HomeMy WebLinkAboutFile Documents.210 W Main St.0056.2019 (15).ARBKEngineering1_0056.2019.3ARBK_210 W Main
Page: 9
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
Clarify that the area that is
exempt is the walkways around
the greenroof.
CIVIL_210 W MAIN_Report_20190206_no plans.pdf (11)
Page: 10
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
Call out which all sidewalk
basins are routed to like PR7.
Page: 10
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
Which basin is this routed to for
treatment?
Page: 11
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
What is the overflow path for the
pervious pavers in this basin?
Page: 13
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
Drainage plan shows pipes at
1% slope. Revise for
consistency.
2.3.1 Proposed Basin PR:1A
Proposed basin PR:1A is comprised of the first floor entrance roof. The roof discharges to Pipe C1. The
basin area totals 79 sf and is 100% impervious. Based on a flow path of 9.5 feet at a slope of 2%, the
time of concentration is 5 minutes. The resulting 100-year flowrate is 0.011 cfs.
PR:1A is collected and directed to a pervious paver system via Pipes C and A in order to provide WQCV.
2.3.1 Proposed Basin PR:1B
Proposed basin PR:1B is comprised of the second and third floor stair and deck areas. The roof dis-
charges to Pipe C2. The basin area totals 141 sf and is 100% impervious. Based on a flow path of 11.2
feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.020 cfs.
PR:1B is collected and directed to a pervious paver system via Pipes C and A in order to provide WQCV.
2.3.1 Proposed Basin PR:2A
Proposed basin PR:2A is comprised of the southwest roof area. The basin area totals 986 sf and is 22%
impervious. Based on a flow path of 23.4 feet at a slope of 1%, the time of concentration is 7.66 minutes.
The resulting 100-year flowrate is 0.055 cfs.
The roof discharges to the west and into basin PB:12. Because the roof is primarily a green roof struc-
ture, the green roof area provides the WQCV although the roof is not entirely “green.” The Aspen Engi-
neering Department has pre-approved this roof be exempt from providing at-grade WQCV for the imper-
vious area. Please see PJ Murray or Hailey Guglielmo if you require an explanation of this determination.
2.3.1 Proposed Basin PR:2B
Proposed basin PR:2B is comprised of the southeast roof area. The basin area totals 630 sf and is 28%
impervious. Based on a flow path of 17.5 feet at a slope of 1%, the time of concentration is 6.43 minutes.
The resulting 100-year flowrate is 0.039 cfs.
The roof discharges to the east and into basin PB:15. Because the roof is primarily a green roof structure,
the green roof area provides the WQCV although the roof is not entirely “green.” The Aspen Engineering
Department has pre-approved this roof be exempt from providing at-grade WQCV for the impervious
area. Please see PJ Murray or Hailey Guglielmo if you require an explanation of this determination.
2.3.1 Proposed Basin PR:3
Proposed basin PR:3 is comprised of the north roof area. The basin area totals 2065 sf and is 16% imper-
vious. Based on a flow path of 32.8 feet at a slope of 1%, the time of concentration is 9.34 minutes. The
resulting 100-year flowrate is 0.101 cfs.
The roof discharges to the east and into basin PB:16. Because the roof is primarily a green roof structure,
the green roof area provides the WQCV although the roof is not entirely “green.” The Aspen Engineering
Department has pre-approved this roof be exempt from providing at-grade WQCV for the impervious
area. Please see PJ Murray or Hailey Guglielmo if you require an explanation of this determination.
Clarify that the area
that is exempt is the
walkways around the
greenroof.
Proposed basin PR:5 is comprised of the sidewalk found on the west of the north building. The basin area
totals 176 sf and is 100% impervious. Based on a flow path of 14.5 feet at a slope of 2%, the time of con-
centration is 5 minutes. The resulting 100-year flowrate is 0.024 cfs.
PR:5 is collected and discharges to a pervious paver system via Pipe A in order to provide WQCV.
2.3.1 Proposed Basin PR:6
Proposed basin PR:6 is comprised of the sidewalk found on the south of the north building. The basin
area totals 58 sf and is 100% impervious. Based on a flow path of 10.8 feet at a slope of 2%, the time of
concentration is 5 minutes. The resulting 100-year flowrate is 0.008 cfs.
PR:6 is collected and discharges to a pervious paver system via Pipe B and A in order to provide WQCV.
2.3.1 Proposed Basin PR:7
Proposed basin PR:7 is comprised of the bike parking area located at the northeast of the north building.
The basin area totals 31 sf and is 100% impervious. Based on a flow path of 8.1 feet at a slope of 2%, the
time of concentration is 5 minutes. The resulting 100-year flowrate is 0.004 cfs.
PR:7 is collected and discharges to a pervious paver system found in PR:4 (parking area pervious pavers)
in order to provide WQCV.
2.3.1 Proposed Basin PR:8
Proposed basin PR:8 is comprised of the sidewalk found in between the southwest and southeast build-
ings. The basin area totals 41 sf and is 100% impervious. Based on a flow path of 8.2 feet at a slope of
2%, the time of concentration is 5 minutes. The resulting 100-year flowrate is 0.006 cfs.
PR:8 is collected and discharges to a pervious paver system via Pipe C and A in order to provide WQCV.
2.3.1 Proposed Basin PR:9
Proposed basin PR:9 is comprised of the sidewalk found at the entrance to the southwest building. The
basin area totals 39 sf and is 100% impervious. Based on a flow path of 4.1 feet at a slope of 2%, the
time of concentration is 5 minutes. The resulting 100-year flowrate is 0.005 cfs.
PR:9 is collected and discharges to PR:12. PR:12 is a vegetated area that meets the definition of a grass
buffer. WQCV is provided by the grass buffer.
2.3.1 Proposed Basin PR:10
Proposed basin PR:10 is comprised of the sidewalk found at the entrance to the courtyard located between
the southwest and southeast buildings. The basin area totals 20 sf and is 100% impervious. Based on a
flow path of 5.4 feet at a slope of 2%, the time of concentration is 5 minutes. The resulting 100-year
flowrate is 0.003 cfs.
Call out which all
sidewalk basins are
routed to like PR7.
dewalk found in between the southwest and southeast build-
% impervious. Based on a flow path of 8.2 feet at a slope of
The resulting 100-year flowrate is 0.006 cfs.
ous paver system via Pipe C and A in order to provide WQCV.
dewalk found at the entrance to the southwest building. The
ous. Based on a flow path of 4.1 feet at a slope of 2%, the
ulting 100-year flowrate is 0.005 cfs.
PR:12 is a vegetated area that meets the definition of a grass
ffer.
idewalk found at the entrance to the courtyard located between
basin area totals 20 sf and is 100% impervious. Based on a
me of concentration is 5 minutes. The resulting 100-year
Which basin is this
routed to for
treatment?
7
Proposed basin PR:14 is comprised of the lawn found at the in between the entrance to the southeast
building and the entrance to the central courtyard. The basin area totals 94 sf and is 0% impervious.
Based on a flow path of 9.3 feet at a slope of 1%, the time of concentration is 5.73 minutes. The resulting
100-year flowrate is 0.005 cfs.
PR:14 does not require WQCV and discharges to the ROW.
2.3.1 Proposed Basin PR:15
Proposed basin PR:15 is comprised of the lawn found at the eastern edge of the southeast building. The
basin area totals 170 sf and is 0% impervious. Based on a flow path of 33.2 feet at a slope of 1%, the
time of concentration is 10.18 minutes. The resulting 100-year flowrate is 0.006 cfs.
PR:15 does not require WQCV and discharges to the ROW.
2.3.1 Proposed Basin PR:16
Proposed basin PR:16 is comprised of the lawn found between the north and southeast buildings. The ba-
sin area totals 507 sf and is 0% impervious. This basin also includes a pervious paver area which treats
many of the impervious areas. Based on a flow path of 40 feet at a slope of 1%, the time of concentration
is 10.22 minutes. The resulting 100-year flowrate is 0.019 cfs.
PR:16 does not require WQCV and discharges to the ROW.
What is the overflow
path for the pervious
pavers in this basin?
tributary runoff.
• Inlet 7
o Inlet 7 is located under a roof, but is provided to collect nuisance drainage.
• Inlet 8
o Inlet 8 collects runoff from basin PR:8 which discharges 0.006 cfs or 2.69 gpm. The inl
has a capacity of 11.78 gpm which when reduced by a factor of safety of 2 becomes 5.89
gpm. The inlet has adequate capacity to convey the tributary runoff.
3.1.1 Pipes
Pipes A, B and C are all 4” PVC pipes laid at a slope of 2% with a capacity of 0.261 cfs when flowing at
80%. As shown in in Table 3, the total tributary flowrate to the pipe network is 0.069 cfs. The pipe net-
work has adequate capacity to convey the tributary runoff.
Basin 100-
Year
Flowrate
(cfs)
PR:1A 0.011
PR:1B 0.020
PR:5 0.024
PR:6 0.008
PR:8 0.006
Total 0.069
Table 3. Pipe A, B and C tributary areas
Drainage plan shows
pipes at 1% slope.
Revise for
consistency.
We have clarified that the walkway portion of the green roof is exempt. We have
updated this sentence for basins PR:2A, 2B and 3.
??
We have stated that the pervious paver system is located within Basin PR:16.
We have stated "The basin flow discharges by overland flow to PR:15 and finally to
PR:17."
Additionally, we have added a high point elevation to C300 and indicated the flow path
from the high point to the Main St. ROW.
We have corrected the report to read 1% rather than 2%. The flowrates in the original
report were for a 1% pipe (supported by the appendix) and are therefore unchanged.
Page: 14
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
Provide operation and
maintenance requirements for
the green roof and grass buffer
areas on site.
Page: 14
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
OS-1 basin is not described in
this drainage report. Should this
refer to the pervious paver areas
on this site?
Page: 14
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
Include a description of access
for maintenance operations for
all BMPs.
Page: 34
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
The plans were not included in
the drainage report.
Page: 34
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
Provide an appendix with
information on the green roof,
include a detail in the civil plan
set. Provide calculations that
show storage capacity of this
system.
Porous Gravel
A porous gravel strip totaling 408 sf of area will provide retention volume for the 91
scribed by Proposed Basin OS-1. Overall the porous gravel will provide 238 cf of st
spaces (7in X 1in / 12 ft X 408 sf X 0.25). The 910 sf area develops 58 cf of runoff d
event (0.77 in X 1 in / 12 ft X 910 sf). The porous gravel has adequate capacity to re
event.
3.2 Operation and Maintenance
The following maintenance recommendations for pervious paver systems can be fou
URMP.
Provide operation
and maintenance
requirements for the
green roof and grass
buffer areas on site.
Porous Gravel
A porous gravel strip totaling 408 sf of area will provide retention volume for the 910 sf of road area de-
scribed by Proposed Basin OS-1. Overall the porous gravel will provide 238 cf of storage in the void
spaces (7in X 1in / 12 ft X 408 sf X 0.25). The 910 sf area develops 58 cf of runoff during the 10-year
event (0.77 in X 1 in / 12 ft X 910 sf). The porous gravel has adequate capacity to retain the 10-year
event.
3.2 Operation and Maintenance
The following maintenance recommendations for pervious paver systems can be found in Table 8.9 of the
URMP.
OS-1 basin is not
described in this
drainage report.
Should this refer to
the pervious paver
areas on this site?
A porous gravel strip totaling 408 sf of area will provide retention volume fo
scribed by Proposed Basin OS-1. Overall the porous gravel will provide 238
spaces (7in X 1in / 12 ft X 408 sf X 0.25). The 910 sf area develops 58 cf of
event (0.77 in X 1 in / 12 ft X 910 sf). The porous gravel has adequate capac
event.
3.2 Operation and Maintenance
The following maintenance recommendations for pervious paver systems can
URMP.
Include a description
of access for
maintenance
operations for all
BMPs.
Appendix C--Plan Set
The plans were not
included in the
drainage report.
Appendix C--Plan Set
Provide an appendix with
information on the green roof,
include a detail in the civil plan
set. Provide calculations that
show storage capacity of this
system.
This section was included in error and has been removed from the report.
This section was updated with maintenance requirements for the green roof and grass
buffers.
Access to the BMPs is now discussed in each of the three BMP O&M sections.
The permit coordinator was unable to upload the report with the planset included in the
appendix. We will attempt to rectify this issue with the resubmittal.
The detail is found on A.6.09. We have added A.6.09 to the civil plan set.
An appendix was added to the report providing information regarding the storage
element of the system. A storage calculation was added to the appendix as well.
Page: 46
Author: pjm
File Name: CIVIL_210 W MAIN_Report_20190206_no
plans.pdf
Were these calculations done
using a 50% clogging factor?
Page: 2
Author: pjm
File Name: DR 02. SHORING-210 W Main
St,Shoring,02-07-19.pdf
Where micropiles are not
proposed, what shoring
technique will be used?
DR 02. SHORING-210 W Main St,Shoring,02-07-19.pdf (3)
Page: 4
Author: pjm
File Name: DR 02. SHORING-210 W Main
St,Shoring,02-07-19.pdf
How will the utilities in conflict
with the micropile walls be
accomodated?
Page: 4
Author: pjm
File Name: DR 02. SHORING-210 W Main
St,Shoring,02-07-19.pdf
Show surcharge restriction areas
on the plan.
Page: [1] 210 W Main-C300
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Show that edge of asphalt work
will be out of the wheel path of
vehicles.
DR 06. CIVIL_210 W Main_Plans_20190206.pdf (13)
Channel Report
Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc.
4 in PVC @ 1%
Circular
Diameter (ft) = 0.33
Invert Elev (ft) = 100.00
Slope (%) = 1.00
N-Value = 0.009
Calculations
Compute by: Q vs Depth
No. Increments = 10
Highlighted
Depth (ft)
Q (cfs)
Area (sqft)
Velocity (ft/s)
Wetted Perim (ft)
Crit Depth, Yc (ft)
Top Width (ft)
EGL (ft)
Were these
calculations done
using a 50% clogging
factor?
CIR
C
U
L
A
T
I
O
N
W
A
L
K
W
AR
E
A
:
4
2
0
S
F
Micropile Wall A
Begin Wall
Micropile Wall A
Turn Line 1
Micropile Wall B
End Wall
0+
2
0
Where micropiles are
not proposed, what
shoring technique will
be used?
ghts as shown on
ace and
4.0 Special Provisions
4.1 Wall geometry used in design was based on plans provided by the client.
4.2 This design is valid only for B&Y Drilling, Inc. at the subject site.
4.3 Excavation shall extend to micropile columns. During the excavation process, material should not be left between the excavation face and the grout/micropile
column.
4.4 The micropile wall designs are valid only for dry surface and subsurface conditions. If surface water or groundwater is encountered during excavation or
installation, RJ Engineering should be notified immediately and the wall may be redesigned at the discretion of RJ Engineering. Surface and subsurface
drainage from adjacent properties should not be discharged at the top or through the micropile wall. Saturated soils may result in materials piping out from
between micropiles resulting in failure and/or excessive wall movements.
4.5 The design life on this micropile wall is 12 weeks. Design life is defined by the beginning of excavation to the construction of the foundation wall. If the
duration of the project exceeds the 12 week duration, RJ Engineering shall be contacted to evaluate the performance of the system and determine if the
design life can be extended.
4.6 RJ Engineering is not responsible for maintaining slope stability above and below the micropile wall during construction.
4.7 Existing utilities appear to be in conflict with proposed shoring wall location. Utility locations presented shall be field verified and exposed or abandoned prior
to micropile wall installation.
4.8 RJ Engineering is not responsible for quality control, quality assurance, changed conditions or problems resulting from improper construction techniques.
4.9 RJ Engineering is not responsible for construction site safety.
4.10 RJ Engineering is not responsible for wall layout. General contractor or representative of the general contractor is responsible for micropile wall layout.
Temporary Micropile Walls
General Notes
February 7, 2019 King Louise
19-001G-D1
Grade-4RDJ
Project Number:
Date:Sheet Number:Prepared by:Project:
Sheet Revisions
Date Revision/Issue Prepared by B&Y Drilling, Inc.
Designed For:
266 Red Cliff Circle Glenwood Springs, CO 81601
How will the utilities
in conflict with the
micropile walls be
accomodated?
Water-cement ratio should be between 0.4 and 0.6.
be in accordance with ASTM A36, Grade 36.
and normal weight aggregate in accordance with
steel.
installed per manufacturers recommendations.
splacement at the surface should be observed during
y up to 3".
es specified herein. Cold weather protection
3.1 The micropile shoring was designed i
Publication No. FHWA NHI-05-039, D
3.2 The following strength parameters we
West Main Street, Aspen, Colorado"
The following values were assumed f
f
(deg) (psf)
Sand and Gravel 36 100
An experienced geotechnical enginee
3.3 Global Factor of Safety = 1.3 min.
3.4 Surcharge Loading - The excavation
loads such as cra
1,000 psf or grea
3.5 No groundwater table was assumed.
below the base of planned excavation
3.6 The micropile walls lateral deflection
the private property line based on ant
4.0 Special Provisions
Show surcharge
restriction areas on
the plan.
REPLACE ASPHALT AT LOCATION OF
CONCRETE PATCH. REPLACE
ASPHALT A MINIMUM 2' OFF GUTTER.
REPLACE ASPHALT OVER WATER
SERVICE TRENCH.
MAIN
ROW
=
Show that edge of
asphalt work will be
out of the wheel path
of vehicles.
Pipe capacities were calculated flowing 80% full. Inlet calculations assume a factor of
safety of 2 or a clogging factor of 50%.
We have updated the plan set to show asphalt replacement to either the edge of the
bus lane or in between wheel paths. A not has been added stating: "Asphalt
replacement shall not terminate within a wheel path." Please note that we have moved
the replacement water service adjacent to the existing service, thus reducing the time
spent in Main St.
Page: [1] 210 W Main-C300
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Include the floating sidewalk
detail in the submittal. Note that
the excavation called out on the
detail may not be attainable on
this site. Call out floating
sidewalk to be used entire length
of tree dripline.
Page: [1] 210 W Main-C300
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
To prevent pavers from shifting
over time, a concrete boarder
could be used.
Page: [1] 210 W Main-C300
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Call out BOW elevations. If this
wall is greater than 4' from footer
to TOW, it will require a
structural engineer's stamp.
Page: [1] 210 W Main-C300
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
To prevent pavers from shifting
over time, a concrete boarder
could be used, especially for this
larger parking area.
Page: [1] 210 W Main-C300
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Is there an existing easement for
the 1' of sidewalk on the
property? This easement shall
be formalized.
Call out spot elevations along
the sidewalk to ensure ADA
slopes are met.
REMOVE CURB CUT & REVEGETATE
Include the floating sidewalk
detail in the submittal. Note
that the excavation called
out on the detail may not be
attainable on this site. Call
out floating sidewalk to be
used entire length of tree
dripline.
GREE
N
R
O
O
F
CIR
C
U
L
A
T
I
O
N
W
A
L
K
W
A
Y
S
AR
E
A
:
4
2
0
S
F
PERVIOUS PATIO A
CIRCULATION PIPED
SUBSTRATE 420 SF
7895.30
7895.30
7895.30
7895.30
7895.30
7895.30
7895.30
7895.30
7895.25
7895.30
7895.28
7895.28
7895.30
7895.29
7895.30
7895.30
7895.307895.30
.30
CLEANOUT 1
RIM:7895.30
INV IN:7893.97 4" PVC
INV OUT:7893.97 4" PVC
CLEANOUT 2
RIM:7895.28
INV IN:7893.87 4" PVC
INLET - 5
RIM:7895.26
INV OUT:7894.36 4" PVC
%
PERFORATED PIPE
10.14' of 4" PVC @ 1.00%
PIPE B2
8.24' of 4" PVC @ 1.00%DISCHARGE ROOF
GRADE
DISCHARGE ROOF
GRADE
PIPE B1
3.06' of 4" PVC @ 1.00%
%
To prevent pavers
from shifting over
time, a concrete
boarder could be
used.
SEWER: ABANDON EXISTING SERVICE.
INSTALL NEW SERVICE PER ASPEN SAN. DIST.
KING
AS
IOUS
RS
TOW: 7895.10
EX:7895
PR:7895
Call out BOW
elevations. If this wall
is greater than 4'
from footer to TOW, it
will require a
structural engineer's
stamp.
G
P
C
SEWER
INSTALL
GAS: NE
PHONE
ELECTRIC: ABANDON EXISTING DIRECT BURY.
PULL NEW CABLE FROM EXISTING TRANSFORMER.
GREE
N
R
O
O
F
AY
S
PARKI
N
G
AREAS
PERVI
O
U
S
PAVER
S
EX:7895.10
PR:7895.10
7895.24
7895.25
7895.30
7895.30
7895.30
7895.30
7895.30
7895.30
7895.24
7895.24
7895.24
7895.30
7895.26
7895.24
TOW: 789
TOW: 789 7895.28
E
TRACKING PAD
MINIMUM
10' WIDTH
5' LENGTH
INLET - 1
RIM:7895.20
INV OUT:7894.59 4" PVC
INLET - 2RIM:7895.20INV IN:7894.44 4" PVCINV OUT:7894.44 4" PVC
INLET - 5
PIPE A114.75' of 4" PVC @ 1.00%
PIPE B28.24' of 4" PVC @ 1.00%
PIPE B311.48' of 4" PVC @ 1.00%
PIPE A229.64' of 4" PVC @ 1.00%
INLET - 3
RIM:7895.26INV IN:7894.14 4" PVCINV IN:7894.14 4" PVCINV OUT:7894.14 4" PVC
INLET - 6RIM:7895.26
INV IN:7894.25 4" PVCINV OUT:7894.25 4" PVC
DISCHA
GRADE
TOW: 7895.2
TOW: 789
EX:7895
PR:7895
To prevent pavers
from shifting over
time, a concrete
boarder could be
used, especially for
this larger parking
area.
ADJA
C
E
N
T
S
I
D
E
W
A
L
K
TO RE
M
A
I
N
.
REPLACE SIDEWALK. SOUTH EDGE AT EXISTING PLANTED
EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO
PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT
DISTURB EXISTING PLANTED AREA ALONG SOUTHERN EDGE.
REMOVE CURB CUT & REVEGETATE
78
7894.71
7895.3
7895.1 7894.
7894.
INLET - 2
RIM:7895.20INV IN:7894.44 4" PVC
INV OUT:7894.44 4" PVC
DISCHARGE ROOF DRAIN TO
GRADE
Is there an existing
easement for the 1' of
sidewalk on the
property? This
easement shall be
formalized.
Call out spot
elevations along the
sidewalk to ensure
ADA slopes are met.
We have updated the plan set to add the detail to
C501. We have referenced the detail in the sidewalk
note on C300.
We have updated the plan set to show a 6" concrete
border around the courtyard and parking pavers.
We have updated the plan set to existing surveyed
bottom of wall elevations. Wall heights do not
exceed 4'.
We have updated the plan set to show a 6" concrete
border around the courtyard and parking pavers.
Per PJ's email sent 6.13. This is no longer required.
Page: [1] 210 W Main-C300
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
It is difficult to see the coloring
difference in the types of
treatment for the concrete areas
on the site plan.
Page: [2] 210 W Main-C200
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Drainage report uses PR to label
basins instead of PB. Revise for
consistency.
Page: [2] 210 W Main-C200
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Is this basin PR14?
Page: [4] 210 W Main-C400
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Does this represent a concrete
boarder around the PP?
Page: [4] 210 W Main-C400
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Call out No. 8 aggregate used in
openings of PP.
CONCRETE TREATED
BY PATIO PERVIOUS
PAVERS
CONCRETE TREATED
BY GRASS BUFFER
OR PAVERS
NEW SIDEWALK
NEW CURB AND
GUTTER
NEW ASPHALT
EXISTING ASPHALT
TO REMAIN
PERVIOUS PAVERS
GREEN ROOF
EELECTRIC METER
GGAS METER
It is difficult to see the
coloring difference in
the types of
treatment for the
concrete areas on
the site plan.
PB:2A
AREA:
985.65
SF
AR
E
A
:
SF PB
:
8
A
R
E
A
:
4
0
.
7
3
S
F
Drainage report uses
PR to label basins
instead of PB. Revise
for consistency.
1SF
PB:1A
AREA:
7
9
.
1
7
S
F
PB:10
A
R
E
A
:
0.25 S
F
PB
:
1
1
A
R
E
A
:
23
.
6
3
S
F
PB:17
A
R
E
A
:
5
9
.
6
4
S
F
PB
:
1
5
A
R
E
A
:
17
0
.
1
8
S
F
Is this basin PR14?
E
7892
7893
7894
IN
2" BEDDING COURSE
NO. 8 AGGREGATE
1' BASE COURSE
NO. 57 AGGREGATE
6" BASE COURSE
NO. 2 STONE
Does this represent a
concrete boarder
around the PP?
El
e
v
a
t
i
o
n
7894
7895
7896
7897
PERFORATED PIPE
0.14' of 4" PVC @ 1.00%
CLEANOUT 2
RIM:7895.28
INV IN:7893.87 4" PVC
PERVIOUS PAVER
TYP THICKNES: 3 1
8"
2" BEDDING COURSE
NO. 8 AGGREGATE
1' BASE COURSE
Call out No. 8
aggregate used in
openings of PP.
We have updated the plan set to better differentiate
the two hatches.
No. These are structures and do not represent a
border. The structures are now shown in the
background. The standard ICPI detail shows a
border around the pavers (C501).
The plans have been updated to call out the No. 8
aggregate between the pavers.
We have changed the planset to read PR to be
consistent with the report.
Yes. We have updated C200 to call out the basin
and its area.
Page: [9] 210 W Main-C600
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Point this comment at the
proposed location of the water
service line.
Page: [9] 210 W Main-C600
Author: pjm
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
The utility plan calls out pulling
from a neighboring transformer
to the west. Loads need to be
calculated to ensure transformer
has capacity for new
development. Please provide
evidence that proposed loads
have been calculated and
existing transformer has
capacity.
WATE
R
M
A
I
N
E
SE
WATER MAIN & SERVICE
NOT SURVEYED
ABANDON EXISTING TAP PER COA WATER DEPT
STANDARDS.
NEW 2" TYPE K COPPER SERVICE MINIMUM
DISTANCE 18" FROM EXISTING TAP
T.
0'
Point this comment at
the proposed location
of the water service
line.
TRANS-
FORMER
The utility plan calls
out pulling from a
neighboring
transformer to the
west. Loads need to
be calculated to
ensure transformer
has capacity for new
development. Please
provide evidence that
proposed loads have
been calculated and
existing transformer
has capacity.
Ron Christian stated via email
"Hey Josh, you are good to take your 3 phase 400
amp service to that transformer location. The only
thing this might require is an upgrade of the
transformer. I am going to figure out what the load is
on it now and will let you know if it needs upgraded.
Thanks, Ron"
on 7/2. We will route power to the location and Ron
will determine whether an upgrade is necessary.