Loading...
HomeMy WebLinkAboutFile Documents.520 S Original St.0001-2020-BCHO (3)The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ SEE NOTES #1 PLANS X 0001.2020.BCHO 01/02/2020 1794 0 0 A-10.11 97% TF 1/10/2020 65 N 4th St., Suite 5, Carbondale, CO 81623 Tel. 970-963-6689 www.greenlinearchitects.com 11.8.2019 Project Narrative for Change Order Dated 11.8.19 A-3.4 Roof Plan – Revisions detailing cricket at entry porch, and leader head, and gutter and downspout locations. A-4.1 Elevation – Revisions depicting changes to cricket at entry porch, and leader head, and gutter and downspout locations. A-4.3 Elevation – Revisions depicting changes to back yard patio and planters and down spout locations. A-8.1C Range Hood Details – New sheet depicting detailing of Kitchen range hood. A-10.1 Details - New sheet detailing planting bed wall section and patio stair east of the house. This sheet depicts the lighting coordinated with the lighting designer. A-10.6 Fire Pit – Details for Fire Pit. Supplemental narrative and burner specifications are also provided in this submittal. A-10.9B Trench Drain at Garage - New sheet detailing trench drain at garage. A-10.10 Back Yard Patio Plan - New Sheet depicting plan for permeable back patio and firepit. This sheet includes This sheet includes coordinated permeable paving, and additional exterior lighting. Supplemental specifications for fire pit burner, and specification narrative from custom fabricator are also included. A-10.11 Snowmelt Plan - New sheet depicting front porch and driveway snowmelt plan. This sheet includes coordinated permeable paving, and insulated permeable snow melted walkways, additional exterior lighting. Updated REMP calculations are also provided in this submittal. The portion of the driveway that is in the ROW is shown on A-10.11. We are preparing a permanent encroachment application for the portion of driveway that is in the ROW up to but not beyond the edge of Snowbunny Lane. A-11.3 Cricket at Entry – Provides supplemental detail to A-3.4 of cricket, and leader head at Entry Porch. C5 - Revisions to the detailing of the full infiltration pervious pavers by the civil engineer now include geotextile and ¼” steel edging. Revisions to the typical concrete slab trench drain now include geotextile, and 3” total of perforated insulation board to maintain permeability. LIGHT - 001 Lighting schedules (spec. sheets also included in submittal) depicting new outdoor lighting at steps. All new outdoor lighting is dark sky compliant. LIGHT - 101 Lighting plans depicting new outdoor lighting at steps. All new outdoor lighting is dark sky compliant. Letter from Structural Engineer describing approval for minor framing changes coordinated in the field. 01/02/2020 6.71 kW 03/20/2020 ALL OUTDOOR LIGHTING MUST COMPLY WITH THE CITY OF ASPEN LIGHTING CODE SECTION 26.575.150 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 PROPERTY INFORMATION ___________________________________ _________ ___________________________ ______________ ______________ ________________________________________ _________________________ _______________ __________________________________ ________________________ _______________ __________________________________ CommericalMulti-FamilySingle Family Use of Building Class of Work NewAdditionAlterationRepair ________ YesNo Will there be any roof/wall penetrations? NOTICE: This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ PROJECTVALUATION SQ FT OF BUILDING WORK AREA UNIT SQ FT SQ FT OF SOILDISTURBANCE BUILDING FOOTPRINT LOT SIZE(SQ FT) PROJECT DETAILS (READ DEFINITIONS BELOW) Mixed-Use IFFRTenant FinishDemolitionChange Order ________ ADDRESS UNIT #PARCEL ID # BLOCK TRACT OR SUBDIVISIONLOT DESCRIPTION OF WORK IN DETAIL Building Review Building Permit Fee Parks Impact Engineering Review Zoning Review (50%) School Lands Dedication Zoning Review (50%) CMP (50%)TDM Impact Energy Code Review REMP Payment Pedestrian Amenity CMP (50%)GIS Housing Cash in Lieu Parks Review City Use Tax Water Tap Utility Review County Use Tax Sanitation SUBMITTAL FEES ISSUANCE FEES APPROVALS ISSUANCE FEES BEST CONTACTNAME CELL EMAIL OWNER NAME CELL EMAIL ____Toilets, Bidets ____Bathtub____Lavatory (Wash Basin)____Shower____Kitchen Sink (+Disposal)____Dishwasher____Laundry Bar, Utility Sink____Clothes Washer ____Floor Sink____Floor Drain____Water Heater (Pan Req)____# Gas Outlets____Water Treatment____Other_________ Fixture Counts Important Review Triggers PC Zoning HPC Building Fire Engineering CMP Water Stormwater Sanitation Env. Health Parks Landscape Efficiency Approved To Issue Issuance Date ApprovedReviewingDepartmentReviewerSign-Off NEW SQ FT Project Valuation: Cost of project as defined in Valuation Affadavit.Sq Ft of Building Work Area: Total square footage of interior area undergoing change or reconfiguration.Unit Sq Ft: Gross square footage, not FAR, of permitted unit.Lot Size: Total surveyed square footage of property.Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbedNew Sq Ft: Total added square footage for additions to net livable or net leasable space.Building Footprint: Grade floor square footage of the permitted structure.Hardscape Area: Square footage of impervious lot surface.Zone District: Underlying zone district of permitted parcel. January 2019 DATE:___________ MASTER PERMIT:______________________ PERMIT NUMBER:__________________________ __________________________________________________________________________________ __________________________________________________________________________________ HARDSCAPEAREA NeedsReview DE F I N I T I O N S ZONEDISTRICT Major Engineering Review• Projects involving less than 50% hardscape area and work affecting 75% or greater of unit sq ft• Projects involving greater than 50% hardscape area and work affecting 50% or greater of unit sq ft• Projects involving 1,000+ sq ft of soil disturbance area Water Efficient Landscaping• Projects that trigger a major engineering review • Projects involving interior alterations affecting 50% or more of exisiting gross square footage THIS SECTION MUST BE COMPLETED IN ITS ENTIRETY NO CHANGES 11/8/2019 0166.2018.ARBK 0001-2020-BCHO 1230 Snowbunny Lane 273512207004 11 2 Snowbunny Subdivision 1230 Snowbunny Lane, LLC.‭(312) 339-3348 lillyvalentine@comcast.net Steve Novy 970.390.2023 snovy@greenlinearchitects.com Revisions to permeable paving, outdoor step lighting, and fire pit. See project narrative included in this submittal. No changes to building work area, or footprint. $100,000 0 no change 14,435 sq.f.t no change no change no change no change R-15 x ll 1/2/2020 x bn 3/20/2020 x TF 1/10/2020 325.00 25.00 321.17 x pjm 3/26/2020 487.50 Air Quality - $35.95 16826.68 3425.99 321.17 01/02/2020 0001-2020-BCHO 1230 SNOWBUNNY LANE LLC 1230 SNOWBUNNY LN 273512207004 DAM 3/27/20