HomeMy WebLinkAboutFile Documents.834 W Hallam St.0010.2018 (24).ARBKCMP Markup Summary
Page: 1
Page Index: 1
Checkmark: Unchecked
Author: tonyk
Date: 3/7/2018 10:43:53 AM
Color:
File Name: Consturction Management Plan.834
Hallam.2018.02.pdf
City of Aspen
tonyk (7)
Page: 1
Page Index: 1
Checkmark: Unchecked
Author: tonyk
Date: 3/7/2018 10:26:34 AM
Color:
File Name: Consturction Management Plan.834
Hallam.2018.02.pdf
City of Aspen
Page: 2
Page Index: 2
Checkmark: Unchecked
Author: tonyk
Date: 3/7/2018 10:33:37 AM
Color:
File Name: Consturction Management Plan.834
Hallam.2018.02.pdf
Complete plan required, see
manual for ideas
Page: 2
Page Index: 2
Checkmark: Unchecked
Author: tonyk
Date: 3/7/2018 10:30:52 AM
Color:
File Name: Consturction Management Plan.834
Hallam.2018.02.pdf
Not included, please supply full
construction schedule
Page: 2
Page Index: 2
Checkmark: Unchecked
Author: tonyk
Date: 3/7/2018 10:28:36 AM
Color:
File Name: Consturction Management Plan.834
Hallam.2018.02.pdf
City of Aspen
Documentation
ts
ontractor shall maintain all applicable local, state, and federal licenses and permits to
pply to the construction project. Applicant is seeking a Pitkin County building permit
nd all applicable sub permits required for a mixed use commercial building.
Notification
otification per Pitkin County Site Plan Review will be completed
oject notifications will be in the form of onsite notifications and direct communication
th neighbors.
ct Sign
project sign per Pitkin County standards including all required project information will
e constructed and posted on site. An example is attached for reference.
ct Designation
ontact list attached.
Implementation
of Construction
oposed dates (depending on date of permit issuance) are 5-1-18 to 5-1-19.
of Construction
City of Aspen
escriptions that i nclude:
The proposed development is an affordable housing project that includes a remodel of
an existing house as well as new units.
The existing house is approximately 1,108.25 sqft
The sqft of the new units is approximately 4208.25 sqft
Project also includes site / landscape improvements and a new parking lot for tenants.
ect Documentation
ermits
Contractor shall maintain all applicable local, state, and federal licenses and permits to
apply to the construction project. Applicant is seeking a Pitkin County building permit
and all applicable sub permits required for a mixed use commercial building.
ublic Notification
Notification per Pitkin County Site Plan Review will be completed
Project notifications will be in the form of onsite notifications and direct communication
with neighbors.
roject Sign
A project sign per Pitkin County standards including all required project information will
be constructed and posted on site. An example is attached for reference.
ontact Designation
Contact list attached.
ect Implementation
ates of Construction
Proposed dates (depending on date of permit issuance) are 5-1-18 to 5-1-19.
ours of Construction
City of Aspen
The property is in a residential neighborhood but with no direct neighbors.
4.5 Project Fencing
Prior to any construction activity the development envelope will be staked and a
construction fence will be erected and will remain for the duration of the project.
4.6 Site Plan for Tree Protection
Existing trees to be protected.
4.7 Park Issues
A full landscaping plan will be submitted as part of the building permit submittal.
Erosion precautions will be put in place per the erosion control plan submitted with the
building permit submittal.
5.Parking Management
5.1 Parking Management Form
Parking will be contained on site and overflow will be adjacent streets.
5.2 Ordinance 35 attached.
5.3 Construction Parking Details
Parking to be mostly contained on site. Trades will be required to car pool in order to
reduce the number of vehicles at the site and in order to maintain continuous access for
deliveries and emergency vehicles.
5.4 Site Map
Staging areas, material storage, trash dumpsters, and portable restrooms are identified
on the attached CMP site plan.
6.Traffic Control
6.1 General
No traffic control plan required.
6.2 Haul Routes
See attached vicinity maps and proposed haul routes for the project. The intent of
these haul routes is to minimize the impact on the City.
6.3 Onsite Vehicle Limitations
Maximum vehicle weights and sizes shall be compliant with Pitkin County requirements.
Complete plan required, see manual for ideas
Per Pitkin County Website and CMP manual construction hours will be 7:30am to
5:30pm Monday – Friday and 9am-5pm on Saturday.
4.3 Sequence of Construction
Preliminary project schedule and sequencing attached.
4.4 Adjoining Properties
The property is in a residential neighborhood but with no direct neighbors.
4.5 Project Fencing
Prior to any construction activity the development envelope will be staked and a
construction fence will be erected and will remain for the duration of the project.
4.6 Site Plan for Tree Protection
Existing trees to be protected.
4.7 Park Issues
A full landscaping plan will be submitted as part of the building permit submittal.
Erosion precautions will be put in place per the erosion control plan submitted with the
building permit submittal.
5.Parking Management
5.1 Parking Management Form
Parking will be contained on site and overflow will be adjacent streets.
Not included, please
supply full construction
schedule
Per Pitkin County Website and CMP manual construction hours will be 7:30am to
5:30pm Monday – Friday and 9am-5pm on Saturday.
4.3 Sequence of Construction
Preliminary project schedule and sequencing attached.
4.4 Adjoining Properties
The property is in a residential neighborhood but with no direct neighbors.
4.5 Project Fencing
Prior to any construction activity the development envelope will be staked and a
construction fence will be erected and will remain for the duration of the project
4.6 Site Plan for Tree Protection
City of Aspen
04/13/2018
Page: 3
Page Index: 3
Checkmark: Unchecked
Author: tonyk
Date: 3/7/2018 10:35:11 AM
Color:
File Name: Consturction Management Plan.834
Hallam.2018.02.pdf
? Please provide Pedestrian
plan
Page: 3
Page Index: 3
Checkmark: Unchecked
Author: tonyk
Date: 3/7/2018 10:43:22 AM
Color:
File Name: Consturction Management Plan.834
Hallam.2018.02.pdf
Sec 5.6- Site plan must include
stabilization plan, extent of
excavation with areas of
surcharge limitation called out by
engineer of record. Please
provide site plans for various
stages of project.
Sec 5.7- Full Waste/Recycling
plan required.
Sec 11.2- Site requires full site
specific Noise Mitigation
modeled plan with proposed
mitigation measures.
6.5 Traffic Control Plan
Hours of deliveries – 7:30am-5:30pm M-F
Exceptions to delivery schedule – N/A
7.Pedestrian Protection
7.1 General
There are no sidewalks along Red butte.
8.Sediment and Erosion Control
8.1 Storm Water Pollution Prevention Plan, to include:
Erosion control measures shown on plan
Mud tracking pads
Concrete washout will be done in a portable unit
9.Fugitive Dust Control
9.1 Fugitive Dust Control Plan
Sediment tracking techniques will include tracking pads for trucks entering and leaving
job site.
? Please provide
Pedestrian plan
10.1 General
Assure proper vehicle maintenance – Subcontractors will properly maintain vehicles
10.2 Emissions from Diesel Powder Engines
Opacity – no darker than 40% - Subcontractors to ensure their truck are compliant
11. Noise Suppression
11.1 General
Noise suppression plan attached
Work not to exceed 80 dB.
Work will be conducted in a manner sensitive to the surrounding neighbors.
Sec 5.6- Site plan must include stabilization plan, extent of excavation with areas
of surcharge limitation called out by engineer of record. Please provide site plans
for various stages of project.
Sec 5.7- Full Waste/Recycling plan required.
Sec 11.2- Site requires full site specific Noise Mitigation modeled plan with
proposed mitigation measures.