HomeMy WebLinkAboutFile Documents.427 Rio Grande Pl.0016.2019 (37).ACBKCOMcheck Software Version 4.1.1.0 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: 425 Rio Grande Place Aspen, CO 81611 Owner/Agent: City of Aspen 130 S. Galena Street Aspen, CO 81611 970-309-7638 jeff.pendarvis@cityofaspen.com Designer/Contractor: Shaw Construction 760 Horizon Drive Suite 201 Grand Junction, CO 81506 970-242-9236 brianthomas@shawconstruction.net Project Information Energy Code: Aspen City Offices at Galena Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package(s) Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Town Hall 35984 0.80 28823 28823Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures 1-Town Hall LED 1: A: 6" Downlight: Other:1 30 20 615 LED 2: B: Perimeter Fixture (per foot): Other:1 207 4 828 LED 3: C: 4' Strip: Other:1 102 32 3264 LED 4: D: 4' Stairwell: Other:1 13 48 624 LED 5: F: Narrow Depth Downlight: Other:1 6 15 90 LED 7: J: Stair Tape Light: Other:1 96 10 960 LED 6: Q: Pendant: Other:1 1 33 33 6414Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES: Design 78% better than code Project Title: Data filename: Aspen City Offices at Galena \\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall - Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck 03/10/20Report date: 81 ofPage Carrie Burgardt - Electrical Engineer 03/10/2020 COMcheck Software Version 4.1.1.0 Exterior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Construction Site: 425 Rio Grande Place Aspen, CO 81611 Owner/Agent: City of Aspen 130 S. Galena Street Aspen, CO 81611 970-309-7638 jeff.pendarvis@cityofaspen.com Designer/Contractor: Shaw Construction 760 Horizon Drive Suite 201 Grand Junction, CO 81506 970-242-9236 brianthomas@shawconstruction.net Project Information Energy Code: Aspen City Offices at Galena 2 (Neighborhood business district)Exterior Lighting Zone Allowed Exterior Lighting Power A Area/Surface Category B Quantity C Allowed Watts / Unit D Tradable Wattage E Allowed Watts (B X C) Main entry 6 ft of door 20 Yes 120 Other door (not main entry)68 ft of door 20 Yes 1360 Stairway 1100 ft2 1 Yes 1100 Walkway < 10 feet wide 200 ft of 0.7 Yes 140 Entry canopy 850 ft2 0.25 Yes 212 Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 2932 2932 600 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Main entry (6 ft of door width): Tradable Wattage LED 4 copy 1: SD: All per foot: Other:1 10 15 150 Other door (not main entry) (68 ft of door width): Tradable Wattage LED 1: SA: Other:1 18 27 486 Stairway (1100 ft2): Tradable Wattage LED 3: SC: Step Light: Other:1 33 8 264 Walkway < 10 feet wide (200 ft of walkway length): Tradable Wattage LED 2: SB: Other:1 15 11 165 Entry canopy (850 ft2): Tradable Wattage LED 4: SD: All per foot: Other:1 154 15 2310 3375Total Tradable Proposed Watts = Project Title: Data filename: Aspen City Offices at Galena \\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall - Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck 03/10/20Report date: 82 ofPage Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Exterior Lighting PASSES: Design 4% better than code Project Title: Data filename: Aspen City Offices at Galena \\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall - Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck 03/10/20Report date: 83 ofPage Carrie Burgardt - Electrical Engineer 03/10/2020 Inspection Checklist Requirements: 12.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. C103.2 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. C406 [PR9]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Aspen City Offices at Galena \\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall - Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck 03/10/20Report date: 84 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.2.5 [EL25]null Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Aspen City Offices at Galena \\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall - Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck 03/10/20Report date: 85 ofPage 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Aspen City Offices at Galena \\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall - Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck 03/10/20Report date: 86 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C405.5.1 [FI19]1 Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Exterior Lighting fixture schedule for values. C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Aspen City Offices at Galena \\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall - Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck 03/10/20Report date: 87 ofPage Project Title: Data filename: Aspen City Offices at Galena \\files\Corporate\Offices\Denver\MKK\01-Denver\2016.01.0223 & 2016.01.0224 Aspen City Hall - Galena Plaza & Rio Grande\Engr\Energy\2019-06-14_ComCheck.cck 03/10/20Report date: 88 ofPage