Loading...
HomeMy WebLinkAboutFile Documents.219 E Durant Ave.0094.2018 (33).ACBK Pierce + Frye Architects  Vail & San Francisco 970.949.0899 Almresi Aspen, 219 E. Durant Ave, Unit C5     RE:  Permit Number:  0094.2018.ACBK  Building Plan Review Comments    February 28, 2019  Attn: Justin Hahn, Plans Examiner, City of Aspen   Phone:  970/429‐2784, Fax:  970/920‐5440,   Justin.Hahn@CityofAspen.com  John Barker, Permit Coordinator, City of Aspen   Phone:  970‐429‐2019  John.Barker@CityofAspen.com     Dear Justin and John,    Regarding your plan review comments for the above reference building permit, dated 10/9/18,  please see the attached drawings, specifications and responses to plan review comments.    Because of the issues raised in the plan reviews, the costs of the kitchen hood venting system  and logistics issues with the initial kitchen design choice, the design for the restaurant has been  modified in response to these concerns.  The lower level is now completely dedicated to storage  needs and employee support spaces and the kitchen has been moved to the street level.  The  airlock entry has been removed from the plans and the modification to the residence lobby has  been removed as well.    The drawings have been revised.  Each of the building plan review comments have been  addressed and resolved, or eliminated.  We have responded to each of the building plan review  comments and these are summarized below.      Building Plan Review Comments emailed to Mark Hallenbeck on October 9, 2018 (attached):  Building Comments:  1. Occupancy R‐1 has been added to list of occupancies on sheet A1.0  2. We have modified the seating plans.  See plan 1‐A2.0.  We now have 64 dining seats and  7 bar seats.  There are 4 accessible dining seats and 2 accessible bar seat identified.   Dining area 3 has been modified.  This area is no longer raised.  3. Notes have been added to the door schedule on sheet A3.0 to clarify the hardware on  each door.  4. See plumbing fixture counts on sheet A2.0.  03/17/2019 Pierce + Frye Architects  Vail & San Francisco 970.949.0899 5. See specs and cut sheets included in Food Service documents. The walk‐in cooler and  freezer have been removed from the plans and only a beer cooler is proposed.  All  kitchen equipment will comply with the applicable sections of the 2015 IECC, Chapter 4.  6. The design of the entry area has been revised and the airlock entry, and the  corresponding section, is no longer applicable.  This section and reference has been  deleted from the drawing set.  7. The kitchen has been moved to the street level and the dumbwaiter is no longer  needed. It has been deleted from the drawings and the comment is no longer  applicable.  8. Ceiling construction notes referencing the suspended ceiling construction sections 1 – 4,  sheet A6.0, have been revised to include a reference to an additional detail, 8‐A6.1,  which shows the typical suspended drywall ceiling construction.    FS Equipment Comments:  1. All remotely mounted compressors have been deleted from the design.  The remaining  beer cooler compressor will be mounted on top of the beer cooler.  This comment is no  longer applicable.  2. The new kitchen design includes a Type 1, ventless hood.  See specs and cut sheets  included in Food Service documents.  3. The proposed revision to the net leasable area has been deleted.  The referenced area  has been revised and drafting conflict deleted.      Mechanical Comments:  1. Refer to separate response letter from MEP Consultant, MKK, now IMEG.  2. Refer to separate response letter from MEP Consultant, MKK, now IMEG.    MEP Index and COMcheck Comments:  1. Refer to separate response letter from MEP Consultant, MKK, now IMEG.    Thank you for your prompt attention to these responses to your building plan review.  We  appreciate your efforts to process all of the information quickly.  Please don’t hesitate to call  with any questions.    Regards,    Tom Frye  Pierce + Frye Architects  970‐949‐0899 x2    Attachments:  Responses to zoning plan review comments.  Three, full size, stamped and signed sets of revised drawing sheets  One copy of lighting specifications/cutsheets  One copy of Food Service specifications/cutsheets  One copy of Interior Lighting and Mechanical Compliance Certificates (COMcheck)  03/17/2019 0094-2018-ACBK_BuildingComment Subject: PlanCheck Page Label: A1.0 Author: justinh File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf Please add R-1 to this list. Almresi Aspen - Arch Permit - 180827_signed.pdf (8) Subject: PlanCheck Page Label: A2.0 Author: justinh File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf You are showing a total of 80 seats (including bench seating, not including the bar seating) which requires a minimum of 4 accessible seats dispersed throughout the space. Currently only one accessible seat is shown. You must also provide an accessible bar seat plus a companion seat both with compliant knee and toe clearance. Forward approaches should be shown tucked into tables/bars 17" demonstrating compliant knee and toe clearance and dining surface height needs to be identified. Dining area 3 does not meet the definition of a mezzanine and is not exempt from accessibility requirements. Subject: PlanCheck Page Label: A2.0 Author: justinh File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf With an occupant load over 50 all egress doors require panic hardware per IBC 1010.10 and must meet the requirements of 2009 ANSI sec 404. Please note or show compliance with the requirement for panic hardware, 10" smooth surface on the bottom of the push side of doors, and max 1/2" thresholds. Subject: PlanCheck Page Label: A2.0 Author: justinh File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf Provide a required plumbing fixture calculation per IPC 403. If you are using you facilities/fixtures that are common to other portions of the building you must include their occupant loads in the fixture requirement calculation as well. Please add R-1 to this list. You are showing a total of 80 seats (including bench seating, not including the bar seating) which requires a minimum of 4 accessible seats dispersed throughout the space. Currently only one accessible seat is shown. You must also provide an accessible bar seat plus a companion seat both with compliant knee and toe clearance. Forward approaches should be shown tucked into tables/bars 17" demonstrating compliant knee and toe clearance and dining surface height needs to be identified. Dining area 3 does not meet the definition of a mezzanine and is not exempt from accessibility requirements. With an occupant load over 50 all egress doors require panic hardware per IBC 1010.10 and must meet the requirements of 2009 ANSI sec 404. Please note or show compliance with the requirement for panic hardware, 10" smooth surface on the bottom of the push side of doors, and max 1/2" thresholds. Provide a required plumbing fixture calculation per IPC 403. If you are using you facilities/fixtures that are common to other portions of the building you must include their occupant loads in the fixture requirement calculation as well. 1 2 3 4 03/17/2019 Subject: PlanCheck Page Label: A3.0 v\/v\/D/ Author: justinh File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf Provide cutsheets on the walk-in coolers/freezers that demonstrates compliance with the requirements of either IECC C403.2.15 or C403.2.16. Subject: PlanCheck Page Label: A3.1 v\/D7 Author: justinh File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf 5/A6.0 is not provided, please do so. Subject: PlanCheck Page Label: A3.1 v\/D7 Author: justinh File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf Dumbwaiters shall be shaft enclosures per IBC 713.14 so the rear wall of the dumbwaiter shaft must also be 1 hour fire rated. Reference a compliant fire barrier detail for the entire shaft enclosure. Subject: PlanCheck Page Label: A6.0 aw Author: justinh File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf Provide a detail for your typ. metal/gypsum board suspension ceiling system that demonstrates compliance with IBC 803.13. Subject: PlanCheck Page Label: FS 1.0 Author: justinh File Name: Almresi Aspen - FS Equip Permit - 180810.pdf Are you proposing cooler compressors in the existing spa space? I see no mention of work in this area in the mechanical drawings. Almresi Aspen - FS Equip Permit - 180810.pdf (3) ice machine t.h.s.ing. bin ing. bin ing. bin d h p prep table w/sinks hot well wok walk-in cooler walk-in freezer walk-in beer cooler beer system glycol pack 11.10 11.10 15.1 15.0 15.215.215.215.2 Provide cutsheets on the walk-in coolers/freezers that demonstrates compliance with the requirements of either IECC C403.2.15 or C403.2.16. 15.5 15.5 15.5 15.1 15.1 T T San w in 5/A6.0 is not provided, please do so. 2.3 2.3 15.0 15.4 Dumbwaiters shall be shaft enclosures per IBC 713.14 so the rear wall of the dumbwaiter shaft must also be 1 hour fire rated. Reference a compliant fire barrier detail for the entire shaft enclosure. DINING AREA 1 RAISED BOOTH Provide a detail for your typ. metal/gypsum board suspension ceiling system that demonstrates compliance with IBC 803.13. VERIFY EXACT LOCATION OF WALK-IN COOLER/FREEZER COMPRESSORS w/MECHANICAL DRAWINGS 43 41 45 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 Are you proposing cooler compressors in the existing spa space? I see no mention of work in this area in the mechanical drawings. 5 6 7 8 1 03/17/2019 Subject: PlanCheck Page Label: FS 1.0 Author: justinh File Name: Almresi Aspen - FS Equip Permit - 180810.pdf This is required to be a type I hood due to the medium and heavy duty appliances under it per IMC 507.2, please identify it as such on the schedule. Subject: PlanCheck Page Label: FS 1.1 Author: justinh File Name: Almresi Aspen - FS Equip Permit - 180810.pdf Please clean up this portion of the drawing to correctly show the proposed plan Subject: PlanCheck Page Label: M-1P MECHANICAL PARKING LEVEL Author: justinh File Name: Almresi Aspen - Mech Permit - 180810.pdf I could not locate where the grease duct gage was called out on the plans or in the specifications and I did not see where the kitchen exhaust make up air operation was provided in any sequence of operations. Please clarify where this information is provided or provide it if it is not currently in the set. Almresi Aspen - Mech Permit - 180810.pdf (2) Subject: PlanCheck Page Label: M1.0 LOWER LEVEL MECHANICAL PLAN Author: justinh File Name: Almresi Aspen - Mech Permit - 180810.pdf Clearly show the required type 1 exhaust hoods and makeup air per IMC 507 and 508. Provide calculations for the hood sizing. Update your equipment schedules to show these items. Subject: PlanCheck Page Label: 11 Author: justinh File Name: Almresi Aspen -MEP Index and COMcheck 180810.pdf Fill out the owner/agent portion on both the mechanical and lighting ComChecks. Almresi Aspen -MEP Index and COMcheck 180810.pdf (2) 16 1 WALL SHELF/POT RACK 17 1 COOKING COUNTER 18 1 FRYER DROP-IN 19 -SPARE NUMBER 20 -SPARE NUMBER 21 2 INDUCTION RANGE 22 1 REFRIGERATED EQUIPMENT STAND w/CASTERS 23 2 GRILL MACHINE BY OWNER 24 2 HOT FOOD WELL (1-WELL), DROP-IN 25 1 INDUCTION GRIDDLE DROP-IN 26 2 INDUCTION WOK RANGE 27 1 SOUS VIDE STATION 28 1 COMBI OVEN ELECTRIC, w/STAND 29 -SPARE NUMBER 30 -SPARE NUMBER 31 1 EXHAUST HOOD 32 1 FIRE PROTECTION CABINET 33 2 HAND SINK 34 2 SOAP & PAPER TOWEL DISPENSER BY OWNER 35 1 PREP TABLE w/UNDERSHELF & 2-COMP. SINK 36 2 WALL SHELF 37 3 INGREDIENT BIN 38 1 WALK-IN COMBO BOX 39 1 WORK TABLE 40 2 41 1 WALK-IN COOLER COMPRESSOR 42 1 WALK-IN COOLER EVAPORATOR COIL 43 1 WALK-IN FREEZER COMPRESSOR 44 1 WALK-IN FREEZER EVAPORATOR COIL 45 1 WALK-IN BEER COOLER COMPRESSOR 46 1 WALK-IN BEER COOLER EVAPORATOR COIL 47 LOT WIRE SHELVING UNIT WALK-IN COOLER/FREEZER 48 1 KEG RACK 49 -SPARE NUMBER 50 51 1 BEER SYSTEM POWER PAK FOR ITEM: 31, WALL MOUNT BY VENDOR LOT TICKET PRINTER NOT SHOWN ON PLANSBY OWNER, VFY. LOCATIONS w/OWNER, w/UNDERSHELF WALL SHELF AIR COOLED AIR COOLED AIR COOLED w/RAMP & FLOOR Al m r e s i - A s p e n 21 9 E a s t D u r a n t S t r e e t This is required to be a type I hood due to the medium and heavy duty appliances under it per IMC 507.2, please identify it as such on the schedule. 74 Please clean up this portion of the drawing to correctly show the proposed plan D.PROVIDE CLEANOUTS EVERY 12 FEET OR AT CHANGED OF DIRECTION FOR GREASE DUCTWORK. I could not locate where the grease duct gage was called out on the plans or in the specifications and I did not see where the kitchen exhaust make up air operation was provided in any sequence of operations. Please clarify where this information is provided or provide it if it is not currently in the set. KITCHEN EXIT EXIT STAIR DUMB WAITER 36/16 (E) VAV-7 FS 14/8 26/13 23/13 A 275 10"ø A 275 10"ø 10"Ø A 275 10"ø A 220 8"ø D24X24 D24X24 36/16 1 2 20/10 23/10 DN DN DNDN DN DN 3 T 44 5 6 7 28/12 28/12 28/10 28/10 24/14 Clearly show the required type 1 exhaust hoods and makeup air per IMC 507 and 508. Provide calculations for the hood sizing. Update your equipment schedules to show these items. OMcheck Software Version 4.0.8.2 nterior Lighting Compliance Certific 2015 IECC Alteration enue Owner/Agent:Designer/Contractor: MKK Consulting Enginee 7600 East Orchard Road Suite 250-S Greenwood Village, CO 8 on Almresi - Aspen ighting Power A Area Category B Floor Area C Allowed Fill out the owner/agent portion on both the mechanical and lighting ComChecks. 2 3 1 2 1 03/17/2019 Subject: PlanCheck Page Label: 11 Author: justinh File Name: Almresi Aspen -MEP Index and COMcheck 180810.pdf No spec was submitted for fixtures F or K. Fixture F has is a 20W fixture per the luminaire schedule on E4.0, you show it as a 2W fixture on this report. Fixture K shows as a custom pendant on the schedule with a wattage of 3W/ft which doesn't make sense for a pendant. I also don't agree with the fixture counts for F and K, please clarify. Provide cutsheets on both fixtures so that I may verify the wattages proposed on this ComCheck, revise as needed. LED 3: C/D: DOWN/WW: Other:1 27 15 405 LED 5: F: LED PANELS: Other:1 23 2 39 LED 6: G: COVE: Other:1 59 3 189 LED 7: H: Other:1 20 3 60 LED 8: K: Other:1 12 3 36 Track lighting 1: J4/J8: TRACK: Wattage based on circuit breaker capacity (7 amps x 120 volts) 0 0 840 840 Track lighting 2: J12: TRACK: Wattage based on circuit breaker capacity (5 amps x 120 volts)0 0 360 600 2750Total Proposed Watts = terior Lighting Compliance Statement ompliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the uilding plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting stems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any pplicable mandatory requirements listed in the Inspection Checklist. terior Lighting PASSES oject Title: ata filename: Almresi - Aspen W:\01-CO\2018.01.0077 Almresi Aspen\DWGS\Linked AutoCAD\ComCheck\IECC_Aspen.cck 07/12/18Report date: 61 ofPage No spec was submitted for fixtures F or K. Fixture F has is a 20W fixture per the luminaire schedule on E4.0, you show it as a 2W fixture on this report. Fixture K shows as a custom pendant on the schedule with a wattage of 3W/ft which doesn't make sense for a pendant. I also don't agree with the fixture counts for F and K, please clarify. Provide cutsheets on both fixtures so that I may verify the wattages proposed on this ComCheck, revise as needed. 2 03/17/2019