Pierce + Frye Architects Vail & San Francisco
970.949.0899
Almresi Aspen, 219 E. Durant Ave, Unit C5
RE: Permit Number: 0094.2018.ACBK
Building Plan Review Comments
February 28, 2019
Attn: Justin Hahn, Plans Examiner, City of Aspen
Phone: 970/429‐2784, Fax: 970/920‐5440,
Justin.Hahn@CityofAspen.com
John Barker, Permit Coordinator, City of Aspen
Phone: 970‐429‐2019
John.Barker@CityofAspen.com
Dear Justin and John,
Regarding your plan review comments for the above reference building permit, dated 10/9/18,
please see the attached drawings, specifications and responses to plan review comments.
Because of the issues raised in the plan reviews, the costs of the kitchen hood venting system
and logistics issues with the initial kitchen design choice, the design for the restaurant has been
modified in response to these concerns. The lower level is now completely dedicated to storage
needs and employee support spaces and the kitchen has been moved to the street level. The
airlock entry has been removed from the plans and the modification to the residence lobby has
been removed as well.
The drawings have been revised. Each of the building plan review comments have been
addressed and resolved, or eliminated. We have responded to each of the building plan review
comments and these are summarized below.
Building Plan Review Comments emailed to Mark Hallenbeck on October 9, 2018 (attached):
Building Comments:
1. Occupancy R‐1 has been added to list of occupancies on sheet A1.0
2. We have modified the seating plans. See plan 1‐A2.0. We now have 64 dining seats and
7 bar seats. There are 4 accessible dining seats and 2 accessible bar seat identified.
Dining area 3 has been modified. This area is no longer raised.
3. Notes have been added to the door schedule on sheet A3.0 to clarify the hardware on
each door.
4. See plumbing fixture counts on sheet A2.0.
03/17/2019
Pierce + Frye Architects Vail & San Francisco
970.949.0899
5. See specs and cut sheets included in Food Service documents. The walk‐in cooler and
freezer have been removed from the plans and only a beer cooler is proposed. All
kitchen equipment will comply with the applicable sections of the 2015 IECC, Chapter 4.
6. The design of the entry area has been revised and the airlock entry, and the
corresponding section, is no longer applicable. This section and reference has been
deleted from the drawing set.
7. The kitchen has been moved to the street level and the dumbwaiter is no longer
needed. It has been deleted from the drawings and the comment is no longer
applicable.
8. Ceiling construction notes referencing the suspended ceiling construction sections 1 – 4,
sheet A6.0, have been revised to include a reference to an additional detail, 8‐A6.1,
which shows the typical suspended drywall ceiling construction.
FS Equipment Comments:
1. All remotely mounted compressors have been deleted from the design. The remaining
beer cooler compressor will be mounted on top of the beer cooler. This comment is no
longer applicable.
2. The new kitchen design includes a Type 1, ventless hood. See specs and cut sheets
included in Food Service documents.
3. The proposed revision to the net leasable area has been deleted. The referenced area
has been revised and drafting conflict deleted.
Mechanical Comments:
1. Refer to separate response letter from MEP Consultant, MKK, now IMEG.
2. Refer to separate response letter from MEP Consultant, MKK, now IMEG.
MEP Index and COMcheck Comments:
1. Refer to separate response letter from MEP Consultant, MKK, now IMEG.
Thank you for your prompt attention to these responses to your building plan review. We
appreciate your efforts to process all of the information quickly. Please don’t hesitate to call
with any questions.
Regards,
Tom Frye
Pierce + Frye Architects
970‐949‐0899 x2
Attachments:
Responses to zoning plan review comments.
Three, full size, stamped and signed sets of revised drawing sheets
One copy of lighting specifications/cutsheets
One copy of Food Service specifications/cutsheets
One copy of Interior Lighting and Mechanical Compliance Certificates (COMcheck)
03/17/2019
0094-2018-ACBK_BuildingComment
Subject: PlanCheck
Page Label: A1.0
Author: justinh
File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf
Please add R-1 to this list.
Almresi Aspen - Arch Permit - 180827_signed.pdf (8)
Subject: PlanCheck
Page Label: A2.0
Author: justinh
File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf
You are showing a total of 80
seats (including bench seating,
not including the bar seating)
which requires a minimum of 4
accessible seats dispersed
throughout the space. Currently
only one accessible seat is
shown. You must also provide
an accessible bar seat plus a
companion seat both with
compliant knee and toe
clearance. Forward approaches
should be shown tucked into
tables/bars 17" demonstrating
compliant knee and toe
clearance and dining surface
height needs to be identified.
Dining area 3 does not meet the
definition of a mezzanine and is
not exempt from accessibility
requirements.
Subject: PlanCheck
Page Label: A2.0
Author: justinh
File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf
With an occupant load over 50
all egress doors require panic
hardware per IBC 1010.10 and
must meet the requirements of
2009 ANSI sec 404. Please
note or show compliance with
the requirement for panic
hardware, 10" smooth surface
on the bottom of the push side of
doors, and max 1/2" thresholds.
Subject: PlanCheck
Page Label: A2.0
Author: justinh
File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf
Provide a required plumbing
fixture calculation per IPC 403.
If you are using you
facilities/fixtures that are
common to other portions of the
building you must include their
occupant loads in the fixture
requirement calculation as well.
Please add R-1 to this
list.
You are showing a total of 80 seats (including bench seating, not
including the bar seating) which requires a minimum of 4
accessible seats dispersed throughout the space. Currently only
one accessible seat is shown. You must also provide an
accessible bar seat plus a companion seat both with compliant
knee and toe clearance. Forward approaches should be shown
tucked into tables/bars 17" demonstrating compliant knee and toe
clearance and dining surface height needs to be identified.
Dining area 3 does not meet the definition of a mezzanine and is
not exempt from accessibility requirements.
With an occupant load over 50 all
egress doors require panic hardware
per IBC 1010.10 and must meet the
requirements of 2009 ANSI sec 404.
Please note or show compliance with
the requirement for panic hardware,
10" smooth surface on the bottom of
the push side of doors, and max 1/2"
thresholds.
Provide a required plumbing fixture calculation per IPC 403. If you are using you
facilities/fixtures that are common to other portions of the building you must include
their occupant loads in the fixture requirement calculation as well.
1
2
3
4
03/17/2019
Subject: PlanCheck
Page Label: A3.0 v\/v\/D/
Author: justinh
File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf
Provide cutsheets on the walk-in
coolers/freezers that
demonstrates compliance with
the requirements of either IECC
C403.2.15 or C403.2.16.
Subject: PlanCheck
Page Label: A3.1 v\/D7
Author: justinh
File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf
5/A6.0 is not provided, please do
so.
Subject: PlanCheck
Page Label: A3.1 v\/D7
Author: justinh
File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf
Dumbwaiters shall be shaft
enclosures per IBC 713.14 so
the rear wall of the dumbwaiter
shaft must also be 1 hour fire
rated. Reference a compliant
fire barrier detail for the entire
shaft enclosure.
Subject: PlanCheck
Page Label: A6.0 aw
Author: justinh
File Name: Almresi Aspen - Arch Permit - 180827_signed.pdf
Provide a detail for your typ.
metal/gypsum board suspension
ceiling system that demonstrates
compliance with IBC 803.13.
Subject: PlanCheck
Page Label: FS 1.0
Author: justinh
File Name: Almresi Aspen - FS Equip Permit - 180810.pdf
Are you proposing cooler
compressors in the existing spa
space? I see no mention of
work in this area in the
mechanical drawings.
Almresi Aspen - FS Equip Permit - 180810.pdf (3)
ice
machine
t.h.s.ing.
bin
ing.
bin
ing.
bin
d
h
p
prep table w/sinks
hot
well wok
walk-in
cooler
walk-in
freezer
walk-in
beer
cooler
beer
system
glycol
pack
11.10
11.10
15.1
15.0
15.215.215.215.2
Provide cutsheets on
the walk-in
coolers/freezers that
demonstrates
compliance with the
requirements of either
IECC C403.2.15 or
C403.2.16.
15.5
15.5
15.5
15.1
15.1
T
T
San
w
in
5/A6.0 is not provided,
please do so.
2.3
2.3
15.0
15.4
Dumbwaiters shall be
shaft enclosures per
IBC 713.14 so the rear
wall of the dumbwaiter
shaft must also be 1
hour fire rated.
Reference a compliant
fire barrier detail for
the entire shaft
enclosure.
DINING AREA 1
RAISED BOOTH
Provide a detail for
your typ.
metal/gypsum board
suspension ceiling
system that
demonstrates
compliance with IBC
803.13.
VERIFY EXACT LOCATION OF
WALK-IN COOLER/FREEZER
COMPRESSORS w/MECHANICAL
DRAWINGS
43
41
45
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Are you proposing
cooler compressors in
the existing spa
space? I see no
mention of work in this
area in the mechanical
drawings.
5
6
7
8
1
03/17/2019
Subject: PlanCheck
Page Label: FS 1.0
Author: justinh
File Name: Almresi Aspen - FS Equip Permit - 180810.pdf
This is required to be a type I
hood due to the medium and
heavy duty appliances under it
per IMC 507.2, please identify it
as such on the schedule.
Subject: PlanCheck
Page Label: FS 1.1
Author: justinh
File Name: Almresi Aspen - FS Equip Permit - 180810.pdf
Please clean up this portion of
the drawing to correctly show the
proposed plan
Subject: PlanCheck
Page Label: M-1P MECHANICAL PARKING LEVEL
Author: justinh
File Name: Almresi Aspen - Mech Permit - 180810.pdf
I could not locate where the
grease duct gage was called out
on the plans or in the
specifications and I did not see
where the kitchen exhaust make
up air operation was provided in
any sequence of operations.
Please clarify where this
information is provided or
provide it if it is not currently in
the set.
Almresi Aspen - Mech Permit - 180810.pdf (2)
Subject: PlanCheck
Page Label: M1.0 LOWER LEVEL MECHANICAL PLAN
Author: justinh
File Name: Almresi Aspen - Mech Permit - 180810.pdf
Clearly show the required type 1
exhaust hoods and makeup air
per IMC 507 and 508. Provide
calculations for the hood sizing.
Update your equipment
schedules to show these items.
Subject: PlanCheck
Page Label: 11
Author: justinh
File Name: Almresi Aspen -MEP Index and COMcheck
180810.pdf
Fill out the owner/agent portion
on both the mechanical and
lighting ComChecks.
Almresi Aspen -MEP Index and COMcheck 180810.pdf (2)
16 1 WALL SHELF/POT RACK
17 1 COOKING COUNTER
18 1 FRYER DROP-IN
19 -SPARE NUMBER
20 -SPARE NUMBER
21 2 INDUCTION RANGE
22 1 REFRIGERATED EQUIPMENT STAND w/CASTERS
23 2 GRILL MACHINE BY OWNER
24 2 HOT FOOD WELL (1-WELL), DROP-IN
25 1 INDUCTION GRIDDLE DROP-IN
26 2 INDUCTION WOK RANGE
27 1 SOUS VIDE STATION
28 1 COMBI OVEN ELECTRIC, w/STAND
29 -SPARE NUMBER
30 -SPARE NUMBER
31 1 EXHAUST HOOD
32 1 FIRE PROTECTION CABINET
33 2 HAND SINK
34 2 SOAP & PAPER TOWEL DISPENSER BY OWNER
35 1 PREP TABLE w/UNDERSHELF & 2-COMP. SINK
36 2 WALL SHELF
37 3 INGREDIENT BIN
38 1 WALK-IN COMBO BOX
39 1 WORK TABLE
40 2
41 1 WALK-IN COOLER COMPRESSOR
42 1 WALK-IN COOLER EVAPORATOR COIL
43 1 WALK-IN FREEZER COMPRESSOR
44 1 WALK-IN FREEZER EVAPORATOR COIL
45 1 WALK-IN BEER COOLER COMPRESSOR
46 1 WALK-IN BEER COOLER EVAPORATOR COIL
47 LOT WIRE SHELVING UNIT WALK-IN COOLER/FREEZER
48 1 KEG RACK
49 -SPARE NUMBER
50
51 1 BEER SYSTEM POWER PAK
FOR ITEM: 31, WALL MOUNT
BY VENDOR
LOT TICKET PRINTER NOT SHOWN ON PLANSBY OWNER, VFY. LOCATIONS w/OWNER,
w/UNDERSHELF
WALL SHELF
AIR COOLED
AIR COOLED
AIR COOLED
w/RAMP & FLOOR
Al
m
r
e
s
i
-
A
s
p
e
n
21
9
E
a
s
t
D
u
r
a
n
t
S
t
r
e
e
t
This is required to be
a type I hood due to
the medium and heavy
duty appliances under
it per IMC 507.2,
please identify it as
such on the schedule.
74
Please clean up this
portion of the drawing
to correctly show the
proposed plan
D.PROVIDE CLEANOUTS EVERY 12 FEET OR AT CHANGED OF DIRECTION FOR
GREASE DUCTWORK.
I could not locate where the grease duct gage was called out on the plans or in the
specifications and I did not see where the kitchen exhaust make up air operation
was provided in any sequence of operations. Please clarify where this information
is provided or provide it if it is not currently in the set.
KITCHEN
EXIT
EXIT
STAIR
DUMB
WAITER
36/16
(E) VAV-7
FS
14/8
26/13
23/13
A 275
10"ø
A 275
10"ø
10"Ø
A 275
10"ø
A 220
8"ø
D24X24
D24X24
36/16
1
2
20/10 23/10
DN DN
DNDN
DN
DN
3
T
44
5
6
7
28/12
28/12
28/10
28/10
24/14
Clearly show the required type
1 exhaust hoods and makeup
air per IMC 507 and 508.
Provide calculations for the
hood sizing. Update your
equipment schedules to show
these items.
OMcheck Software Version 4.0.8.2
nterior Lighting Compliance Certific
2015 IECC
Alteration
enue
Owner/Agent:Designer/Contractor:
MKK Consulting Enginee
7600 East Orchard Road
Suite 250-S
Greenwood Village, CO 8
on
Almresi - Aspen
ighting Power
A
Area Category
B
Floor Area
C
Allowed
Fill out the
owner/agent portion
on both the
mechanical and
lighting ComChecks.
2
3
1
2
1
03/17/2019
Subject: PlanCheck
Page Label: 11
Author: justinh
File Name: Almresi Aspen -MEP Index and COMcheck
180810.pdf
No spec was submitted for
fixtures F or K. Fixture F has is
a 20W fixture per the luminaire
schedule on E4.0, you show it as
a 2W fixture on this report.
Fixture K shows as a custom
pendant on the schedule with a
wattage of 3W/ft which doesn't
make sense for a pendant. I
also don't agree with the fixture
counts for F and K, please
clarify. Provide cutsheets on
both fixtures so that I may verify
the wattages proposed on this
ComCheck, revise as needed.
LED 3: C/D: DOWN/WW: Other:1 27 15 405
LED 5: F: LED PANELS: Other:1 23 2 39
LED 6: G: COVE: Other:1 59 3 189
LED 7: H: Other:1 20 3 60
LED 8: K: Other:1 12 3 36
Track lighting 1: J4/J8: TRACK: Wattage based on circuit breaker capacity (7 amps x 120
volts)
0 0 840 840
Track lighting 2: J12: TRACK: Wattage based on circuit breaker capacity (5 amps x 120 volts)0 0 360 600
2750Total Proposed Watts =
terior Lighting Compliance Statement
ompliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
uilding plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
stems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any
pplicable mandatory requirements listed in the Inspection Checklist.
terior Lighting PASSES
oject Title:
ata filename:
Almresi - Aspen
W:\01-CO\2018.01.0077 Almresi Aspen\DWGS\Linked AutoCAD\ComCheck\IECC_Aspen.cck
07/12/18Report date:
61 ofPage
No spec was submitted for fixtures F or K. Fixture F has is a 20W
fixture per the luminaire schedule on E4.0, you show it as a 2W
fixture on this report. Fixture K shows as a custom pendant on the
schedule with a wattage of 3W/ft which doesn't make sense for a
pendant. I also don't agree with the fixture counts for F and K,
please clarify. Provide cutsheets on both fixtures so that I may
verify the wattages proposed on this ComCheck, revise as needed.
2
03/17/2019