HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0320.2017 (112).ARBKThe City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
The following criteria must also be met with construction:
Ø A construction fence must be erected along the entire dripline of
all trees on site and any tree canopy from neighboring property.
This will serve as the tree protection zone (TPZ). This fence is to
be constructed in such a manner that the area inside the dripline is
protected. AN INSPECTION OF THIS FENCE MUST BE
PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION
ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION
WITH BEN CARLSEN AT 429-2034.
Ø No materials may be stored in the TPZ, including but not limited
to, construction backfill, construction traffic, or any other
construction materials.
Ø No excavation, grading or trenching may occur within the TPZ
without the consent of the City of Aspen Forester or his designee.
Ø No parking of vehicles or equipment may occur in the TPZ.
Ø No dumping of any waste products may occur in the TPZ.
Ø Any roots cut during excavation shall be pruned with sharp
loppers/pruners back to the soil line. The roots will further be
protected by burlap draped over the side of the excavation
covering the exposed roots. This burlap shall be kept moist until
the excavation is backfilled.
Ø Pruning to provide clearance for construction activities shall only
be done under the direction of an arborist.
Ø Site inspections shall be performed on a weekly basis, to ensure
the above listed conditions are met.
Ø Any unapproved improvements or activities outside of those
approved within this permit will be subject to mitigation in the form
of restoration.
Ø This permit must be posted on site during the construction
process.
City of Aspen - Tree Planting Specifications
Trunk caliper shall
meet ANSI Z60 current
edition for root ball size.
Modified soil. Depth
varies. (See soil preparation
plan).
Finished grade.
Bottom of root ball rests on
existing or recompacted
soil.
Central leader. (See crown
observations detail).
SECTION VIEW
Remove 1/3 of
burlap and basket
wire.
Round-topped
soil berm 4" high x 8" wide
above root ball surface
shall be constructed around
the root ball. Berm shall
begin at root ball periphery.
Top of root ball shall be flush with
finished grade.
Prior to mulching, lightly tamp soil
around the root ball in 6" lifts to
brace tree. Do not over compact.
When the planting hole has been
backfilled, pour water around the
root ball to settle the soil.
4" layer of mulch.
No more than 1" of mulch on
top of root ball. (See
specifications for mulch).
Notes:
1- Trees shall be of quality
prescribed in crown
observations and root
observations details and
specifications.
2- See specifications for
further requirements related to
this detail.
Existing soil.
TP-1
s >5
1/ iT\ 1//0/1>/1'/1';;; /1'/1
\ */ ’ \ */ \ */ \ */ \ */ \
"-'i .-..t ■ 1 'i.i-i 1 i- -i-- V »
I.v '/ O'/' \ '/ ' '/ O'/' O/
^ i'l —I r i'l [v-
I yqTTE3TTr=rrfSSvSOI ItFFt
Tr TT
A
LJ
The City of Aspen
Tree protection fencing is required at the driplines of all trees shown.
There is NO activity allowed within this fenced area, including, but not
limited to: digging, storage of material, equipment, machinery, foot or
vehicle traffic.
Please contact the City Forester or his designee at 920-5120 for an
inspection of this fencing Prior to any activity.
If the need arises to perform any activity in the tree protection area, please
contact the City Forester and you will be given specific instructions as to
how to proceed to minimize impacts to the tree root zone.
City of Aspen - Tree Protection Zone
Crown drip line or other limit of Tree Protection area. See
tree preservation plan for fence alignment.
4'
-
0
"
Maintain existing
grade with the tree
protection fence
unless otherwise
indicated on the
plans.
2" x 6' steel posts
or approved equal.
Tree Protection
fence: High density
polyethylene fencing
with 3.5" x 1.5"
openings; Color-
orange. Steel posts
installed at 8' o.c.
5" thick
layer of mulch.
Notes:
1- See specifications for additional tree
protection requirements.
2- If there is no existing irrigation, see
specifications for watering requirements.
3- No pruning shall be performed except
by approved arborist.
4- No equipment shall operate inside the
protective fencing including during fence
installation and removal.
5- See site preparation plan for any
modifications with the Tree Protection
area.
SECTION VIEW
KEEP OUT
TREE
PROTECTION
AREA
8.5" x 11"
sign
laminated in
plastic spaced
every 50'
along the
fence.
URBAN TREE FOUNDATION
OPEN SOURCE FREE TO USETPZ-1
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
x
0320.2017.ARBK &
0007.2018.ARBK
11/16/18
1148
51 sqft non exempt, 40 sqft exempt
A1.3
95%
PV (5.54 kW inverter total), GSHP
NT
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviwed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
__________________________
__________________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__
H__
I __
E R__
S__
U
M IRC
IBC
2015 IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
August 2017
01/08/2018
0320.2017.ARBK 209 Bleeker Unit A
n
n
260 40 (exempt)0
1 1
2
2 0
2 2
1 0
2 0
2 Bedrooms, 2 3/4 baths, 1 1/2 bath, living room, mechanical, laundry
garage, 1/2 bath, kitchen, living, dining
NT 11/16/18
Building Total
Fire Area:
8262 sqft
Unit fire area:
2215 sqft
Code Editions
Fire Sprinkler System
Type Of Construction Fire Alarms Installed
Required Special Inspections
Energy Code Compliance
Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________
Building Type/Occupancy Group
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
BUILDING CODE INFORMATION
2015 IRC
Existing?NFPA 13 NFPA 13 R
High-Strength Bolting Epoxy Anchors Structual Steel Welding
Permanent Micropiles Other _____________
Prescriptive Table
UNIT DESCRIPTION AS PROPOSED
# Stories Above Grade ______ # Stories Below Grade _______
Parking Spaces ______ Parking Spaces ______ Parking Spaces ______
# Bedrooms ______ # Full Baths ______ Deck Area ______
# 3/4 Baths ______ # 1/2 Baths ______
# Kitchens ______ # Wood Fireplaces ______
# Gas Appliances ______ # Gas Logs______
NFPA 13 D
RESCheck UA Alternative
Yes No
One Family Two Family
Townhouse
Reviwed By: _____________________Date:__________
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement ___________________________________________________________________________________
___________________________________________________________________________________________
Main Level __________________________________________________________________________________
____________________________________________________________________________________________
2nd Floor ___________________________________________________________________________________
__________________________________________________________________________________________
3rd Floor ___________________________________________________________________________________
___________________________________________________________________________________________
Additional ___________________________________________________________________________________
___________________________________________________________________________________________
Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____
# Other Rooms (List)____________
ADU BUILDING DESCRIPTION
YesNo
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
(As Adopted and Amended)
Other (Please Explain)
__________________________
__________________________
VA VB IV IIIA IIIB IIA IIB IA IB
Sprayed Fire-Resistants
COMCheck UA Alternative
(Existing + New)
A__B
B (A <50)
F__
H__
I __
E R__
S__
U
M IRC
IBC
2015 IBC
(As Adopted and Amended)
Yes
No Required?Yes
No Type
August 2017
01/08/2018
0007.2018.ARBK 209 Bleeker Unit B
n
n
888 51 (non-exempt)0
2 1
2
5 2
3 2
1 0
2 1
2 bedrooms, 2 3/4 baths, media, mechanical, laundry, exercise room
2 bedrooms, 1 full bath, 1 3/4 bath, 1 1/2 bath, garage, mudrooms, entry, exterior storage
1 bedroom, 1 full bath, 1 1/2 bath, kitchen, living, dining, deck
NT 11/16/18
Building Total
Fire Area:
8262 sqft
Unit fire area:
6047 sqft
11/1
6
/
2
0
1
8
nick
t
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
11/19/2018
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION
MASTER PERMIT: ______________________DATE:___________
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
PROPERTY INFORMATION
___________________________________ _________ ___________________________
______________ ______________ ________________________________________
__________________________________________________________________________________
____________________________________________________________________________________________
_________________________ _______________ __________________________________
________________________ _______________ __________________________________
PERMIT NUMBER: __________________________
CommericalMulti-FamilySingle Family
Use of Building Class of Work
NewAdditionAlterationRepair
________
YesNo
Will there be any roof/wall penetrations?
NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced.
__________________
_________________ __________________
____________________ ________________
_________________
__________
PROJECTVALUATION
SQ FT OF WORK AREA
UNIT SQ FT
SQ FT OF LAND-SCAPE WORK
SQ FT OF ROOMS WITH UTILITY WORK
LOT SIZE(SQ FT)
PROJECT DETAILS
Mixed-Use IFFRTenant FinishDemolitionChange Order
________
ADDRESS UNIT #PARCEL ID #
BLOCK TRACT OR SUBDIVISIONLOT
DESCRIPTION OF WORK IN DETAIL
FOR CITY USE ONLY
Plan Check Permit Fee Parks Impact
Energy Code REMP School Ded.
Zoning (50%)Plan Check
(Hourly)
TDM Impact
Engineering Review Zoning (Hourly)Ped. Amenity
CMP (50%)Engineering
(Hourly)
Housing Cash in Lieu
Parks Review Zoning (50%)Stormwater
Utility Review CMP (50%)City Use Tax
Other Electrical County Use Tax
Plumbing GIS
Mechanical Sanitation
SUBMITTAL FEES ISSUANCE FEES
__________________PLANS LOCATION
_________Lot Area
_________Zone District
_________Deed Restricted
_________Census Code
_________# of Dwellings
APPROVALS
ISSUANCE FEES
BEST CONTACTNAME CELL EMAIL
OWNER NAME CELL EMAIL
____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Shower____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________
Fixture Counts
____Forced Air/Gravity Systems
____Wall, Suspended, or Unit Heaters
____Gas Log
____Gas Appliancew
____Appliance Vents
____Heat, Refrig, Cooling, or
Absorption Unit
____Boilers (includes vent)
____Air Handling Unit
____Cooling Systems
____Ventilation Fans
____Range Hood
____# of Gas System Outlets
____Snowmelt System Sq Ft_________
Equipment Checklist
Zoning
HPC
Building
Fire
Engineering
CMP
Utilities
Water
Stormwater
Sanitation
Env. Health
Parks
Landscape
Efficiency
Approved
To Issue
Issuance
ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials
Call Assessor (970-920-5160) to verify
NEW SQ FT
Details Term DefinitionsProject Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Landscape Work: Square footage of disturbed exterior area.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS?
August 2017
01/08/2018
0320.2017.ARBK 01/08/18
209 E. Bleeker Street unit A 2737 073 20 002
C&D 73 City & Townsite of Aspen
Historic Restoration & New Construction - Duplex
Cathedral Cutthroat LLC (816)304-8001 afromm@smg.com
5,326,762.00 112
12
722
5,559 sf
8,279 SF
8262
6,000 1
3
2
7,466 SF
2,195 sf
1
4
4
8 2
X JPo 11/19/18
NT 11/19/18
0 NT 11/19/18
sw 11/16/18
x RM 7/5/18
x
x
x
x
x
x
x
x
x
x
x
AS 10/30/2
pjm 11/19/18
11/21/18
ar 01/09/18
pm11/07/18
bc 11/12/18
50,521.72
9,319.47
180.00
7037.15
2195.00
69105.1511658.86
500.00
4429.27
4429.27
7037.15 54881.00
36564.00
77725.72
13316.91
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER
___________________________________ _____________________ ________________________Name Phone E-mail
FOR PLAN REVIEW QUESTIONS
___________________________________ _____________________ ________________________Name Phone E-mail
FOR INSPECTION QUESTIONS
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
OWNER’S AUTHORIZED AGENT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
APPLICATION BEST CONTACT
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
ARCHITECT OR DESIGNER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
CIVIL ENGINEER OF RECORD
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
STRUCTUAL ENGINEER OF RECORD
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
________________________________________________________ _____________________ContractorSignature Date
INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
___________________________________ _____________________ _____________________
________________________________________ __________________ _________ ____________
_______________________________________________________________________________________
Name Phone Cell Phone
CityMailing Address
E-mailAddress
State ZIP
GENERAL CONTRACTOR
Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file
ADDRESS: ____________________________PERMIT NUMBER: _______________________________
August 2017
01/08/2018
Cathdral Cutthroat LLC
5601 High Dr.Mission Hills KS 66208
afromm@smg.com
Z Group Architects 970-925-1832
411 e. mAIN sTREET, #205 Aspen CO 81611
seth@zgrouparchitects.com
Z Group Architects 970-925-1832
411 E. Main St, #205 Aspen CO 81601
melanie@zgrouparchitects.com
Justin Yarnell 970-323-7008
229 Midland Ave.Basalt CO 81621
justin@theyarnells.com
Albright & Associates 970-927-4363 402
402 Park Ave, Unit A Basalt CO 81621
jack@albright-associates.com
0320.2017.ARBK
CATHEDRAL CUTTHROAT LLC
209 E BLEEKER UNIT A
273707320002
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
DAM 11/30/18
Generated by REScheck-Web Software
Compliance Certificate
Project 209 E Bleeker
Energy Code:2015 IECC
Location:Aspen, Colorado
Construction Type:Single-family
Project Type:New Construction
Conditioned Floor Area:7,594 ft2
Glazing Area 14%
Climate Zone:7 (9922 HDD)
Permit Date:
Construction Site:
209 E. Bleeker St.
Aspen, CO 81611
Owner/Agent:
Cathedral Cutthroat LLC
5601 High Dr.
Mission Hills, KS 66208
Designer/Contractor:
Arliss Merrell
Resource Engineering Group
502 Whiterock Ave.
Crested Butte, CO 81224
merrell@reginc.com
Permit Number:
Compliance: Passes using UA trade-off
4.1% Better Than Code Maximum UA:1187 Your UA:1138
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Compliance:
Envelope Assemblies
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Ceiling: Other 4,448 0.017 75
Wall-North: Wood Frame, 16" o.c.2,146 35.7 0.0 0.045 76
Window-North: Wood Frame 466 0.350 163
Wall-East: Wood Frame, 16" o.c.2,573 35.7 0.0 0.045 101
Window-East: Wood Frame 320 0.350 112
Wall-South: Wood Frame, 16" o.c.2,113 35.7 0.0 0.045 78
Window-South: Wood Frame 376 0.350 131
Wall-West: Wood Frame, 16" o.c.2,516 35.7 0.0 0.045 107
Window-West: Wood Frame 145 0.350 51
Wall-North Cabin: Wood Frame, 16" o.c.287 22.7 0.0 0.055 12
Window-North Cabin: Wood Frame 62 0.350 22
Wall-East Cabin: Wood Frame, 16" o.c.349 22.7 0.0 0.055 15
Window-East Cabin: Wood Frame 68 0.350 24
Wall-South Cabin: Wood Frame, 16" o.c.273 22.7 0.0 0.055 12
Window-South Cabin: Wood Frame 59 0.350 21
Wall-West Cabin: Wood Frame, 16" o.c.390 22.7 0.0 0.055 20
Project Title: 209 E Bleeker
Data filename:Page 1 of 10
09/24/18Report date:10/11/2018
11/1
6
/
2
0
1
8
nick
t
Assembly
Gross Area
or
Perimeter
Cavity
R-Value
Cont.
R-Value U-Factor UA
Window-West Cabin: Wood Frame 18 0.350 6
Floor: All-Wood Joist/Truss 41 38.0 0.0 0.026 1
Basement: Solid Concrete or Masonry
Wall height: 10.0'
Depth below grade: 10.0'
Insulation depth: 10.0'
3,482 14.0 10.0 0.032 111
Name - Title Signature Date
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Project Title: 209 E Bleeker
Data filename:Page 2 of 10
09/24/18Report date:
Arliss E. Merrell-Project Engineer 09-24-2018
10/11/2018
11/16
/
2
0
1
8
nickt
0320.2017.ARBK
3
2. Approval of fabricator. Approval shall be based upon review of the fabricator’s written
procedural and quality control manuals and periodic auditing of fabrication practices by
an approved special inspection agency.
3. Completion of fabrication. Upon completion of fabrication, the approved fabricator
shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
G. Building Department Responsibilities
1. Approve special-inspection program. The building department shall approve all
special inspectors and special-inspection requirements.
2. Enforce special inspection. Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors. His\Her approval, in
addition to that of the special inspector, must be obtained prior to placement of concrete,
covering of structural steel, or other similar materials.
3. Review inspection reports. The building official should review special-inspection
progress and final reports.
4. Perform final inspection. The building official should perform the final inspection and
approval for a project [IBC Sec. 109.3.1] after the final special-inspection report has been
reviewed and approved.
Project Address: __________________________________ Permit Number:______________________
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special Inspection Agency:
__________________________
Owner:
__________________________
Engineer/ Architect:
__________________________
Contractor:
__________________________
Approved Fabricator:
__________________________
Inspected Fabricator:
__________________________
(circle one)
CITY OF ASPEN
PITKIN COUNTY:
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Signature:
__________________________
Printed Name:
__________________________
Printed Name
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Printed Name:
__________________________
Date:
__________________________
Date
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Date:
__________________________
Tiffany PhippsWest End House LLC 09/26/18
209 E. Bleeker Street 0320.2017.ARBK
Nick Thompson 11/16/18
11/16
/
2
0
1
8
nickt
Stamp is not valid for building department use unless it
contains a valid third party verified electronic signature.
10/11/2018
11/1
6
/
2
0
1
8
nickt
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SHEET NO.
SHEET TITLE
NO
.
NA
M
E
YA
R
N
E
L
L
C
O
N
S
U
L
T
I
N
G
&
CI
V
I
L
D
E
S
I
G
N
,
L
L
C
22
9
M
I
D
L
A
N
D
A
V
E
N
U
E
,
B
A
S
A
L
T
,
C
O
L
O
R
A
D
O
8
1
6
2
1
(9
7
0
)
3
2
3
-
7
0
0
8
IS
S
U
E
/
R
E
V
I
S
I
O
N
DA
T
E
:
DA
T
E
TH
E
D
E
S
I
G
N
S
S
H
O
W
N
H
E
R
E
I
N
I
N
C
L
U
D
I
N
G
AL
L
T
E
C
H
N
I
C
A
L
D
R
A
W
I
N
G
S
,
G
R
A
P
H
I
C
RE
P
R
E
S
E
N
T
A
T
I
O
N
&
M
O
D
E
L
S
T
H
E
R
E
O
F
,
A
R
E
PR
O
P
R
I
E
T
A
R
Y
&
C
A
N
N
O
T
B
E
C
O
P
I
E
D
,
DU
P
L
I
C
A
T
E
D
,
O
R
C
O
M
M
E
R
C
I
A
L
L
Y
E
X
P
L
O
I
T
E
D
IN
W
H
O
L
E
O
R
I
N
P
A
R
T
W
I
T
H
O
U
T
T
H
E
S
O
L
E
AN
D
E
X
P
R
E
S
S
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
F
R
O
M
YA
R
N
E
L
L
C
O
N
S
U
L
T
I
N
G
&
C
I
V
I
L
D
E
S
I
G
N
,
L
L
C
.
DE
S
I
G
N
B
Y
:
DR
A
W
N
B
Y
:
RE
V
I
E
W
E
D
B
Y
:
PR
O
J
E
C
T
N
O
.
:
HI
S
T
O
R
I
C
R
E
S
T
O
R
A
T
I
O
N
&
A
D
D
I
T
I
O
N
20
9
E
.
B
L
E
E
K
E
R
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
J.
Y
A
R
N
E
L
L
J.
Y
A
R
N
E
L
L
J.
Y
A
R
N
E
L
L
17
.
0
1
3
2/
2
6
/
2
0
1
8
811
OVERALL UTILITY
PLAN
C6.1
02/26/2018
24'-1"
Existing historic cabin to be temporarily located here during