Loading...
HomeMy WebLinkAboutFile Documents.209 E Bleeker St.0320.2017 (112).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK The following criteria must also be met with construction: Ø A construction fence must be erected along the entire dripline of all trees on site and any tree canopy from neighboring property. This will serve as the tree protection zone (TPZ). This fence is to be constructed in such a manner that the area inside the dripline is protected. AN INSPECTION OF THIS FENCE MUST BE PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION ACTIVITIES BEGIN. PLEASE ARRANGE THIS INSPECTION WITH BEN CARLSEN AT 429-2034. Ø No materials may be stored in the TPZ, including but not limited to, construction backfill, construction traffic, or any other construction materials. Ø No excavation, grading or trenching may occur within the TPZ without the consent of the City of Aspen Forester or his designee. Ø No parking of vehicles or equipment may occur in the TPZ. Ø No dumping of any waste products may occur in the TPZ. Ø Any roots cut during excavation shall be pruned with sharp loppers/pruners back to the soil line. The roots will further be protected by burlap draped over the side of the excavation covering the exposed roots. This burlap shall be kept moist until the excavation is backfilled. Ø Pruning to provide clearance for construction activities shall only be done under the direction of an arborist. Ø Site inspections shall be performed on a weekly basis, to ensure the above listed conditions are met. Ø Any unapproved improvements or activities outside of those approved within this permit will be subject to mitigation in the form of restoration. Ø This permit must be posted on site during the construction process. City of Aspen - Tree Planting Specifications Trunk caliper shall meet ANSI Z60 current edition for root ball size. Modified soil. Depth varies. (See soil preparation plan). Finished grade. Bottom of root ball rests on existing or recompacted soil. Central leader. (See crown observations detail). SECTION VIEW Remove 1/3 of burlap and basket wire. Round-topped soil berm 4" high x 8" wide above root ball surface shall be constructed around the root ball. Berm shall begin at root ball periphery. Top of root ball shall be flush with finished grade. Prior to mulching, lightly tamp soil around the root ball in 6" lifts to brace tree. Do not over compact. When the planting hole has been backfilled, pour water around the root ball to settle the soil. 4" layer of mulch. No more than 1" of mulch on top of root ball. (See specifications for mulch). Notes: 1- Trees shall be of quality prescribed in crown observations and root observations details and specifications. 2- See specifications for further requirements related to this detail. Existing soil. TP-1 s >5 1/ iT\ 1//0/1>/1'/1';;; /1'/1 \ */ ’ \ */ \ */ \ */ \ */ \ "-'i .-..t ■ 1 'i.i-i 1 i- -i-- V » I.v '/ O'/' \ '/ ' '/ O'/' O/ ^ i'l —I r i'l [v- I yqTTE3TTr=rrfSSvSOI ItFFt Tr TT A LJ The City of Aspen Tree protection fencing is required at the driplines of all trees shown. There is NO activity allowed within this fenced area, including, but not limited to: digging, storage of material, equipment, machinery, foot or vehicle traffic. Please contact the City Forester or his designee at 920-5120 for an inspection of this fencing Prior to any activity. If the need arises to perform any activity in the tree protection area, please contact the City Forester and you will be given specific instructions as to how to proceed to minimize impacts to the tree root zone. City of Aspen - Tree Protection Zone Crown drip line or other limit of Tree Protection area. See tree preservation plan for fence alignment. 4' - 0 " Maintain existing grade with the tree protection fence unless otherwise indicated on the plans. 2" x 6' steel posts or approved equal. Tree Protection fence: High density polyethylene fencing with 3.5" x 1.5" openings; Color- orange. Steel posts installed at 8' o.c. 5" thick layer of mulch. Notes: 1- See specifications for additional tree protection requirements. 2- If there is no existing irrigation, see specifications for watering requirements. 3- No pruning shall be performed except by approved arborist. 4- No equipment shall operate inside the protective fencing including during fence installation and removal. 5- See site preparation plan for any modifications with the Tree Protection area. SECTION VIEW KEEP OUT TREE PROTECTION AREA 8.5" x 11" sign laminated in plastic spaced every 50' along the fence. URBAN TREE FOUNDATION ‹ OPEN SOURCE FREE TO USETPZ-1 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ x 0320.2017.ARBK & 0007.2018.ARBK 11/16/18 1148 51 sqft non exempt, 40 sqft exempt A1.3 95% PV (5.54 kW inverter total), GSHP NT Code Editions Fire Sprinkler System Type Of Construction Fire Alarms Installed Required Special Inspections Energy Code Compliance Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________ Building Type/Occupancy Group COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 BUILDING CODE INFORMATION 2015 IRC Existing?NFPA 13 NFPA 13 R High-Strength Bolting Epoxy Anchors Structual Steel Welding Permanent Micropiles Other _____________ Prescriptive Table UNIT DESCRIPTION AS PROPOSED # Stories Above Grade ______ # Stories Below Grade _______ Parking Spaces ______ Parking Spaces ______ Parking Spaces ______ # Bedrooms ______ # Full Baths ______ Deck Area ______ # 3/4 Baths ______ # 1/2 Baths ______ # Kitchens ______ # Wood Fireplaces ______ # Gas Appliances ______ # Gas Logs______ NFPA 13 D RESCheck UA Alternative Yes No One Family Two Family Townhouse Reviwed By: _____________________Date:__________ BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement ___________________________________________________________________________________ ___________________________________________________________________________________________ Main Level __________________________________________________________________________________ ____________________________________________________________________________________________ 2nd Floor ___________________________________________________________________________________ __________________________________________________________________________________________ 3rd Floor ___________________________________________________________________________________ ___________________________________________________________________________________________ Additional ___________________________________________________________________________________ ___________________________________________________________________________________________ Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____ # Other Rooms (List)____________ ADU BUILDING DESCRIPTION YesNo ADDRESS: ____________________________PERMIT NUMBER: _______________________________ (As Adopted and Amended) Other (Please Explain) __________________________ __________________________ VA VB IV IIIA IIIB IIA IIB IA IB Sprayed Fire-Resistants COMCheck UA Alternative (Existing + New) A__B B (A <50) F__ H__ I __ E R__ S__ U M IRC IBC 2015 IBC (As Adopted and Amended) Yes No Required?Yes No Type August 2017 01/08/2018 0320.2017.ARBK 209 Bleeker Unit A n n 260 40 (exempt)0 1 1 2 2 0 2 2 1 0 2 0 2 Bedrooms, 2 3/4 baths, 1 1/2 bath, living room, mechanical, laundry garage, 1/2 bath, kitchen, living, dining NT 11/16/18 Building Total Fire Area: 8262 sqft Unit fire area: 2215 sqft Code Editions Fire Sprinkler System Type Of Construction Fire Alarms Installed Required Special Inspections Energy Code Compliance Exterior Energy Use Total Approved On-Site Snowmelt________ Spa_______ Pool _________ Building Type/Occupancy Group COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DESCRIPTION FORM - IRC & IBC CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 BUILDING CODE INFORMATION 2015 IRC Existing?NFPA 13 NFPA 13 R High-Strength Bolting Epoxy Anchors Structual Steel Welding Permanent Micropiles Other _____________ Prescriptive Table UNIT DESCRIPTION AS PROPOSED # Stories Above Grade ______ # Stories Below Grade _______ Parking Spaces ______ Parking Spaces ______ Parking Spaces ______ # Bedrooms ______ # Full Baths ______ Deck Area ______ # 3/4 Baths ______ # 1/2 Baths ______ # Kitchens ______ # Wood Fireplaces ______ # Gas Appliances ______ # Gas Logs______ NFPA 13 D RESCheck UA Alternative Yes No One Family Two Family Townhouse Reviwed By: _____________________Date:__________ BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage) Basement ___________________________________________________________________________________ ___________________________________________________________________________________________ Main Level __________________________________________________________________________________ ____________________________________________________________________________________________ 2nd Floor ___________________________________________________________________________________ __________________________________________________________________________________________ 3rd Floor ___________________________________________________________________________________ ___________________________________________________________________________________________ Additional ___________________________________________________________________________________ ___________________________________________________________________________________________ Attached Garage Detached Garage Carport Is there an ADU? # Living Rooms_____# Kitchens _____# Full Baths _____# 3/4 Baths _____# 1/2 Baths _____# Bedrooms _____ # Other Rooms (List)____________ ADU BUILDING DESCRIPTION YesNo ADDRESS: ____________________________PERMIT NUMBER: _______________________________ (As Adopted and Amended) Other (Please Explain) __________________________ __________________________ VA VB IV IIIA IIIB IIA IIB IA IB Sprayed Fire-Resistants COMCheck UA Alternative (Existing + New) A__B B (A <50) F__ H__ I __ E R__ S__ U M IRC IBC 2015 IBC (As Adopted and Amended) Yes No Required?Yes No Type August 2017 01/08/2018 0007.2018.ARBK 209 Bleeker Unit B n n 888 51 (non-exempt)0 2 1 2 5 2 3 2 1 0 2 1 2 bedrooms, 2 3/4 baths, media, mechanical, laundry, exercise room 2 bedrooms, 1 full bath, 1 3/4 bath, 1 1/2 bath, garage, mudrooms, entry, exterior storage 1 bedroom, 1 full bath, 1 1/2 bath, kitchen, living, dining, deck NT 11/16/18 Building Total Fire Area: 8262 sqft Unit fire area: 6047 sqft 11/1 6 / 2 0 1 8 nick t FIRE SPRINKLERS REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 11/19/2018 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION MASTER PERMIT: ______________________DATE:___________ CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ __________________________________________________________________________________ ____________________________________________________________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ PERMIT NUMBER: __________________________ CommericalMulti-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT SQ FT OF LAND-SCAPE WORK SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Energy Code REMP School Ded. Zoning (50%)Plan Check (Hourly) TDM Impact Engineering Review Zoning (Hourly)Ped. Amenity CMP (50%)Engineering (Hourly) Housing Cash in Lieu Parks Review Zoning (50%)Stormwater Utility Review CMP (50%)City Use Tax Other Electrical County Use Tax Plumbing GIS Mechanical Sanitation SUBMITTAL FEES ISSUANCE FEES __________________PLANS LOCATION _________Lot Area _________Zone District _________Deed Restricted _________Census Code _________# of Dwellings APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Shower____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts ____Forced Air/Gravity Systems ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew ____Appliance Vents ____Heat, Refrig, Cooling, or Absorption Unit ____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems ____Ventilation Fans ____Range Hood ____# of Gas System Outlets ____Snowmelt System Sq Ft_________ Equipment Checklist Zoning HPC Building Fire Engineering CMP Utilities Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials Call Assessor (970-920-5160) to verify NEW SQ FT Details Term DefinitionsProject Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Landscape Work: Square footage of disturbed exterior area.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS? August 2017 01/08/2018 0320.2017.ARBK 01/08/18 209 E. Bleeker Street unit A 2737 073 20 002 C&D 73 City & Townsite of Aspen Historic Restoration & New Construction - Duplex Cathedral Cutthroat LLC (816)304-8001 afromm@smg.com 5,326,762.00 112 12 722 5,559 sf 8,279 SF 8262 6,000 1 3 2 7,466 SF 2,195 sf 1 4 4 8 2 X JPo 11/19/18 NT 11/19/18 0 NT 11/19/18 sw 11/16/18 x RM 7/5/18 x x x x x x x x x x x AS 10/30/2 pjm 11/19/18 11/21/18 ar 01/09/18 pm11/07/18 bc 11/12/18 50,521.72 9,319.47 180.00 7037.15 2195.00 69105.1511658.86 500.00 4429.27 4429.27 7037.15 54881.00 36564.00 77725.72 13316.91 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. ________________________________________________________ _____________________ContractorSignature Date INSPECTIONS: The General Contractor must schedule inspections online. Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so. ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone CityMailing Address E-mailAddress State ZIP GENERAL CONTRACTOR Check if you are a tested owner builder (single-family homes only). You must take a test and complete the owner/building affidavit. (CITY USE ONLY) Owner builder approved by:________________________Date:______________________ Affidavit on file ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 01/08/2018 Cathdral Cutthroat LLC 5601 High Dr.Mission Hills KS 66208 afromm@smg.com Z Group Architects 970-925-1832 411 e. mAIN sTREET, #205 Aspen CO 81611 seth@zgrouparchitects.com Z Group Architects 970-925-1832 411 E. Main St, #205 Aspen CO 81601 melanie@zgrouparchitects.com Justin Yarnell 970-323-7008 229 Midland Ave.Basalt CO 81621 justin@theyarnells.com Albright & Associates 970-927-4363 402 402 Park Ave, Unit A Basalt CO 81621 jack@albright-associates.com 0320.2017.ARBK CATHEDRAL CUTTHROAT LLC 209 E BLEEKER UNIT A 273707320002 SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. DAM 11/30/18 Generated by REScheck-Web Software Compliance Certificate Project 209 E Bleeker Energy Code:2015 IECC Location:Aspen, Colorado Construction Type:Single-family Project Type:New Construction Conditioned Floor Area:7,594 ft2 Glazing Area 14% Climate Zone:7 (9922 HDD) Permit Date: Construction Site: 209 E. Bleeker St. Aspen, CO 81611 Owner/Agent: Cathedral Cutthroat LLC 5601 High Dr. Mission Hills, KS 66208 Designer/Contractor: Arliss Merrell Resource Engineering Group 502 Whiterock Ave. Crested Butte, CO 81224 merrell@reginc.com Permit Number: Compliance: Passes using UA trade-off 4.1% Better Than Code Maximum UA:1187 Your UA:1138 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Compliance: Envelope Assemblies Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Ceiling: Other 4,448 0.017 75 Wall-North: Wood Frame, 16" o.c.2,146 35.7 0.0 0.045 76 Window-North: Wood Frame 466 0.350 163 Wall-East: Wood Frame, 16" o.c.2,573 35.7 0.0 0.045 101 Window-East: Wood Frame 320 0.350 112 Wall-South: Wood Frame, 16" o.c.2,113 35.7 0.0 0.045 78 Window-South: Wood Frame 376 0.350 131 Wall-West: Wood Frame, 16" o.c.2,516 35.7 0.0 0.045 107 Window-West: Wood Frame 145 0.350 51 Wall-North Cabin: Wood Frame, 16" o.c.287 22.7 0.0 0.055 12 Window-North Cabin: Wood Frame 62 0.350 22 Wall-East Cabin: Wood Frame, 16" o.c.349 22.7 0.0 0.055 15 Window-East Cabin: Wood Frame 68 0.350 24 Wall-South Cabin: Wood Frame, 16" o.c.273 22.7 0.0 0.055 12 Window-South Cabin: Wood Frame 59 0.350 21 Wall-West Cabin: Wood Frame, 16" o.c.390 22.7 0.0 0.055 20 Project Title: 209 E Bleeker Data filename:Page 1 of 10 09/24/18Report date:10/11/2018 11/1 6 / 2 0 1 8 nick t Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value U-Factor UA Window-West Cabin: Wood Frame 18 0.350 6 Floor: All-Wood Joist/Truss 41 38.0 0.0 0.026 1 Basement: Solid Concrete or Masonry Wall height: 10.0' Depth below grade: 10.0' Insulation depth: 10.0' 3,482 14.0 10.0 0.032 111 Name - Title Signature Date Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: 209 E Bleeker Data filename:Page 2 of 10 09/24/18Report date: Arliss E. Merrell-Project Engineer 09-24-2018 10/11/2018 11/16 / 2 0 1 8 nickt 0320.2017.ARBK 3 2. Approval of fabricator. Approval shall be based upon review of the fabricator’s written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. G. Building Department Responsibilities 1. Approve special-inspection program. The building department shall approve all special inspectors and special-inspection requirements. 2. Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. His\Her approval, in addition to that of the special inspector, must be obtained prior to placement of concrete, covering of structural steel, or other similar materials. 3. Review inspection reports. The building official should review special-inspection progress and final reports. 4. Perform final inspection. The building official should perform the final inspection and approval for a project [IBC Sec. 109.3.1] after the final special-inspection report has been reviewed and approved. Project Address: __________________________________ Permit Number:______________________ ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: __________________________ Owner: __________________________ Engineer/ Architect: __________________________ Contractor: __________________________ Approved Fabricator: __________________________ Inspected Fabricator: __________________________ (circle one) CITY OF ASPEN PITKIN COUNTY: Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Printed Name: __________________________ Printed Name __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Date: __________________________ Date __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Tiffany PhippsWest End House LLC 09/26/18 209 E. Bleeker Street 0320.2017.ARBK Nick Thompson 11/16/18 11/16 / 2 0 1 8 nickt   Stamp is not valid for building department use unless it contains a valid third party verified electronic signature. 10/11/2018 11/1 6 / 2 0 1 8 nickt The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SHEET NO. SHEET TITLE NO . NA M E YA R N E L L C O N S U L T I N G & CI V I L D E S I G N , L L C 22 9 M I D L A N D A V E N U E , B A S A L T , C O L O R A D O 8 1 6 2 1 (9 7 0 ) 3 2 3 - 7 0 0 8 IS S U E / R E V I S I O N DA T E : DA T E TH E D E S I G N S S H O W N H E R E I N I N C L U D I N G AL L T E C H N I C A L D R A W I N G S , G R A P H I C RE P R E S E N T A T I O N & M O D E L S T H E R E O F , A R E PR O P R I E T A R Y & C A N N O T B E C O P I E D , DU P L I C A T E D , O R C O M M E R C I A L L Y E X P L O I T E D IN W H O L E O R I N P A R T W I T H O U T T H E S O L E AN D E X P R E S S W R I T T E N P E R M I S S I O N F R O M YA R N E L L C O N S U L T I N G & C I V I L D E S I G N , L L C . DE S I G N B Y : DR A W N B Y : RE V I E W E D B Y : PR O J E C T N O . : HI S T O R I C R E S T O R A T I O N & A D D I T I O N 20 9 E . B L E E K E R S T R E E T AS P E N , C O L O R A D O J. Y A R N E L L J. Y A R N E L L J. Y A R N E L L 17 . 0 1 3 2/ 2 6 / 2 0 1 8 811 OVERALL UTILITY PLAN C6.1 02/26/2018 24'-1" Existing historic cabin to be temporarily located here during excavation and concrete foundation installation.