Loading...
HomeMy WebLinkAboutFile Documents.210 W Main St.0056.2019 (16).ARBKMarkup Summary Dev Rev 3-18-2019 Rnd1 Stormwater Comments 210 W. Main Permit#0056.2019.ARBK Subject: Dev Rev Page: [11] 210 W Main-C800 Author: aaronr Date: 3/18/2019 8:24:24 AM Creation Date: 3/18/2019 8:23:35 AM File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf Ensure sediment containment BMP does not cross vehicle tracking pad. Dev Rev (6) Subject: Dev Rev Page: [11] 210 W Main-C800 Author: aaronr Date: 3/18/2019 8:13:58 AM Creation Date: 3/18/2019 8:07:51 AM File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf The dimensions described are not consistent with the Detail Sheet C504. Please update the Detail or modify this specification. The 5' length also my not be sufficient enough to provide the required tracking control, if this length is deemed insufficient field modifications will be required. Subject: Dev Rev Page: [11] 210 W Main-C800 Author: aaronr Date: 3/18/2019 8:27:50 AM Creation Date: 3/18/2019 8:25:41 AM File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf Place tracking control within the alley adjacent to paved surfaces (1st and 2nd Street) if there will be any construction traffic using the alley for access or deliveries. Subject: Dev Rev Page: [11] 210 W Main-C800 Author: aaronr Date: 3/18/2019 8:23:23 AM Creation Date: 3/18/2019 8:21:48 AM File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf Sediment containment BMPs as described cannot effectively be placed on paved surfaces. Subject: Dev Rev Page: [11] 210 W Main-C800 Author: aaronr Date: 3/18/2019 8:30:22 AM Creation Date: 3/18/2019 8:29:05 AM File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf Will stock piling of soils occur on site? If so please describe identify the BMPs associated with this activity. P P TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH GATE CONC. WASHOUT Ensure sediment containment BMP does not cross vehicle tracking pad. GREE N R O O F PARKI N G AREA S PERVI O U S PAVE R S TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH GATE CONC. WASHOUT The dimensions described are not consistent with the Detail Sheet C504. Please update the Detail or modify this specification. The 5' length also my not be sufficient enough to provide the required tracking control, if this length is deemed insufficient field modifications will be required. REA=90 SF DRAIN TO Place tracking control within the alley adjacent to paved surfaces (1st and 2nd Street) if there will be any construction traffic using the alley for access or deliveries. ADJA C E N T CURB C U T & SIDE W A L K T O REMA I N . REE Sediment containment BMPs as described cannot effectively be placed on paved surfaces. GREE N R O O F GREEN R O O F GREEN R O O F REPLACE SIDEWALK. SOUTH EDGE AT EXISTING PLANTED EDGE. NORTH EDGE ENCROACHES APPROX. 1' ONTO PROPERTY. MINIMUM WIDTH 6'. MAX SLOPE=2% DO NOT TRACKING PAD MINIMUM 10' WIDTH 5' LENGTH CONC. WASHOUT DISCHARGE ROOF DRAIN TO GRADE Will stock piling of soils occur on site? If so please describe identify the BMPs associated with this activity. We have updated the plans to better show the break in the fence where the gate is to be located. We have updated the plans to show a 10' length. We have updated the plans to show a 10' X 10' tracking pad at each end of the alley. We have updated the plans to show the sediment control fence at the edge of the sidewalk. It is unlikely as the sight is small. Subject: Dev Rev Page: [11] 210 W Main-C800 Author: aaronr Date: 3/18/2019 8:21:09 AM Creation Date: 3/18/2019 8:20:12 AM File Name: DR 06. CIVIL_210 W Main_Plans_20190206.pdf Provide BMPs in the flow-line during concrete and asphalt removal and placement ADJAC E N T CURB C U T & SIDE W A L K T O REMA I N . EE Provide BMPs in the flow-line during concrete and asphalt removal and placement A rock sock detail has been called out for this location.