Loading...
HomeMy WebLinkAboutFile Documents.535 E Hyman Ave.0093.2018 (7).ACBK10/09/18 JH 11/19/18 OCCUPANT LOAD 45 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK READ THIS OR FAIL YOUR INSPECTION! Furred & Dropped Ceilings, Soffits, and Walls 20015 IBC 803.13 This applies to the attachment of finishes or furring to any assemblies that are required to be either fire-rated or non-combustible and is separate from the fire-rated assembly requirement. Walls, Ceilings & Soffits: If furred 1 ¾ inches or less, do one of the following: 4.Fill spaces with Class A material. 5.Fill spaces with inorganic or non-combustible material. 6.Fire block 8 feet in all directions. Walls: If set out (furred) greater than 1 ¾ inches, do one of the following: 4.Use a Class A finish material (such as drywall). 5.Use non-combustible framing. 6.Protect both sides with fire sprinklers. Ceilings & Soffits: If dropped (furred) greater than 1 ¾ inches: Framing members, hangers, and other assembly members must be non-combustible. You may not use wood. In Type III and V construction only, you may use fire retardant treated wood or non-combustible framing. 11/08/2018 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site.Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items.The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 1 521 E. Hyman Ave.0092.2018.ACBK0093.2018.ACBK SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities.The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. 3. Review shop drawings and submit design changes.The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records.Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 JH Justin Hahn 11/19/18 JH Justin Hahn 11/19/18 50 X X X X X X PC SV 10/09 2,210.30 2,210.30 50.00 1,525.82 1,525.82 5,140.59 641.70 7,908.60 1,645.14 X 0093.2018.ACBK 10/09/18 SV 11/08 AS 10/26/18 JH 11/19/18 JH 11/19/18 TK 10/30/18 SW 11/14/18 PM 11/19/18 10/09/18 FIRE SPRINKLERS REQUIRED DAM 11/20/18 The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK COMcheck Software Version 4.0.8.1 Mechanical Compliance Certificate Project Title: 2015 IECC Project Type:Alteration Location:Aspen, Colorado Climate Zone:7 Construction Site: 535 E. HOPKINS AVE. ASPEN, CO 81611 Owner/Agent:Designer/Contractor: BG BUILDINGWORKS 251 LINDEN ST 200 FORT COLLINS, CO 80524 970-221-5691 Project Information Energy Code: BENTON TI Mechanical Systems List Quantity System Type & Description Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 90 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Hydronic Coil, Capacity = 41 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: FC-1B -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1900 CFM, 1.0 motor nameplate hp, 0.0 fan efficiency grade 1 FC-1B (Single Zone): Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 12 kBtu/h No minimum efficiency requirement applies Cooling: 1 each - Hydronic Coil, Capacity = 12 kBtu/h, No Economizer, Economizer exception: None No minimum efficiency requirement applies Fan System: FC-2B -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 2 Supply, Constant Volume, 750 CFM, 0.7 motor nameplate hp, 0.0 fan efficiency grade 1 FC-2B (Single Zone): Electric Storage Water Heater, Capacity: 2 gallons No minimum efficiency requirement applies 1 WH-1: Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: BENTON TI S:\BGProjects\9203.12 Aspen Core Benton TI Space\Engineering\ComCheck\9203.12 Aspen Core Benton TI ComCheck.cck 09/11/18Report date: 111 ofPage Erin Pasold-Project Manager 09.11.18 10/09/18 11/19/2018 justinh COMcheck Software Version 4.0.8.2 Interior Lighting Compliance Certificate Project Title: 2015 IECC Project Type:Alteration Construction Site: 535 E. HOPKINS AVE. ASPEN, CO 81611 Owner/Agent: Mockingbird Interest Aspen, LLC 4403 N. Central Expressway 303 Dalla, TX 75205 Designer/Contractor: BG BUILDINGWORKS 251 LINDEN ST 200 FORT COLLINS, CO 80524 970-221-5691 Project Information Energy Code: BENTON TI Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Retail:Sales Area 2400 1.59 3816 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a) 1.00 61 (b)Allowance: Decorative Appearance / Fix. ID: Deco Pendant 61 (a) 1.00 238 (b)Allowance: Decorative Appearance / Fix. ID: Deco Linear 238 (a) 2-Common Space Types:Office - Enclosed 475 1.11 527 3-Retail:Dressing/Fitting Room 63 0.71 45 4-Common Space Types:Restrooms 46 0.98 45 5-Common Space Types:Electrical/Mechanical 165 0.95 157 6237Total Allowed Watts = 231Supplemental Allowed Watts (null) = (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s) are specified. (b)Allowance is (B x C) or the actual wattage of the fixtures given in Proposed Power section, whichever is less. (c)Supplemental watts must be associated with retail merchandise highlighting fixtures. Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Project Title: Data filename: BENTON TI S:\BGProjects\9203.12 Aspen Core Benton TI Space\Engineering\ComCheck\9203.12 Aspen Core Benton TI ComCheck - 11192018 Tenant Revisions.cck 11/19/18Report date: 61 ofPage 11/19/2018 justinh E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Retail:Sales Area (2400 sq.ft.) Track lighting 18: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 17: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 16: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 15: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 14: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 13: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 12: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 11: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 10: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 9: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 8: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 7: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 6: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 5: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 4: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 3: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 2: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Track lighting 1: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device capacity 0 0 300 300 Deco Pendant: Other:1 1 61 61 Deco Linear: Other:1 54 4 238 Common Space Types:Office - Enclosed (475 sq.ft.) Linear Fluorescent 1: 48" T8 32W: Electronic:2 5 64 320 Retail:Dressing/Fitting Room (63 sq.ft.) Deco Monopoint: Other:1 2 35 70 Common Space Types:Restrooms (46 sq.ft.) Deco Sconce: Other:1 1 20 20 Common Space Types:Electrical/Mechanical (165 sq.ft.) Linear Fluorescent 1 copy 1: 48" T8 32W: Electronic:2 2 64 128 6237Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting : Passes using retail merchandise highlighting supplemental watts. Project Title: Data filename: BENTON TI S:\BGProjects\9203.12 Aspen Core Benton TI Space\Engineering\ComCheck\9203.12 Aspen Core Benton TI ComCheck - 11192018 Tenant Revisions.cck 11/19/18Report date: 62 ofPage Brian G. Robertson II, P.E. - Principal November 19, 2018 11/19/2018 justinh 11/19/2018 Approved