Loading...
HomeMy WebLinkAboutFile Documents.520 S Original St.0116.2019 (5).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 04/19/2019 0116.2019.ARBK 1230 SNOWBUNNY LANE LLC 1230 SNOWBUNNY LN 273512207004 05/22/2019 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 SEE NOTES #1 PLANS COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION MASTER PERMIT: ______________________DATE:___________ CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ __________________________________________________________________________________ ____________________________________________________________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ PERMIT NUMBER: __________________________ CommericalMulti-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. __________________ _________________ __________________ ____________________ ________________ _________________ __________ PROJECTVALUATION SQ FT OF WORK AREA UNIT SQ FT SQ FT OF LAND-SCAPE WORK SQ FT OF ROOMS WITH UTILITY WORK LOT SIZE(SQ FT) PROJECT DETAILS Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL FOR CITY USE ONLY Plan Check Permit Fee Parks Impact Energy Code REMP School Ded. Zoning (50%)Plan Check (Hourly) TDM Impact Engineering Review Zoning (Hourly)Ped. Amenity CMP (50%)Engineering (Hourly) Housing Cash in Lieu Parks Review Zoning (50%)Stormwater Utility Review CMP (50%)City Use Tax Other Electrical County Use Tax Plumbing GIS Mechanical Sanitation SUBMITTAL FEES ISSUANCE FEES __________________PLANS LOCATION _________Lot Area _________Zone District _________Deed Restricted _________Census Code _________# of Dwellings APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Shower____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts ____Forced Air/Gravity Systems ____Wall, Suspended, or Unit Heaters ____Gas Log ____Gas Appliancew ____Appliance Vents ____Heat, Refrig, Cooling, or Absorption Unit ____Boilers (includes vent) ____Air Handling Unit ____Cooling Systems ____Ventilation Fans ____Range Hood ____# of Gas System Outlets ____Snowmelt System Sq Ft_________ Equipment Checklist Zoning HPC Building Fire Engineering CMP Utilities Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance ReviewRequired Date ApprovedReviewingDepartmentReviewerInitials Call Assessor (970-920-5160) to verify NEW SQ FT Details Term DefinitionsProject Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Work Area: Total square footage of area undergoing change or reconfiguration.Unit Sq Ft: Gross Square Footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Landscape Work: Square footage of disturbed exterior area.New Sq Ft: Total added square footage for additions to net livable or net leasble space.Sq Ft of Rooms with Utility Work: Total square footage, not FAR, of all rooms with plumbing work.DO YOU LIKE DOGS? August 2017 0166.2018.ARBK 0116.2019.ARBK 4.17.2019 1230 Snowbunny Ln.273512207004 11 2 Snowbunny Subdivision CHANGE ORDER: MINOR CHANGES TO FRONT EXTERIOR PORCH AND LIVING ROOM ROOF. CIVIL ENGINEERING IS ALSO BEING SUBMITTED. Steve Novy 970-309-2023 snovy@greenlinearchitects.com 1230 Snowbunny Lane LLC NA NA $2,000,000 63 8 312 1000 2000 4320 14,435 12 0 625 1000 1 0 0 1 0 1 111 101211 x BN 5/22/19 25.00 0 x TF 5/29/19 0 TF 5/29/19x x0 0 0 14,435 R-15 x BB: 952-856-714 434 04/19/2019 pj 9/15/19 DAM 9/19/19