HomeMy WebLinkAboutFile Documents.230 E Hopkins Ave.0089.2018 (31).ACBKCOMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
90.1 (2013) Standard
Project Type:Alteration
Construction Site:
200-234 E. HOPKINS
ASPEN, CO 81611
Owner/Agent:
Peter Gluck
360 Hexagon LLC
119 Hyslop Road
Brookline, MA 02445
Designer/Contractor:
Stanton Humphries
AEC
Avon, CO
970-748-8520
stan@aec-vail.com
Project Information
Energy Code:
MOUNTAIN FORGE REMODEL
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-COMMON AREAS (Common Space Types:Corridor/Transition <8 ft wide)2060 0.66 1360
1360Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
COMMON AREAS ( Common Space Types:Corridor/Transition <8 ft wide 2060 sq.ft.)
LED 1: R3 & R4: DOWNLIGHT: Other:1 56 12 666
LED 2: P2: PENDENT AT BATHROOM: Other:1 2 60 120
LED 3: P3: PENDENT AT BATHROOM: Other:1 2 15 30
LED 4: F2: LED STRIP AT UTILITY: Other:1 6 28 168
LED 5: S5: BATHROOM SCONCE: Other:1 9 6 56
LED 6: S6: BATHROOM SCONCE: Other:2 2 40 80
1120Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck Version 4.1.1.0 and to comply with
any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
71 ofPage
Stanton O. Humphries, PE 09/04/19
09/06/2019
09/13/2019
nickt
COMcheck Software Version 4.1.1.0
Exterior Lighting Compliance Certificate
Project Title:
90.1 (2013) Standard
Project Type:Alteration
Construction Site:
200-234 E. HOPKINS
ASPEN, CO 81611
Owner/Agent:
Peter Gluck
360 Hexagon LLC
119 Hyslop Road
Brookline, MA 02445
Designer/Contractor:
Stanton Humphries
AEC
Avon, CO
970-748-8520
stan@aec-vail.com
Project Information
Energy Code:
MOUNTAIN FORGE REMODEL
2 (Residential mixed use area)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
LOWER LEVEL (Entry canopy)300 ft2 0.25 Yes 75
MAIN LEVEL (Entry canopy)600 ft2 0.25 Yes 150
UPPER DECK (Walkway >= 10 feet wide)1809 ft2 0.14 Yes 253
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
478
478
600
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
LOWER LEVEL ( Entry canopy 300 ft2): Tradable Wattage
LED 1: EX3: DOWNLIGHT: Other:1 1 23 23
LED 2: EX1: STEPLIGHT: Other:1 1 4 4
LED 3: EX5: SCONCE: Other:1 2 11 22
MAIN LEVEL ( Entry canopy 600 ft2): Tradable Wattage
LED 4: EX1: STEPLIGHT: Other:1 6 4 23
LED 5: EX3: DOWNLIGHT: Other:1 11 23 253
LED 6: EX4: SCONCE: Other:1 4 15 60
LED 7: EX2: SCONCE: Other:1 5 11 55
UPPER DECK ( Walkway >= 10 feet wide 1809 ft2): Tradable Wattage
LED 9: EX1: Other:1 13 4 51
LED 10: EX5: Other:1 2 11 22
LED 11: EX7: Other:1 4 7 28
541Total Tradable Proposed Watts =
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
72 ofPage
09/06/2019
09/13/2019
nickt
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting
systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck Version 4.1.1.0 and to comply with
any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
73 ofPage
09/04/19Stanton O. Humphries, PE
09/06/2019
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2013) Standard
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
4.2.2,
8.4.1.1,
8.4.1.2,
8.7
[PR6]2
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the electrical systems
and equipment and document where
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
Complies
Does Not
Not Observable
Not Applicable
4.2.2,
9.4.3, 9.7
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
9.7
[PR8]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the exterior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
74 ofPage
09/06/2019
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
8.4.2
[EL10]2
At least 50% of all 125 volt 15- and
20-Amp receptacles are controlled by
an automatic control device.
Complies
Does Not
Not Observable
Not Applicable
9.4.1.1
[EL1]2
Automatic control requirements
prescribed in Table 9.6.1, for the
appropriate space type, are installed.
Mandatory lighting controls (labeled
as 'REQ') and optional choice controls
(labeled as 'ADD1' and 'ADD2') are
implemented.
Complies
Does Not
Not Observable
Not Applicable
9.4.1.1
[EL2]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
9.4.1.2
[EL11]2
Parking garage lighting is equipped
with required lighting controls and
daylight transition zone lighting.
Complies
Does Not
Not Observable
Not Applicable
9.4.1.1f
[EL13]1
Daylight areas under skylights and
roof monitors that have more than
150 W combined input power for
general lighting are controlled by
photocontrols.
Complies
Does Not
Not Observable
Not Applicable
9.4.1.4
[EL3]2
Automatic lighting controls for exterior
lighting installed.
Complies
Does Not
Not Observable
Not Applicable
9.4.1.3
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
9.6.2
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
75 ofPage
09/06/2019
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
8.7.1
[FI16]3
Furnished as-built drawings for
electric power systems within 30 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
8.7.2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
9.2.2.3
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
9.4.2
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
76 ofPage
09/06/2019
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
77 ofPage