These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
X
MASTER PERMIT: 0142.2018.ARBK
0047-2020-BCHO 8/31/2020
44 SQ.FT. HYDRO 2285 SQ.FT. ELECTRIC
96 SQ.FT
A101C,
97%
13.64 kW PV SYSTEM
JH
0047-2020-BCHO
KARING LLC
546 MCSKIMMING RD
273718102002
1
2
3
4
MASTER PERMIT 0142.2018.ARBK
0018.2019.ARBK
0154.2019.ARBK
0190.2019.ARBK
08/31/2020
justinh
SEE NOTES #1 PLANS
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S
All snowmelt systems shall meet the following:
- Any portions in the Right of Way must be on a separate zone. A ROW permit
and Permanent Encroachment License are required.
- R10 insulation shall be installed under the area to be snowmelted or R5 insulation
shall be installed under the slab edges. (Ordinance 11 Series 2011)
- Automatic controls installed for system shut off when pavement temperature is above
50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5)
- Automatic or manual controls installed for system shut off when outdoor temperature
is above 40°F. (2015 IECC R403.9 and C403.2.3.5)
- Inspection by testing hydrostatically at 1.5 times max system design pressure, but not
less than 100psi, for 15 minutes. (2015 IMC 1208.1)
09/29/2020
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150