HomeMy WebLinkAboutFile Documents.230 E Hopkins Ave.0089.2018 (32).ACBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
10/09/18
0089.2018.ACBK
360 HEXAGON LLC
230 E HOPKINS
273707328008
SEPERATE PERMIT REQUIRED
FOR SIGNS.
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
x
0089.2019.ACBK 9/13/19
312 sqft
A1.2, M-120, M-121, M-602
95%
N/A
NT
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
0089.2019.ACBK 9/13/19
A1.2, M-120, M-121, M-602
95%
N/A
NT
x
102 sqft
135 sqft
49 sqft (exempt)
ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM
Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08
Verification of Building Location by Building Contractor
For Building and Permit Information, please refer to our website at:
http://www.aspenpitkin.com/depts/41/
Exemption
A City verification of building location is not needed when the project creates less the 200 square feet of new floor area.
PART A: Complete and Submit as part of the Building Permit Application
o Building / Job Address or Location: __230/234 E Hopkins ___________________________________________
o Your Name (Person Completing Part A): _Jason Neil___________________________________________
o Your Company: _Peak Surveying, Inc._______________________________________________________________
o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary.
Are building ties shown? (circle one) ‘Yes’ ‘No’
o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the
elevation of this benchmark? _________________________________
o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk.
Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’
o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation:
(i.e., 100’ first floor elev = 7962.50’) _______________________________
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City
o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’
o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
building plans.
o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________
o According to the building plans, what was the design elevation for the same place on the foundation wall?
______________________________
o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’
o If yes, why? ________________________________________________
The undersigned qualified individual certifies that the information in Part B is accurate -
Signature: Date: _
Printed Name: Contact ph. # : ____________________
Company: ______________________________________________________________
7906.73'
100' Main Level = 7908.23'
Jason R. Neil, P.L.S.
06/20/18
970-625-1954
Peak Surveying, Inc.
10/09/18
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
230 E. Hopkins Ave.
970-429-8707Dana Ellis dana@rowlandbroughton.com
970-319-2232Chris Madigan chris@madiganco.com
360 Hexagon LLC
119 Hyslop Rd.Brookline MA 02445
sedgerley@hexagon-properties.com
970-429-8707Dana Ellis - Rowland+Broughton Architecture 203-610-7633
234 E. Hopkins Ave.Aspen CO 81611
dana@rowlandbroughton.com
970-429-8707Dana Ellis - Rowland+Broughton Architecture 203-610-7633
234 E. Hopkins Ave.Aspen CO 81611
dana@rowlandbroughton.com
970-544-9006John Rowland - Rowland+Broughton Architecture 970-379-9910
234 E. Hopkins Ave.Aspen CO 81611
john@rowlandbroughton.com
970-323-7008Justin Yarnell - Yarnell Consulting & Civil Design LLC
229 Midland Ave.Basalt CO 81621
justin@theyarnells.com
970-927-5174Brett McElvain - KL&A
215 N. 12th St., Unit E Carbondale CO 81623
bmcelvain@klaa.com
970-319-2232Chris Madigan - Madigan & Co.
P.O. Box 9682 Aspen CO 81612
chris@madiganco.com
10/09/18
09/13/2019
nickt
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Spray applied fire resistive materials
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
MANDATORY TESTING
REQUIRED
This construction project is required to
comply with the 2015 International
Energy Conservation Code.
Commercial projects will require a
blower door test performed in the
manner complying with section C402.5
of the 2015 IECC.
Maximum 0.40 cfm/sqft at 75 Pa.
READ THIS OR FAIL YOUR INSPECTION!
Furred & Dropped Ceilings, Soffits, and Walls
20015 IBC 803.13
This applies to the attachment of finishes or furring to any
assemblies that are required to be either fire-rated or
non-combustible and is separate from the fire-rated
assembly requirement.
Walls, Ceilings & Soffits: If furred 1 ¾ inches or
less, do one of the following:
4.Fill spaces with Class A material.
5.Fill spaces with inorganic or non-combustible material.
6.Fire block 8 feet in all directions.
Walls: If set out (furred) greater than 1 ¾ inches,
do one of the following:
4.Use a Class A finish material (such as drywall).
5.Use non-combustible framing.
6.Protect both sides with fire sprinklers.
Ceilings & Soffits: If dropped (furred) greater
than 1 ¾ inches:
Framing members, hangers, and other assembly
members must be non-combustible. You may not
use wood.
In Type III and V construction only, you may use fire
retardant treated wood or non-combustible framing.
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviewed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport
Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
_________________
_________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__
H__
I __
E R__
S__
U
M IRC
IBC
2015 IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
January 2018
2015 IEBC
(As Adopted and Amended)
Other _____________
Gross Area of Building: __________ Gross Area of Unit: __________
Occupant Load: ___________
414 sf
2
3
2 1 1
1
1
2
Den, Storage
Commercial, Mechanical, Restrooms, ADU
Commercial, Garage, Restrooms, ADU
Commercial, Residential
Roof top Deck
10,909
2
4 3
5
2
10/09/18
x
for lighting
49 sf exempt 135 sf
85
09/19/2019
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
______________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
DISTURBEDEXTERIOR AREA
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Engineering Zoning (50%)School Ded.
Zoning (50%)CMP (50%)TDM Impact
Energy Code REMP Ped. Amenity
CMP (50%)Plan Check
(Hourly)Housing Cash in Lieu
Parks Review Zoning
(Hourly)Stormwater
Utility Review Engineering
(Hourly)City Use Tax
GIS County Use Tax
SUBMITTAL FEES ISSUANCE FEES
_________Lot Area _________Deed Restricted
_________Census Code _________# of Dwellings _________Plans Location
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____Ventilation Fans
____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
PC
Zoning
HPC
Building
Fire
Engineering
CMP
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
Date ApprovedReviewingDepartment
Re-viewerSign-Off
NEW SQ FT
Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Disturbed Exterior Area: Square footage of lot affected by permit application.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.
DO YOU LIKE DOGS?
December 2017
DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________
__________________________________________________________________________________
__________________________________________________________________________________
ZONE DISTRICT
NeedsReview
DE
F
I
N
I
T
I
O
N
S
0089.2018.ACBK
230 E. Hopkins Ave, Aspen, CO 81611 273707328008
Subdivision: 220 & 230 E Hopkins Ave/117 S Monarch St Minor Sub Adj Parcel A
360 Hexagon LLC
Dana Ellis - Rowland+Broughton 203-610-7633 dana@rowlandbroughton.com
Exterior and interior remodel of an existing mixed-use building. Addition to the alley (north) side of the building.
6,640,000
6,000 SF
6,000 SF
6,000 SF
4,127 SF
932
MU
SV 10/09/18
56,923.75
X
87,575.00 14,173.14 X SV 09.18.19
12,403.21 5,100.00 137,913.71
X NT 9/16/19
5,100.00 3,210.00 1,586.35 X NT 9/16/19
X PJ 09/10/19
13,136.25 34,968.21 X TK 03/03/19
X SW 08/07/19
3,210.00 X AR 11/27/18
180.00
X PM 10/23/18
X NT 7/30/19
932.00 68,670.00 X
Parking 153,840.00 500.00 16,600.00 R MX
6000 Y - CAT 3 UNIT
2
10/09/18
Dr 9/18/19
BM 9/23/19
09/25/2019
COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
90.1 (2013) Standard
Project Type:Alteration
Construction Site:
200-234 E. HOPKINS
ASPEN, CO 81611
Owner/Agent:
Peter Gluck
360 Hexagon LLC
119 Hyslop Road
Brookline, MA 02445
Designer/Contractor:
Stanton Humphries
AEC
Avon, CO
970-748-8520
stan@aec-vail.com
Project Information
Energy Code:
MOUNTAIN FORGE TENANT FINISH
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
2-#4 COMMERCIAL UNIT (Common Space Types:Office - Enclosed)1585 1.11 1759
3-#6 COMMERCIAL UNIT (Common Space Types:Office - Enclosed)520 1.11 577
1-#2 COMMERCIAL UNIT (Common Space Types:Office - Enclosed)322 1.11 357
4-#3 COMMERCIAL UNIT (Common Space Types:Office - Enclosed)655 1.11 727
5-#7 COMMERCIAL UNIT (Common Space Types:Office - Enclosed)485 1.11 538
6-#5 COMMERCIAL (Common Space Types:Office - Enclosed)133 1.11 148
4107Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
#4 COMMERCIAL UNIT ( Common Space Types:Office - Enclosed 1585 sq.ft.)
LED 1: R3 & R4: DOWNLIGHT: Other:1 22 13 286
LED 2: P2: PENDENT AT BATHROOM: Other:1 4 13 52
LED 3: P3: PENDENT AT BATHROOM: Other:1 1 15 15
LED 4: T1: LED STRIP AT UTILITY: Other:1 1 32 32
LED 5: S2 & S3: SCONCE: Other:1 5 20 100
LED 6: TR1 &TR2: TRACK: Other:1 4 20 80
LED 7: C1: PENDANT AT POOL TABLE: Other:1 1 45 45
#6 COMMERCIAL UNIT ( Common Space Types:Office - Enclosed 520 sq.ft.)
LED 7: R3: DOWNLIGHT: Other:1 10 13 130
LED 8: S4: SCONCE: Other:1 10 20 200
LED 9: S4: LED STRIP AT UTILITY: Other:1 1 32 32
#2 COMMERCIAL UNIT ( Common Space Types:Office - Enclosed 322 sq.ft.)
LED 9: R3: DOWNLIGHT: Other:1 3 13 39
LED 10: TR1 & TR2: TRACK LIGHT: Other:1 12 20 240
#3 COMMERCIAL UNIT ( Common Space Types:Office - Enclosed 655 sq.ft.)
LED 11: R3: DOWNLIGHT: Other:1 13 13 169
Project Title:
Data filename:
MOUNTAIN FORGE TENANT FINISH
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE TI LTG COMCHECK.cck
09/04/19Report date:
61 ofPage
09/06/2019
09/13/2019
nickt
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
LED 12: P1: PENDANTS: Other:1 3 20 60
#7 COMMERCIAL UNIT ( Common Space Types:Office - Enclosed 485 sq.ft.)
LED 13: R3: DOWNLIGHT: Other:1 13 13 169
LED 14: P9: PENDANT: Other:1 4 20 80
LED 15: UC3: UNDERCABINET: Other:1 3 2 8
#5 COMMERCIAL ( Common Space Types:Office - Enclosed 133 sq.ft.)
LED 18: T1: LED STRIP: Other:1 2 32 64
1800Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck Version 4.1.1.0 and to comply with
any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES
Project Title:
Data filename:
MOUNTAIN FORGE TENANT FINISH
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE TI LTG COMCHECK.cck
09/04/19Report date:
62 ofPage
9/4/19Stanton O. Humphries, PE
09/06/2019
COMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
90.1 (2013) Standard
Project Type:Alteration
Construction Site:
200-234 E. HOPKINS
ASPEN, CO 81611
Owner/Agent:
Peter Gluck
360 Hexagon LLC
119 Hyslop Road
Brookline, MA 02445
Designer/Contractor:
Stanton Humphries
AEC
Avon, CO
970-748-8520
stan@aec-vail.com
Project Information
Energy Code:
MOUNTAIN FORGE REMODEL
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-COMMON AREAS (Common Space Types:Corridor/Transition <8 ft wide)2060 0.66 1360
1360Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
COMMON AREAS ( Common Space Types:Corridor/Transition <8 ft wide 2060 sq.ft.)
LED 1: R3 & R4: DOWNLIGHT: Other:1 56 12 666
LED 2: P2: PENDENT AT BATHROOM: Other:1 2 60 120
LED 3: P3: PENDENT AT BATHROOM: Other:1 2 15 30
LED 4: F2: LED STRIP AT UTILITY: Other:1 6 28 168
LED 5: S5: BATHROOM SCONCE: Other:1 9 6 56
LED 6: S6: BATHROOM SCONCE: Other:2 2 40 80
1120Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck Version 4.1.1.0 and to comply with
any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
71 ofPage
Stanton O. Humphries, PE 09/04/19
09/06/2019
09/13/2019
nickt
COMcheck Software Version 4.1.1.0
Exterior Lighting Compliance Certificate
Project Title:
90.1 (2013) Standard
Project Type:Alteration
Construction Site:
200-234 E. HOPKINS
ASPEN, CO 81611
Owner/Agent:
Peter Gluck
360 Hexagon LLC
119 Hyslop Road
Brookline, MA 02445
Designer/Contractor:
Stanton Humphries
AEC
Avon, CO
970-748-8520
stan@aec-vail.com
Project Information
Energy Code:
MOUNTAIN FORGE REMODEL
2 (Residential mixed use area)Exterior Lighting Zone
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
LOWER LEVEL (Entry canopy)300 ft2 0.25 Yes 75
MAIN LEVEL (Entry canopy)600 ft2 0.25 Yes 150
UPPER DECK (Walkway >= 10 feet wide)1809 ft2 0.14 Yes 253
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
478
478
600
(a)Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
LOWER LEVEL ( Entry canopy 300 ft2): Tradable Wattage
LED 1: EX3: DOWNLIGHT: Other:1 1 23 23
LED 2: EX1: STEPLIGHT: Other:1 1 4 4
LED 3: EX5: SCONCE: Other:1 2 11 22
MAIN LEVEL ( Entry canopy 600 ft2): Tradable Wattage
LED 4: EX1: STEPLIGHT: Other:1 6 4 23
LED 5: EX3: DOWNLIGHT: Other:1 11 23 253
LED 6: EX4: SCONCE: Other:1 4 15 60
LED 7: EX2: SCONCE: Other:1 5 11 55
UPPER DECK ( Walkway >= 10 feet wide 1809 ft2): Tradable Wattage
LED 9: EX1: Other:1 13 4 51
LED 10: EX5: Other:1 2 11 22
LED 11: EX7: Other:1 4 7 28
541Total Tradable Proposed Watts =
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
72 ofPage
09/06/2019
09/13/2019
nickt
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting
systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck Version 4.1.1.0 and to comply with
any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES
Project Title:
Data filename:
MOUNTAIN FORGE REMODEL
P:\Current Projects\18009.00 - Mountain Forge Building Renovation &
Addition\Calculations\COMcheck\MOUNTAIN FORGE LTG COMCHECK.cck
09/04/19Report date:
73 ofPage
09/04/19Stanton O. Humphries, PE
09/06/2019
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as
applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
2.
4.
1
230 E Hopkins 0089.2019.ACBK
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall
not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
Review shop drawings and submit design changes. The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
2.
3.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2
10/09/18
230 E Hopkins 0089.2019.ACBK
Nick Thompson 9/13/19
10/09/18
10/09/18