HomeMy WebLinkAboutFile Documents.210 W Main St.0056.2019 (16).ARBKMarkup Summary Dev Rev 3-18-2019 Rnd1 Stormwater Comments 210 W. Main Permit#0056.2019.ARBK
Subject: Dev Rev
Page: [11] 210 W Main-C800
Author: aaronr
Date: 3/18/2019 8:24:24 AM
Creation Date: 3/18/2019 8:23:35 AM
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Ensure sediment containment
BMP does not cross vehicle
tracking pad.
Dev Rev (6)
Subject: Dev Rev
Page: [11] 210 W Main-C800
Author: aaronr
Date: 3/18/2019 8:13:58 AM
Creation Date: 3/18/2019 8:07:51 AM
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
The dimensions described are
not consistent with the Detail
Sheet C504. Please update the
Detail or modify this
specification. The 5' length also
my not be sufficient enough to
provide the required tracking
control, if this length is deemed
insufficient field modifications will
be required.
Subject: Dev Rev
Page: [11] 210 W Main-C800
Author: aaronr
Date: 3/18/2019 8:27:50 AM
Creation Date: 3/18/2019 8:25:41 AM
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Place tracking control within the
alley adjacent to paved surfaces
(1st and 2nd Street) if there will
be any construction traffic using
the alley for access or deliveries.
Subject: Dev Rev
Page: [11] 210 W Main-C800
Author: aaronr
Date: 3/18/2019 8:23:23 AM
Creation Date: 3/18/2019 8:21:48 AM
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Sediment containment BMPs as
described cannot effectively be
placed on paved surfaces.
Subject: Dev Rev
Page: [11] 210 W Main-C800
Author: aaronr
Date: 3/18/2019 8:30:22 AM
Creation Date: 3/18/2019 8:29:05 AM
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Will stock piling of soils occur on
site?
If so please describe identify the
BMPs associated with this
activity.
P
P
TRACKING PAD
MINIMUM
10' WIDTH
5' LENGTH
GATE
CONC.
WASHOUT
Ensure sediment
containment BMP
does not cross
vehicle tracking pad.
GREE
N
R
O
O
F
PARKI
N
G
AREA
S
PERVI
O
U
S
PAVE
R
S
TRACKING PAD
MINIMUM
10' WIDTH
5' LENGTH
GATE
CONC.
WASHOUT
The dimensions
described are not
consistent with the
Detail Sheet C504.
Please update the
Detail or modify this
specification. The 5'
length also my not be
sufficient enough to
provide the required
tracking control, if
this length is deemed
insufficient field
modifications will be
required.
REA=90 SF
DRAIN TO
Place tracking control
within the alley
adjacent to paved
surfaces (1st and 2nd
Street) if there will be
any construction
traffic using the alley
for access or
deliveries.
ADJA
C
E
N
T
CURB
C
U
T
&
SIDE
W
A
L
K
T
O
REMA
I
N
.
REE
Sediment
containment BMPs
as described cannot
effectively be placed
on paved surfaces.
GREE
N
R
O
O
F
GREEN
R
O
O
F
GREEN
R
O
O
F
REPLACE SIDEWALK. SOUTH EDGE AT EXISTING PLANTED
EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO
PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT
TRACKING PAD
MINIMUM
10' WIDTH
5' LENGTH
CONC.
WASHOUT
DISCHARGE ROOF DRAIN TO
GRADE
Will stock piling of
soils occur on site?
If so please describe
identify the BMPs
associated with this
activity.
We have updated the plans to better show the break
in the fence where the gate is to be located.
We have updated the plans to show a 10' length.
We have updated the plans to show a 10' X 10'
tracking pad at each end of the alley.
We have updated the plans to show the sediment
control fence at the edge of the sidewalk.
It is unlikely as the sight is small.
Subject: Dev Rev
Page: [11] 210 W Main-C800
Author: aaronr
Date: 3/18/2019 8:21:09 AM
Creation Date: 3/18/2019 8:20:12 AM
File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf
Provide BMPs in the flow-line
during concrete and asphalt
removal and placement
ADJAC
E
N
T
CURB
C
U
T
&
SIDE
W
A
L
K
T
O
REMA
I
N
.
EE
Provide BMPs in the
flow-line during
concrete and asphalt
removal and
placement A rock sock detail has been called out for this
location.