Loading...
HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0002-2022-BCHO (5)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SEE NOTES #1 PLANS It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. 04/15/2022 nickt Z-Group Architects 411 East Main Street, Suite 205 Aspen, Colorado 81611 Telephone 970-925-1832 FAX 970-925-1371 Date: November 8, 2021 Project Name: 209 E Bleeker Street Permit No.: 0320-2017-ARBK Project Contact: Melanie Noonan CHANGE ORDER NARRATIVE 209 E BLEEKER STREET This change order is for the following revisions: 1. Exterior Window changes- deletion of windows (J,I,& H), new windows (SS & TT), & revision of window F size & location. This occurs on the non-historic addition only. No changes to the Historic Cabin. 2. Changes to Interior plan layouts at the Main Level only – Unit B: Deletion of Bedroom #1 & Bath #1 to create one large Master Suite Unit A: Walls added to enclose Kitchen area. New Interior doors (A-03 & A-110) added. 3. Revisions to Mechanical systems per new plan layouts. All exterior revisions have been reviewed and approved by HPC Monitor & staff. Thank you for your time, Melanie Noonan Z Group Architects 01/04/2022