Loading...
HomeMy WebLinkAboutFile Documents.834 W Hallam St.0010.2018 (19).ARBK834 W Hallam_BuildingComments_3 Page Label: A-09 PROPOSED MAIN LEVEL ACESIBILITY File Name: CompletePermitSetClarification2.834Hallam.2018. 05.pdf Author: bonniem Subject: PlanCheck Color: Finish floor elevation difference is greater 3/4". Provide a door threshold detail showing compliance with 1010.1.7 CompletePermitSetClarification2.834Hallam.2018.05.pdf (4) Page Label: A-503 EXTERIOR ONSTRUCTION DETAILS File Name: CompletePermitSetClarification2.834Hallam.2018. 05.pdf Author: bonniem Subject: PlanCheck Color: The 1 hour walls and ceilings at the trash enclosures are fire barriers per 707.3.7 The fire barrier must be continuous to the underside of the floor sheathing above. Page Label: A-503 EXTERIOR ONSTRUCTION DETAILS File Name: CompletePermitSetClarification2.834Hallam.2018. 05.pdf Author: bonniem Subject: PlanCheck Color: The 1 hour assembly ends at the ceiling and needs to extend to the sheathing above. Page Label: S-400 DETAILS File Name: CompletePermitSetClarification2.834Hallam.2018. 05.pdf Author: bonniem Subject: PlanCheck Color: This detail does not allow for the fire barrier to be extend to the floor sheathing. Obtaining a continuous fire barrier around the trash enclosure looks to be almost impossible with the current framing layout. 707.5 Page Label: P.6.01 WASTE & VENT PIPING ISOMETRICS File Name: plumbing plans.pdf Author: bonniem Subject: PlanCheck Color: Plumbing isometrics still show all levels draining to the sump. Revise to show levels above grade draining to gravity. 2015 IPC 712.1 plumbing plans.pdf (1) T.O. CONC98'-0" T.O. CONC98'-0" T.O. SLAB98'-1" T.O. SLAB98'-1" ACCESS AISLE SETBACK LINE GE 4 ACCESSIBLE VAN 96" MIN WIDTH PER ANSI 502.2 ACCESS AISLE 96" MIN WIDTH PER ANSI 502.2 66 67 68 69 70 71 EXTERIO SNOW ST PAINTED HISTORIC COLUMN ORNAME FRONT P WOOD FR REPLICAT HARDSCA BE FLOAT Finish floor elevation difference is greater 3/4". Provide a door threshold detail showing compliance with 1010.1.7 A-503 EXTERIOR CONSTRUCTION DETAILS 9 W-10 R-4 CONCRETE TOPPING REF STRUCT TOP PLATE SILL PLATE FIRE-RATED CAULK W-9 F-3 W-6 F-7 TOP PLATE SILL PLATE SIMPSON DRYWALL HANGER FIRE-RATED CAULK BLOCKING LEDGER PER STRUCT. RIM BOARD PER STUCT. FIRE-RATED CAULK F-2 W-10 TOP PLATE MEMBER REF STRUCT MEMBER REF STRUCTW-8 F-2 OP PLATE ED CAULK 2"= 1'-0" TRASH ENCLOSURE LOWER SCALE: 1 1/2"= 1'-0"13 FR. TRASH ENCLOSURE UPPER SCALE: 1 1/2"= 1'-0"17 F.R. TYP STAGGERED WALLS 2"= 1'-0" TYP DEMISING WALL The 1 hour walls and ceilings at the trash enclosures are fire barriers per 707.3.7 The fire barrier must be continuous to the underside of the floor sheathing above. F-3 W-6 SILL PLATE BLOCKING LEDGER PER STRUCT. FIRE-RATED CAULK STAGGERED WALLS The 1 hour assembly ends at the ceiling and needs to extend to the sheathing above. WALL EDGE NAILING WALL EDGE NAILING G FLOOR SHEATHING WOOD I-JOIST LVL RIM BOARD, ATTACHW/ SIMPSON A35 CLIPS,RE: SHEAR WALL SCHEDULEFOR SPACING OR 48"OC MAX T/SHEATHING 3 FLOOR SHEATHING WOOD I-JOIST FULL HEIGHT BLOCKING FOR(1) BAY @32"OC, ATTACHSHEATHING W/ (3)8d NAILS STUB 2x STUD WALL 2x STUD WALL LVL RIM BOARD, ATTACH W/SIMPSON A35 CLIPS @32"OC FLOOR EDGE NAILING FLOOR SHEATHING WOOD I-JOIST FULL HEIGHT BLOCKING FOR(1) BAY @32"OC, ATTACHSHEATHING W/ (3)8d NAILS T/SHEATHING T/SHEATHING CONT LVL RIM BOARD, ATTACHW/ SIMPSON A35 CLIPS,RE: SHEAR WALL SCHEDULEFOR SPACING OR @32"OC GRID H FLOOR SHEATHING FLOOR EDGE NAILING FLOOR EDGE NAILING 2x BLOCKINGBETWEEN JOISTS,ATTACH W/ 10d@6"OC WALL EDGE NAILING 2x STUD WALL T/SHEATHING WOOD I-JOIST JOIST HANGER LVL JOIST JOIST HANGER LVL BEAM 2x STUD WALL SIMPSON H3 CLIP,(1) EA JOIST NG I N D I C A T E S T H A T T H E I N F O R MA T I O N S H O W N A N D T H E C A L C U L A T I ON S P E R T A I N I N G T O T H A T I N F O R M A T IO N H A V E B E E N P RE P A R E D B Y Q U A L IF I E D P E O P L E U N D ER T H E SE A L D O E S N OT I M P L Y R E S P O N SIB I L I T Y F O R I N F O RM A T I O N P R E P A R E D B Y O T H E R S N O R F O R A N Y I N F O R M AT I O N N O T S H O W N O N T H I S D R A W I N G A N D S U C H P H A S E D P R OJ E C T S , D R A W I N G S TH A T A R E I S S U E D B U T N O T S E A L E D S H A L L B E C O N S ID E R E D T O B E P R EL I M I N A R Y I N N A T U RE A N D A R E I S S U ED F O R I N F O R M A T IO N O N L Y . TH E S E D RA W I N G S A R E T O B E U S E D I N C O N J U NC T I O N W I T H T H E A R C H I T E C T U R A L D OF T H E R EQ U I R E M E N T S F O R T H E C O N S T R U C T IO N . W H E R E C O N FLI C T S O C C U R C O N 1" = 1'-0"4 FLOOR FR 1" = 1'-0"5 FLOOR FR 1" = 1'-0"7 FLOOR FRAMING DETAIL 1" = 1'-0"8 DECK FRAMING DETAIL This detail does not allow for the fire barrier to be extend to the floor sheathing. Obtaining a continuous fire barrier around the trash enclosure looks to be almost impossible with the current framing layout. 707.5 WC-1 LV-1 SH-1 SP-1 SH-1 WC-1 LV-1 FCO KS-1 WC-1 LL ML LL ML SH-1 LV-1 LL ML SH-1 WC-1 SH-1 WC-1 LV-1 FCO LV-1SH-1 LL WC-1 ML 2nd SH-1 LL ML ML LL ML LL ML LL CWB KS-1 ML CWB LV-1 WC-1 FCO LV-1 WC-1 FCO LV-1 SH-1 KS-1 ML ML LL LV-1 WC-1 SH-1 WC-1 LV-1 KS-1 LL ML LL COTG WC-1 FCO LV-1 SH-1 ML WC-1 LV-1 ML LL LL LL LL LL LV-1 WC-1 SH-1 KS-1 2nd 2nd 2nd 2nd LLFCO LV-1 WC-1 SH-1 ML 2nd 2nd LL ML CWB KS-1 LL ML LL ML CWB 2nd 2nd 2nd 2nd 2nd LL LL LL LL 2nd 2nd 2nd 2nd LL CWB 2nd 2nd 2nd 2nd 2nd Waste & Vent Piping Isometric NO SCALE 112" 4" 2" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 4" 112" 112" 112" 112" 2"112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 112" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2"2" 2" 2" 2" 4" 4" 2" 2"2" 4" 6" 6" 6" 6" 4" 4" 4" 4" 112" 112" 112" 112"112" 3" VTR 3" VTR 3" VTR 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 4" 4" 4" 2" 2" 2" 2" 2" 2" 112" 3" VTR 2" 2" 2" 2" 2" 2"4" 4" 4"4" 4" 4" 4" 2" 2"4" 4" 2" 2"112" 4" 112" 4" 4" 2" 2" 4" 3" VTR 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" SEE UNIT 105 PARTIALWASTE & VENT PIPING ISOMETRIC 2" LV-1 WC-1 SH-1 CWB KS-1 3rd 3rd 3rd 3rd 3rd 3" VTR 2nd Unit 105 Partial Waste NO SCALE & Vent Piping Isometric3"3" 2" 4" 2" 2" 4" 4" 112" 112"2" 112" 2" 2" 2" 2" 2" 112" 3" VTR 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 2" 112" 2" 2" 2" 2" 2" 2" 2" 2"4" 2" 4"4" 112" 112" 2" 2" 2" 2" 112" 4" 4" 4" 4" 2" 4" 2" 112" 2" 4" 2" 112" 2" 2" 4" SHEET NUMBER: DRAWN BY: CHECKED BY: PROJECT MANAGER: SHEET TITLE: SEAL: NO.ISSUE DATE PROJECT NUMBER: SCALE: of PO BOX 810825A CHAMBERS AVENUEEAGLE, CO 81631800.543.9365www.randhmechanical.com 170915-01 BW ajs BW AS NOTED Permit Documents To w n s i t e o f A s p e n b l o c k : 1 0 , L o t K & L 11 BID DOC 10/19/2017 NO.REVISIONS DATE CITY STAMPS: 12 PERMIT DRAWINGS 11/20/2017 PEAK DESIGN GROUP LLC1338 GRAND AVE NO315GLENWOOD SPRINGS CO 81601970-688-0102www.peakdesign.org 3 PERMIT DRAWINGS MODS 11/20/2017 7 8P.6.01 WASTE & VENT PIPINGISOMETRICS Plumbing isometricsstill show all levelsdraining to the sump. Revise to show levelsabove grade drainingto gravity. 2015 IPC712.1 FP Response: Drainage revised to show levels above grade draining to gravity. REF P.6.01. FP Response: Finish floor thickness has been reduced, revising elevations from 98'-1" to 98'-3/4", making the difference no greater than 3/4". REF Architectural Detail 23: A-503. FP Response: The construction detail has been revised to include a continuous fire barrier to the underside of sheathing. REF Architectural Detail 13: A-503 & Structural Details 5 & 7: S-400. FP Response: The floor framing layout has been revised to allow a continous fire barrier around the trash enclosure. REF Structural Details 5 & 7: S-400. FP Response: The construction detail has been revised to include a continuous fire barrier to the underside of sheathing. REF Architectural Detail 13: A-503 & Structural Details 5 & 7: S-400. 07/20/2018