Loading...
HomeMy WebLinkAboutFile Documents.210 W Main St.0056.2019 (17).ARBKThe City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. FIRE SPRINKLERS REQUIRED ASPEN LINE GRADE VERIFICATION FORMASPEN LINE GRADE VERIFICATION FORM Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf Rev. 04-08 Verification of Building Location by Building Contractor For Building and Permit Information, please refer to our website at: http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building / Job Address or Location: _____________________________________________ o Your Name (Person Completing Part A): ____________________________________________ o Your Company: ________________________________________________________________ o Plans must show horizontal dimensions that ‘tie’ the building to the property boundary. Are building ties shown? (circle one) ‘Yes’ ‘No’ o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans. What is the elevation of this benchmark? _________________________________ o If the garage is located within 10 feet of the roadway or sidewalk, provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? ‘Yes’ ‘No’ ‘N/A’ o Provide the equation comparing site (surveyed) elevation to structure/ architectural plan elevation: (i.e., 100’ first floor elev = 7962.50’) _______________________________ ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PART B: Complete prior to first Foundation Inspection, by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one): ‘Yes’ ‘No’ o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? ____________ o According to the building plans, what was the design elevation for the same place on the foundation wall? ______________________________ o Was the elevation of the building adjusted in field? (circle one): ‘Yes’ ‘No’ o If yes, why? ________________________________________________ The undersigned qualified individual certifies that the information in Part B is accurate - Signature: Date: _ Printed Name: Contact ph. # : ____________________ Company: ______________________________________________________________ 210 W. Main Street, Aspen CO 81611 Kim Raymond Kim Raymond Architects Inc. x x 100'-0" = 7895.30' Site Benchmark- El. = 7894.65' Colorado Department of Public Health and Environment Air Pollution Control Division-Indoor Environment Program-Asbestos/lAO Air Unit 4300 Cherry Creek Drive South, APCD-IE-81 Denver, Colorado 80246-1530 Phone: 303-692-3100-Fax: 303-782-0278 E-mail: asbestos@state.co.us DEMOLITION APPROVAL NOTICE This approval notice is granted subject to Colorado Air Quality Control Commission Regulation No.8, Part B , adopted December 21, 2007, and effective January 30, 2008 and the Colorado Air Pollution Prevention and Control Act C.R.S. (25-7-101 and 25-7-501 et seq). This notic~ signifies that the structure was inspected for asbestos, luminous exit signs (containing radioactive material), and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the . Colorado Department of Public Health and Environment pursuant to Regulation No.8, Part B. As a contractor, you may be subject to other demolition licenses and permits, depending on the requirements of the county and municipality in which the work is peing performed. The Colorado Department of Public Health and Environment, Air Pollution Control Division, strongly suggests that you check with county and municip'alauthorities in order to -determine any other local building/permitting requirements that must be met. Please note that certain asbestos-containing materials (ACM) may remain in the structure during demolition. Therefore, any demolition debris left behind after the completion of post- demolition site cleanup may constitute a "reason to know of asbestos-contaminated soil" at the site, subject to the requirements of Section 5.5 of the Solid Waste Regulations (6 CCR 1007-2, Part 1). THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES. Immediately notify the Asbestos/IAQ Unit of project modifications by fax (number above) or e-mail (address above) and the appropriate county health department by fax. Project modifications include changes in the scope of work or the scheduled work dates, etc. This demolition approval notice is valid beginning 7/22/2 019. The actual scheduled work dates are from 7/22/2019 through 7/29 /2 019. Approval issued on : 7118/2019 Record number: 150708 Fee Paid: $60.00 Notice Number: 19PI4726D For the location specified below: Fourplex 210 W. Main Aspen Pitkin County This notice has been issued to: Keelty Construction Inc 204 Park Ave. Ste. 1K Basalt, CO ~1621 Check number: 2920 Asbestos Building Inspector: Douglas A. Close Cerification No.: 2930 Inspection Date: 06/25/2019 11/25/2019 nickt SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ x 0056.2019.ARBK 11/25/19 0 0 0 NT 03/16/2019 10,817sqft x 2 NT 11/25/19 Units 101 and 103 are Type B Accessible units x 2 x RESIDENTIAL REFERENCES FROM 2015 IBC CV/CS = crawl space ventilation sec. 1203.4. 18” x 24” access required 1209.1 EE = emergency escape required sec 1030 EU = enclosed usable space under stairs shall be 1-hr construction or stair enclosure rating. No access from stair enclosure. ½” gypsum permitted for stairs inside a single dwelling unit. 1011.7.3. RV = roof and rafter ventilation required 1203.2 A = Attic Access 20” x 30” 1209.2 SA = smoke alarm (NFPA 72) required sec 907.2.11 CO = carbon monoxide detector req. per Aspen Municipal Code 8.15 SG = safety glazing required sec 2406 V = mechanical ventilation required sec 1203.1 & IMC 403 (bath fans and whole house ventilation) GR = guards, 42” min ht, 4” max opening. Guards within dwelling unit 36” min ht sec 1015 HR = handrails 34”-38” ht sec 1014 DS = Draft stopping / fire blocking 718 RD = Roof drainage 1503.4 STC = Sound transmission class not less than 50 at dwelling separations, sec 1207 SI = Stairway Illumination 1205.4 PD = protect against decay, sec 2304.12 REFERENCES FROM 2015 IMC DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM AS = access and service space for maintenance req’d, sec 306 MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2 ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes, 501.3.1 IT= intake openings 10’ from lot line & contaminant sources (vents, streets), 401.4 D = fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV = direct vent req’d, sec 303.3 CA = combustion air not taken from bedrooms, bathrooms or storage sec 303.3 OD = outdoor appliances must be listed for outdoor use, sec 303.6 REFERENCES FROM 2015 IECC F = new or replacement fenestration shall not exceed 0.28 U-factor, NFRC label required, Ordinance 40, 2016 L = 75% of lamps in permanently installed lights must be high efficacy, sec R404.1 SE = Continuous air barrier required; all exterior joints, cracks, and holes to be caulked, gasketed, sealed, table R402.4.1.1 REFERENCES FROM 2014 NEC EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26 Electric vehicle charging (IRC 309.6). Newly constructed one- or two-family dwellings and townhouses with a dedicated attached or detached garage shall facilitate future installation and use of electric vehicle chargers. For each dwelling unit, a 208/240-volt individual branch circuit or a listed raceway to accommodate a future individual branch circuit shall be installed. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or other enclosure, and in close proximity to the proposed location of the electric vehicle charger. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel or subpanel circuit directory shall provide capacity to install a 40-ampere minimum dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overcurrent device. Electrical vehicle supply equipment shall be installed in accordance with NFPA 70. 20 Exception: Additions and alterations to existing one- or two-family dwellings and townhomes constructed per the IRC are exempt from this requirement. Recessed luminaires installed in building thermal envelope shall be sealed and IC-rated – IECC sec R402.4.5 Any recessed light fixtures in contact with insulation must be IC rated. FIRE RATED HATS REQUIRED Where floor/ceiling or roof/ceiling assemblies are required to have a fire-resistive rating, recessed fixtures shall be installed such that the required fire resistance will not be reduced (IBC 714.4.2) Dwelling Separation Required - 2015 IBC -708 Fire Partitions, 711 Horizontal Assemblies: Walls and floor/ceilings separating dwelling units shall have a fire-resistance rating of at least 1 hour. Walls shall extend from the top of the floor assembly below to the underside of the floor or roof slab or deck above or to the fire-resistance-rated floor/ceiling assembly above. -714: Penetrations must be protected by a through-penetration firestop system. Recessed fixtures shall not reduce the required fire resistance by use of a listed fixture, a listed firehood, or a drywall assembly meeting the required fire resistance. Exhaust fans require ceiling radiation damper. -1207 Sound Transmission: Separating walls and floor/ceilings shall have an STC rating of at least 50. Floor/ceilings shall have an IIC rating of at least 50. 0056.2019.ARBK GUY 210 WEST MAIN STREET 273512440009 09/27/2019 09/27/2019 09/27/2019 09/27/2019 09/27/2019 09/27/2019 09/27/2019 09/27/2019 11/25/2019 nickt 09/27/2019 09/27/2019 09/27/2019 09/27/2019 09/27/2019 11/25/2019 nickt