Loading...
HomeMy WebLinkAboutFile Documents.401 Eagle Park Dr.0155.2019 (10).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 06/21/2019 0155.2019.ARBK SOREN AND KAREN WEST 100 N 8TH ST UNIT 34 273512313009 07/10/2019 SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 Dwelling Separation Required - 2015 IBC -708 Fire Partitions, 711 Horizontal Assemblies: Walls and floor/ceilings separating dwelling units shall have a fire-resistance rating of at least 1 hour. Walls shall extend from the top of the floor assembly below to the underside of the floor or roof slab or deck above or to the fire-resistance-rated floor/ceiling assembly above. -714: Penetrations must be protected by a through-penetration firestop system. Recessed fixtures shall not reduce the required fire resistance by use of a listed fixture, a listed firehood, or a drywall assembly meeting the required fire resistance. Exhaust fans require ceiling radiation damper. -1207 Sound Transmission: Separating walls and floor/ceilings shall have an STC rating of at least 50. Floor/ceilings shall have an IIC rating of at least 50. External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ RESIDENTIAL REFERENCES FROM 2015 IBC CV/CS = crawl space ventilation sec. 1203.4. 18” x 24” access required 1209.1 EE = emergency escape required sec 1030 EU = enclosed usable space under stairs shall be 1-hr construction or stair enclosure rating. No access from stair enclosure. ½” gypsum permitted for stairs inside a single dwelling unit. 1011.7.3. RV = roof and rafter ventilation required 1203.2 A = Attic Access 20” x 30” 1209.2 SA = smoke alarm (NFPA 72) required sec 907.2.11 CO = carbon monoxide detector req. per Aspen Municipal Code 8.15 SG = safety glazing required sec 2406 V = mechanical ventilation required sec 1203.1 & IMC 403 (bath fans and whole house ventilation) GR = guards, 42” min ht, 4” max opening. Guards within dwelling unit 36” min ht sec 1015 HR = handrails 34”-38” ht sec 1014 DS = Draft stopping / fire blocking 718 RD = Roof drainage 1503.4 STC = Sound transmission class not less than 50 at dwelling separations, sec 1207 SI = Stairway Illumination 1205.4 PD = protect against decay, sec 2304.12 REFERENCES FROM 2015 IMC DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement fenestration shall not exceed 0.28 U-factor, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 2015 IBC 601 Fire Resistive Requirements for Type of Construction: ____ Primary Structural Frame: ____hr (columns, beams, girders, etc) Exterior Bearing Walls: ____hr Interior Bearing Walls: ____hr Floors/Ceilings: ____hr Roof : ____hr Unless noted otherwise for occupancy separation or fire separation distance. VA 1 1 1 1 1 X 0155.2019.arbk 8/8/2019 0 0 0 NA NA NA TF 06/21/2019 06/21/2019 0155.2019.ARBK X X X X X X ll 6/21/19 7498.99 1756.13 393.75 1073.75 1730.54 1073.75 1756.13 11536.90 1095.24 RMF BN 7/10/19 0 0 0 0 0 06/21/2019 X NA x 2 x TF 8/8/2019 08/08/2019 tonyf AR 7/17/19 AR 7/17/19 PM 7/8/19 DAM 8/9/19 SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 1 100 N 8th St Unit 34 0155.2019.ARBK 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. 2. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. 3. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 2.Approval of fabricator. Approval shall be based upon review of the fabricator's writtenprocedural and quality control manuals and periodic auditing of fabrication practices byan approved special inspection agency.3.Completion of fabrication. Upon completion of fabrication, the approved fabricatorshall submit certificate of compliance to the building official stating that the work wasperformed in accordance with the approved construction docwnents.G.Building Department Responsibilities1.Approve special-inspection program. The building department shall approve allspecial inspectors and special-inspection requirements.2.Enforce special inspection. Work requiring special inspection and the buildinginspector shall monitor the performance of special inspectors. His\Her approval, inaddition to that of the special inspector, must be obtained prior to placement of concrete,covering of structural steel, or other similar materials.3.Review inspection reports. The building official should review special-inspectionprogress and final reports.4.Perform final inspection. The building official should perfonn the final inspection andapproval for a project [lBC Sec. I 09.3.1] after the fmal special-inspection report has beenreviewed and approved.Project Address: __ 1_0_0 _N_8_th_S_t _U_n_it_3_4 ___ Permit Number: 0155.2019.ARBKACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: Sif;jture: Western Slope Testing & Inspection (JJ. (, 6J-t Owne,c S� • Soren & Karen West � Engineer/ Architect: Kaup Engineering Contractor: FUSE architecture +construction Approved Fabricator: Inspected Fabricator: -&:-rf\ao\ $1)\� � He., ( circle one) CITY OF ASPEN PITKIN COUNTY: Signature: Signay�Signature: Signature: Printed Name: flalf\ � /,,t [, Y,,�{\, Printed Name 5o(<_;J lJV�S(Printed Name: Printed Name: Jason LaPointe Printed Name: Printed Name: Printed Name: 3 Date: T/ Date: Date: 10.03.2019 Date: Date: /o./1.L') Date: Dale Kaup 10/8/19 JH Justin Hahn 10/11/19 Dale Kaup P.E. Digitally signed by Dale Kaup P.E. DN: cn=Dale Kaup P.E., o=Kaup Engineering, INC, ou, email=dale@kaupengineering. com, c=US Date: 2019.10.01 13:36:35 -06'00' 10/11/2019 justinh Dale Kaup P.E. Digitally signed by Dale Kaup P.E. DN: cn=Dale Kaup P.E., o=Kaup Engineering, INC, ou, email=dale@kaupengineering .com, c=US Date: 2019.10.01 13:36:18 -06'00' 10/11/2019 justinh Dale Kaup P.E. Digitally signed by Dale Kaup P.E. DN: cn=Dale Kaup P.E., o=Kaup Engineering, INC, ou, email=dale@kaupengineering.com , c=US Date: 2019.10.01 13:36:02 -06'00'10/11/2019 justinh Dale Kaup P.E. Digitally signed by Dale Kaup P.E. DN: cn=Dale Kaup P.E., o=Kaup Engineering, INC, ou, email=dale@kaupengineering.co m, c=US Date: 2019.10.01 13:35:47 -06'00' 10/11/2019 justinh SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection.