HomeMy WebLinkAboutFile Documents.535 E Hyman Ave.0093.2018 (7).ACBK10/09/18
JH 11/19/18
OCCUPANT LOAD 45
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
READ THIS OR FAIL YOUR INSPECTION!
Furred & Dropped Ceilings, Soffits, and Walls
20015 IBC 803.13
This applies to the attachment of finishes or furring to any
assemblies that are required to be either fire-rated or
non-combustible and is separate from the fire-rated
assembly requirement.
Walls, Ceilings & Soffits: If furred 1 ¾ inches or
less, do one of the following:
4.Fill spaces with Class A material.
5.Fill spaces with inorganic or non-combustible material.
6.Fire block 8 feet in all directions.
Walls: If set out (furred) greater than 1 ¾ inches,
do one of the following:
4.Use a Class A finish material (such as drywall).
5.Use non-combustible framing.
6.Protect both sides with fire sprinklers.
Ceilings & Soffits: If dropped (furred) greater
than 1 ¾ inches:
Framing members, hangers, and other assembly
members must be non-combustible. You may not
use wood.
In Type III and V construction only, you may use fire
retardant treated wood or non-combustible framing.
11/08/2018
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the
owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1. Signify presence at job site.Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
2. Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3. Report nonconforming items.The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
4. Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as
applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
1
521 E. Hyman Ave.0092.2018.ACBK0093.2018.ACBK
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities.The project owner, the engineer or architect or record, or an agent of the
owner is responsible for employing special-inspection services. The special inspector\agency shall
not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
C. Engineer or Architect of Record Responsibilities
1. Prepare special inspection program. The engineer or architect of record shall list the
items for which special inspection is required; and shall indicate any items for which the
IBC or the building official approves periodic inspection and the frequency of such
inspections.
2. Respond to field discrepancies. The engineer or architect of record shall respond to
uncorrected field discrepancies in design, material, or workmanship observed by the
special inspector.
3. Review shop drawings and submit design changes.The engineer or architect of record
shall acknowledge and review for conformance with the construction drawings those
shop drawings that may detail structural information, shall submit to the building official
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents, and shall submit revised
documents for building official approval as required.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
2. Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
3. Retain special inspection records.Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members.Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
2. Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection.
2
JH Justin Hahn 11/19/18
JH Justin Hahn 11/19/18
50
X
X
X
X
X
X
PC SV 10/09
2,210.30
2,210.30
50.00
1,525.82
1,525.82
5,140.59
641.70
7,908.60
1,645.14
X
0093.2018.ACBK
10/09/18
SV 11/08
AS 10/26/18
JH 11/19/18
JH 11/19/18
TK 10/30/18
SW 11/14/18
PM 11/19/18
10/09/18
FIRE
SPRINKLERS
REQUIRED
DAM 11/20/18
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
COMcheck Software Version 4.0.8.1
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Location:Aspen, Colorado
Climate Zone:7
Construction Site:
535 E. HOPKINS AVE.
ASPEN, CO 81611
Owner/Agent:Designer/Contractor:
BG BUILDINGWORKS
251 LINDEN ST
200
FORT COLLINS, CO 80524
970-221-5691
Project Information
Energy Code:
BENTON TI
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 90 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Hydronic Coil, Capacity = 41 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: FC-1B -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1900 CFM, 1.0 motor nameplate hp, 0.0 fan efficiency grade
1 FC-1B (Single Zone):
Heating: 1 each - Hydronic or Steam Coil, Hot Water, Capacity = 12 kBtu/h
No minimum efficiency requirement applies
Cooling: 1 each - Hydronic Coil, Capacity = 12 kBtu/h, No Economizer, Economizer exception: None
No minimum efficiency requirement applies
Fan System: FC-2B -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 2 Supply, Constant Volume, 750 CFM, 0.7 motor nameplate hp, 0.0 fan efficiency grade
1 FC-2B (Single Zone):
Electric Storage Water Heater, Capacity: 2 gallons
No minimum efficiency requirement applies
1 WH-1:
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
BENTON TI
S:\BGProjects\9203.12 Aspen Core Benton TI Space\Engineering\ComCheck\9203.12 Aspen Core
Benton TI ComCheck.cck
09/11/18Report date:
111 ofPage
Erin Pasold-Project Manager 09.11.18
10/09/18
11/19/2018
justinh
COMcheck Software Version 4.0.8.2
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:Alteration
Construction Site:
535 E. HOPKINS AVE.
ASPEN, CO 81611
Owner/Agent:
Mockingbird Interest Aspen, LLC
4403 N. Central Expressway
303
Dalla, TX 75205
Designer/Contractor:
BG BUILDINGWORKS
251 LINDEN ST
200
FORT COLLINS, CO 80524
970-221-5691
Project Information
Energy Code:
BENTON TI
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Retail:Sales Area 2400 1.59 3816
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
0.60 80 (b)Allowance: Other retail highlighting / Fix. ID: T1 133 (a)
1.00 61 (b)Allowance: Decorative Appearance / Fix. ID: Deco Pendant 61 (a)
1.00 238 (b)Allowance: Decorative Appearance / Fix. ID: Deco Linear 238 (a)
2-Common Space Types:Office - Enclosed 475 1.11 527
3-Retail:Dressing/Fitting Room 63 0.71 45
4-Common Space Types:Restrooms 46 0.98 45
5-Common Space Types:Electrical/Mechanical 165 0.95 157
6237Total Allowed Watts =
231Supplemental Allowed Watts (null) =
(a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s) are specified.
(b)Allowance is (B x C) or the actual wattage of the fixtures given in Proposed Power section, whichever is less.
(c)Supplemental watts must be associated with retail merchandise highlighting fixtures.
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Project Title:
Data filename:
BENTON TI
S:\BGProjects\9203.12 Aspen Core Benton TI Space\Engineering\ComCheck\9203.12 Aspen Core
Benton TI ComCheck - 11192018 Tenant Revisions.cck
11/19/18Report date:
61 ofPage
11/19/2018
justinh
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Retail:Sales Area (2400 sq.ft.)
Track lighting 18: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 17: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 16: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 15: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 14: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 13: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 12: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 11: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 10: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 9: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 8: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 7: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 6: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 5: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 4: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 3: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 2: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Track lighting 1: T1: TRACK W/ 2.5A LIMITER: Wattage based on current limiting device
capacity
0 0 300 300
Deco Pendant: Other:1 1 61 61
Deco Linear: Other:1 54 4 238
Common Space Types:Office - Enclosed (475 sq.ft.)
Linear Fluorescent 1: 48" T8 32W: Electronic:2 5 64 320
Retail:Dressing/Fitting Room (63 sq.ft.)
Deco Monopoint: Other:1 2 35 70
Common Space Types:Restrooms (46 sq.ft.)
Deco Sconce: Other:1 1 20 20
Common Space Types:Electrical/Mechanical (165 sq.ft.)
Linear Fluorescent 1 copy 1: 48" T8 32W: Electronic:2 2 64 128
6237Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.0.8.2 and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting : Passes using retail merchandise highlighting supplemental watts.
Project Title:
Data filename:
BENTON TI
S:\BGProjects\9203.12 Aspen Core Benton TI Space\Engineering\ComCheck\9203.12 Aspen Core
Benton TI ComCheck - 11192018 Tenant Revisions.cck
11/19/18Report date:
62 ofPage
Brian G. Robertson II, P.E. - Principal November 19, 2018
11/19/2018
justinh
11/19/2018
Approved