Loading...
HomeMy WebLinkAboutFile Documents.546 McSkimming Rd.0047-2020-BCHO (7)The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X MASTER PERMIT: 0142.2018.ARBK 0047-2020-BCHO 8/31/2020 44 SQ.FT. HYDRO 2285 SQ.FT. ELECTRIC 96 SQ.FT A101C, 97% 13.64 kW PV SYSTEM JH 0047-2020-BCHO KARING LLC 546 MCSKIMMING RD 273718102002 1 2 3 4 MASTER PERMIT 0142.2018.ARBK 0018.2019.ARBK 0154.2019.ARBK 0190.2019.ARBK 08/31/2020 justinh SEE NOTES #1 PLANS SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S All snowmelt systems shall meet the following: - Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. - R10 insulation shall be installed under the area to be snowmelted or R5 insulation shall be installed under the slab edges. (Ordinance 11 Series 2011) - Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5) - Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2015 IECC R403.9 and C403.2.3.5) - Inspection by testing hydrostatically at 1.5 times max system design pressure, but not less than 100psi, for 15 minutes. (2015 IMC 1208.1) 09/29/2020 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150