Loading...
HomeMy WebLinkAboutFile Documents.834 W Hallam St.0010.2018 (24).ARBKCMP Markup Summary Page: 1 Page Index: 1 Checkmark: Unchecked Author: tonyk Date: 3/7/2018 10:43:53 AM Color: File Name: Consturction Management Plan.834 Hallam.2018.02.pdf City of Aspen tonyk (7) Page: 1 Page Index: 1 Checkmark: Unchecked Author: tonyk Date: 3/7/2018 10:26:34 AM Color: File Name: Consturction Management Plan.834 Hallam.2018.02.pdf City of Aspen Page: 2 Page Index: 2 Checkmark: Unchecked Author: tonyk Date: 3/7/2018 10:33:37 AM Color: File Name: Consturction Management Plan.834 Hallam.2018.02.pdf Complete plan required, see manual for ideas Page: 2 Page Index: 2 Checkmark: Unchecked Author: tonyk Date: 3/7/2018 10:30:52 AM Color: File Name: Consturction Management Plan.834 Hallam.2018.02.pdf Not included, please supply full construction schedule Page: 2 Page Index: 2 Checkmark: Unchecked Author: tonyk Date: 3/7/2018 10:28:36 AM Color: File Name: Consturction Management Plan.834 Hallam.2018.02.pdf City of Aspen Documentation ts ontractor shall maintain all applicable local, state, and federal licenses and permits to pply to the construction project. Applicant is seeking a Pitkin County building permit nd all applicable sub permits required for a mixed use commercial building. Notification otification per Pitkin County Site Plan Review will be completed oject notifications will be in the form of onsite notifications and direct communication th neighbors. ct Sign project sign per Pitkin County standards including all required project information will e constructed and posted on site. An example is attached for reference. ct Designation ontact list attached. Implementation of Construction oposed dates (depending on date of permit issuance) are 5-1-18 to 5-1-19. of Construction City of Aspen escriptions that i nclude: The proposed development is an affordable housing project that includes a remodel of an existing house as well as new units. The existing house is approximately 1,108.25 sqft The sqft of the new units is approximately 4208.25 sqft Project also includes site / landscape improvements and a new parking lot for tenants. ect Documentation ermits Contractor shall maintain all applicable local, state, and federal licenses and permits to apply to the construction project. Applicant is seeking a Pitkin County building permit and all applicable sub permits required for a mixed use commercial building. ublic Notification Notification per Pitkin County Site Plan Review will be completed Project notifications will be in the form of onsite notifications and direct communication with neighbors. roject Sign A project sign per Pitkin County standards including all required project information will be constructed and posted on site. An example is attached for reference. ontact Designation Contact list attached. ect Implementation ates of Construction Proposed dates (depending on date of permit issuance) are 5-1-18 to 5-1-19. ours of Construction City of Aspen The property is in a residential neighborhood but with no direct neighbors. 4.5 Project Fencing Prior to any construction activity the development envelope will be staked and a construction fence will be erected and will remain for the duration of the project. 4.6 Site Plan for Tree Protection Existing trees to be protected. 4.7 Park Issues A full landscaping plan will be submitted as part of the building permit submittal. Erosion precautions will be put in place per the erosion control plan submitted with the building permit submittal. 5.Parking Management 5.1 Parking Management Form Parking will be contained on site and overflow will be adjacent streets. 5.2 Ordinance 35 attached. 5.3 Construction Parking Details Parking to be mostly contained on site. Trades will be required to car pool in order to reduce the number of vehicles at the site and in order to maintain continuous access for deliveries and emergency vehicles. 5.4 Site Map Staging areas, material storage, trash dumpsters, and portable restrooms are identified on the attached CMP site plan. 6.Traffic Control 6.1 General No traffic control plan required. 6.2 Haul Routes See attached vicinity maps and proposed haul routes for the project. The intent of these haul routes is to minimize the impact on the City. 6.3 Onsite Vehicle Limitations Maximum vehicle weights and sizes shall be compliant with Pitkin County requirements. Complete plan required, see manual for ideas Per Pitkin County Website and CMP manual construction hours will be 7:30am to 5:30pm Monday – Friday and 9am-5pm on Saturday. 4.3 Sequence of Construction Preliminary project schedule and sequencing attached. 4.4 Adjoining Properties The property is in a residential neighborhood but with no direct neighbors. 4.5 Project Fencing Prior to any construction activity the development envelope will be staked and a construction fence will be erected and will remain for the duration of the project. 4.6 Site Plan for Tree Protection Existing trees to be protected. 4.7 Park Issues A full landscaping plan will be submitted as part of the building permit submittal. Erosion precautions will be put in place per the erosion control plan submitted with the building permit submittal. 5.Parking Management 5.1 Parking Management Form Parking will be contained on site and overflow will be adjacent streets. Not included, please supply full construction schedule Per Pitkin County Website and CMP manual construction hours will be 7:30am to 5:30pm Monday – Friday and 9am-5pm on Saturday. 4.3 Sequence of Construction Preliminary project schedule and sequencing attached. 4.4 Adjoining Properties The property is in a residential neighborhood but with no direct neighbors. 4.5 Project Fencing Prior to any construction activity the development envelope will be staked and a construction fence will be erected and will remain for the duration of the project 4.6 Site Plan for Tree Protection City of Aspen 04/13/2018 Page: 3 Page Index: 3 Checkmark: Unchecked Author: tonyk Date: 3/7/2018 10:35:11 AM Color: File Name: Consturction Management Plan.834 Hallam.2018.02.pdf ? Please provide Pedestrian plan Page: 3 Page Index: 3 Checkmark: Unchecked Author: tonyk Date: 3/7/2018 10:43:22 AM Color: File Name: Consturction Management Plan.834 Hallam.2018.02.pdf Sec 5.6- Site plan must include stabilization plan, extent of excavation with areas of surcharge limitation called out by engineer of record. Please provide site plans for various stages of project. Sec 5.7- Full Waste/Recycling plan required. Sec 11.2- Site requires full site specific Noise Mitigation modeled plan with proposed mitigation measures. 6.5 Traffic Control Plan Hours of deliveries – 7:30am-5:30pm M-F Exceptions to delivery schedule – N/A 7.Pedestrian Protection 7.1 General There are no sidewalks along Red butte. 8.Sediment and Erosion Control 8.1 Storm Water Pollution Prevention Plan, to include: Erosion control measures shown on plan Mud tracking pads Concrete washout will be done in a portable unit 9.Fugitive Dust Control 9.1 Fugitive Dust Control Plan Sediment tracking techniques will include tracking pads for trucks entering and leaving job site. ? Please provide Pedestrian plan 10.1 General Assure proper vehicle maintenance – Subcontractors will properly maintain vehicles 10.2 Emissions from Diesel Powder Engines Opacity – no darker than 40% - Subcontractors to ensure their truck are compliant 11. Noise Suppression 11.1 General Noise suppression plan attached Work not to exceed 80 dB. Work will be conducted in a manner sensitive to the surrounding neighbors. Sec 5.6- Site plan must include stabilization plan, extent of excavation with areas of surcharge limitation called out by engineer of record. Please provide site plans for various stages of project. Sec 5.7- Full Waste/Recycling plan required. Sec 11.2- Site requires full site specific Noise Mitigation modeled plan with proposed mitigation measures. 04/13/2018