 98'-1" T.O.CONC 98'-0" 1:12 T.O. SLAB 98'-1" T.O.CONC 98'-05/8" OVERHANG ABOVE WALKWAY 5'-0" PARKING 5 REAR YARD SETBACK A 42 T.O.CONC 98'-03/4" 42 T.O. CONC 98'-03/4" 17'-113/8" A A 63 PARKING 6 99'-6" T.O. PLY 99'-7" T.O. FF SLOPE T.O. CONC 99'-6" 1:12 1/2:12 T.O.CONC 99'-63/4"A BUILDING C UNIT 103 MAIN LEVEL T.O FF at 99'-7" = 7917'-7" BUILDING C MAIN LEVEL T.O FF at 98'-1" = 7916'-1" ACCESS AISLE A 22'-113/8" 1/4" PER 1'-0" 98'-0" T.O. PLY 98'-1" T.O. FF VAN ACCESSIBLE 43 41 43 EXISTING WOOD FENCE PROPOSED SITE PLAN AT GRADE 9' - 8 7 / 8 " 3' - 0 " SI D E Y A R D SE T B A C K 5' - 0 " SI D E Y A R D SE T B A C K 5' - 0 " PE R S C R I P T I V E DI T C H E A S E M E N T 3' - 1 3 / 4 " SE T B A C K L I N E PR O P E R T Y L I N E 10 ' D I T C H E A S E M E N T SE E B O O K 2 7 6 AT P A G E 4 7 4 0+ 8 0 1+ 6 0 1+ 8 0 2+ 0 0 2+40 2+60 0+ 2 0 0+ 4 0 0+ 6 0 1+ 7 0 GR A D E - 5 1+ 8 0 GR A D E - 5 2+50 GRADE-5 0+ 5 0 GR A D E - 5 1+10 GRADE-5 1+ 0 0 1+20 Proposed Micropile Cap Location Micropile Wall Begin Micropile Wall Turn Line 1 Micropile Wall Turn Line 7 Micropile Wall Turn Line 9 Micropile Wall Turn Lines 2 and 3 Micropile Wall Turn Lines 4 and 5 Heavy loads shall not be placed between micropile cap and this line (Sheet Grade-4, Note 7.5) Micropile Wall Turn Line 8 1+ 4 0 2+ 2 0 Micropile Wall Turn Line 6Heavy loads shall not be placed between micropile cap and this line (Sheet Grade-4, Note 3.4) Proposed Micropile Cap Location Temporary Micropile Wall Location October 5, 2020 Residence 834 West Hallam Street 17-075G-D2 GRADE-2 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For: RDJ Seal: N SCALE: 1" = 5' 5 0 2.5 5 Notes: 1. Base plan by Forum Phi. 2. Ground nail and micropile walls and temporary slopes shall be constructed entirely within property boundaries. 3. For utility installation, trench to back of micropile or ground nail wall. For micropile wall, hand dig between micropiles and extend utilities through wall. For ground nail wall, saw or hammer through shotcrete facing and extend utilities through wall.266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 RDJ 5' accidental overdig area that will be backfilled once micropile cap has been poured. Reviewed by Engineering 10/23/2020 10:43:16 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. 7910 7920 7900 7890 7880 El e v a t i o n ( f e e t ) 0+ 0 0 . 0 B e g i n W a l l Mi c r o p i l e - S y s t e m 1 EG = 7 9 1 7 . 0 TO W = 7 9 1 7 . 0 BO E = 7 9 0 7 . 0 0+ 5 0 7930 7910 7920 7900 7890 7880 El e v a t i o n ( f e e t ) 7930 1+ 0 0 1+ 5 0 0+ 0 4 . 7 T u r n L i n e 1 Mi c r o p i l e - S y s t e m 1 EG = 7 9 1 7 . 0 TO W = 7 9 1 7 . 0 BO E = 7 9 0 7 . 0 0+ 3 8 . 5 T u r n L i n e 3 Mi c r o p i l e - S y s t e m 1 EG = 7 9 1 5 . 6 TO W = 7 9 1 5 . 6 St e p B O E = 7 9 0 7 . 0 t o 7 9 0 5 . 0 1+ 5 3 . 2 C h a n g e S y s t e m Mi c r o p i l e - C h a n g e S y s t e m 1 t o 3 EG = 7 9 1 5 . 4 TO W = 7 9 1 5 . 4 BO E = 7 9 0 5 . 0 1+ 7 7 . 1 C h a n g e S y s t e m Mi c r o p i l e - C h a n g e S y s t e m 3 t o 2 EG = 7 9 1 6 . 1 TO W = 7 9 1 6 . 1 BO E = 7 9 0 5 . 0 1+ 8 6 . 7 C h a n g e S y s t e m Mi c r o p i l e - C h a n g e S y s t e m 2 t o 3 EG = 7 9 1 6 . 5 TO W = 7 9 1 6 . 5 BO E = 7 9 0 5 . 0 1+ 9 7 . 5 C h a n g e S y s t e m Mi c r o p i l e - C h a n g e S y s t e m 3 t o 2 EG = 7 9 1 7 . 0 TO W = 7 9 1 7 . 0 BO E = 7 9 0 5 . 0 2+ 0 9 . 9 C h a n g e S y s t e m Mi c r o p i l e - C h a n g e S y s t e m 2 t o 3 EG = 7 9 1 7 . 0 TO W = 7 9 1 7 . 0 BO E = 7 9 0 5 . 0 2+ 1 5 . 1 C h a n g e S y s t e m Mi c r o p i l e - C h a n g e S y s t e m 3 t o 2 EG = 7 9 1 7 . 0 TO W = 7 9 1 7 . 0 BO E = 7 9 0 5 . 0 2+ 2 4 . 5 T u r n L i n e 9 Mi c r o p i l e - S y s t e m 2 EG = 7 9 1 7 . 0 TO W = 7 9 1 7 . 0 BO E = 7 9 0 5 . 0 2+ 4 8 . 1 S t e p B O E Mi c r o p i l e - C h a n g e S y s t e m 2 t o 1 EG = 7 9 1 7 . 0 TO W = 7 9 1 7 . 0 St e p B O E = 7 9 0 5 . 0 t o 7 9 0 7 . 0 2+ 0 0 Bottom of Excavation (BOE) 0+ 3 6 . 4 T u r n L i n e 2 Mi c r o p i l e - S y s t e m 1 EG = 7 9 1 5 . 7 TO W = 7 9 1 5 . 7 BO E = 7 9 0 7 . 0 0+ 5 5 . 5 T u r n L i n e 4 Mi c r o p i l e - S y s t e m 1 EG = 7 9 1 5 . 0 TO W = 7 9 1 5 . 0 BO E = 7 9 0 5 . 0 0+ 8 3 . 5 S t e p B O E Mi c r o p i l e - S y s t e m 1 t o 4 EG = 7 9 1 4 . 5 TO W = 7 9 1 4 . 5 BO E = 7 9 0 5 . 0 t o 7 8 9 9 . 0 2+ 6 9 . 3 E n d W a l l Mi c r o p i l e - S y s t e m 2 EG = 7 9 1 7 . 0 TO W = 7 9 1 7 . 0 BO E = 7 9 0 7 . 0 Micropile Wall Cap Existing GradeExisting Grade Bottom of Excavation (BOE) 1+ 0 2 . 1 T u r n L i n e 7 Mi c r o p i l e - S y s t e m 4 EG = 7 9 1 4 . 5 TO W = 7 9 1 4 . 5 BO E = 7 8 9 9 . 0 1+ 3 4 . 7 T u r n L i n e 8 Mi c r o p i l e - S y s t e m 4 t o 1 EG = 7 9 1 4 . 5 TO W = 7 9 1 2 . 5 BO E = 7 8 9 9 . 0 t o 7 9 0 5 . 0 0+ 5 7 . 6 T u r n L i n e 5 Mi c r o p i l e - S y s t e m 1 EG = 7 9 1 5 . 0 TO W = 7 9 1 5 . 0 BO E = 7 9 0 5 . 0 0+ 7 0 . 5 T u r n L i n e 6 Mi c r o p i l e - S y s t e m 1 EG = 7 9 1 4 . 5 TO W = 7 9 1 4 . 5 BO E = 7 9 0 5 . 0 Temporary Micropile Wall Profile October 5, 2020 Residence 834 West Hallam Street 17-075G-D2 GRADE-3 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 SCALE: HORIZONTAL 1" = 10' VERTICAL 1" = 10' ABBREVIATIONS: EG - Existing Grade PG - Proposed Grade TOW - Top of Wall BOE - Bottom of Excavation Reviewed by Engineering 10/23/2020 10:43:26 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. 1.0 Temporary Micropile Wall Materials 1.1 Micropile bars - Williams B7X1-38 Injection Bars or equivalent (Systems 1 and 2) Williams B7X1-51 Injection Bars or equivalent (Systems 3 and 4) fy=85,000 psi 1.2 Grout - Grout may be neat-cement or with sand, with Type II cement in accordance with ASTM C150. Water-cement ratio should be between 0.4 and 0.6. f'c=3,000 psi (28-day strength) 1.3 End hardware - Nuts shall be in accordance with manufacturer's recommendations. Bearing plate shall be in accordance with ASTM A36, Grade 36. 1.4 Concrete - Concrete mix shall consist of Type II cement in accordance with ASTM C150, potable water and normal weight aggregate in accordance with ASTM C33. Air entrainment is not required. Admixtures, if used, should be non-corrosive to steel. f'c=3,000 psi (28-day strength) 1.5 Cap reinforcement shall be in accordance with ASTM A615. fy=60,000 psi 2.0 Micropile Wall Construction Sequence 2.1 Install micropiles at the locations and to the lengths shown on the plans. Micropile injection bars shall be installed per manufacturers recommendations. Micropile locations may vary by up to 3". 2.2 Install end hardware and reinforcing bars as shown on the drawings. 2.3 Pour concrete cap to the minimum thickness shown on the drawings and to attain the minimum coverages specified herein. Cold weather protection measures may be necessary. 2.4 After concrete and grout has attained 80% of specified strength, complete excavation to full depth of wall not to exceed maximum wall heights as shown on the drawings. Excavation shall extend to grout/micropile columns (cap may be undermined). Soil should not be left between excavation face and grout/micropile columns. 3.0 Temporary Micropile Wall Design Parameters 3.1 The micropile shoring was designed in general accordance with procedures contained in the FHWA "Micropile Design and Construction Reference Manual", Publication No. FHWA NHI-05-039, December 2005. 3.2 The following strength parameters were assumed for the subsoils based on the "Subsoil Study for Foundation Design, Proposed Apartment Complex, 834 West Hallam Street, Aspen, Colorado" by H-P Kumar, Project No. 16-7-645, report dated January 10, 2017. The following values were assumed for soil design parameters: f g (deg) (psf) (pcf) Sand and Gravel 36 100 130 An experienced geotechnical engineer should verify the above design parameters during construction. 3.3 Global Factor of Safety = 1.3 min. (temporary) 3.4 Surcharge Loading - The excavation shoring systems are designed to accommodate normal construction surcharge of material and light trucks, not heavy loads such as cranes (wheels or outriggers), concrete pumpers (wheels or outriggers) or large stockpiles that apply a ground pressure of 1,000 psf or greater. Heavy loads shall not be placed within 8 feet of micropile cap unless approved by RJ Engineering. 3.5 No groundwater table was assumed. If groundwater is encountered during excavation, the excavation shall not continue and the site shall be dewatered to below the base of planned excavation elevation prior to completion of the excavation. 3.6 The micropile walls lateral deflection may range from 0 to 2 inches. The design calculations show there will be no adverse deflection of the ground surface at the property line based on anticipated subsurface conditions. 4.0 Special Provisions 4.1 Wall geometry used in design was based on plans provided by client. 4.2 This design is valid only for B&Y Drilling, Inc. at the subject site. B&Y Drilling shall construct all shoring systems shown herein. 4.3 Excavation shall extend to micropile columns. During the excavation process, material should not be left between the excavation face and the grout/micropile column. 4.4 The micropile wall designs are valid only for dry surface and subsurface conditions. If surface water or groundwater is encountered during excavation or installation, RJ Engineering should be notified immediately and the wall may be redesigned at the discretion of RJ Engineering. Surface and subsurface drainage from adjacent properties should not be discharged at the top or through the micropile wall. Saturated soils may result in materials piping out from between micropiles resulting in failure and/or excessive wall movements. 4.5 The design life on this micropile wall is 12 weeks. Design life is defined by the beginning of excavation to backfill completion of the foundation wall. If the duration of the project exceeds the 12 week duration, RJ Engineering shall be contacted to evaluate the performance of the system and determine if the design life can be extended. 4.6 RJ Engineering is not responsible for maintaining slope stability above and below the micropile wall during construction. 4.7 RJ Engineering is not aware of any utility conflicts. The contractors are responsible for field locating all nearby utilities. Conflicting utilities may require micropile wall redesign at RJ Engineerings' discretion. 4.8 RJ Engineering is not responsible for quality control, quality assurance, changed conditions or problems resulting from improper construction techniques. 4.9 RJ Engineering is not responsible for construction site safety. 4.10 RJ Engineering is not responsible for wall layout. General contractor or representative of the general contractor is responsible for micropile wall layout. 4.11 Observation of micropile wall installation should be performed by a qualified engineer. Inspection and/or monitoring of the micropile wall after completion of excavation should be performed. The frequency and duration of the observation and monitoring shall be determined by the qualified engineer. The qualified engineer shall have experience with design and installation of micropile wall systems using injection bars. Observations shall be made at least on a weekly basis during installation and during the service life of the system. Temporary Micropile Wall General Notes October 5, 2020 Residence 834 West Hallam Street 17-075G-D2 GRADE-4 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 Reviewed by Engineering 10/23/2020 10:43:29 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. NORTH SIDE Micropile - System 4 Station 1+10 EAST SIDE Micropile - System 3 Station 1+70 WEST SIDE Micropile - System 1 Station 0+50 EAST SIDE Micropile - System 2 Station 1+80 SOUTH SIDE Micropile - System 1 Station 2+50 Temporary Micropile Wall Sections October 5, 2020 Residence 834 West Hallam Street 17-075G-D2 GRADE-5 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: Notes: 1. The micropile wall shall be constructed entirely within property boundaries. 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 SCALE: HORIZONTAL 1" = 10' VERTICAL 1" = 10' ABBREVIATIONS EG - Existing Grade PG - Proposed Grade TOW - Top of Wall BOE - Bottom of Excavation Reviewed by Engineering 10/23/2020 10:43:33 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. Injection Bar Field Installed Grout MICROPILE CROSS SECTION A-A' Borehole MICROPILE BEARING PLATE FRONT VIEW 6" Micropile Hole Diameter = Bar Diameter +1/4" 6" 1/2" Min Hex Nut Bearing Plate MICROPILE DETAIL Grout A'A Williams Injection Bar 6" Min 9" Column MICROPILE BEARING PLATE SIDE VIEW Cross Bar, 24" OC Vertical Pile MICROPILE CAP PLAN VIEW VERTICAL SYSTEM SYSTEMS 1, 2 AND 4 MICROPILE CAP CROSS SECTION VERTICAL SYSTEM SYSTEMS 1, 2 AND 4 12" 18" Cross Bar, #4 Rebar Continuous Waler, #4 Rebar 3" 2" min. 3,000 psi Concrete Grout Vertical Pile Continuous Waler, #4 Rebar Notes: Vertical piles 12" center to center with back row at 12" offset 12" 12" Continuous Waler, #4 Rebar Continuous Waler, #4 Rebar Cross Bar, 24" OC Vertical Pile MICROPILE CAP PLAN VIEW VERTICAL SYSTEM SYSTEM 3 MICROPILE CAP CROSS SECTION VERTICAL SYSTEM SYSTEM 3 12" 6" Cross Bar, #4 Rebar Continuous Waler, #4 Rebar 3" 2" min. 3,000 psi Concrete Grout Continuous Waler, #4 Rebar Notes: Horizontal reinforcement shall be continuous between Systems 2 and 3 Continuous Waler, #4 Rebar Continuous Waler, #4 Rebar TYPICAL SECTION SYSTEM 2 12.0' MAX CUT EXISTING GRADE VARIES PROPOSED EXCAVATION RL = 2 0 ' MICROPILE CAP SEE DETAILS VARIES 2' MAX. DH = 12.0' MAX. WILLIAMS 38mm INJECTION BAR BOTTOM OF EXCAVATION (SEE SHEET GRADE-3) SEE SHEET GRADE-3 FOR TOP OF CAP/WALL EL. PROPOSED TEMPORARY EXCAVATION AT 1H:1V TYPICAL SECTION SYSTEM 3 12.0' MAX. CUT PROPOSED EXCAVATION RL = 2 0 ' MICROPILE CAP SEE DETAILS WILLIAMS 51mm INJECTION EXISTING GRADE BOTTOM OF EXCAVATION (SEE SHEET GRADE-3) DH = 12.0' MAX. SEE SHEET GRADE-3 FOR TOP OF CAP/WALL EL. TYPICAL SECTION SYSTEM 1 11.0' MAX CUT PROPOSED EXCAVATION RL = 1 5 ' MICROPILE CAP SEE DETAILS BOTTOM OF EXCAVATION (SEE SHEET GRADE-3) SEE SHEET GRADE-3 FOR TOP OF CAP/WALL EL. VARIES WILLIAMS 38mm INJECTION BAR EXISTING GRADE 2' MIN. DH = 11.0' MAX. PROPOSED TEMPORARY EXCAVATION AT 1.5H:1V TYPICAL SECTION SYSTEM 4 16.0' MAX CUT EXISTING GRADE PROPOSED EXCAVATION RL = 2 0 ' MICROPILE CAP SEE DETAILS DH=16.0' MAX. WILLIAMS 51mm INJECTION BAR BOTTOM OF EXCAVATION (SEE SHEET GRADE-3) SEE SHEET GRADE-3 FOR TOP OF CAP/WALL EL. Temporary Micropile Wall Typical Sections and Details October 5, 2020 Residence 834 West Hallam Street 17-075G-D2 GRADE-6 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: NOT TO SCALE Abbreviations: RL - Reinforcement Length DH - Design Height 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 NOTES: 1. See Sheet GRADE-3 for top of wall/cap and bottom of excavation elevations. Reviewed by Engineering 10/23/2020 10:43:37 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data.